CN109470469A - The automatic test line system of building regulation boxes - Google Patents

The automatic test line system of building regulation boxes Download PDF

Info

Publication number
CN109470469A
CN109470469A CN201910028221.2A CN201910028221A CN109470469A CN 109470469 A CN109470469 A CN 109470469A CN 201910028221 A CN201910028221 A CN 201910028221A CN 109470469 A CN109470469 A CN 109470469A
Authority
CN
China
Prior art keywords
solenoid valve
pressure
detected
inlet end
regulating box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910028221.2A
Other languages
Chinese (zh)
Other versions
CN109470469B (en
Inventor
张伟
陈燚
郑文学
马铁铸
黄聪
何敏
陈仁志
侯伯忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sc Chuanli Intelligent Fluid Equipment Co Ltd
Original Assignee
Sc Chuanli Intelligent Fluid Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sc Chuanli Intelligent Fluid Equipment Co Ltd filed Critical Sc Chuanli Intelligent Fluid Equipment Co Ltd
Priority to CN201910028221.2A priority Critical patent/CN109470469B/en
Publication of CN109470469A publication Critical patent/CN109470469A/en
Application granted granted Critical
Publication of CN109470469B publication Critical patent/CN109470469B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Measuring Fluid Pressure (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The present invention discloses a kind of automatic test line system of building regulation boxes, including solenoid valve A, the inlet end of the outlet side connection flowmeter of solenoid valve A, the outlet side of flowmeter is connected to the inlet end of pressure regulating box to be detected, the inlet end of the outlet side connection solenoid valve B of pressure regulating box to be detected, the inlet end of solenoid valve C, the inlet end of solenoid valve D, the connecting pipeline of flowmeter and pressure regulating box to be detected is equipped with absolute pressure transducer, the connecting pipeline of pressure regulating box to be detected and solenoid valve B are equipped with differential pressure transmitter, solenoid valve A, solenoid valve B, solenoid valve C, solenoid valve D, absolute pressure transducer, differential pressure transmitter, flowmeter is electrically connected with control centre.The present invention can be improved efficiency, can also significant increase detection record accuracy and trackability.

Description

The automatic test line system of building regulation boxes
Technical field
The present invention relates to air feed equipment technical field more particularly to a kind of automatic test line systems of building regulation boxes.
Background technique
Existing building regulation boxes substantially lean on veteran worker to be detected manually, manually recorded data, artificially Subjectivity is larger, low efficiency.
Summary of the invention
The present invention is intended to provide a kind of automatic test line system of building regulation boxes, can be improved efficiency, can also greatly mention Rise the accuracy and trackability of detection record.
In order to achieve the above objectives, realization that the present invention adopts the following technical solutions:
The automatic test line system of building regulation boxes disclosed by the invention, including solenoid valve A, the outlet of the solenoid valve A The inlet end of end connection flowmeter, the outlet side of the flowmeter is connected to the inlet end of pressure regulating box to be detected, pressure regulating box to be detected The outlet side connection inlet end of solenoid valve B, the inlet end of solenoid valve C, solenoid valve D inlet end, flowmeter and tune to be detected The connecting pipeline of case is pressed to be equipped with absolute pressure transducer, the connecting pipeline of pressure regulating box to be detected and solenoid valve B is equipped with differential pressure Transmitter, solenoid valve A, solenoid valve B, solenoid valve C, solenoid valve D, absolute pressure transducer, differential pressure transmitter, flowmeter with control Center electrical connection processed.
Further, the inlet end of parallel connection pneumatic ball valve A, the pneumatic ball valve A are connected to 0.2MPa gas on the solenoid valve A Source further includes pneumatic ball valve B, and the inlet end of the pneumatic ball valve B is connected to 0.4MPa gas source, the outlet side connection of pneumatic ball valve B The outlet side of solenoid valve A, the flowmeter by pneumatic ball valve C connection pressure regulating box to be detected, pneumatic ball valve A, pneumatic ball valve B, Pneumatic ball valve C is electrically connected with control centre.
Further, the connecting pipeline of the solenoid valve A and flowmeter is equipped with temperature transmitter, the temperature transmitter It is electrically connected with control centre.
Further, pressure gauge A is arranged in the inlet end of the pneumatic ball valve A, and pressure is arranged in the inlet end of the pneumatic ball valve B Power table B.
Preferably, the outlet side of the pressure regulating box to be detected passes through the inlet end of manual ball valve A connection solenoid valve C, to be checked The outlet side for surveying pressure regulating box passes through the inlet end of manual ball valve B connection solenoid valve D.
Further, the invention also includes quality certification printer and nameplate printer, the quality certification printer, nameplate are beaten Print machine is electrically connected with control centre.
Preferably, the flow is calculated as waist drum flowmeter.
A new step, the invention also includes the tooling for fixing pressure regulating box to be detected, the tooling is rack-mount.
Preferably, the present invention includes following rate-determining steps:
A, opens solenoid valve A, when the air inlet end pressure of pressure regulating box to be detected reaches 0.18MPa, solenoid valve A is closed, gas Dynamic ball valve A is fully open;
B, solenoid valve C is opened, and is started pressure regulating box to be detected after setting the outlet pressure of pressure regulating box to be detected, is passed through absolute pressure Power transmitter records inlet pressure, while recording the data of differential pressure transmitter and flowmeter;
C, solenoid valve C is closed, and is recorded by differential pressure transmitter and is closed pressure data;Solenoid valve D is opened, while recording differential pressure The outlet pressure of transmitter and the flow value of flowmeter judge whether pressure regulating box to be detected is qualified;
D, solenoid valve D is closed, pneumatic ball valve B is opened, by the inlet pressure of absolute pressure transducer record at this time, is opened Solenoid valve C records outlet pressure at this time, and the flow value of recording flowmeter at this time by differential pressure transmitter, closes solenoid valve C, the pressure after being closed by differential pressure transmitter record, opens solenoid valve D, passes through the outlet pressure of differential pressure transmitter record at this time And the flow value of recording flowmeter, judge whether pressure regulating box to be detected is qualified;
E, it closes solenoid valve D, close pneumatic ball valve B.
Further, the rate-determining steps further include:
F, after c and d judge qualification, control centre automatically generates coding, prints encoding strip.
Beneficial effects of the present invention are as follows:
1, the present invention can optimize the characterization processes of building regulation boxes, to improve building regulation boxes productivity and safety Property.
2, the present invention can significant increase detection record accuracy and trackability.
3, control centre can handle collected data by PLC and host computer computer, and export as a result, reducing artificial Subjectivity judgement improve the accuracy of detection.
4, optimizing detection technique reduces cost, improves benefit.
5, detection data digitizes, and strengthens the trackability of product, improves the controllability of product quality.
Detailed description of the invention
Fig. 1 is the principle of the present invention figure.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing, to the present invention into Row is further described.
As shown in Figure 1, the automatic test line system of building regulation boxes disclosed by the invention, including solenoid valve A2, solenoid valve The inlet end of the outlet side connection flowmeter 1 of A2, flowmeter 1 use waist drum flowmeter, and the outlet side connection of flowmeter 1 is to be detected The inlet end of pressure regulating box 10, the air inlet of the inlet end, solenoid valve C12 of the outlet side connection solenoid valve B8 of pressure regulating box 10 to be detected It holds, the inlet end of solenoid valve D14, the connecting pipeline of flowmeter 1 and pressure regulating box 10 to be detected is equipped with absolute pressure transducer 6, The connecting pipeline of solenoid valve A2 and flowmeter 1 is equipped with temperature transmitter 5, and temperature transmitter 5 is electrically connected with control centre.Electromagnetism The inlet end of parallel connection pneumatic ball valve A3, pneumatic ball valve A3 are connected to 0.2MPa gas source on valve A2, further include pneumatic ball valve B9, Pneumatic ball The inlet end of valve B9 is connected to 0.4MPa gas source, the outlet side of the outlet side connection solenoid valve A2 of pneumatic ball valve B9, and flowmeter 1 passes through Pneumatic ball valve C4 connection pressure regulating box 10 to be detected, pneumatic ball valve A3, pneumatic ball valve B9, pneumatic ball valve C4 are electrically connected with control centre It connects.The connecting pipeline of pressure regulating box 10 and solenoid valve B8 to be detected is equipped with differential pressure transmitter 7, solenoid valve A2, solenoid valve B8, electromagnetism Valve C12, solenoid valve D14, absolute pressure transducer 4, differential pressure transmitter 6, flowmeter 1 are electrically connected with control centre.Pneumatic ball Pressure gauge A15 is arranged in the inlet end of valve A2, and pressure gauge B16 is arranged in the inlet end of pneumatic ball valve B9.Pressure regulating box 10 to be detected goes out Gas end passes through the inlet end of manual ball valve A11 connection solenoid valve C12, and the outlet side of pressure regulating box 10 to be detected passes through manual ball valve The inlet end of B13 connection solenoid valve D14.
The invention also includes quality certification printer and nameplate printer, quality certification printer, nameplate printer with control Center electrical connection.The invention also includes the tooling for fixing pressure regulating box to be detected, tooling is rack-mount.
The present invention includes following rate-determining steps:
A, opens solenoid valve A2, when the air inlet end pressure of pressure regulating box 10 to be detected reaches 0.18MPa, solenoid valve A2 is closed It closes, pneumatic ball valve A3 is fully open;
B, solenoid valve C12 is opened, and is started pressure regulating box 10 to be detected after setting the outlet pressure of pressure regulating box 10 to be detected, is passed through Absolute pressure transducer 6 records inlet pressure, while recording the data of differential pressure transmitter 7 and flowmeter 1;
C, solenoid valve C12 is closed, and is recorded by differential pressure transmitter 7 and is closed pressure data;Solenoid valve D14 is opened, is remembered simultaneously The outlet pressure of differential pressure transmitter 7 and the flow value of flowmeter 1 are recorded, judges whether pressure regulating box 10 to be detected is qualified;
D, solenoid valve D14 is closed, pneumatic ball valve B9 is opened, inlet pressure at this time is recorded by absolute pressure transducer 6, Opens solenoid valve C12 records outlet pressure at this time, and the flow value of recording flowmeter 1 at this time by differential pressure transmitter 7, closes Solenoid valve C12 is closed, the pressure after closing by the record of differential pressure transmitter 7 is opened solenoid valve D14, recorded by differential pressure transmitter 7 The flow value of outlet pressure and recording flowmeter 1 at this time, judges whether pressure regulating box 10 to be detected is qualified;
Specifically, pneumatic ball valve C4 is slowly opened, acquisition outlet pressure and instantaneous flow, frequency acquisition 1 are started simultaneously at Second 1, when outlet pressure is lower than specified value, pneumatic ball valve C4 slowly closing, and form transfer curve.Pneumatic ball valve C4, which is closed, completes 0.2 closing pressure of record, while opening VX102 and carrying out 0.4MPA pressure test, repeats the above steps, will acquire 0.2MPA and 0.4MPA be automatically credited database, and compare with preset value, shown on the screen of control centre if qualified Show green qualified printed words, unqualified printed words shown if unqualified, and test result is stored in report,
E, it closes solenoid valve D14, close pneumatic ball valve B9.
F, after c and d judge qualification, control centre automatically generates coding, prints encoding strip.If wherein have one not Qualification closes all valves of inlet end, after manual pressure release, removes pressure regulating box 10 to be detected.
When detection, pressure regulating box 10 to be detected is fixed in tooling, manually closed after detection pressure regulating box 10 to be detected, Manual ball valve A11, manual ball valve B13, and pressure regulating box 10 to be detected is dismantled when pressure is zero by solenoid valve B8 pressure release.
Certainly, the present invention can also have other various embodiments, without deviating from the spirit and substance of the present invention, ripe Various corresponding changes and modifications, but these corresponding changes and modifications can be made according to the present invention by knowing those skilled in the art All it should fall within the scope of protection of the appended claims of the present invention.

Claims (10)

1. the automatic test line system of building regulation boxes, which is characterized in that including solenoid valve A, the outlet side of the solenoid valve A connects The inlet end of through-flow meter, the outlet side of the flowmeter are connected to the inlet end of pressure regulating box to be detected, and pressure regulating box to be detected goes out Gas end is connected to the inlet end of the inlet end of solenoid valve B, the inlet end of solenoid valve C, solenoid valve D, flowmeter and pressure regulating box to be detected Connecting pipeline be equipped with absolute pressure transducer, the connecting pipeline of pressure regulating box to be detected and solenoid valve B are equipped with differential pressure transporting Device, solenoid valve A, solenoid valve B, solenoid valve C, solenoid valve D, absolute pressure transducer, differential pressure transmitter, flowmeter are and in control Electrocardio connection.
2. the automatic test line system of building regulation boxes according to claim 1, which is characterized in that on the solenoid valve A The inlet end of pneumatic ball valve A in parallel, the pneumatic ball valve A are connected to 0.2MPa gas source, further include pneumatic ball valve B, the Pneumatic ball The inlet end of valve B is connected to 0.4MPa gas source, the outlet side of the outlet side connection solenoid valve A of pneumatic ball valve B, and the flowmeter passes through Pneumatic ball valve C connection pressure regulating box to be detected, pneumatic ball valve A, pneumatic ball valve B, pneumatic ball valve C are electrically connected with control centre.
3. the automatic test line system of building regulation boxes according to claim 2, which is characterized in that the solenoid valve A with The connecting pipeline of flowmeter is equipped with temperature transmitter, and the temperature transmitter is electrically connected with control centre.
4. the automatic test line system of building regulation boxes according to claim 2, which is characterized in that the pneumatic ball valve A Inlet end pressure gauge A is set, pressure gauge B is arranged in the inlet end of the pneumatic ball valve B.
5. the automatic test line system of building regulation boxes according to claim 1, it is characterised in that: the pressure regulation to be detected The outlet side of case passes through the inlet end of manual ball valve A connection solenoid valve C, and the outlet side of pressure regulating box to be detected passes through manual ball valve B Connect the inlet end of solenoid valve D.
6. the automatic test line system of building regulation boxes according to claim 1, which is characterized in that further include that the quality certification is beaten Print machine and nameplate printer, the quality certification printer, nameplate printer are electrically connected with control centre.
7. the automatic test line system of building regulation boxes according to claim 1, which is characterized in that the flow is calculated as waist Drum flowmeter.
8. the automatic test line system of building regulation boxes according to claim 1, which is characterized in that further include for fixing The tooling of pressure regulating box to be detected, the tooling are rack-mount.
9. the automatic test line system of building regulation boxes according to claim 2, which is characterized in that walked including following control It is rapid:
A, opens solenoid valve A, when the air inlet end pressure of pressure regulating box to be detected reaches 0.18MPa, solenoid valve A is closed, Pneumatic ball Valve A is fully open;
B, solenoid valve C is opened, and is started pressure regulating box to be detected after setting the outlet pressure of pressure regulating box to be detected, is become by absolute pressure It send device to record inlet pressure, while recording the data of differential pressure transmitter and flowmeter;
C, solenoid valve C is closed, and is recorded by differential pressure transmitter and is closed pressure data;Solenoid valve D is opened, while recording differential pressure transporting The outlet pressure of device and the flow value of flowmeter judge whether pressure regulating box to be detected is qualified;
D, solenoid valve D is closed, pneumatic ball valve B is opened, by the inlet pressure of absolute pressure transducer record at this time, opens electromagnetism Valve C, by the outlet pressure of differential pressure transmitter record at this time, and the flow value of recording flowmeter at this time, closing solenoid valve C lead to The pressure after differential pressure transmitter record is closed is crossed, solenoid valve D is opened, outlet pressure and note at this time are recorded by differential pressure transmitter The flow value for recording flowmeter, judges whether pressure regulating box to be detected is qualified;
E, it closes solenoid valve D, close pneumatic ball valve B.
10. the automatic test line system of building regulation boxes according to claim 9, which is characterized in that further include:
F, after c and d judge qualification, control centre automatically generates coding, prints encoding strip.
CN201910028221.2A 2019-01-11 2019-01-11 Automatic test pipeline system for building pressure regulating box Active CN109470469B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910028221.2A CN109470469B (en) 2019-01-11 2019-01-11 Automatic test pipeline system for building pressure regulating box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910028221.2A CN109470469B (en) 2019-01-11 2019-01-11 Automatic test pipeline system for building pressure regulating box

Publications (2)

Publication Number Publication Date
CN109470469A true CN109470469A (en) 2019-03-15
CN109470469B CN109470469B (en) 2024-08-09

Family

ID=65678402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910028221.2A Active CN109470469B (en) 2019-01-11 2019-01-11 Automatic test pipeline system for building pressure regulating box

Country Status (1)

Country Link
CN (1) CN109470469B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111693276A (en) * 2020-06-23 2020-09-22 四川凯德源科技有限公司 High-efficiency pressure regulating box test method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110094956A (en) * 2010-02-18 2011-08-24 자동차부품연구원 Cng regulator testing apparatus
CN203275081U (en) * 2013-05-30 2013-11-06 宁波富华阀门有限公司 Performance detection system of low-temperature pressure-regulating valve
CN103439125A (en) * 2013-06-26 2013-12-11 安徽中科智能高技术有限责任公司 Device and method for detecting pressure regulation performance of gas pressure regulator
CN103776640A (en) * 2012-10-26 2014-05-07 西安信唯信息科技有限公司 Combination property test system of fuel gas pressure regulating device
CN205785283U (en) * 2016-06-30 2016-12-07 重庆市山城燃气设备有限公司 There is the gas pressure regulator, governor detecting system of multiple pressure stage
CN209214897U (en) * 2019-01-11 2019-08-06 成都川力智能流体设备股份有限公司 The automatic test line system of building regulation boxes

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110094956A (en) * 2010-02-18 2011-08-24 자동차부품연구원 Cng regulator testing apparatus
CN103776640A (en) * 2012-10-26 2014-05-07 西安信唯信息科技有限公司 Combination property test system of fuel gas pressure regulating device
CN203275081U (en) * 2013-05-30 2013-11-06 宁波富华阀门有限公司 Performance detection system of low-temperature pressure-regulating valve
CN103439125A (en) * 2013-06-26 2013-12-11 安徽中科智能高技术有限责任公司 Device and method for detecting pressure regulation performance of gas pressure regulator
CN205785283U (en) * 2016-06-30 2016-12-07 重庆市山城燃气设备有限公司 There is the gas pressure regulator, governor detecting system of multiple pressure stage
CN209214897U (en) * 2019-01-11 2019-08-06 成都川力智能流体设备股份有限公司 The automatic test line system of building regulation boxes

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111693276A (en) * 2020-06-23 2020-09-22 四川凯德源科技有限公司 High-efficiency pressure regulating box test method
CN111693276B (en) * 2020-06-23 2022-04-01 四川凯德源科技有限公司 High-efficiency pressure regulating box test method

Also Published As

Publication number Publication date
CN109470469B (en) 2024-08-09

Similar Documents

Publication Publication Date Title
CN103365306B (en) A kind of high-speed wind tunnel special test compressed air require adjusting means and method
CN207336052U (en) A kind of safety valve, regulating valve Performance Test System
CN107421728A (en) A kind of safety valve and quick action emergency valve comprehensive calibration device and its method of calibration
CN108225443A (en) Natural gas flow detects loop device
CN109187001A (en) A kind of motorized adjustment class valve big flow performance test apparatus and its test method
CN205745489U (en) Relief valve and the on-line measuring device of relief valve
EP2976134A2 (en) Water deluge system testing apparatus and method
CN109470469A (en) The automatic test line system of building regulation boxes
CN209214897U (en) The automatic test line system of building regulation boxes
CA1127414A (en) Meter proving method
CN100482935C (en) Method of testing a fuel injection valve for a diesel engine
CN103776640A (en) Combination property test system of fuel gas pressure regulating device
CN103808501A (en) On-line calibration device for breather valve
CN115274148A (en) Nuclear power plant containment tightness simulation test system
CN104215467B (en) A kind of ground system test for verifying pressure charging system function
CA2996491C (en) System and method for testing a fire suppression system
CN210119328U (en) High-temperature air tightness testing device
CN107933954B (en) Oil tank oil transportation and consumption simulation system
CN202453012U (en) Multi-step dual-pore plate differential pressure fluid flow measurement device
CN201739776U (en) On-line density measuring device for oil delivery pipelines
CN117782471B (en) Device and method for detecting conduction capacity of argon blowing pipeline of RH vacuum tank dip pipe
CN206724996U (en) A kind of self-closing valve detecting system
CN109856186A (en) A kind of gas pipeline hydrocarbon dew point on-line real-time measuremen device
CN102620786A (en) Cascade-type double-orifice-plate differential pressure fluid flow measuring device and measuring method thereof
CN216816525U (en) Gas cylinder dew point on-line measuring device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant