CN109469347A CN201811276041.8A CN201811276041A CN109469347A CN 109469347 A CN109469347 A CN 109469347A CN 201811276041 A CN201811276041 A CN 201811276041A CN 109469347 A CN109469347 A CN 109469347A
Authority
CN
China
Prior art keywords
rubbing device
steel
type
anchor
triangle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811276041.8A
Other languages
Chinese (zh)
Other versions
CN109469347B (en
Inventor
王艳武
崔伟龙
张士炼
温和民
孙玉清
李卫娟
信改义
杜顺禹
吴庆博
张志勇
王孟浩
王秉宇
赵争光
张海刚
李想到
巩树宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI PROV ARCHITECTURE SCIENCE ACADEMY
Original Assignee
HEBEI PROV ARCHITECTURE SCIENCE ACADEMY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI PROV ARCHITECTURE SCIENCE ACADEMY filed Critical HEBEI PROV ARCHITECTURE SCIENCE ACADEMY
Priority to CN201811276041.8A priority Critical patent/CN109469347B/en
Publication of CN109469347A publication Critical patent/CN109469347A/en
Application granted granted Critical
Publication of CN109469347B publication Critical patent/CN109469347B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The present invention relates to a kind of "-" type end anchors applied to assembled external prestressing, including rubbing device module, "-" type construction part module and anchoring assembly module;Rubbing device module includes upper triangle rubbing device and lower triangle rubbing device, and upper and lower triangle rubbing device is respectively arranged on the downside of steel I-beam top flange and on the upside of steel I-beam lower flange;"-" type construction part module includes "-" type component, upper strut and lower supporting rod, "-" type construction part module is connected and fixed on steel I-beam top flange by upper strut and upper triangle rubbing device, and is connected and fixed on steel I-beam lower flange by lower supporting rod and lower triangle rubbing device;Anchoring assembly module includes anchor and tightening latch, and anchor is fixed on "-" type member lower position by tightening latch;Steel strand wires pass through anchor, and are anchored by anchorage.The device is used for the tip node connection during strengthening of steel bridge, can effectively solve the influence because of welding steel fastener to raw steel component.

Description

A kind of "-" type end anchor applied to assembled external prestressing
Technical field
The present invention relates to a kind of anchor, especially a kind of "-" type end applied to assembled external prestressing is anchored Device belongs to technical field of structural engineering.
Background technique
It is manufacture of steel structure simplicity, construction is simple, cheap, the life of people is more and more come into its unique advantage It is living, almost they big figure can be seen in each corner.On the other hand with society development and economic level raising, Demand of the people to steel mechanism is also increasing, there is an urgent need to the girder steel of more large span, bigger workshop, however part steel construction Structural elements Lack of support caused by the presence of increasing because of the dead load or deformation of member is larger is unsatisfactory for asking using functional requirement etc. Topic.
Tradition, which is reinforced, reinforces steel construction with the method for enhancing bonding strength using increasing original structure member section, needs to stop first Only internal normal activity, and a large amount of support scaffolding manufacture workbenches are set up, construction quality can not also accomplish effectively to protect Barrier, and such method also has a certain amount of welding and installment work, causes centainly to damage to original structure.In addition, answering in advance in vitro The application technical requirements of power are higher brought to construction it is constant.
Summary of the invention
For the above-mentioned deficiency for solving the prior art, the invention proposes an a kind of words applied to assembled external prestressing Type end anchor, the assembled device are used for the tip node connection during strengthening of steel bridge, can effectively solve to connect because of welding steel Influence of the fitting to raw steel component, and can constructing in normal activity, construction method is simple, and can be with The effectively reduction strengthening construction period.
In order to solve the above technical problems, the technical solution used in the present invention is:
A kind of "-" type end anchor applied to assembled external prestressing, the "-" type end anchor mainly wrap Include rubbing device module, "-" type construction part module and anchoring assembly module;
The rubbing device module includes upper triangle rubbing device and lower triangle rubbing device, upper triangle friction Device and lower triangle rubbing device are respectively arranged on the downside of steel I-beam top flange and on the upside of steel I-beam lower flange, and are risen To the effect frictionally secured;
The "-" type construction part module includes "-" type component, upper strut and lower supporting rod, and "-" type construction part module passes through Upper strut and upper triangle rubbing device are connected and fixed on steel I-beam top flange, and are filled by lower supporting rod and the friction of lower triangle It sets and is connected and fixed on steel I-beam lower flange;It is provided on the upper triangle rubbing device and lower triangle rubbing device Pre-manufactured hole, the upper strut and lower supporting rod pass through the pre-manufactured hole;Fixed link, fixed link are equipped on the "-" type component Abutted respectively with upper triangle rubbing device and lower triangle rubbing device, play prevent triangle rubbing device and under The inclined effect of triangle rubbing device;
The anchoring assembly module includes anchor and tightening latch, and anchor is fixed on "-" type structure by tightening latch Part lower position;Steel strand wires pass through anchor, and are anchored by anchorage.
Further, the anchor is connect by two or more tightening latches with "-" type member lower, can be according to existing The position that field situation selection adapts to is connect with anchor by tightening latch.
Further, the upper triangle rubbing device and lower triangle rubbing device are a pair, are respectively symmetrically set It is placed in steel I-beam web two sides, cross section is respectively T-type and inverted T shaped, and on the downside of top flange and steel I-beam Blasting treatment is done at the upper contact of lower flange with increasing friction force.
Further, the upper triangle rubbing device and lower triangle rubbing device is relatively oblique is arranged in a staggered manner.
Further, the tightening latch and fixed link are bolted with "-" type component.
A kind of installation method of above-mentioned "-" type end anchor applied to assembled external prestressing:
Firstly, two good upper triangle rubbing devices of pre-production are placed in symmetrical position on the downside of steel I-beam top flange It sets, it is ensured that upper triangle rubbing device abuts steel I-beam web, and lower triangle rubbing device is placed in steel I-beam lower flange Upside is relative to the upper slightly backward position of triangle rubbing device;
Secondly, installing "-" type component and being fixed by upper strut and lower supporting rod, anchor is finally installed;
Again, fixed link is installed, "-" type component and upper triangle rubbing device and lower triangle rubbing device are adjusted Distance, it is ensured that the two is parallel;
Finally, and be fixed by anchorage, and apply certain prestressing force in use, steel strand wires pass through anchor, It realizes self-locking.
Under static(al) state, "-" type component, lower triangle rubbing device and upper triangle rubbing device form a thick stick Bar, lower triangle rubbing device are fulcrum.On vertical direction, the component of the gravity G of "-" type end anchor in vertical direction Point of the power downward to "-" type component and lower triangle rubbing device to "-" type component upwards with upper triangle rubbing device Power keeps balancing in Y direction;In horizontal direction, the gravity G component in the horizontal direction and girder steel of "-" type end anchor Upper triangle rubbing device and lower triangle rubbing device frictional force are kept balancing in X-direction.Whole device is against self weight It realizes and self-locking reaches balance.
Under pre-stressed state, the component and I-shaped of the gravity G of prestressing force F and "-" type end anchor in vertical direction Girder steel keeps balance in the component of Y direction to upper triangle rubbing device and lower triangle rubbing device frictional force;Level side Upwards, the gravity G component in the horizontal direction and steel I-beam of prestressing force F and "-" type end anchor are to upper triangle friction Device and lower triangle rubbing device frictional force keep balancing in the component of X-direction, and whole device realization is self-locking to reach balance.
Upper triangle rubbing device, lower triangular form rubbing device, "-" type type component in the anchor of "-" type end and Anchor is completed according to design in factory process, and site machinery assembly is completed.It needs to be faced before not applying prestressing force When anchor.
Upper triangle rubbing device is to uniform by upper triangle rubbing device to the pressure on the downside of steel I-beam top flange Be applied under steel I-beam top flange and survey, effectively prevent stress concentration.
Lower triangle rubbing device is to uniform by lower triangle rubbing device to the pressure on the upside of steel I-beam lower flange Be applied on steel I-beam lower flange and survey, effectively prevent stress concentration.
The device can effectively solve the influence because of welding steel fastener to raw steel component, can be in normal activity It constructs, construction method is simple, can effectively reduce the strengthening construction period.
Compared with the existing technology, the present invention has the following technical effect that
This kind of "-" type end anchor is safely and effectively, to examine from actual experiment.The device is by steel I-beam The concentrated stress that tip node connects in reinforcing process passes through upper triangle rubbing device, the lower ingenious uniform conversion of triangle rubbing device Lower flange on to girder steel effectively prevents the concentration of stress, and whole process has evaded traditional welding to original using mechanical assembly Structured damage.The tip node anchor whole design is brief, clear and cheap by power path, can use extensively The connection of tip node in strengthening of steel bridge.
Detailed description of the invention
Fig. 1 is the auspicious figure of the positive facade of "-" type end anchor applied to assembled external prestressing of the invention;
Fig. 2 is the "-" type end anchor sectional detail drawing applied to assembled external prestressing of the invention;
Fig. 3 is upper and lower triangle rubbing device schematic diagram of the invention;
Fig. 4 is Fig. 3 sectional view;
Fig. 5 is "-" type component schematic diagram of the invention.
Specific embodiment
Specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing.
As shown in Figs. 1-5, a kind of "-" type end anchor applied to assembled external prestressing of the invention, this one Font end anchor mainly includes rubbing device module, "-" type construction part module and anchoring assembly module.Rubbing device mould Block includes upper triangle rubbing device 1 and lower triangle rubbing device 2, and upper triangle rubbing device 1 and lower triangle rub It wipes device 2 to be respectively arranged on the downside of 7 top flange of steel I-beam and on the upside of 7 lower flange of steel I-beam, and plays the work frictionally secured With.Wherein, upper triangle rubbing device 1 and lower triangle rubbing device 2 is relatively oblique is arranged in a staggered manner, upper triangle friction dress Set 1 and lower triangle rubbing device 2 be a pair, be symmetrically arranged in 7 web two sides of steel I-beam, cross section difference For T-type and inverted T shaped, and blasting treatment is done on the downside of top flange and at 7 lower flange upper contact of steel I-beam rubbed with increasing Wipe power."-" type construction part module includes "-" type component 3, upper strut 5 and lower supporting rod 6, and "-" type construction part module passes through upper support Bar 5 and upper triangle rubbing device 1 are connected and fixed on 7 top flange of steel I-beam, and are filled by lower supporting rod 6 and the friction of lower triangle It sets 2 and is connected and fixed on 7 lower flange of steel I-beam.It is provided on upper triangle rubbing device 1 and lower triangle rubbing device 2 Pre-manufactured hole, upper strut 5 and lower supporting rod 6 pass through pre-manufactured hole.Be equipped with fixed link 9 on "-" type component 3, fixed link 9 respectively with Upper triangle rubbing device 1 and lower triangle rubbing device 2 abut, and playing prevents triangle rubbing device 1 and lower three The inclined effect of angular rubbing device 2.Anchoring assembly module includes anchor 4 and tightening latch 8, and anchor 4 passes through tightening latch 8 It is fixed on 3 lower position of "-" type component.Steel strand wires pass through anchor 4, and are anchored by anchorage.Anchor 4 passes through two Root tightening latch 8 is connect with 3 lower part of "-" type component.Tightening latch 8 and fixed link 9 are bolted with "-" type component 3.
A kind of installation method of above-mentioned "-" type end anchor applied to assembled external prestressing:
Firstly, two good upper triangle rubbing devices 1 of pre-production are placed in symmetrical on the downside of 7 top flange of steel I-beam Position, it is ensured that upper triangle rubbing device 1 abuts 7 web of steel I-beam, and lower triangle rubbing device 2 is placed in steel I-beam 7 Relative to the slightly backward position of upper triangle rubbing device 1 on the upside of lower flange.
Secondly, installing "-" type component 3 and being fixed by upper strut 5 and lower supporting rod 6, anchor is finally installed 4。
Again, fixed link 9 is installed, "-" type component 3 and upper triangle rubbing device 1 and lower triangle rubbing device are adjusted 2 distance, it is ensured that the two is parallel.
Finally, and be fixed by anchorage in use, steel strand wires pass through anchor 4, and apply certain pre- answer Power is realized self-locking.
Upper triangle rubbing device 1, lower triangular form rubbing device 2, one in the present embodiment, in the anchor of "-" type end Font type component 3 and anchor 4 are completed according to design in factory process, and site machinery assembly is completed.Do not applying pre- answer It needs to carry out anchoring temporarily before power.
Above-described embodiment, which is intended merely to become apparent from, illustrates that technical solution of the present invention made enumerates, not to of the invention It limits, those skilled in the art are according to the common knowledge of this field to the accommodation of technical scheme also in this Shen Please be within protection scope, in short, above-described embodiment is only to enumerate, the protection scope of the application is with scope It is quasi-.

Claims (6)

1. a kind of "-" type end anchor applied to assembled external prestressing, it is characterised in that: "-" type end anchoring Device mainly includes rubbing device module, "-" type construction part module and anchoring assembly module;
The rubbing device module includes that upper triangle rubbing device (1) and lower triangle rubbing device (2), upper triangle rub It wipes device (1) and lower triangle rubbing device (2) is respectively arranged on the downside of steel I-beam (7) top flange and steel I-beam (7) On the upside of lower flange, and play the role of frictionally securing;
The "-" type construction part module includes "-" type component (3), upper strut (5) and lower supporting rod (6), "-" type construction part module It is connected and fixed on steel I-beam (7) top flange by upper strut (5) and upper triangle rubbing device (1), and passes through lower supporting rod (6) Steel I-beam (7) lower flange is connected and fixed on lower triangle rubbing device (2);The upper triangle rubbing device (1) and Pre-manufactured hole is provided on lower triangle rubbing device (2), the upper strut (5) and lower supporting rod (6) pass through the pre-manufactured hole; Be equipped with fixed link (9) on the "-" type component (3), fixed link (9) respectively with upper triangle rubbing device (1) and lower three Angular rubbing device (2) abuts, and playing prevents triangle rubbing device (1) and lower triangle rubbing device (2) inclined Effect;
The anchoring assembly module includes anchor (4) and tightening latch (8), and anchor (4) is fixed on by tightening latch (8) "-" type component (3) lower position;Steel strand wires pass through anchor (4), and are anchored by anchorage.
2. a kind of "-" type end anchor applied to assembled external prestressing according to claim 1, feature Be: the anchor (4) is connect by two or more tightening latches (8) with "-" type component (3) lower part, can be according to live feelings The position that condition selection adapts to is connect with anchor (4) by tightening latch (8).
3. a kind of "-" type end anchor applied to assembled external prestressing according to claim 1, feature Be: the upper triangle rubbing device (1) and lower triangle rubbing device (2) are a pair, are symmetrically arranged in institute State steel I-beam (7) web two sides, cross section is respectively T-type and inverted T shaped, and on the downside of top flange and steel I-beam (7) Blasting treatment is done at the upper contact of lower flange with increasing friction force.
4. a kind of "-" type end anchor applied to assembled external prestressing according to claim 1, feature It is: the upper triangle rubbing device (1) and lower triangle rubbing device (2) is relatively oblique is arranged in a staggered manner.
5. a kind of "-" type end anchor applied to assembled external prestressing according to claim 1, feature Be: the tightening latch (8) and fixed link (9) are bolted with "-" type component (3).
6. a kind of a kind of -5 any "-" type ends applied to assembled external prestressing according to claim 1 anchor dress The installation method set, it is characterised in that:
Firstly, pre-production good two upper triangle rubbing device (1) is placed in symmetrical on the downside of steel I-beam (7) top flange Position, it is ensured that upper triangle rubbing device (1) abuts steel I-beam (7) web, and lower triangle rubbing device (2) is placed in I-shaped Relative to the slightly backward position of upper triangle rubbing device (1) on the upside of girder steel (7) lower flange;
Secondly, "-" type component (3) are installed and are fixed by upper strut (5) and lower supporting rod (6), finally installation anchoring dress Set (4);
Again, fixed link (9) are installed, adjust "-" type component (3) and upper triangle rubbing device (1) and the friction of lower triangle fills Set the distance of (2), it is ensured that the two is parallel;
Finally, and be fixed by anchorage, and apply certain prestressing force in use, steel strand wires pass through anchor (4), It realizes self-locking.
CN201811276041.8A 2018-10-30 2018-10-30 Be applied to external prestressing force's of assembled style of calligraphy end anchor Active CN109469347B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811276041.8A CN109469347B (en) 2018-10-30 2018-10-30 Be applied to external prestressing force's of assembled style of calligraphy end anchor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811276041.8A CN109469347B (en) 2018-10-30 2018-10-30 Be applied to external prestressing force's of assembled style of calligraphy end anchor

Publications (2)

Publication Number Publication Date
CN109469347A true CN109469347A (en) 2019-03-15
CN109469347B CN109469347B (en) 2021-03-05

Family

ID=65666345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811276041.8A Active CN109469347B (en) 2018-10-30 2018-10-30 Be applied to external prestressing force's of assembled style of calligraphy end anchor

Country Status (1)

Country Link
CN (1) CN109469347B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3902401A1 (en) * 1989-01-27 1990-08-02 Karsten R Process for improving dynamic and static characteristic values in the case of reinforced-concrete floors
JPH10220027A (en) * 1997-02-03 1998-08-18 Taisei Corp Aseismatic reinforced construction
CN101479487A (en) * 2006-06-27 2009-07-08 威廉·亨利·奥利斯 Fastener & fastening system
CN101781936A (en) * 2009-12-10 2010-07-21 中国建筑科学研究院 Method and device for reinforcing beam by adopting prestressed carbon fiber plate
CN106760607A (en) * 2016-12-29 2017-05-31 华北水利水电大学 A kind of pre-stress fibre plate stretching end anchor and its anchoring process
CN207920136U (en) * 2017-12-05 2018-09-28 广东国赢网络科技有限公司 A kind of novel in vitro prestressed reinforcement device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3902401A1 (en) * 1989-01-27 1990-08-02 Karsten R Process for improving dynamic and static characteristic values in the case of reinforced-concrete floors
JPH10220027A (en) * 1997-02-03 1998-08-18 Taisei Corp Aseismatic reinforced construction
CN101479487A (en) * 2006-06-27 2009-07-08 威廉·亨利·奥利斯 Fastener & fastening system
CN101781936A (en) * 2009-12-10 2010-07-21 中国建筑科学研究院 Method and device for reinforcing beam by adopting prestressed carbon fiber plate
CN106760607A (en) * 2016-12-29 2017-05-31 华北水利水电大学 A kind of pre-stress fibre plate stretching end anchor and its anchoring process
CN207920136U (en) * 2017-12-05 2018-09-28 广东国赢网络科技有限公司 A kind of novel in vitro prestressed reinforcement device

Also Published As

Publication number Publication date
CN109469347B (en) 2021-03-05

Similar Documents

Publication Publication Date Title
CN108612188B (en) Assembled self-resetting prestressed concrete frame
CN111255065B (en) Connection node of assembled beam column of pre-buried connecting element
CN103388408A (en) External pre-stressed tendon reinforcing steering block for building structure
CN107419658A (en) A kind of bridge expansion joint installation
KR102169029B1 (en) Strength reinforced bridge inspection facility
JP2011074604A (en) Bridge movement restraining apparatus and movement restraining method
CN109469347A (en) A kind of "-" type end anchor applied to assembled external prestressing
CN103603507A (en) Two-side or three-side wrapping type reinforced concrete column underpinning method
CN108442236A (en) Assembled bridge pier and construction method, prefabricated assembled beam bridge
CN103981807B (en) A kind of without bracket steel anchor beam
CN208869942U (en) A kind of long-span continuous rigid-framed bridge external prestressing load system
CN111705623A (en) Arch steel pipe central buckle structure of oversized span suspension bridge
KR100648046B1 (en) Beam and Girder Reinforcing Apparatus using External Post-Tension and Reinforcing Method using the same
CN108086481B (en) A kind of metro depot upper cover Estate Development Self-resetting integral structure and method
CN109469346A (en) A kind of sickle end anchor applied to assembled external prestressing
CN212175846U (en) Connecting structure of precast concrete column and precast base
CN113481885B (en) Construction method of I-steel reinforced beam for bridge
CN210887654U (en) Damping device for constructional engineering
CN215167210U (en) Local connection and anchor effect reinforced steel concrete column
CN211498972U (en) Improved foundation shockproof structure
CN210975502U (en) Anchor box capable of self-adapting to angle of suspender
CN208105035U (en) A kind of bridge pad with quick-replaceable and girder falling function
CN108149927A (en) A kind of Cantilever Beams tension and compression constrainer and its application method
CN109826457A (en) Concrete building structures and beams of concrete prestressed reinforcement device
CN220266318U (en) Anchoring and adjusting device for catwalk bearing rope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 050000 No. 395 Huaian West Road, Shijiazhuang City, Hebei Province

Applicant after: Hebei Academy of Architectural Sciences Co., Ltd.

Address before: 050000 No. 395 Huaian West Road, Shijiazhuang City, Hebei Province

Applicant before: Hebei Prov. Architecture Science Academy

GR01 Patent grant