CN109471706A - A kind of response method and system of testing test - Google Patents

A kind of response method and system of testing test Download PDF

Info

Publication number
CN109471706A
CN109471706A CN201811183895.1A CN201811183895A CN109471706A CN 109471706 A CN109471706 A CN 109471706A CN 201811183895 A CN201811183895 A CN 201811183895A CN 109471706 A CN109471706 A CN 109471706A
Authority
CN
China
Prior art keywords
test
testing
execution terminal
terminal
test execution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811183895.1A
Other languages
Chinese (zh)
Other versions
CN109471706B (en
Inventor
陈天庆
陈仕财
陈亚殊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Technology Shenzhen Co Ltd
Original Assignee
Ping An Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Technology Shenzhen Co Ltd filed Critical Ping An Technology Shenzhen Co Ltd
Priority to CN201811183895.1A priority Critical patent/CN109471706B/en
Publication of CN109471706A publication Critical patent/CN109471706A/en
Application granted granted Critical
Publication of CN109471706B publication Critical patent/CN109471706B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Program initiating; Program switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching
    • G06F9/4843Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Software Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Quality & Reliability (AREA)
  • Debugging And Monitoring (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The present invention is suitable for Internet technical field, provides the response method and system of a kind of testing test, comprising: task scheduling server is detecting that generation testing test instructs when currently meeting preset testing entry condition;Test execution terminal obtains the testing process of testing test instruction, and each test machine being connected with test execution terminal is tested according to testing process;Each test machine is packaged based on the operating parameter of testing test instruction feedback, generates the test data about testing test instruction, and test data is sent to data processing node;Test data is directed respectively into the verification template that testing test instructs associated each testing project by data processing node, determines the check results of each testing project;Test report is generated based on each check results, and test report is uploaded to task scheduling server.The present invention improves the load pressure for reducing task scheduling server, improves the stability of system and the accuracy of test result processing.

Description

A kind of response method and system of testing test
Technical field
The invention belongs to generation methods and system that Internet technical field more particularly to a kind of wage are reported
Background technique
How testing fast and effeciently carries out testing test, then directly as the important means of test communication network completeness Connect the construction efficiency for affecting communication network.Task dispatcher is usually used to issue testing test in existing testing technology Instruction, and each test execution terminal is transferred to feed back corresponding test data, after task scheduling server receives test data, Each test data is analyzed, test result is obtained.
However as being continuously increased for test assignment and test sample, the data volume of the test data of testing test also with Increase, what task scheduling server will not only carry out testing test assignment issues operation, also receive a large amount of test data into The analysis of row data, to substantially increase the load pressure of task scheduling server, reduces the stability of testing test macro And the accuracy of test result processing.
Summary of the invention
In view of this, the embodiment of the invention provides the response method and system of a kind of testing test, it is existing to solve Testing technology, what task scheduling server will not only carry out testing test assignment issues operation, also receives a large amount of test data Carrying out data analysis reduces the stabilization of testing test macro to substantially increase the load pressure of task scheduling server Property and test result processing accuracy the problem of.
The first aspect of the embodiment of the present invention provides a kind of response method of testing test, is applied to testing test system System, the testing test macro includes: task scheduling server, data processing node and test execution terminal;The testing The response method of test, comprising:
The task scheduling server is detecting that generation testing test refers to when currently meeting preset testing entry condition It enables, and testing test instruction is sent to the test execution terminal;
The test execution terminal obtains the testing process of the testing test instruction, and is tested according to the testing process The each test machine being connected with the test execution terminal;
The test execution terminal to each test machine based on the testing test instruction feedback operating parameter into Row encapsulation generates the test data about testing test instruction, and the test data is sent to the data processing Node;
The test data is directed respectively into the testing test and instructs associated each testing by the data processing node The verification template of project determines the check results of each testing project;
The data processing node is based on each check results and generates test report, and the test report is uploaded To the task scheduling server.
It includes: task scheduling server, data that the second aspect of the embodiment of the present invention, which provides a kind of testing test macro, Handle node and test execution terminal;
The task scheduling server, for detect currently meet preset testing entry condition when, generate testing Test instruction, and testing test instruction is sent to the test execution terminal;
The test execution terminal for obtaining the testing process of the testing test instruction, and is flowed according to the test Journey tests each test machine being connected with the test execution terminal;
The test execution terminal, for being joined to each test machine based on the operation of testing test instruction feedback Number is packaged, and generates the test data about testing test instruction, and the test data is sent to the data Handle node;
The data processing node, it is associated each for the test data to be directed respectively into the testing test instruction The verification template of testing project determines the check results of each testing project;
The data processing node for generating test report based on each check results, and the test is reported Announcement is uploaded to the task scheduling server.
The response method and system for implementing a kind of testing test provided in an embodiment of the present invention have the advantages that
The embodiment of the present invention is by being sent to test execution terminal for testing test instruction, and test execution terminal is first to adopting The operating parameter for collecting each test machine is summarized, and it is indirect operating parameter is transmitted to task scheduling server, generate Testing test instructs corresponding test data, thus reduce summarize operation of the task scheduling server to data, and It is configured with data processing node on communication link between task scheduling server and test execution terminal, test data is carried out Parsing, generates test report, task scheduling server is handled without to test data, and task scheduling server only needs To testing test assignment is issued, the load pressure of task scheduling server is greatly reduced, improves testing test macro Stability and test result processing accuracy.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is a kind of implementation flow chart of the response method for testing test that first embodiment of the invention provides;
Fig. 2 is a kind of response method specific implementation flow chart for testing test that second embodiment of the invention provides;
Fig. 3 is a kind of response method S101 specific implementation flow chart for testing test that third embodiment of the invention provides;
Fig. 4 is the specific implementation flow of the response method S102 for testing test that fourth embodiment of the invention provides a kind of Figure;
Fig. 5 is a kind of response method S101 specific implementation flow chart for testing test that fifth embodiment of the invention provides;
Fig. 6 is a kind of structural block diagram for testing test macro that one embodiment of the invention provides.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
The embodiment of the present invention is by being sent to test execution terminal for testing test instruction, and test execution terminal is first to adopting The operating parameter for collecting each test machine is summarized, and it is indirect operating parameter is transmitted to task scheduling server, generate Testing test instructs corresponding test data, thus reduce summarize operation of the task scheduling server to data, and It is configured with data processing node on communication link between task scheduling server and test execution terminal, test data is carried out Parsing, generates test report, task scheduling server is handled without to test data, and task scheduling server only needs To issuing testing test assignment, the load pressure of task scheduling server is greatly reduced, testing test macro is improved Stability and test result processing accuracy, solve existing testing technology, task scheduling server not only will be into Row testing test assignment issues operation, also receives a large amount of test data and carries out data analysis, to substantially increase task The load pressure of dispatch server, the accuracy that the stability and test result for reducing testing test macro are handled are asked Topic.
In embodiments of the present invention, the executing subject of process is testing task scheduling system, the testing task scheduling system Include: task scheduling server, data processing node and test execution terminal.The task scheduling server can be a clothes Business device, issues rich test assignment to each test execution terminal, test execution terminal includes but is not limited to: computer, intelligent hand Machine and tablet computer etc. can be communicated with task scheduling server, and the equipment for responding testing test request.Fig. 1 is shown The interaction diagrams of the response method for the testing test that first embodiment of the invention provides, details are as follows:
In S101, the task scheduling server detect currently meet preset testing entry condition when, generate Testing test instruction, and testing test instruction is sent to the test execution terminal.
In the present embodiment, when communication network exception occurs or needs to carry out network update, administrator can be by dialling The means of test test the communication network, to determine abnormal cause, and detect after reparation or network extremely update Whether communication network can be used.And during executing testing test, need task scheduling server by the testing of required test Test instruction is sent to test execution terminal, and responds corresponding testing test instruction by test execution terminal, and this is referred to Corresponding test result is enabled to feed back to task scheduling server.
In the present embodiment, task scheduling server can be connected with multiple test execution terminals, and each test execution is whole End can execute the testing test instruction that task scheduling server issues, and base by each test machine with the multiple test machines of the second line of a couplet In the response condition of each test machine, the test result of testing test terminal is generated, and passes through established legitimate correspondence chain The test result is returned to task scheduling server by road.Same test machine can be passed through with the multiple test execution terminals of the first line of a couplet Time-multiplexed mode responds the testing test assignment that different test execution terminals are sent.Task scheduling server can be to pass through Preset testing triggering rule sends testing test instruction to each test execution terminal with the preset mission dispatching period, holds Row testing test operation, to periodically be detected to the completeness of communication network.When the task scheduling server passes through When parsing test result, detects that abnormal conditions occurs in communication network, then execute corresponding exception response process.
In the present embodiment, it since the test item of testing test process is more, is dialled corresponding to different testing projects Surveying entry condition may be different.Therefore, task scheduling server, which is worked as, detects that current time meets preset testing trip bar When part, the corresponding testing project of the testing entry condition can be identified.It should be noted that its is corresponding for different testing projects Testing entry condition can be identical, and in this case, task scheduling server then needs to be implemented multiple testing projects, and different dials Survey project can transfer to different test execution terminals to carry out concurrent processing.Certainly, if the degree of association of different testing projects compared with Test result that is big and relying on other testing projects, then can transfer to the multiple testing projects of the same test execution terminal processes.
In the present embodiment, different testing projects can transfer to corresponding test execution terminal to be handled, i.e. task tune Degree server can store the corresponding relationship of a testing project and test execution terminal, and task scheduling server is obtaining group After survey project, the matched test execution terminal of the testing project can be obtained based on the corresponding relationship, to obtain corresponding end End mark.It should be noted that the terminal iidentification can appoint for the physical address of test execution terminal, network address, in testing Device numbering etc. in business scheduling system can be used for indicating the information of the equipment identities, and then task scheduling server can root Testing is tested into instruction directive sending to the test execution terminal of target according to the terminal iidentification.
In S102, the test execution terminal obtains the testing process of the testing test instruction, and according to the survey Each test machine that examination flow testing is connected with the test execution terminal.
In the present embodiment, test execution terminal receive task scheduling server transmission testing test instruction after, The test script of each testing project can be obtained, and be based on each group based on the testing project for including in testing test instruction The testing sequence of survey project obtains testing test and instructs corresponding testing process.Since testing test item is detection communication Whether the function of network is normal, is based on this, needs to simulate a certain number of user terminals and communicated using the communication network, Section communication function can be carried out abnormality detection, therefore test execution terminal generally requires the multiple test machines of the second line of a couplet, be used for mould The communication request that quasi- user terminal is initiated expands testable testing content so as to realize more equipment concurrent communications.
Preferably due to be deployed at data on communication link between test execution terminal and task scheduling server Node is managed, therefore testing can be tested instruction and be sent to data processing node by task scheduling server, and is arranged and issued condition, Data processing node then can carry out testing to corresponding test execution terminal when detecting that current time satisfaction issues condition Test instruction issues operation.By the above-mentioned means, task scheduling server only need on data processing node configuration distributing item Part and by the testing that terminal iidentification is executed comprising target detection test instruction be sent to data processing node in advance, pass through data Node is handled to monitor in real time to the condition of issuing, the load pressure of task scheduling server can be further reduced, is improved The stability of testing test macro.
In the present embodiment, the test script of each testing project can be sent to corresponding survey by test execution terminal Test-run a machine, test machine can execute corresponding test operation based on the test script after receiving the test script.It needs to illustrate It is that test execution terminal can be before being sent to test machine for test script, the default call opposite end based on test machine, to each A test script is adjusted, to can pass through communication network to specified call opposite end when test machine runs test script Network initiates communication request, so that multiple test machines be avoided to initiate communication request to same call opposite end, leads to the feelings of communication failure Condition.
In S103, fortune of the test execution terminal to each test machine based on testing test instruction feedback Row parameter is packaged, and generates the test data about testing test instruction, and the test data is sent to described Data processing node.
In the present embodiment, test machine can tested after executing completion testing test and instructing corresponding testing process The collected operating parameter of period test machine feeds back to test execution terminal.The operating parameter includes but is not limited to: network bandwidth, The parameters such as transmission rate, response time, the bit error rate, signal-to-noise ratio, the operating parameter for specifically feeding back that type can be surveyed according to testing Examination instructs the type of corresponding testing project to determine.Since the function that different testing projects is tested has differences, thus institute The parameter that need to be acquired may also change accordingly.Test machine can acquire the operating parameter with testing test instructions match, to avoid Invalid operating parameter is uploaded, the data volume size of the efficiency of testing analysis and the operating parameter of upload is improved.
In the present embodiment, test execution terminal can be after the operating parameter for receiving all test machine feedbacks, can be right All operating parameters are packaged, and generate the test data about testing test instruction.Optionally, it can wrap in the test data Device identification and corresponding operating parameter containing each test machine generate corresponding relationship list, can then be closed by the correspondence Series of tables determines the operating status of different types in a communication network.Optionally, if test execution terminal detects any survey Test-run a machine not back-to-back running parameter in preset response cycle can then identify that the test machine is in abnormality, generate and close Task scheduling server is fed back in the exception information of abnormality test machine, and by exception information, so that task scheduling server is held Row exception response process.
In the present embodiment, in order to reduce the processing pressure of task scheduling server, avoid task scheduling server to big The test data of amount is analyzed, and the test data of generation can be sent to data processing node by test execution terminal, to count The operation of data analysis is completed according to processing node, task scheduling server only needs the analysis result of storing data processing node feeding back , reduce the data processing pressure of task scheduling server.In this case, test execution terminal can fix one corresponding The test data that data processing node, i.e. test execution terminal each moment generate uploads to the data processing node and is counted It is handled according to analysis.
Preferably, the grade of load at test execution terminal available each data processing node current time, the load The data volume size that grade is used to parse needed for limiting the data processing node corresponds to if the data volume of required parsing is bigger The grade of load it is higher.Test execution terminal can based on the grade of load and the test execution terminal and data processing node it Between amount of bandwidth, calculate the priority of each data processing node, and choose a data processing node of highest priority Node is handled as target, and test data is sent to target processing node, to realize the dynamic tune of data processing node The load balancing of section and testing test macro.
In S104, it is associated that the test data is directed respectively into testing test instruction by the data processing node The verification template of each testing project determines the check results of each testing project.
In the present embodiment, testing test instruction can correspond to multiple testing projects, for the ease of each testing item of determination Purpose test result, data processing node can be the corresponding verification template of each testing project configuration.Therefore, when receive test After executing the test data that terminal is sent, data processing node can be determined associated by the instruction based on testing test instruction Testing project, and the verification template of each testing project is obtained out of template database, and the test data is directed respectively into It is each to extract in obtained verification template, so as to obtain the check results of each testing project.
Optionally, each verification template is configured with the operating parameter range of corresponding testing project, if corresponding in test data Operating parameter within the scope of the operating parameter, then identify the testing project check results be verify successfully;Conversely, if any The operating parameter of test data then identifies the check results of the testing project for verification failure outside the operating parameter range.It is logical Aforesaid way is crossed, determines the check results of each testing project, and executes the relevant operation of S105.
In S105, the data processing node is based on each check results and generates test report, and by the survey Examination report is uploaded to the task scheduling server.
In the present embodiment, data processed result, can be to all schools after the check results for obtaining each testing project It tests result and is packaged integrated, test report of the generation about testing test instruction.It should be noted that testing test instruction pair Multiple test execution terminals are answered, then data processing node can be parsed in the test data uploaded to each test execution terminal After verification, unified encapsulation is being carried out to the corresponding test result of all test datas, is generating the survey about testing test instruction Examination report.The test report is used to indicate the completeness of the communication function of current communication network, i.e. the communication function of communication network Can whether abnormal.Task scheduling server can store in database receiving the test report, so that user is by looking into The content for asking database, determines the operating status of present communications network.
Above as can be seen that a kind of response method of testing test provided in an embodiment of the present invention is by referring to testing test Order is sent to test execution terminal, and test execution terminal first summarizes the operating parameter for collecting each test machine, and It is indirect that operating parameter is transmitted to task scheduling server, it generates testing test and instructs corresponding test data, to subtract Summarize operation of the task scheduling server to data is lacked, and logical between task scheduling server and test execution terminal Letter chain road is configured with data processing node, parses to test data, generates test report, task scheduling server Without handling test data, task scheduling server only need to greatly reduce and appoint to testing test assignment is issued The load pressure of business dispatch server improves the stability of testing test macro and the accuracy of test result processing.
Fig. 2 shows the specific implementation flows for the response method that a kind of testing that second embodiment of the invention provides is tested Figure.In the present embodiment, the executing subject of process is that task scheduling server states embodiment, this reality relative to Fig. 1 referring to fig. 2 The response method for applying a kind of testing test of example offer is based on described dial to each test machine in the test execution terminal The operating parameter of test instruction feedback is packaged, and generates the test data about testing test instruction, and will be described Test data is sent to before the data processing node, further includes: S201~S203, specific details are as follows:
In S201, the task scheduling server obtains the operating parameter of each test execution terminal, and is based on The test-types of the testing test instruction, determine the response weight of each test execution terminal.
In the present embodiment, task scheduling server is being surveyed after thinking that test execution terminal sends testing test instruction Before examination executes terminal feedback test data, an original test execution terminal conduct can be chosen in testing test macro Data processing node, so that dynamic adjusts the topological structure of testing test macro, by data-handling capacity preferably test execution Terminal improves the testing efficiency of testing test as data processing node.
In the present embodiment, task scheduling server can obtain the operation of all test execution terminals in testing test macro Parameter, which includes but is not limited to: maximum arithmetic speed, current operation rate, maximum memory capacity, current memory hold The parameters relevant to the calculation processing power of test execution terminal such as amount, maximum concurrent thread number, current occupancy number of threads ?.By the operating parameter of current time each test execution terminal, each test execution terminal current time can be determined Loading condition, to choose the load higher test execution terminal of less and operational capability as data processing node.
In the present embodiment, task scheduling server can also test the test-types of instruction according to testing, determine each survey Examination executes the response weight of terminal.Since the different different types of data capabilities of test execution terminal processes can have differences, For example, the ability of a certain test execution terminal processes audio data is stronger, then the test processes terminal corresponds to audio test-types Response weight it is then higher;And the ability of a certain test execution terminal processes image data is stronger, then the test processes terminal pair Answer the response weight of image measurement type then higher.It therefore, can be each according to the data-handling capacity of test processes terminal Test processes terminal configures the mapping table an of test-types and response weight.Task responds terminal according to the corresponding relationship Table can determine that each test execution terminal corresponds to the response weight of current test-types.
In S202, the task scheduling server is respectively by the operating parameter of each test execution terminal and institute It states response weight to imported into priority computation model, calculates the processing priority of each test execution terminal;It is described excellent First grade computation model specifically:
Wherein, PrioritynIt (k) is the processing priority of k-th of test execution terminal;Priorityn-1 It (k) is the history priority of k-th of test execution terminal;WorkikFor i-th of fortune of k-th of test execution terminal Row parameter;M is the total number of the operating parameter;αkFor the response weight of k-th of test execution terminal, and 0 < αk<1;K For the total number of the test execution terminal.
In the present embodiment, operating parameter and test response weight are imported into priority computation model, so as to The corresponding priority of each test execution terminal is enough calculated.By priority computation model it is found that working as a certain test execution The numerical value of the operating parameter of terminal is bigger, then it represents that the data-handling capacity of the test execution terminal is higher, and what is be calculated is excellent First value of series is also bigger, i.e., is positively related relationship between operating parameter and priority, meets preset selection logic.Pass through Operating parameter is normalized in Max function, to reduce different parameters value because of parameter dimension and numerical values recited pair In the influence of priority, the accuracy of priority is improved.
In the present embodiment, task scheduling server also will record the history priority of each test execution terminal, by It is higher in the history priority, then it represents that the test execution terminal can be stably held in higher data processing level, therefore The history priority is higher, and corresponding current priority is also higher.
In S203, the task scheduling server chooses the highest test execution terminal of processing priority as mesh Mark executes terminal, and adjusts the operating mode that the target executes terminal, and identifying that the target adjusted executes terminal is institute State data processing node.
In the present embodiment, task scheduling server, can be by priority most after calculating each test execution terminal High test execution terminal recognition is that target executes terminal, and adjusts built-in script information and the mesh that the target executes terminal Mapping try terminal operating mode, due to the original operating mode of test execution terminal be execute testing test instruction, in order to will Target executes terminal processes test data, and the operating mode for executing terminal to the target is needed to be adjusted.Specifically, task tune The Run Script of data processing node can be sent to target and execute terminal by degree server, and restarted the target and executed terminal, To which the operating mode for executing terminal to the target is adjusted.Test execution terminal holds the target after operating mode after adjustment Row terminal recognition is data processing node.
In embodiments of the present invention, by obtaining the operating parameter of each test execution terminal, it is more excellent to choose operational capability Test execution terminal as data processing node, so that dynamic adjusts the topological structure of testing test macro, improve testing and survey The robustness of test system.
Fig. 3 shows the specific implementation stream of the response method S101 of testing test of second embodiment of the invention offer a kind of Cheng Tu.Referring to Fig. 3, relative to Fig. 1 the embodiment described, a kind of response method S101 packet of testing test provided in this embodiment Include: S1011~S1014, specific details are as follows:
Further, the task scheduling server detect currently meet preset testing entry condition when, generate Testing test instruction, and testing test instruction is sent to the test execution terminal, comprising:
In S1011, the task scheduling server obtains the associated communication key of terminal iidentification, is based on the communication Key generates the first transmission control protocol TCP message, and first TCP message is sent to the test execution terminal.
In the present embodiment, network authentication can be established two processes with communication link and melted by task scheduling server It closes, therefore, communication key can be packaged in transmission control protocol TCP message by task scheduling server, thus carrying out TCP tri- It is secondary shake hands during, by identification TCP message in communication key judge whether test execution terminal is legitimate device.Specifically Ground, terminal device can determine the communication key being associated according to the terminal iidentification of the test execution terminal.The communication key can Think a static keys, i.e., has arranged a pair of secret keys between test execution terminal and task scheduling server, be respectively stored in Communication key in task scheduling server, and the associated key being stored in test execution terminal, two keys are mutual It is associated with, such as each character in communication key can be converted by preset transformational relation, to obtain associated key. It can be seen that if the associated key that test execution terminal can be returned based on the communication key, can identify the task schedule Server is legitimate device.
Optionally, in the present embodiment, the key between task scheduling server and test execution terminal can be dynamic Distribution.In this case, task scheduling server and test execution terminal are connected with a upper server.The upper clothes Business device can issue communication key and associated key with the preset time cycle.Wherein, communication key and associated key can It is sent to task scheduling server and test execution terminal in pairs, and communication key and associated key are in the time cycle Interior effectively to reach subsequent time period, upper server can retransmit a pair of new key, and the communication that a upper period sends is close Key and associated key will fail.
In S1012, the test execution terminal determines institute according to the communication key in first TCP message The corresponding associated key of communication key is stated, and the second TCP message is generated based on the associated key, by second TCP message It is sent to the task scheduling server.
In the present embodiment, test execution terminal is when receiving the first TCP message, then it represents that task scheduling server with Test execution terminal needs to establish communication link, and executes testing testing process, in response to the first TCP message, is appointed with informing The link connection of business dispatch server between the two, test execution terminal can generate the 2nd TCP report based on first TCP message Text.
Summarize in the present embodiment, test execution terminal can parse the communication key for including in first TCP message, and inquire With the matched associated key of communication key, then associated key is packaged in the TCP message of generation, it is preferable that the association is close Key can store in the reserved field of TCP message, and adjust the place value of Option Field, so that task scheduling server is receiving When to second TCP message, it can determine and carry valid data in reserved field, is i.e. associated key.
Optionally, since test execution terminal can be connected with multiple tasks dispatch server, i.e., in test execution terminal The associated key of different task dispatch server can be stored with.In this case, test execution terminal can be based on the first TCP message Interior source address determines the server identification of the task scheduling server, to obtain and the matched association of the server identification Key, and be packaged in the second TCP message.
In S1013, the task scheduling server verifies the associated key of second TCP message, if school Testing result is to verify successfully, then generates testing test instruction based on the testing project.
In the present embodiment, task scheduling server can extract second TCP message after receiving the second TCP message The associated key for inside including, and identify whether the associated key matches with communication key.Specifically, task scheduling server can To be stored with checking algorithm, communication key and associated key can be imported into the checking algorithm by task scheduling server Interior, whether both check value identification based on the checking algorithm matches.Optionally, which can be a hash function, Communication key can be imported into the hash function by task scheduling server, determine the cryptographic Hash of the communication key, if association Key is imported into the hash function, and the cryptographic Hash of output and the cryptographic Hash of communication key are identical, then identifies that the two matches, i.e., It verifies successfully;Conversely, identifying that the two mismatches if the cryptographic Hash of output is different from the cryptographic Hash of communication key, i.e. verification is lost It loses.
In the present embodiment, task scheduling server is after recognizing and verifying successfully, then it represents that test execution terminal is to close Method equipment can issue testing test instruction, to it to respond testing project.Specifically, task scheduling server, which can obtain, dials The project label of survey project, and test parameter is determined based on the project label, testing test instruction is generated according to test parameter.
In S1014, the task scheduling server sends the third TCP message for carrying the testing test instruction Communication link is established to the test execution terminal, and with the test execution terminal.
In the present embodiment, the testing of generation can be tested instruction and is added in third TCP message by task scheduling server, And third TCP message is sent to test execution terminal, after sending third TCP message, task scheduling server can identify this Communication link is legal communication link, and test execution terminal is also legitimate device.When test execution terminal receives third After TCP message, since three-way handshake operation is completed, test execution terminal can equally identify that the communication link is legal Communication link, and testing test instruction is extracted out of third TCP message, and complete the corresponding test content of testing project.
In embodiments of the present invention, by task scheduling server and test execution terminal carry out TCP three-way handshake with During establishing communication link, communication key is added in TCP message, so that TCP message can be used not only for ensuring task Whether the communication link between dispatch server and test execution terminal is connected to, moreover it is possible to which the operation for completing legitimacy authentication will lead to Letter two processes of link establishment and network authentication carry out unification, reduce between task scheduling server and test execution terminal Data interaction number, improve communication link establishes efficiency, thus improve testing test efficiency.
Fig. 4 shows the specific implementation stream of the response method S103 of testing test of fourth embodiment of the invention offer a kind of Cheng Tu.In the present embodiment, the executing subject of process is test execution terminal, referring to fig. 4, is implemented relative to described in Fig. 1-Fig. 3 Example, S103 includes: S1021~S1023 in a kind of response method of testing test provided in this embodiment, and specific details are as follows:
In S1021, detection is currently at the number of the test machine of idle state.
In the present embodiment, test execution terminal is tested in response to testing and is instructed, and can obtain the state of each test machine, And test machine that current state is in idle condition is chosen as target detection machine, in the operating status for detecting each test machine Afterwards, the number for the test machine being in idle condition can be counted, is connected to create corresponding thread with each test machine.
In S1022, concurrent thread identical with the number is created, and virtual logical for each concurrent thread configuration Believe interface.
In the present embodiment, test execution terminal is each in idle test machine for con current control, will create and the sky The concurrent thread of not busy test machine equivalent, and corresponding virtual communication interface is configured for each concurrent thread, it is virtual logical will pass through The test machine of letter interface and each idle state is communicatively coupled.
In S1023, it is based on each virtual communication interface, the concurrent thread is established and each test machine connects It connects, and calls the concurrent thread to control the test machine and tested.
In the present embodiment, test execution terminal can control concurrent thread by each communication interface and test machine is established and led to Believe link, and by the communication link, synchronizes to each test machine being in idle condition and send test script, executed testing Test the testing process of instruction.
In embodiments of the present invention, a plurality of concurrent thread is created, a plurality of concurrent thread is controlled while multiple test machines are held Row test operation, to improve the testing efficiency of testing test.
Fig. 5 shows the specific implementation stream of the response method S101 of testing test of fifth embodiment of the invention offer a kind of Cheng Tu.In the present embodiment, the executing subject of process is task scheduling server, referring to Fig. 5, relative to real described in Fig. 1-Fig. 3 Apply example, S101 includes: S1015~S1016 in a kind of response method of testing test provided in this embodiment, specific to be described in detail such as Under:
In S1015, the operating status list about test execution terminal is obtained, and choosing operating status is idle survey It is candidate execution terminal that examination, which executes terminal,.
In the present embodiment, task scheduling server is determining that needing to be implemented testing tests, and can obtain operating status column Table, record has the operating status of each test execution terminal in the testing scheduling system, the operation shape in the operating status list State includes occupied state, idle state and malfunction.It, can synchronized update when the state of test execution terminal changes To the operating status list.Therefore, task scheduling server can determine each test execution according to the operating status list The operating status at terminal current time.Task schedule terminal, which can detect, whether there is operating status as sky in the operating status list Not busy test execution terminal, and if it exists, then identify that the test execution terminal executes terminal to be candidate.
In S1016, each candidate executable project information for executing terminal is inquired, and judge the eecutable item Whether comprising the associated testing project of testing test instruction in mesh information, the candidate comprising the testing project is held Row terminal recognition is that the test execution terminal of instructions match is tested with the testing.
In the present embodiment, task scheduling server can obtain after detecting the presence of the test execution terminal of idle state Each candidate executable project information for executing terminal is taken, the executable project information is for indicating that the test execution terminal can The testing project of response is based on this, and whether task scheduling server can inquire in the executable project information and obtain comprising identification Testing project, and if it exists, then indicate that candidate execution terminal has corresponding ability and completes the testing project, therefore, identification should It is the test execution terminal that the testing project is criticized that candidate, which executes terminal,.
In embodiments of the present invention, believed by the operating status and executable project that obtain each test execution terminal Breath selects the test execution terminal criticized with testing project, improves the response efficiency of testing project.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit It is fixed.
Fig. 6 shows a kind of structural block diagram of testing task scheduling system of one embodiment of the invention offer, which sets The standby each unit for including is used to execute each step in the corresponding embodiment of Fig. 1.Referring specifically to reality corresponding to Fig. 1 and Fig. 1 Apply the associated description in example.For ease of description, only the parts related to this embodiment are shown.
Referring to Fig. 6, the testing test macro includes: task scheduling server 61, data processing node 62 and test Execute terminal 63;
The task scheduling server 61, for detecting that generation is dialled when currently meeting preset testing entry condition Test instruction, and testing test instruction is sent to the test execution terminal 63;
The test execution terminal 63, for obtaining the testing process of the testing test instruction, and according to the test Each test machine that flow testing is connected with the test execution terminal 63;
The test execution terminal 63, for the operation to each test machine based on testing test instruction feedback Parameter is packaged, and generates the test data about testing test instruction, and the test data is sent to the number According to processing node 62;
The data processing node 62, it is associated each for the test data to be directed respectively into the testing test instruction The verification template of a testing project determines the check results of each testing project;
The data processing node 62, for generating test report based on each check results, and by the test Report is uploaded to the task scheduling server 61.
Optionally, the task scheduling server 61 is also used to:
The operating parameter of each test execution terminal, and the test-types based on testing test instruction are obtained, Determine the response weight of each test execution terminal;
The operating parameter of each test execution terminal and the response weight priority is imported into respectively to calculate In model, the processing priority of each test execution terminal is calculated;The priority computation model specifically:
Wherein, PrioritynIt (k) is the processing priority of k-th of test execution terminal;Priorityn-1 It (k) is the history priority of k-th of test execution terminal;WorkikFor i-th of fortune of k-th of test execution terminal Row parameter;M is the total number of the operating parameter;αkFor the response weight of k-th of test execution terminal, and 0 < αk<1;K For the total number of the test execution terminal;
The highest test execution terminal of the processing priority is chosen as target and executes terminal, and adjusts the target and holds The operating mode of row terminal, identifying that the target adjusted executes terminal is the data processing node.
Optionally, the task scheduling server 61 and the test execution terminal 63 are also used to:
The task scheduling server 61, it is close based on the communication for obtaining the associated communication key of the terminal iidentification Key generates the first transmission control protocol TCP message, and first TCP message is sent to the test execution terminal 63;
The test execution terminal 63, for determining described logical according to the communication key in first TCP message Believe the corresponding associated key of key, and the second TCP message is generated based on the associated key, second TCP message is sent To the task scheduling server 61;
The task scheduling server 61 is verified for the associated key to second TCP message, if verification knot Fruit is to verify successfully, then generates testing test instruction based on the testing project;
The task scheduling server 61, for the third TCP message for carrying the testing test instruction to be sent to The test execution terminal 63, and communication link is established with the test execution terminal.
Optionally, the test execution terminal 63, for obtaining the testing process of the testing test instruction, and according to institute It states testing process and tests each test machine being connected with the test execution terminal, comprising:
Detection is currently at the number of the test machine of idle state;
Concurrent thread identical with the number is created, and configures virtual communication interface for each concurrent thread;
It based on each virtual communication interface, establishes the concurrent thread and is connect with each test machine, and call The concurrent thread controls the test machine and is tested.
Optionally, the task scheduling server 61, for detect currently meet preset testing entry condition when, Testing test instruction is then generated, and testing test instruction is sent to the test execution terminal, comprising:
The operating status list about test execution terminal is obtained, and choosing operating status is idle test execution terminal Terminal is executed for candidate;
Inquire each candidate executable project information for executing terminal, and judge be in the executable project information It is no to instruct associated testing project comprising testing test, by the candidate execution terminal recognition comprising the testing project For the test execution terminal for testing instructions match with the testing.
Therefore, in testing task scheduling system provided in an embodiment of the present invention, task scheduling server is without to test Data are handled, and task scheduling server only need to greatly reduce task schedule service to testing test assignment is issued The load pressure of device improves the stability of testing test macro and the accuracy of test result processing.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all It is included within protection scope of the present invention.

Claims (10)

1. a kind of response method of testing test, is applied to testing test macro, which is characterized in that the testing test macro packet It includes: task scheduling server, data processing node and test execution terminal;The response method of the testing test, comprising:
The task scheduling server is detecting that generation testing test instructs when currently meeting preset testing entry condition, And testing test instruction is sent to the test execution terminal;
The test execution terminal obtains the testing process of the testing test instruction, and according to testing process test and institute State the connected each test machine of test execution terminal;
The test execution terminal seals each test machine based on the operating parameter of testing test instruction feedback Dress generates the test data about testing test instruction, and the test data is sent to the data processing node;
The test data is directed respectively into the testing test and instructs associated each testing project by the data processing node Verification template, determine the check results of each testing project;
The data processing node is based on each check results and generates test report, and the test report is uploaded to institute State task scheduling server.
2. response method according to claim 1, which is characterized in that in the test execution terminal to each test Machine is packaged based on the operating parameter of testing test instruction feedback, generates the test number about testing test instruction According to, and the test data is sent to before the data processing node, further includes:
The task scheduling server obtains the operating parameter of each test execution terminal, and is referred to based on testing test The test-types of order determine the response weight of each test execution terminal;
The task scheduling server respectively leads the operating parameter of each test execution terminal and the response weight Enter into priority computation model, calculates the processing priority of each test execution terminal;The priority computation model Specifically:
Wherein, PrioritynIt (k) is the processing priority of k-th of test execution terminal;Priorityn-1It (k) is the The history priority of the k test execution terminals;WorkikFor i-th of operating parameter of k-th of test execution terminal;m For the total number of the operating parameter;αkFor the response weight of k-th of test execution terminal, and 0 < αk<1;K is the survey Examination executes the total number of terminal;
The task scheduling server chooses the highest test execution terminal of processing priority as target and executes terminal, and The operating mode that the target executes terminal is adjusted, identifying that the target adjusted executes terminal is the data processing section Point.
3. response method according to claim 1, which is characterized in that the task scheduling server is detecting currently completely When the preset testing entry condition of foot, testing test instruction is generated, and testing test instruction is sent to the test and is held Row terminal, comprising:
The task scheduling server obtains the associated communication key of terminal iidentification, generates first based on the communication key and passes Transport control protocol discusses TCP message, and first TCP message is sent to the test execution terminal;
The test execution terminal determines that the communication key is corresponding according to the communication key in first TCP message Associated key, and based on the associated key generate the second TCP message, second TCP message is sent to the task Dispatch server;
The task scheduling server verifies the associated key of second TCP message, if check results be verification at Function then generates testing test instruction based on the testing project;
The third TCP message for carrying the testing test instruction is sent to the test execution by the task scheduling server Terminal, and communication link is established with the test execution terminal.
4. response method according to claim 1-3, which is characterized in that described in the test execution terminal obtains The testing process of testing test instruction, and each test being connected with the test execution terminal is tested according to the testing process Machine, comprising:
Detection is currently at the number of the test machine of idle state;
Concurrent thread identical with the number is created, and configures virtual communication interface for each concurrent thread;
It based on each virtual communication interface, establishes the concurrent thread and is connect with each test machine, and described in calling Concurrent thread controls the test machine and is tested.
5. response method according to claim 1-3, which is characterized in that the task scheduling server is detecting It is instructed to testing test when currently meeting preset testing entry condition, is then generated, and testing test instruction is sent to The test execution terminal, comprising:
The operating status list about test execution terminal is obtained, and choosing the test execution terminal that operating status is the free time is time Choosing executes terminal;
Each candidate executable project information for executing terminal is inquired, and judges whether wrap in the executable project information The test containing the testing instructs associated testing project, by comprising the testing project it is described it is candidate execute terminal recognition be with The test execution terminal of the testing test instructions match.
6. a kind of testing test macro, which is characterized in that the testing test macro includes: task scheduling server, at data Manage node and test execution terminal;
The task scheduling server, for detecting that generation testing is tested when currently meeting preset testing entry condition Instruction, and testing test instruction is sent to the test execution terminal;
The test execution terminal for obtaining the testing process of the testing test instruction, and is surveyed according to the testing process Try each test machine being connected with the test execution terminal;
The test execution terminal, for each test machine based on the testing test instruction feedback operating parameter into Row encapsulation generates the test data about testing test instruction, and the test data is sent to the data processing Node;
The data processing node instructs associated each testing for the test data to be directed respectively into the testing test The verification template of project determines the check results of each testing project;
The data processing node, for generating test report based on each check results, and will be in the test report Reach the task scheduling server.
7. testing test macro according to claim 6, which is characterized in that the task scheduling server is also used to:
The operating parameter of each test execution terminal, and the test-types based on testing test instruction are obtained, are determined The response weight of each test execution terminal;
The operating parameter of each test execution terminal and the response weight are imported into priority computation model respectively It is interior, calculate the processing priority of each test execution terminal;The priority computation model specifically:
Wherein, PrioritynIt (k) is the processing priority of k-th of test execution terminal;Priorityn-1It (k) is the The history priority of the k test execution terminals;WorkikFor i-th of operating parameter of k-th of test execution terminal;m For the total number of the operating parameter;αkFor the response weight of k-th of test execution terminal, and 0 < αk<1;K is the survey Examination executes the total number of terminal;
The highest test execution terminal of the processing priority is chosen as target and executes terminal, and adjusts the target and executes end The operating mode at end, identifying that the target adjusted executes terminal is the data processing node.
8. testing test macro according to claim 6, which is characterized in that the task scheduling server and the survey Examination executes terminal and is also used to:
The task scheduling server is generated for obtaining the associated communication key of the terminal iidentification based on the communication key First transmission control protocol TCP message, and first TCP message is sent to the test execution terminal;
The test execution terminal, for determining the communication key according to the communication key in first TCP message Corresponding associated key, and the second TCP message is generated based on the associated key, second TCP message is sent to described Task scheduling server;
The task scheduling server is verified for the associated key to second TCP message, if check results are school Success is tested, then testing test instruction is generated based on the testing project;
The task scheduling server, for the third TCP message for carrying the testing test instruction to be sent to the survey Examination executes terminal, and establishes communication link with the test execution terminal.
9. according to the described in any item testing test macros of claim 6-8, which is characterized in that the test execution terminal is used It is connected in the testing process for obtaining the testing test instruction, and according to testing process test with the test execution terminal Each test machine, comprising:
Detection is currently at the number of the test machine of idle state;
Concurrent thread identical with the number is created, and configures virtual communication interface for each concurrent thread;
It based on each virtual communication interface, establishes the concurrent thread and is connect with each test machine, and described in calling Concurrent thread controls the test machine and is tested.
10. according to the described in any item testing test macros of claim 6-8, which is characterized in that the task scheduling server, For detect currently meet preset testing entry condition when, then generate testing test instruction, and the testing tested Instruction is sent to the test execution terminal, comprising:
The operating status list about test execution terminal is obtained, and choosing the test execution terminal that operating status is the free time is time Choosing executes terminal;
Each candidate executable project information for executing terminal is inquired, and judges whether wrap in the executable project information The test containing the testing instructs associated testing project, by comprising the testing project it is described it is candidate execute terminal recognition be with The test execution terminal of the testing test instructions match.
CN201811183895.1A 2018-10-11 2018-10-11 Response method and system for dial testing Active CN109471706B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811183895.1A CN109471706B (en) 2018-10-11 2018-10-11 Response method and system for dial testing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811183895.1A CN109471706B (en) 2018-10-11 2018-10-11 Response method and system for dial testing

Publications (2)

Publication Number Publication Date
CN109471706A true CN109471706A (en) 2019-03-15
CN109471706B CN109471706B (en) 2024-07-05

Family

ID=65663957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811183895.1A Active CN109471706B (en) 2018-10-11 2018-10-11 Response method and system for dial testing

Country Status (1)

Country Link
CN (1) CN109471706B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109992506A (en) * 2019-03-18 2019-07-09 平安科技(深圳)有限公司 Scheduling tests method, apparatus, computer equipment and storage medium
CN111786854A (en) * 2020-06-30 2020-10-16 曙光信息产业(北京)有限公司 Network card testing method and device, electronic equipment and readable storage medium
CN112016012A (en) * 2019-05-30 2020-12-01 中国移动通信集团浙江有限公司 Intelligent dial testing method and device for resource service quality
CN112732559A (en) * 2020-12-30 2021-04-30 广东粤云工业互联网创新科技有限公司 Picture comparison method, automatic dial testing method and system and storage medium
CN113068216A (en) * 2021-03-17 2021-07-02 上海牙木通讯技术有限公司 Network dial testing method, network dial testing system and computer readable storage medium
CN114615696A (en) * 2020-12-08 2022-06-10 中国联合网络通信集团有限公司 Automatic dial testing method, device, system, server and storage medium
CN115623077A (en) * 2022-10-18 2023-01-17 开元华创科技(集团)有限公司 Autonomous controllable test system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101727389A (en) * 2009-11-23 2010-06-09 中兴通讯股份有限公司 Automatic test system and method of distributed integrated service
US7921282B1 (en) * 2007-08-20 2011-04-05 F5 Networks, Inc. Using SYN-ACK cookies within a TCP/IP protocol
CN103716198A (en) * 2013-07-05 2014-04-09 中国南方电网有限责任公司 Data network quality automatic dial testing method and system
CN103870348A (en) * 2012-12-14 2014-06-18 中国电信股份有限公司 Test method and system for concurrent user access
CN104317658A (en) * 2014-10-17 2015-01-28 华中科技大学 MapReduce based load self-adaptive task scheduling method
CN104753735A (en) * 2013-12-31 2015-07-01 中国移动通信集团上海有限公司 Dialing testing system and method
CN105335293A (en) * 2015-11-30 2016-02-17 努比亚技术有限公司 Automatic testing system and method based on parallel ports

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7921282B1 (en) * 2007-08-20 2011-04-05 F5 Networks, Inc. Using SYN-ACK cookies within a TCP/IP protocol
CN101727389A (en) * 2009-11-23 2010-06-09 中兴通讯股份有限公司 Automatic test system and method of distributed integrated service
CN103870348A (en) * 2012-12-14 2014-06-18 中国电信股份有限公司 Test method and system for concurrent user access
CN103716198A (en) * 2013-07-05 2014-04-09 中国南方电网有限责任公司 Data network quality automatic dial testing method and system
CN104753735A (en) * 2013-12-31 2015-07-01 中国移动通信集团上海有限公司 Dialing testing system and method
CN104317658A (en) * 2014-10-17 2015-01-28 华中科技大学 MapReduce based load self-adaptive task scheduling method
CN105335293A (en) * 2015-11-30 2016-02-17 努比亚技术有限公司 Automatic testing system and method based on parallel ports

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨诚: "基于推送的用户拨测系统关键技术研究与数据分析", 《中国优秀硕士学位论文全文数据库信息科技辑》, no. 10, 15 October 2018 (2018-10-15), pages 10 - 11 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109992506A (en) * 2019-03-18 2019-07-09 平安科技(深圳)有限公司 Scheduling tests method, apparatus, computer equipment and storage medium
CN109992506B (en) * 2019-03-18 2024-05-31 平安科技(深圳)有限公司 Scheduling test method, scheduling test device, computer equipment and storage medium
CN112016012A (en) * 2019-05-30 2020-12-01 中国移动通信集团浙江有限公司 Intelligent dial testing method and device for resource service quality
CN112016012B (en) * 2019-05-30 2023-09-08 中国移动通信集团浙江有限公司 Resource service quality intelligent dial testing method and device
CN111786854A (en) * 2020-06-30 2020-10-16 曙光信息产业(北京)有限公司 Network card testing method and device, electronic equipment and readable storage medium
CN111786854B (en) * 2020-06-30 2022-08-16 曙光信息产业(北京)有限公司 Network card testing method and device, electronic equipment and readable storage medium
CN114615696A (en) * 2020-12-08 2022-06-10 中国联合网络通信集团有限公司 Automatic dial testing method, device, system, server and storage medium
CN112732559A (en) * 2020-12-30 2021-04-30 广东粤云工业互联网创新科技有限公司 Picture comparison method, automatic dial testing method and system and storage medium
CN113068216A (en) * 2021-03-17 2021-07-02 上海牙木通讯技术有限公司 Network dial testing method, network dial testing system and computer readable storage medium
CN115623077A (en) * 2022-10-18 2023-01-17 开元华创科技(集团)有限公司 Autonomous controllable test system
CN115623077B (en) * 2022-10-18 2023-08-18 开元华创科技(集团)有限公司 Autonomous controllable test system

Also Published As

Publication number Publication date
CN109471706B (en) 2024-07-05

Similar Documents

Publication Publication Date Title
CN109471706A (en) A kind of response method and system of testing test
CN104579822B (en) Mobile application automated performance testing system and method based on Http agreements
CN103312551B (en) The method of testing of CGI(Common gateway interface) and testing apparatus
CN110719212A (en) Method, system, and computer readable medium for testing network nodes using source code
CN104581785B (en) wireless network test method, test device and mobile terminal
CN107797923A (en) Code coverage rate analysis method and application server
CN103139017B (en) The test system and method for a kind of network equipment
CN107015902B (en) Test method and test equipment
CN107241315A (en) Cut-in method, device and the computer-readable recording medium of bank&#39;s gateway interface
CN112367680A (en) External communication test method and device based on intelligent electric meter and computer equipment
CN106658545A (en) Test method, mobile terminal and server
CN107943697A (en) Problem distribution method, device, system, server and computer-readable storage medium
CN109391618A (en) A kind of method for building up and system of communication link
CN104065538B (en) Measurement control method, control server and the system of network performance
CN112306864A (en) Method and system for testing Mock based on microservice, storage medium and computing equipment
CN107704331A (en) Electrical equipment fault analyzes and processes householder method and device
CN104703206B (en) Towards the Network Protocol Performance Testing bed system and test method of wireless sense network
CN109584105A (en) A kind of method and system of service response
CN113747150B (en) Method and system for testing video service system based on container cloud
KR20130075252A (en) Apparatus and method for conformance testing of service choreography
CN102624587B (en) System and method capable of achieving defect detection for IEC60870-5-101/104 communication protocol
CN109788251A (en) Method for processing video frequency, device and storage medium
CN110515819A (en) Performance test methods, electronic equipment, scheduling system and medium
CN111935767B (en) Network simulation system
CN108459889A (en) Task executing method and device, storage medium and electronic device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant