CN109470222B - Supervision control method for super high-rise building engineering measurement - Google Patents

Supervision control method for super high-rise building engineering measurement Download PDF

Info

Publication number
CN109470222B
CN109470222B CN201811524066.5A CN201811524066A CN109470222B CN 109470222 B CN109470222 B CN 109470222B CN 201811524066 A CN201811524066 A CN 201811524066A CN 109470222 B CN109470222 B CN 109470222B
Authority
CN
China
Prior art keywords
measurement
control
building
construction
elevation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811524066.5A
Other languages
Chinese (zh)
Other versions
CN109470222A (en
Inventor
张文之
刘敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weifang University of Science and Technology
Original Assignee
Weifang University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang University of Science and Technology filed Critical Weifang University of Science and Technology
Priority to CN201811524066.5A priority Critical patent/CN109470222B/en
Publication of CN109470222A publication Critical patent/CN109470222A/en
Application granted granted Critical
Publication of CN109470222B publication Critical patent/CN109470222B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Length Measuring Devices By Optical Means (AREA)
  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

The invention discloses a supervision control method for super high-rise building engineering measurement, which is characterized by comprising the following steps: the method comprises the following steps of a, plane control measurement; b, measuring elevation control; c, performing laser scanning simulation three-dimensional measurement on the building by adopting a three-dimensional laser scanner; d, a coordinate system and a construction elevation control system of the construction plane control network are consistent with a coordinate and elevation system of a design construction drawing, and deformation supervision detection is carried out on the building to be detected by adopting a standard corresponding to a geographical position; e, construction lofting measurement, lofting according to coordinates, checking and processing with design, supervision and construction personnel on site when the lofting is in and out of the drawing size, protecting a control point for measurement, checking frequently and preventing errors. The invention can carry out systematic supervision on high-rise buildings, has high supervision accuracy and simple method, and solves the problems of measurement precision, verticality and plane positioning of the super high-rise buildings.

Description

Supervision control method for super high-rise building engineering measurement
Technical Field
The invention relates to the technical field of building supervision control, in particular to a supervision control method for super high-rise building engineering measurement.
Background
The engineering measurement and supervision are special talents with high technical applicability, which are suitable for civil engineering construction and road and bridge measurement and have the working capacity of engineering measurement and engineering measurement supervision. Graduates have basic knowledge and basic skills of engineering measurement and engineering measurement supervision, and can be used for medium-sized engineering construction measurement and lofting, cadastral survey, picture and data processing and other capabilities. The system has the capabilities of engineering control network and town control network design, GPS measurement, observation adjustment calculation and the like, and has the capabilities of undertaking civil engineering and road and bridge measurement supervision management and the like, wherein the engineering supervision refers to the entrustment of a supervision unit with related qualification by a party A, and represents a specialized service activity of monitoring the engineering construction of the party B by the party A according to the state approved engineering project construction files, laws and regulations related to the engineering construction, engineering construction supervision contracts and other engineering construction contracts. The project supervision is paid project consultation service and is entrusted by a first party, the supervision is mainly based on laws, regulations, technical standards, related contracts and documents, and the supervision criterion is law keeping, integrity, justice and science; the supervision aims to ensure the quality and safety of engineering construction, improve the engineering construction level and fully exert investment benefits.
At present, the existing supervision of the super high-rise building mainly creates a chart through field measurement, records the chart and then performs unified calculation, so that more measurement errors are easy to occur, the accuracy is poor, and aiming at the above, a supervision control method for the super high-rise building engineering measurement is provided.
Disclosure of Invention
The invention adopts the following modified technical scheme to solve the phenomenon, and the supervision control method for the super high-rise building engineering measurement comprises the following method steps,
firstly, rechecking a construction control network laid by a construction unit by using a total station according to a known point result, wherein the precision of the construction control network is not lower than the precision requirement of primary wire measurement, namely the error in a measuring angle is less than +/-5%, the error in distance measurement is less than 15mm, and the relative error is less than 1/30000; finding out at least three control points on the roof to obtain the coordinates of a plurality of points on the ground and the roof under a coordinate system; the coordinates and the elevation of the lower measuring point are measured through the ground control point, and the coordinates and the elevation of the upper measuring point are measured through the roof control point, wherein the lower measuring point and the upper measuring point are on the same outer edge line; calculating the ratio of the horizontal coordinate displacement difference and the elevation difference of the lower measuring point and the upper measuring point to obtain the plane data value of the building;
b, elevation control measurement: the elevation control point of a construction unit is rechecked according to a known elevation point by utilizing a level gauge, a leveling staff and a laser plummet, the accuracy of the elevation control point is not lower than the accuracy requirement of four-equal leveling measurement, namely, the elevation closure difference is less than 12cm, the elevation control measurement is carried out, firstly, a GPS base station is erected on a control point at the top of a building, the GPS antenna height of the base station is measured, and after a satellite is locked and data recording is started, the mobile measurement equipment is started; moving the mobile measuring equipment to an open area, switching on a power supply, determining that the mobile measuring equipment locks a satellite and starts to record data, starting inertial navigation equipment, and adjusting the laser plummet instrument in the vertical direction to enable laser emitted by the laser plummet instrument to be vertical upwards; the method comprises the following steps of firstly determining a first vertical distance from a space measurement site to the plane to be measured, and measuring a depression angle and an azimuth angle of each corner in the plane to be measured relative to the space measurement site by using a direction sensor; calculating the area of the plane to be measured according to the first vertical distance, the depression angle and the azimuth angle corresponding to each corner;
c, performing laser scanning simulation three-dimensional measurement on the building by adopting a three-dimensional laser scanner, scanning a specific entity and a reflection reference point in the building by utilizing the three-dimensional laser scanner in laser mapping, acquiring point cloud data, connecting underground spaces into a whole by splicing target and obvious ground object points, and converting the underground spaces into an absolute coordinate system by converting overground and underground control points to obtain the three-dimensional structure information of the building;
d, a coordinate system and a construction elevation control system of the construction control network are consistent with a coordinate and an elevation system of a design construction drawing, a standard corresponding to a geographical position is adopted, deformation monitoring detection is carried out on a building to be detected, the deformation monitoring detection comprises the steps that a plurality of control points for measuring plane and vertical face deformation are arranged on each plane and vertical face of the building, the inclination angle and basic settlement deformation data of the control points are respectively measured by using an inclinometer and a high-precision static level gauge, the control points for settlement observation are arranged along the periphery of the building on the first floor plane of the building, the plurality of static level gauges are arranged on the control points for settlement observation, and the static level gauges are connected through water pipes; measuring basic settlement deformation data of the control points by using the static level gauge;
e, construction lofting measurement, lofting according to coordinates, checking with design, supervision and construction personnel on site when lofting is in or out of the drawing size, protecting a control point for measurement, checking twice and preventing errors.
The invention adopts the three-dimensional laser scanner, the inclinometer, the level, the leveling staff, the laser plummet and the wireless transmission equipment to supervise the building in real time and measure the plane, the height, the area and the deformation state of the building in real time, the supervision method is scientific and has high accuracy, the parameters of the building can be truly reflected, the problems of measuring precision, verticality and plane positioning of the super high-rise building are solved, the integral method is simple, and the method is worthy of popularization.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides a technical scheme that: a supervision control method for super high-rise building engineering measurement comprises the following steps,
firstly, rechecking a construction control network laid by a construction unit by using a total station according to a known point result, wherein the precision of the construction control network is not lower than the precision requirement of primary wire measurement, namely the error in a measuring angle is less than +/-5%, the error in distance measurement is less than 15mm, and the relative median error is less than 1/30000;
b, elevation control measurement: rechecking an elevation control point of a construction unit according to a known elevation point by using a level gauge, a leveling staff and a laser plummet, wherein the accuracy of the elevation control point is not lower than the accuracy requirement of four-equal leveling measurement, namely, the elevation closure difference is less than 12 cm;
c, performing laser scanning simulation three-dimensional measurement on the building by adopting a three-dimensional laser scanner;
d, a coordinate system and a construction elevation control system of the construction control network are consistent with a coordinate and elevation system of a design construction drawing, and deformation supervision detection is carried out on the building to be detected by adopting a standard corresponding to the geographic position;
e, construction lofting measurement, lofting according to coordinates, checking with design, supervision and construction personnel on site when lofting is in or out of the drawing size, protecting a control point for measurement, checking twice and preventing errors.
In the step a, the specific implementation comprises the steps of firstly finding out at least three control points on the ground and forming a coordinate system; finding out at least three control points on the roof to obtain the coordinates of a plurality of points on the ground and the roof under a coordinate system; the coordinates and the elevation of the lower measuring point are measured through the ground control point, and the coordinates and the elevation of the upper measuring point are measured through the roof control point, wherein the lower measuring point and the upper measuring point are on the same outer edge line; and calculating the ratio of the horizontal coordinate displacement difference and the elevation difference of the lower measuring point and the upper measuring point to obtain the plane data value of the building.
B, performing elevation control measurement, namely firstly erecting a GPS base station on a control point at the top of the building, measuring the height of a GPS antenna of the base station, locking a satellite and starting to record data, and then starting up the mobile measuring equipment; moving the mobile measuring equipment to an open area, switching on a power supply, determining that the mobile measuring equipment locks a satellite and starts to record data, starting inertial navigation equipment, and adjusting the laser plummet instrument in the vertical direction to enable laser emitted by the laser plummet instrument to be vertical upwards; and then, the laser plumb line instrument is adjusted in the horizontal direction, so that laser emitted by the laser plumb line instrument just passes through the axis of the projection hole, and meanwhile, the leveling instrument and the leveling staff are matched for axis measurement.
Step b, determining the area of a plane to be measured, specifically comprising the steps of firstly determining a first vertical distance from a spatial measurement position point to the plane to be measured, and measuring a depression angle and an azimuth angle of each corner in the plane to be measured relative to the spatial measurement position point by using a direction sensor; and calculating the area of the plane to be measured according to the first vertical distance, the depression angle and the azimuth angle corresponding to each corner.
And c, scanning specific entities and reflection reference points in the building by using a three-dimensional laser scanner in laser mapping, collecting point cloud data, connecting underground spaces into a whole by splicing target and obvious ground object points, converting the underground spaces into an absolute coordinate system by converting overground and underground control points, and acquiring the three-dimensional structure information of the building.
In the step d, the deformation monitoring detection comprises the steps of setting a plurality of control points for measuring the deformation of the plane and the vertical face on each plane and vertical face of the building, respectively measuring the inclination angle and the basic settlement deformation data of the control points by using an inclinometer and a high-precision static level gauge, wherein the control points for settlement observation are arranged along the periphery of the building on the plane of the first floor of the building, the plurality of static level gauges are arranged on the control points for settlement observation, and the static level gauges are connected through water pipes; and measuring the basic settlement deformation data of the control point by using the static level gauge.
The supervision control method of the invention has the following parameter tables: TABLE 1
Supervision building Supervision time Supervision method Accuracy of proctoring Cost of proctoring
10 are provided with 3-6 days Multiple kinds of 99.78% In general
The traditional supervision control method parameter table is as follows: TABLE 2
Supervision building Supervision time Supervision method Accuracy of proctoring Cost of proctoring
10 are provided with 5-12 days Conventional measurement 96.42% Is higher than
The table shows that the method can accurately perform supervision and is better.
In conclusion, the invention adopts the three-dimensional laser scanner, the inclinometer, the level, the leveling staff, the laser plummet and the wireless transmission equipment to supervise the building and measure the plane, the height, the area and the deformation state of the building in real time, the supervision method is scientific and has high accuracy, the parameters of the building can be truly reflected, the problems of measurement precision, verticality and plane positioning of the super high-rise building are solved, the integral method is simple, and the method is worthy of popularization.
While there have been shown and described what are at present considered the fundamental principles and essential features of the invention and its advantages, it will be apparent to those skilled in the art that the invention is not limited to the details of the foregoing exemplary embodiments, but is capable of other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (1)

1. A supervision control method for super high-rise building engineering measurement is characterized by comprising the following steps: comprising the following method steps of the method,
firstly, rechecking a construction control network laid by a construction unit by using a total station according to a known point result, wherein the precision of the construction control network is not lower than the precision requirement of primary wire measurement, namely the error in a measuring angle is less than +/-5%, the error in distance measurement is less than 15mm, and the relative error is less than 1/30000; finding out at least three control points on the roof to obtain the coordinates of a plurality of points on the ground and the roof under a coordinate system; the coordinates and the elevation of the lower measuring point are measured through the ground control point, and the coordinates and the elevation of the upper measuring point are measured through the roof control point, wherein the lower measuring point and the upper measuring point are on the same outer edge line; calculating the ratio of the horizontal coordinate displacement difference and the elevation difference of the lower measuring point and the upper measuring point to obtain the plane data value of the building;
b, elevation control measurement: the elevation control point of a construction unit is rechecked according to a known elevation point by utilizing a level gauge, a leveling staff and a laser plummet, the accuracy of the elevation control point is not lower than the accuracy requirement of four-equal leveling measurement, namely, the elevation closure difference is less than 12cm, the elevation control measurement is carried out, firstly, a GPS base station is erected on a control point at the top of a building, the GPS antenna height of the base station is measured, and after a satellite is locked and data recording is started, the mobile measurement equipment is started; moving the mobile measuring equipment to an open area, switching on a power supply, determining that the mobile measuring equipment locks a satellite and starts to record data, starting inertial navigation equipment, and adjusting the laser plummet instrument in the vertical direction to enable laser emitted by the laser plummet instrument to be vertical upwards; the method comprises the following steps of firstly determining a first vertical distance from a space measurement site to the plane to be measured, and measuring a depression angle and an azimuth angle of each corner in the plane to be measured relative to the space measurement site by using a direction sensor; calculating the area of the plane to be measured according to the first vertical distance, the depression angle and the azimuth angle corresponding to each corner;
c, performing laser scanning simulation three-dimensional measurement on the building by adopting a three-dimensional laser scanner, scanning a specific entity and a reflection reference point in the building by utilizing the three-dimensional laser scanner in laser mapping, acquiring point cloud data, connecting underground spaces into a whole by splicing target and obvious ground object points, and converting the underground spaces into an absolute coordinate system by converting overground and underground control points to obtain the three-dimensional structure information of the building;
d, a coordinate system and a construction elevation control system of the construction control network are consistent with a coordinate and an elevation system of a design construction drawing, a standard corresponding to a geographical position is adopted, deformation monitoring detection is carried out on a building to be detected, the deformation monitoring detection comprises the steps that a plurality of control points for measuring plane and vertical face deformation are arranged on each plane and vertical face of the building, the inclination angle and basic settlement deformation data of the control points are respectively measured by using an inclinometer and a high-precision static level gauge, the control points for settlement observation are arranged along the periphery of the building on the first floor plane of the building, the plurality of static level gauges are arranged on the control points for settlement observation, and the static level gauges are connected through water pipes; measuring basic settlement deformation data of the control points by using the static level gauge;
e, construction lofting measurement, lofting according to coordinates, checking with design, supervision and construction personnel on site when lofting is in or out of the drawing size, protecting a control point for measurement, checking twice and preventing errors.
CN201811524066.5A 2018-12-13 2018-12-13 Supervision control method for super high-rise building engineering measurement Active CN109470222B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811524066.5A CN109470222B (en) 2018-12-13 2018-12-13 Supervision control method for super high-rise building engineering measurement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811524066.5A CN109470222B (en) 2018-12-13 2018-12-13 Supervision control method for super high-rise building engineering measurement

Publications (2)

Publication Number Publication Date
CN109470222A CN109470222A (en) 2019-03-15
CN109470222B true CN109470222B (en) 2021-08-10

Family

ID=65674989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811524066.5A Active CN109470222B (en) 2018-12-13 2018-12-13 Supervision control method for super high-rise building engineering measurement

Country Status (1)

Country Link
CN (1) CN109470222B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109855611B (en) * 2019-03-27 2022-03-15 中南大学 PC wall body rapid measurement and calibration method based on total station
CN109974680A (en) * 2019-04-10 2019-07-05 山东科技大学 Marine engineering equipment manufactures live large scale in-situ measuring method
CN111288977B (en) * 2020-03-25 2022-02-11 广东海外建设咨询有限公司 Supervision method for measuring and controlling super high-rise building engineering
CN112197755A (en) * 2020-09-18 2021-01-08 中国二冶集团有限公司 Construction lofting method and construction lofting system
CN112859087A (en) * 2020-12-31 2021-05-28 上海外高桥造船海洋工程有限公司 Positioning method for ship floating state
CN114001720A (en) * 2021-11-10 2022-02-01 中冶建工集团有限公司 Supervision control method for building engineering measurement
CN117516348B (en) * 2024-01-04 2024-03-12 惠民县国土空间生态修复中心(惠民县土地整理储备中心) Area measurement device for land planning

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1170800A (en) * 1997-08-11 1998-01-21 任永堂 Digital control technology for high-rise building verticality
JP2005213972A (en) * 2004-02-02 2005-08-11 Taisei Corp Construction management system and its method
CN102080960A (en) * 2010-10-22 2011-06-01 上海市第一建筑有限公司 Super-high-rise building verticality measuring and controlling method based on GPS (Global Positioning System)
CN106931942A (en) * 2017-03-21 2017-07-07 中冶成都勘察研究总院有限公司 A kind of super high rise building tilt measuring method
CN107101621A (en) * 2017-03-20 2017-08-29 广州珠江工程建设监理有限公司 A kind of supervision control method of high-rise building engineering survey
CN107402001A (en) * 2017-06-30 2017-11-28 上海建工集团股份有限公司 Construction of super highrise building deviation digitlization checking system and method based on 3D scannings
CN108253950A (en) * 2018-01-31 2018-07-06 乐清市建设监理有限公司 A kind of supervision control method of high-rise building engineering survey

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1170800A (en) * 1997-08-11 1998-01-21 任永堂 Digital control technology for high-rise building verticality
JP2005213972A (en) * 2004-02-02 2005-08-11 Taisei Corp Construction management system and its method
CN102080960A (en) * 2010-10-22 2011-06-01 上海市第一建筑有限公司 Super-high-rise building verticality measuring and controlling method based on GPS (Global Positioning System)
CN107101621A (en) * 2017-03-20 2017-08-29 广州珠江工程建设监理有限公司 A kind of supervision control method of high-rise building engineering survey
CN106931942A (en) * 2017-03-21 2017-07-07 中冶成都勘察研究总院有限公司 A kind of super high rise building tilt measuring method
CN107402001A (en) * 2017-06-30 2017-11-28 上海建工集团股份有限公司 Construction of super highrise building deviation digitlization checking system and method based on 3D scannings
CN108253950A (en) * 2018-01-31 2018-07-06 乐清市建设监理有限公司 A kind of supervision control method of high-rise building engineering survey

Also Published As

Publication number Publication date
CN109470222A (en) 2019-03-15

Similar Documents

Publication Publication Date Title
CN109470222B (en) Supervision control method for super high-rise building engineering measurement
CN102080960B (en) Super-high-rise building verticality measuring and controlling method based on GPS (Global Positioning System)
CN103389136B (en) Based on the outer floating roof metal tin method for measuring volume of three-dimensional laser scanning technique
CN103591944B (en) A kind of arcuate building measures construction method
CN109033592B (en) BIM lofting method for special-shaped veneer
CN108871266A (en) Automatic settlement monitoring method based on intermediate method triangle elevation method
JP2016206178A (en) Laser measurement method, laser measurement marker and coordinate calculation program
CN112964237B (en) Measurement control system, method and device for construction engineering and computer equipment
CN108225293B (en) Automatic laser verticality measuring instrument and verticality measuring method
Abduraufovich SIMPLE AND ACCURATE METHODS OF SYOMKAS PERFORMED IN THE FORMATION OF THE EARTH
Mohammed Important methods measurements to exam the accuracy and reliability of reflector-less total station measurements
Bertacchini et al. Terrestrial laser scanner for surveying and monitoring middle age towers
El-Ashmawy Developing and testing a method for deformations measurements of structures
Křemen et al. Determination of pavement elevations by the 3d scanning system and its verification
Novomlynets et al. Modern Technologies of Geodetic Support of Planning Works in High-Rise Construction
Bikbulatova et al. Geodetic control in construction of steel roof structures
CN110567448A (en) Method for measuring elevation coordinates by total station
Ellis et al. Improving survey infrastructure in NSW: Construction of the Eglinton EDM baseline
JP7505957B2 (en) Measurement method for winding space in tunnel construction
Călina et al. Topographic survey carried out for the rehabilitation and modernization of the road from the agro-balneoturistic location Bala, Mehedinţi County
Pham et al. Resection method for direct georeferencing in Terrestrial Laser Scanner
Maiyudi et al. SITUATION DETAIL MAPPING OF THE FACULTY OF MATHEMATICS AND NATURAL SCIENCES, UNIVERSITAS NEGERI PADANG USING TOTAL STATION
Urban DETERMINING OF PLATE FLATNESS
Hui The Design and Implementation of High-rise Building Construction Based on GPS Positioning Technology
Na’aim et al. Determination of Orthometric Height for TBM in Hydrographic Surveys Work

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant