CN109472496A - Workflow construction method and device based on visualization guidance and automatic Verification - Google Patents
Workflow construction method and device based on visualization guidance and automatic Verification Download PDFInfo
- Publication number
- CN109472496A CN109472496A CN201811351817.8A CN201811351817A CN109472496A CN 109472496 A CN109472496 A CN 109472496A CN 201811351817 A CN201811351817 A CN 201811351817A CN 109472496 A CN109472496 A CN 109472496A
- Authority
- CN
- China
- Prior art keywords
- workflow
- role
- module
- visualization
- automatic verification
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Abstract
The invention discloses a kind of based on the workflow construction method and device that visualize guidance and automatic Verification, which comprises the building in response to user instructs, and opens editing process interface;The editing process interface includes visualization the form tool module;In response to user to the drag operation of visualization the form tool module, business form is drawn;Business datum table is generated according to the business form;According to the role of participant, role's group is generated;According to the business datum table and role's group, product process node;Based on the flow nodes construction work process;Workflow described in automatic Verification.The present invention realizes visualization guidance, without code rapid build flow engine device, and according to preset rules, automatic Verification flow path device quickly positions and carries out early warning or reparation according to pre-defined rule, ensure that the accuracy of operation flow.
Description
Technical field
The invention belongs to field of computer technology, be related to a kind of method and device of construction work process, in particular to one
Workflow construction method and device of the kind based on visualization guidance and automatic Verification.
Background technique
Development with information technology and the commercial competition that is growing more intense, people are no longer content with independent, scattered offices
Automation and computer application, but need comprehensive, integrated solution.Pipe is carried out to routinely affairs as one kind
Reason, integrated technology, the appearance of workflow is inevitable.Workflow is the computation model of workflow, i.e., by workflow
In work how the logic that organizes together of front and back and rule are indicated in a computer and in fact with appropriate model
Play tricks calculation.Operation flow can be improved and optimized using workflow, improve vocational work efficiency;Realize better services process
Control improves customer service quality;Improve the flexibility etc. of operation flow.
However, generalling use general basic framework, unified processing configuration life in the prior art in construction work process
At operation flow, process construction step is cumbersome, and implementation personnel are easy to generate mistake, and this in the building process of workflow
Kind mistake is usually when workflow constructs completion and not detectable.
Accordingly, it is desirable to provide a kind of relatively reliable or effective scheme, to simplify the building of workflow, it is ensured that building
Workflow it is correct.
Summary of the invention
In order to solve problems in the prior art, the embodiment of the invention provides one kind based on visualization guidance and automatic Verification
Workflow construction method and device.The technical solution is as follows:
On the one hand, a kind of workflow construction method based on visualization guidance and automatic Verification is provided, which comprises
In response to the building instruction of user, editing process interface is opened;The editing process interface includes visualization the form tool
Module;
In response to user to the drag operation of visualization the form tool module, business form is drawn;
Business datum table is generated according to the business form;
According to the role of participant, role's group is generated;
According to the business datum table and role's group, product process node;
Based on the flow nodes construction work process;
Verify the workflow.
Further, after generating business datum table according to the business form, the method also includes:
Obtain the element information mark in the business form;
Obtain data information mark corresponding with element information mark in the business datum table;
Judge the element information identify corresponding element information data information corresponding with data information mark whether phase
Matching;
When the result judged is no, the data information is adjusted according to the element information.
Further, after based on the flow nodes construction work process, the method also includes:
According to the Role Information of personnel in role's group of each flow nodes, the operating right of the personnel is configured.
Further, after verifying the workflow, the method also includes:
If the result of the verification is to report an error, the information to report an error according to corrects the workflow automatically.
Further, the editing process interface further includes visual navigation icon;The visual navigation icon is used for
Indicate each step of workflow building.
Further, the method also includes:
The display of icon corresponding with the current procedures in the visual navigation icon is adjusted according to current procedures, so that
The display of icon corresponding from current procedures shows different with residual graph target.
On the other hand, a kind of workflow construction device based on visualization guidance and automatic Verification, the dress are provided
It sets and includes:
Opening module opens editing process interface for the building instruction in response to user;The editing process interface includes can
Depending on changing the form tool module;
Drafting module draws business form for the drag operation in response to user to visualization the form tool module;
First generation module, for generating business datum table according to the business form;
Second generation module generates role's group for the role according to participant;
Third generation module, for according to the business datum table and role's group, product process node;
Module is constructed, for being based on the flow nodes construction work process;
Correction verification module, for verifying the workflow.
Further, described device further include:
First obtains module, for obtaining the mark of the element information in the business form;
Second obtains module, for obtaining data information mark corresponding with element information mark in the business datum table
Know;
Judgment module, for judging the corresponding element information of element information mark number corresponding with data information mark
It is believed that whether breath matches;
Module is adjusted, for adjusting the data information according to the element information when the result judged is no.
Further, described device further include:
Permission configuration module configures the behaviour of the personnel for the Role Information of personnel in role's group according to each flow nodes
Make permission.
Further, described device further include:
It is automatic to correct module, it is when reporting an error for the result in the verification, then the information to report an error according to is to the work
Process is corrected automatically.
On the other hand, a kind of electronic equipment is provided, comprising:
Processor is adapted for carrying out one or one or more instruction;And
Memory, the memory are stored with one or one or more instruction, and described one or one or more instruction are suitable for by institute
Processor is stated to load and execute the above-mentioned workflow construction method based on visualization guidance and automatic Verification.
Technical solution provided in an embodiment of the present invention has the benefit that
The present invention opens editing process interface by the building instruction in response to user;The editing process interface includes visual
Change the form tool module;In response to user to the drag operation of visualization the form tool module, business form is drawn;According to
The business form generates business datum table;According to the role of participant, role's group is generated;According to the business datum table and
Role's group, product process node;Based on the flow nodes construction work process;The workflow is verified, is realized visual
Change guidance, without code rapid build flow engine device, and according to preset rules, automatic Verification flow path device is quickly positioned simultaneously
Early warning or reparation are carried out according to pre-defined rule, ensure that the accuracy of operation flow.
In addition, guided in the building process of entire workflow by each step of the navigation icon to implementation,
It is incremental, rapid build workflow.And it can also be adjusted in the visual navigation icon when current procedures are completed
The display of icon corresponding with the current procedures avoids the omission of step to clearly construct progress.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment
Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for
For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other
Attached drawing.
Fig. 1 is a kind of workflow construction method based on visualization guidance and automatic Verification provided in an embodiment of the present invention
Flow diagram;
Fig. 2 is the method flow schematic diagram provided in an embodiment of the present invention checked to data in business datum table;
Fig. 3 is another workflow construction method based on visualization guidance and automatic Verification provided in an embodiment of the present invention
Flow diagram;
Fig. 4 is a kind of knot of workflow construction device based on visualization guidance and automatic Verification provided in an embodiment of the present invention
Structure schematic diagram;
Fig. 5 is another workflow construction device based on visualization guidance and automatic Verification provided in an embodiment of the present invention
Structural schematic diagram;
Fig. 6 is the structural schematic diagram of a kind of electronic equipment provided in an embodiment of the present invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to embodiment party of the present invention
Formula is described in further detail.
Referring to FIG. 1, it show a kind of work based on visualization guidance and automatic Verification provided in an embodiment of the present invention
Make the flow diagram of process construction method.It should be noted that present description provides as described in embodiment or flow chart
Method operating procedure, but based on routine or may include more or less operating procedure without creative labor.Implement
The step of enumerating, sequence was only one of numerous step execution sequences mode in example, does not represent and unique executes sequence.?
When system or product in practice executes, it can execute according to embodiment or method shown in the drawings sequence or execute parallel
(such as environment of parallel processor or multiple threads).As shown in Figure 1, this method may include:
S101, the building in response to user instruct, and open editing process interface;The editing process interface includes visualization list
Tool model.
In this specification embodiment, the building of workflow can be carried out by workflow engine system, works as needs
When construction work process, user can enter in workflow engine system, carry out the building of workflow.Specifically, user can
To click the building button of corresponding workflow engine system, corresponding workflow engine system can be in response to the building of user
Instruction, opens editing process interface, which includes visualization the form tool module, visualization the form tool mould
Block can quickly draw traffic table by pulling corresponding units for each unit needed for providing drafting business form, user
It is single, without carrying out the creation of business form by edit code.
It should be noted that in this specification embodiment, being compiled for the ease of the more quick construction work process of user
Collecting process interface can also include visual navigation icon, which be used to indicate each of workflow building
Step.Specifically, corresponding visualization icon can be set for each step, will be corresponded to according to the building process of workflow
It is connected in the visualization icon of each step, for example, can be in the leftward position of editing process, by each of construction work process
The corresponding visualization icon of step constitutes visual navigation icon by first step to final step vertical array.
For the step of making user define current progress, building progress is determined, avoid omitting some step, in this specification
In embodiment, when current procedures are completed, the display of icon corresponding with current procedures in adjustable visual navigation icon,
For example, the step of can completing, lights, or the color using region in do not carry out also the step of, e.g., the step of completion
The step of being set as green, not carrying out also is set as grey etc..
S103 draws business form in response to user to the drag operation of visualization the form tool module.
In this specification embodiment, the corresponding units in the form tool module are visualized by drag operation, it can be complete
At the drafting of business form.
S105 generates business datum table according to the business form.
In this specification embodiment, after the drafting of finishing service list, system can be automatically generated and the traffic table
Single corresponding business datum table.
In order to avoid in the business datum table of generation there are problem, in this specification embodiment, raw according to business form
After business datum table, it can also include the steps that checking data in business datum table, specifically, may refer to figure
Shown in 2, described the step of checking to data in business datum table, may include:
S201 obtains the element information mark in the business form.
In the present specification, it is identified in business form comprising element information and element information corresponding with element information,
Element information mark being capable of one element information of unique identification.Element information is information relevant to business, for example, traffic table
Single to be that office undertakes single, then corresponding element information can include but is not limited to applicant, document received unit, envision opinion etc.
Deng.
S203 obtains data information mark corresponding with element information mark in the business datum table.
In this specification embodiment, data information mark can identify for service fields.
S205 judges the corresponding element information of element information mark data letter corresponding with data information mark
Whether breath matches.
In this specification embodiment, element information is obtained respectively and identifies the element information in corresponding business form, with
And data information identifies the data information in corresponding business datum table, and element information is compared with data information, judgement
Whether the two matches, and when the result judged mismatches as the two, can execute step S207.
S207 adjusts the data information according to the element information.
When the result judged does not match that as the data information in the element information and business datum table in business form,
Show that there are problems for corresponding data information in the business datum table, can adjust business datum table according to element information at this time
In corresponding data information so that the two is consistent.
S107 generates role's group according to the role of participant.
In this specification embodiment, participant is the personnel for participating in the workflow that will be constructed, and participant can
To be pulled from the background data base of system according to current type of service, can also be inputted from foreground.It pulls and obtains input
Participant includes personnel role to be executed in workflow, for example, auditor, signed by, applicant etc..
Corresponding role's group can be generated according to the role of each participant, may include multiple participations in role's group
Personnel, for example, auditor may include 2, signed by may include 3 people etc..
S109, according to the business datum table and role's group, product process node.
In this specification embodiment, after completing role's group creation, it can be walked automatically into the generation of flow nodes
It suddenly, in this step, can include corresponding flow nodes icon in operation interface, it can be according to the process involved in workflow
Number of nodes pulls the flow nodes icons of respective numbers to editing interface.Business datum table and role's group can be encapsulated into pair
With product process node in the flow nodes icon answered.
S111 is based on the flow nodes construction work process.
After product process node, each flow nodes can be attached, with construction work process.
In this specification embodiment, as shown in figure 3, can also be wrapped after based on flow nodes construction work process
S301 is included, according to the Role Information of personnel in role's group of each flow nodes, configures the personnel to the operating rights of business form
Limit.
S113, workflow described in automatic Verification.
In this specification embodiment, in order to ensure the accuracy of the workflow of building, after construction work process,
It also needs to carry out automatic Verification to the workflow, for example, the automatically scanning workflow, if the result of automatic Verification is report
Mistake, that is, there are problems in the workflow constructed, then can be according to the Information locating to report an error to link of problems, and to work
Make process to be corrected automatically.
To sum up, the present invention opens editing process interface by the building instruction in response to user;The editing process interface
Including visualizing the form tool module;In response to user to the drag operation of visualization the form tool module, business is drawn
List;Business datum table is generated according to the business form;According to the role of participant, role's group is generated;According to the industry
Tables of data of being engaged in and role's group, product process node;Based on the flow nodes construction work process;The workflow is verified,
Realize visualization, without code construction, building process is simple, and carries out school to workflow automatically after workflow creation
It tests, so as to position the problems in entire workflow building process, ensure that the correctness of the workflow of building.
In addition, guided in the building process of entire workflow by each step of the navigation icon to implementation,
It is incremental, rapid build workflow.And it can also be adjusted in the visual navigation icon when current procedures are completed
The display of icon corresponding with the current procedures avoids the omission of step to clearly construct progress.
It is opposite with the workflow construction method based on visualization guidance and automatic Verification that above-mentioned several embodiments provide
It answers, the embodiment of the present invention also provides a kind of workflow construction device based on visualization guidance and automatic Verification, due to this hair
The workflow construction device based on visualization guidance and automatic Verification that bright embodiment provides is provided with above-mentioned several embodiments
Based on visualization guidance and automatic Verification workflow construction method it is corresponding, therefore it is aforementioned based on visualization guidance and from
The embodiment of the workflow construction method of dynamic verification is also applied for provided in this embodiment based on visualization guidance and automatic
The workflow construction device of verification, is not described in detail in the present embodiment.
Referring to Fig. 4, it, which show the present invention, implements a kind of based on visualization guidance and the work of automatic Verification of offer
The structural schematic diagram of process construction device, as shown in figure 4, the apparatus may include:
Opening module 410 can be used for the building instruction in response to user, open editing process interface;Editing process circle
Face includes visualization the form tool module;
Specifically, the editing process interface further includes visual navigation icon;The visual navigation icon is used to indicate work
Make each step of process building.
Specifically, being adjusted corresponding with the current procedures in the visual navigation icon when current procedures are completed
The display of icon.
Drafting module 420 can be used for the drag operation in response to user to visualization the form tool module, draw
Business form;
First generation module 430 can be used for generating business datum table according to the business form;
Second generation module 440 can be used for the role according to participant, generate role's group;
Third generation module 450 can be used for according to the business datum table and role's group, product process node;
Module 460 is constructed, can be used for based on the flow nodes construction work process;
Correction verification module 470 can be used for workflow described in automatic Verification.
In one example, as shown in figure 5, the device can also include:
First obtains module 510, for obtaining the mark of the element information in the business form;
Second obtains module 520, for obtaining data information corresponding with element information mark in the business datum table
Mark;
Judgment module 530, for judging that it is corresponding with data information mark that the element information identifies corresponding element information
Data information whether match;
Module 540 is adjusted, for adjusting the data information according to the element information when the result judged is no.
With continued reference to Fig. 5, in another example, which can also include:
Permission configuration module 550 configures the personnel couple for the Role Information of personnel in role's group according to each flow nodes
The operating right of business form.
With continued reference to Fig. 5, in another example, which can also include:
It is automatic to correct module 560, it is when reporting an error for the result in the verification, then the information to report an error according to is to the work
Make process to be corrected automatically.
To sum up, the workflow construction device provided in an embodiment of the present invention based on visualization guidance and automatic Verification passes through
In response to the building instruction of user, editing process interface is opened;The editing process interface includes visualization the form tool module;
In response to user to the drag operation of visualization the form tool module, business form is drawn;It is raw according to the business form
At business datum table;According to the role of participant, role's group is generated;According to the business datum table and role's group, stream is generated
Cheng Jiedian;Based on the flow nodes construction work process;The workflow is verified, realizes visualization, without code construction,
Building process is simple, and verifies automatically to workflow after workflow creation, so as to position entire workflow
The problems in journey building process ensure that the correctness of the workflow of building.
In addition, guided in the building process of entire workflow by each step of the navigation icon to implementation,
It is incremental, rapid build workflow.And it can also be adjusted in the visual navigation icon when current procedures are completed
The display of icon corresponding with the current procedures avoids the omission of step to clearly construct progress.
It should be noted that device provided by the above embodiment, when realizing its function, only with above-mentioned each functional module
It divides and carries out for example, can according to need in practical application and be completed by different functional modules above-mentioned function distribution,
The internal structure of equipment is divided into different functional modules, to complete all or part of the functions described above.
Referring to Fig. 6, its structural schematic diagram for showing a kind of electronic equipment provided in an embodiment of the present invention, which is set
The workflow construction device based on visualization guidance and automatic Verification for implementing to provide in above-described embodiment is provided.The electronics
Equipment can be the terminal devices such as such as PC (PersonalComputer, personal computer), mobile phone, PDA (tablet computer),
It is also possible to the service equipments such as application server, cluster server.Fig. 6 is referred to, the internal structure of the electronic equipment can
Including but not limited to: processor, network interface and memory.Wherein, the processor in electronic equipment, network interface and memory
It can be connected by bus or other modes, in Fig. 6 shown in this specification embodiment for being connected by bus.
Wherein, processor (or CPU (Central Processing Unit, central processing unit)) is electronic equipment
Calculate core and control core.Network interface optionally may include that standard wireline interface and wireless interface (such as WI-FI, is moved
Dynamic communication interface etc.).Memory (Memory) is the memory device in electronic equipment, for storing program and data.It can manage
Solution, memory herein can be high-speed RAM storage equipment, be also possible to non-labile storage equipment (non-
Volatile memory), a for example, at least disk storage equipment;It is aforementioned optionally to can also be that at least one is located remotely from
The storage device of processor.Memory provides memory space, which stores the operating system of electronic equipment, it may include
But it is not limited to: Windows system (a kind of operating system), Linux (a kind of operating system), Android (Android, a kind of movement
Operating system) system, IOS (a kind of Mobile operating system) system etc., the present invention is to this and is not construed as limiting;Also, it deposits at this
It also houses and is suitable for by one or more than one instructions that processor loads and executes in storage space, these instructions can be one
A or more than one computer program (including program code).In this specification embodiment, processor is loaded and is executed and deposits
One stored in reservoir or one or more instruction, to realize that above method embodiment provides based on visualization guidance and automatic
The workflow construction method of verification.
The embodiments of the present invention also provide a kind of storage medium, the storage medium may be disposed among electronic equipment with
The workflow construction method saved for realizing one of embodiment of the method based on visualization guidance and automatic Verification is related
At least one instruction, at least a Duan Chengxu, code set or instruction set, at least one instruction, an at least Duan Chengxu, the generation
Code collection or instruction set can be loaded and be executed by the processor of electronic equipment with realize above method embodiment provide based on visual
Change the workflow construction method of guidance and automatic Verification.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that process, method, article or device including a series of elements are not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or device
Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in process, method, article or device including the element.
Those of ordinary skill in the art will appreciate that realizing that all or part of the steps of above-described embodiment can pass through hardware
It completes, relevant hardware can also be instructed to complete by program, the program can store in a kind of computer-readable
In storage medium, storage medium mentioned above can be read-only memory, disk or CD etc..
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and
Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of workflow construction method based on visualization guidance and automatic Verification, which is characterized in that the described method includes:
In response to the building instruction of user, editing process interface is opened;The editing process interface includes visualization the form tool
Module;
In response to user to the drag operation of visualization the form tool module, business form is drawn;
Business datum table is generated according to the business form;
According to the role of participant, role's group is generated;
According to the business datum table and role's group, product process node;
Based on the flow nodes construction work process;
Workflow described in automatic Verification.
2. the workflow construction method according to claim 1 based on visualization guidance and automatic Verification, feature exist
In, after generating business datum table according to the business form, the method also includes:
Obtain the element information mark in the business form;
Obtain data information mark corresponding with element information mark in the business datum table;
Judge the element information identify corresponding element information data information corresponding with data information mark whether phase
Matching;
When the result judged is no, the data information is adjusted according to the element information.
3. the workflow construction method according to claim 1 based on visualization guidance and automatic Verification, feature exist
In, after based on the flow nodes construction work process, the method also includes:
According to the Role Information of personnel in role's group of each flow nodes, the personnel are configured to the operating right of business form.
4. the workflow construction method according to claim 1 based on visualization guidance and automatic Verification, feature exist
In, after workflow described in automatic Verification, the method also includes:
If the result of the verification is to report an error, the information to report an error according to corrects the workflow automatically.
5. the workflow construction method according to claim 1 based on visualization guidance and automatic Verification, feature exist
In the editing process interface further includes visual navigation icon;The visual navigation icon is used to indicate workflow structure
The each step built.
6. the workflow construction method according to claim 5 based on visualization guidance and automatic Verification, feature exist
In, the method also includes: when current procedures are completed, adjust corresponding with the current procedures in the visual navigation icon
Icon display.
7. a kind of workflow construction device based on visualization guidance and automatic Verification, which is characterized in that described device includes:
Opening module opens editing process interface for the building instruction in response to user;The editing process interface includes can
Depending on changing the form tool module;
Drafting module draws business form for the drag operation in response to user to visualization the form tool module;
First generation module, for generating business datum table according to the business form;
Second generation module generates role's group for the role according to participant;
Third generation module, for according to the business datum table and role's group, product process node;
Module is constructed, for being based on the flow nodes construction work process;
Correction verification module, for workflow described in automatic Verification.
8. the workflow construction device according to claim 7 based on visualization guidance and automatic Verification, feature exist
In described device further include:
First obtains module, for obtaining the mark of the element information in the business form;
Second obtains module, for obtaining data information mark corresponding with element information mark in the business datum table
Know;
Judgment module, for judging the corresponding element information of element information mark number corresponding with data information mark
It is believed that whether breath matches;
Module is adjusted, for adjusting the data information according to the element information when the result judged is no.
9. the workflow construction device according to claim 7 based on visualization guidance and automatic Verification, feature exist
In described device further include: permission configuration module is matched for the Role Information of personnel in role's group according to each flow nodes
The personnel are set to the operating right of business form.
10. the workflow construction device according to claim 7 based on visualization guidance and automatic Verification, feature exist
In described device further include: correct module automatically, be when reporting an error, then to report an error according to for the result in the verification
Information corrects the workflow automatically.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811351817.8A CN109472496A (en) | 2018-11-14 | 2018-11-14 | Workflow construction method and device based on visualization guidance and automatic Verification |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811351817.8A CN109472496A (en) | 2018-11-14 | 2018-11-14 | Workflow construction method and device based on visualization guidance and automatic Verification |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109472496A true CN109472496A (en) | 2019-03-15 |
Family
ID=65672837
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811351817.8A Pending CN109472496A (en) | 2018-11-14 | 2018-11-14 | Workflow construction method and device based on visualization guidance and automatic Verification |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109472496A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110007913A (en) * | 2019-03-21 | 2019-07-12 | 佳都新太科技股份有限公司 | Visual flow chart of data processing setting method, device, equipment and storage medium |
CN110377279A (en) * | 2019-07-24 | 2019-10-25 | 江苏中威科技软件系统有限公司 | Visualization guidance is without code construction workflow and automatic verification method and system |
CN110533390A (en) * | 2019-08-30 | 2019-12-03 | 广东鼎义互联科技股份有限公司 | A kind of secretary's formula business householder method |
CN111104103A (en) * | 2019-11-26 | 2020-05-05 | 武汉烽火信息集成技术有限公司 | Visualization method and system for software editing microservice |
CN113805873A (en) * | 2021-11-19 | 2021-12-17 | 深圳市明源云科技有限公司 | Codeless workflow definition method, terminal device and computer-readable storage medium |
US11494291B2 (en) | 2019-12-20 | 2022-11-08 | UiPath, Inc. | System and computer-implemented method for analyzing test automation workflow of robotic process automation (RPA) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102663569A (en) * | 2012-05-07 | 2012-09-12 | 广东优迈信息通信技术有限公司 | Visualized workflow engine system |
CN105700888A (en) * | 2016-01-14 | 2016-06-22 | 国网山东省电力公司物资公司 | Visualization rapid developing platform based on jbpm workflow engine |
CN107203626A (en) * | 2017-05-27 | 2017-09-26 | 网宿科技股份有限公司 | A kind of BPM method and system |
CN108427556A (en) * | 2018-03-12 | 2018-08-21 | 深圳市博安达信息技术股份有限公司 | A kind of form design analytic method and system |
-
2018
- 2018-11-14 CN CN201811351817.8A patent/CN109472496A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102663569A (en) * | 2012-05-07 | 2012-09-12 | 广东优迈信息通信技术有限公司 | Visualized workflow engine system |
CN105700888A (en) * | 2016-01-14 | 2016-06-22 | 国网山东省电力公司物资公司 | Visualization rapid developing platform based on jbpm workflow engine |
CN107203626A (en) * | 2017-05-27 | 2017-09-26 | 网宿科技股份有限公司 | A kind of BPM method and system |
CN108427556A (en) * | 2018-03-12 | 2018-08-21 | 深圳市博安达信息技术股份有限公司 | A kind of form design analytic method and system |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110007913A (en) * | 2019-03-21 | 2019-07-12 | 佳都新太科技股份有限公司 | Visual flow chart of data processing setting method, device, equipment and storage medium |
CN110377279A (en) * | 2019-07-24 | 2019-10-25 | 江苏中威科技软件系统有限公司 | Visualization guidance is without code construction workflow and automatic verification method and system |
CN110533390A (en) * | 2019-08-30 | 2019-12-03 | 广东鼎义互联科技股份有限公司 | A kind of secretary's formula business householder method |
CN111104103A (en) * | 2019-11-26 | 2020-05-05 | 武汉烽火信息集成技术有限公司 | Visualization method and system for software editing microservice |
CN111104103B (en) * | 2019-11-26 | 2023-09-15 | 武汉烽火信息集成技术有限公司 | Visualization method and system for software editing micro-service |
US11494291B2 (en) | 2019-12-20 | 2022-11-08 | UiPath, Inc. | System and computer-implemented method for analyzing test automation workflow of robotic process automation (RPA) |
CN113805873A (en) * | 2021-11-19 | 2021-12-17 | 深圳市明源云科技有限公司 | Codeless workflow definition method, terminal device and computer-readable storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109472496A (en) | Workflow construction method and device based on visualization guidance and automatic Verification | |
CN106897809A (en) | Workflow creation method, workflow designer and workflow system | |
Alashwal et al. | Determining success criteria and success factors for international construction projects for Malaysian contractors | |
CN108733508A (en) | Method and system for controlling data backup | |
EP2778929A1 (en) | Test script generation system | |
CN106897806A (en) | Workflow creation method and system, operation system | |
US20050080655A1 (en) | System and model for performance value based collaborative relationships | |
CN107908542A (en) | Test case creation method, apparatus, computer equipment and storage medium | |
CN103984626B (en) | A kind of method and device for generating test case script | |
CN104536997B (en) | Batch data processing method and processing device for client end interface | |
CN113868102A (en) | Method, electronic device and computer program product for information display | |
CN110377279A (en) | Visualization guidance is without code construction workflow and automatic verification method and system | |
US8996341B2 (en) | Generating and evaluating expert networks | |
CN108648093A (en) | Data processing method, device and equipment | |
CN106850316A (en) | A kind of optical fiber into end graphically managing method and system | |
CN110515600A (en) | A kind of method and apparatus of workflow conditional configuration | |
CN110008277A (en) | The visible processing method and device of resource flow direction | |
CN104517186A (en) | Business process design method based on data drive | |
KR101291443B1 (en) | Organization creativity simulation system using network structure and complexity of task | |
CN106250147A (en) | application development management method and device | |
CN110363409A (en) | A kind of team's configuration method based on output capacity, apparatus and system | |
CN109725884A (en) | Air control ' In System Reconfiguration Method, device, equipment and readable storage medium storing program for executing | |
CN104461549B (en) | The arrangement display methods and device of graphical interfaces | |
US9769036B1 (en) | Port assignment of network devices reference and management | |
JP4922644B2 (en) | Time series analysis program, time series analysis system, and time series analysis apparatus used therefor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190315 |