CN109469347A - A kind of "-" type end anchor applied to assembled external prestressing - Google Patents
A kind of "-" type end anchor applied to assembled external prestressing Download PDFInfo
- Publication number
- CN109469347A CN109469347A CN201811276041.8A CN201811276041A CN109469347A CN 109469347 A CN109469347 A CN 109469347A CN 201811276041 A CN201811276041 A CN 201811276041A CN 109469347 A CN109469347 A CN 109469347A
- Authority
- CN
- China
- Prior art keywords
- rubbing device
- steel
- type
- anchor
- triangle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
The present invention relates to a kind of "-" type end anchors applied to assembled external prestressing, including rubbing device module, "-" type construction part module and anchoring assembly module;Rubbing device module includes upper triangle rubbing device and lower triangle rubbing device, and upper and lower triangle rubbing device is respectively arranged on the downside of steel I-beam top flange and on the upside of steel I-beam lower flange;"-" type construction part module includes "-" type component, upper strut and lower supporting rod, "-" type construction part module is connected and fixed on steel I-beam top flange by upper strut and upper triangle rubbing device, and is connected and fixed on steel I-beam lower flange by lower supporting rod and lower triangle rubbing device;Anchoring assembly module includes anchor and tightening latch, and anchor is fixed on "-" type member lower position by tightening latch;Steel strand wires pass through anchor, and are anchored by anchorage.The device is used for the tip node connection during strengthening of steel bridge, can effectively solve the influence because of welding steel fastener to raw steel component.
Description
Technical field
The present invention relates to a kind of anchor, especially a kind of "-" type end applied to assembled external prestressing is anchored
Device belongs to technical field of structural engineering.
Background technique
It is manufacture of steel structure simplicity, construction is simple, cheap, the life of people is more and more come into its unique advantage
It is living, almost they big figure can be seen in each corner.On the other hand with society development and economic level raising,
Demand of the people to steel mechanism is also increasing, there is an urgent need to the girder steel of more large span, bigger workshop, however part steel construction
Structural elements Lack of support caused by the presence of increasing because of the dead load or deformation of member is larger is unsatisfactory for asking using functional requirement etc.
Topic.
Tradition, which is reinforced, reinforces steel construction with the method for enhancing bonding strength using increasing original structure member section, needs to stop first
Only internal normal activity, and a large amount of support scaffolding manufacture workbenches are set up, construction quality can not also accomplish effectively to protect
Barrier, and such method also has a certain amount of welding and installment work, causes centainly to damage to original structure.In addition, answering in advance in vitro
The application technical requirements of power are higher brought to construction it is constant.
Summary of the invention
For the above-mentioned deficiency for solving the prior art, the invention proposes an a kind of words applied to assembled external prestressing
Type end anchor, the assembled device are used for the tip node connection during strengthening of steel bridge, can effectively solve to connect because of welding steel
Influence of the fitting to raw steel component, and can constructing in normal activity, construction method is simple, and can be with
The effectively reduction strengthening construction period.
In order to solve the above technical problems, the technical solution used in the present invention is:
A kind of "-" type end anchor applied to assembled external prestressing, the "-" type end anchor mainly wrap
Include rubbing device module, "-" type construction part module and anchoring assembly module;
The rubbing device module includes upper triangle rubbing device and lower triangle rubbing device, upper triangle friction
Device and lower triangle rubbing device are respectively arranged on the downside of steel I-beam top flange and on the upside of steel I-beam lower flange, and are risen
To the effect frictionally secured;
The "-" type construction part module includes "-" type component, upper strut and lower supporting rod, and "-" type construction part module passes through
Upper strut and upper triangle rubbing device are connected and fixed on steel I-beam top flange, and are filled by lower supporting rod and the friction of lower triangle
It sets and is connected and fixed on steel I-beam lower flange;It is provided on the upper triangle rubbing device and lower triangle rubbing device
Pre-manufactured hole, the upper strut and lower supporting rod pass through the pre-manufactured hole;Fixed link, fixed link are equipped on the "-" type component
Abutted respectively with upper triangle rubbing device and lower triangle rubbing device, play prevent triangle rubbing device and under
The inclined effect of triangle rubbing device;
The anchoring assembly module includes anchor and tightening latch, and anchor is fixed on "-" type structure by tightening latch
Part lower position;Steel strand wires pass through anchor, and are anchored by anchorage.
Further, the anchor is connect by two or more tightening latches with "-" type member lower, can be according to existing
The position that field situation selection adapts to is connect with anchor by tightening latch.
Further, the upper triangle rubbing device and lower triangle rubbing device are a pair, are respectively symmetrically set
It is placed in steel I-beam web two sides, cross section is respectively T-type and inverted T shaped, and on the downside of top flange and steel I-beam
Blasting treatment is done at the upper contact of lower flange with increasing friction force.
Further, the upper triangle rubbing device and lower triangle rubbing device is relatively oblique is arranged in a staggered manner.
Further, the tightening latch and fixed link are bolted with "-" type component.
A kind of installation method of above-mentioned "-" type end anchor applied to assembled external prestressing:
Firstly, two good upper triangle rubbing devices of pre-production are placed in symmetrical position on the downside of steel I-beam top flange
It sets, it is ensured that upper triangle rubbing device abuts steel I-beam web, and lower triangle rubbing device is placed in steel I-beam lower flange
Upside is relative to the upper slightly backward position of triangle rubbing device;
Secondly, installing "-" type component and being fixed by upper strut and lower supporting rod, anchor is finally installed;
Again, fixed link is installed, "-" type component and upper triangle rubbing device and lower triangle rubbing device are adjusted
Distance, it is ensured that the two is parallel;
Finally, and be fixed by anchorage, and apply certain prestressing force in use, steel strand wires pass through anchor,
It realizes self-locking.
Under static(al) state, "-" type component, lower triangle rubbing device and upper triangle rubbing device form a thick stick
Bar, lower triangle rubbing device are fulcrum.On vertical direction, the component of the gravity G of "-" type end anchor in vertical direction
Point of the power downward to "-" type component and lower triangle rubbing device to "-" type component upwards with upper triangle rubbing device
Power keeps balancing in Y direction;In horizontal direction, the gravity G component in the horizontal direction and girder steel of "-" type end anchor
Upper triangle rubbing device and lower triangle rubbing device frictional force are kept balancing in X-direction.Whole device is against self weight
It realizes and self-locking reaches balance.
Under pre-stressed state, the component and I-shaped of the gravity G of prestressing force F and "-" type end anchor in vertical direction
Girder steel keeps balance in the component of Y direction to upper triangle rubbing device and lower triangle rubbing device frictional force;Level side
Upwards, the gravity G component in the horizontal direction and steel I-beam of prestressing force F and "-" type end anchor are to upper triangle friction
Device and lower triangle rubbing device frictional force keep balancing in the component of X-direction, and whole device realization is self-locking to reach balance.
Upper triangle rubbing device, lower triangular form rubbing device, "-" type type component in the anchor of "-" type end and
Anchor is completed according to design in factory process, and site machinery assembly is completed.It needs to be faced before not applying prestressing force
When anchor.
Upper triangle rubbing device is to uniform by upper triangle rubbing device to the pressure on the downside of steel I-beam top flange
Be applied under steel I-beam top flange and survey, effectively prevent stress concentration.
Lower triangle rubbing device is to uniform by lower triangle rubbing device to the pressure on the upside of steel I-beam lower flange
Be applied on steel I-beam lower flange and survey, effectively prevent stress concentration.
The device can effectively solve the influence because of welding steel fastener to raw steel component, can be in normal activity
It constructs, construction method is simple, can effectively reduce the strengthening construction period.
Compared with the existing technology, the present invention has the following technical effect that
This kind of "-" type end anchor is safely and effectively, to examine from actual experiment.The device is by steel I-beam
The concentrated stress that tip node connects in reinforcing process passes through upper triangle rubbing device, the lower ingenious uniform conversion of triangle rubbing device
Lower flange on to girder steel effectively prevents the concentration of stress, and whole process has evaded traditional welding to original using mechanical assembly
Structured damage.The tip node anchor whole design is brief, clear and cheap by power path, can use extensively
The connection of tip node in strengthening of steel bridge.
Detailed description of the invention
Fig. 1 is the auspicious figure of the positive facade of "-" type end anchor applied to assembled external prestressing of the invention;
Fig. 2 is the "-" type end anchor sectional detail drawing applied to assembled external prestressing of the invention;
Fig. 3 is upper and lower triangle rubbing device schematic diagram of the invention;
Fig. 4 is Fig. 3 sectional view;
Fig. 5 is "-" type component schematic diagram of the invention.
Specific embodiment
Specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing.
As shown in Figs. 1-5, a kind of "-" type end anchor applied to assembled external prestressing of the invention, this one
Font end anchor mainly includes rubbing device module, "-" type construction part module and anchoring assembly module.Rubbing device mould
Block includes upper triangle rubbing device 1 and lower triangle rubbing device 2, and upper triangle rubbing device 1 and lower triangle rub
It wipes device 2 to be respectively arranged on the downside of 7 top flange of steel I-beam and on the upside of 7 lower flange of steel I-beam, and plays the work frictionally secured
With.Wherein, upper triangle rubbing device 1 and lower triangle rubbing device 2 is relatively oblique is arranged in a staggered manner, upper triangle friction dress
Set 1 and lower triangle rubbing device 2 be a pair, be symmetrically arranged in 7 web two sides of steel I-beam, cross section difference
For T-type and inverted T shaped, and blasting treatment is done on the downside of top flange and at 7 lower flange upper contact of steel I-beam rubbed with increasing
Wipe power."-" type construction part module includes "-" type component 3, upper strut 5 and lower supporting rod 6, and "-" type construction part module passes through upper support
Bar 5 and upper triangle rubbing device 1 are connected and fixed on 7 top flange of steel I-beam, and are filled by lower supporting rod 6 and the friction of lower triangle
It sets 2 and is connected and fixed on 7 lower flange of steel I-beam.It is provided on upper triangle rubbing device 1 and lower triangle rubbing device 2
Pre-manufactured hole, upper strut 5 and lower supporting rod 6 pass through pre-manufactured hole.Be equipped with fixed link 9 on "-" type component 3, fixed link 9 respectively with
Upper triangle rubbing device 1 and lower triangle rubbing device 2 abut, and playing prevents triangle rubbing device 1 and lower three
The inclined effect of angular rubbing device 2.Anchoring assembly module includes anchor 4 and tightening latch 8, and anchor 4 passes through tightening latch 8
It is fixed on 3 lower position of "-" type component.Steel strand wires pass through anchor 4, and are anchored by anchorage.Anchor 4 passes through two
Root tightening latch 8 is connect with 3 lower part of "-" type component.Tightening latch 8 and fixed link 9 are bolted with "-" type component 3.
A kind of installation method of above-mentioned "-" type end anchor applied to assembled external prestressing:
Firstly, two good upper triangle rubbing devices 1 of pre-production are placed in symmetrical on the downside of 7 top flange of steel I-beam
Position, it is ensured that upper triangle rubbing device 1 abuts 7 web of steel I-beam, and lower triangle rubbing device 2 is placed in steel I-beam 7
Relative to the slightly backward position of upper triangle rubbing device 1 on the upside of lower flange.
Secondly, installing "-" type component 3 and being fixed by upper strut 5 and lower supporting rod 6, anchor is finally installed
4。
Again, fixed link 9 is installed, "-" type component 3 and upper triangle rubbing device 1 and lower triangle rubbing device are adjusted
2 distance, it is ensured that the two is parallel.
Finally, and be fixed by anchorage in use, steel strand wires pass through anchor 4, and apply certain pre- answer
Power is realized self-locking.
Upper triangle rubbing device 1, lower triangular form rubbing device 2, one in the present embodiment, in the anchor of "-" type end
Font type component 3 and anchor 4 are completed according to design in factory process, and site machinery assembly is completed.Do not applying pre- answer
It needs to carry out anchoring temporarily before power.
Above-described embodiment, which is intended merely to become apparent from, illustrates that technical solution of the present invention made enumerates, not to of the invention
It limits, those skilled in the art are according to the common knowledge of this field to the accommodation of technical scheme also in this Shen
Please be within protection scope, in short, above-described embodiment is only to enumerate, the protection scope of the application is with scope
It is quasi-.
Claims (6)
1. a kind of "-" type end anchor applied to assembled external prestressing, it is characterised in that: "-" type end anchoring
Device mainly includes rubbing device module, "-" type construction part module and anchoring assembly module;
The rubbing device module includes that upper triangle rubbing device (1) and lower triangle rubbing device (2), upper triangle rub
It wipes device (1) and lower triangle rubbing device (2) is respectively arranged on the downside of steel I-beam (7) top flange and steel I-beam (7)
On the upside of lower flange, and play the role of frictionally securing;
The "-" type construction part module includes "-" type component (3), upper strut (5) and lower supporting rod (6), "-" type construction part module
It is connected and fixed on steel I-beam (7) top flange by upper strut (5) and upper triangle rubbing device (1), and passes through lower supporting rod (6)
Steel I-beam (7) lower flange is connected and fixed on lower triangle rubbing device (2);The upper triangle rubbing device (1) and
Pre-manufactured hole is provided on lower triangle rubbing device (2), the upper strut (5) and lower supporting rod (6) pass through the pre-manufactured hole;
Be equipped with fixed link (9) on the "-" type component (3), fixed link (9) respectively with upper triangle rubbing device (1) and lower three
Angular rubbing device (2) abuts, and playing prevents triangle rubbing device (1) and lower triangle rubbing device (2) inclined
Effect;
The anchoring assembly module includes anchor (4) and tightening latch (8), and anchor (4) is fixed on by tightening latch (8)
"-" type component (3) lower position;Steel strand wires pass through anchor (4), and are anchored by anchorage.
2. a kind of "-" type end anchor applied to assembled external prestressing according to claim 1, feature
Be: the anchor (4) is connect by two or more tightening latches (8) with "-" type component (3) lower part, can be according to live feelings
The position that condition selection adapts to is connect with anchor (4) by tightening latch (8).
3. a kind of "-" type end anchor applied to assembled external prestressing according to claim 1, feature
Be: the upper triangle rubbing device (1) and lower triangle rubbing device (2) are a pair, are symmetrically arranged in institute
State steel I-beam (7) web two sides, cross section is respectively T-type and inverted T shaped, and on the downside of top flange and steel I-beam (7)
Blasting treatment is done at the upper contact of lower flange with increasing friction force.
4. a kind of "-" type end anchor applied to assembled external prestressing according to claim 1, feature
It is: the upper triangle rubbing device (1) and lower triangle rubbing device (2) is relatively oblique is arranged in a staggered manner.
5. a kind of "-" type end anchor applied to assembled external prestressing according to claim 1, feature
Be: the tightening latch (8) and fixed link (9) are bolted with "-" type component (3).
6. a kind of a kind of -5 any "-" type ends applied to assembled external prestressing according to claim 1 anchor dress
The installation method set, it is characterised in that:
Firstly, pre-production good two upper triangle rubbing device (1) is placed in symmetrical on the downside of steel I-beam (7) top flange
Position, it is ensured that upper triangle rubbing device (1) abuts steel I-beam (7) web, and lower triangle rubbing device (2) is placed in I-shaped
Relative to the slightly backward position of upper triangle rubbing device (1) on the upside of girder steel (7) lower flange;
Secondly, "-" type component (3) are installed and are fixed by upper strut (5) and lower supporting rod (6), finally installation anchoring dress
Set (4);
Again, fixed link (9) are installed, adjust "-" type component (3) and upper triangle rubbing device (1) and the friction of lower triangle fills
Set the distance of (2), it is ensured that the two is parallel;
Finally, and be fixed by anchorage, and apply certain prestressing force in use, steel strand wires pass through anchor (4),
It realizes self-locking.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811276041.8A CN109469347B (en) | 2018-10-30 | 2018-10-30 | Be applied to external prestressing force's of assembled style of calligraphy end anchor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811276041.8A CN109469347B (en) | 2018-10-30 | 2018-10-30 | Be applied to external prestressing force's of assembled style of calligraphy end anchor |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109469347A true CN109469347A (en) | 2019-03-15 |
CN109469347B CN109469347B (en) | 2021-03-05 |
Family
ID=65666345
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811276041.8A Active CN109469347B (en) | 2018-10-30 | 2018-10-30 | Be applied to external prestressing force's of assembled style of calligraphy end anchor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109469347B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3902401A1 (en) * | 1989-01-27 | 1990-08-02 | Karsten R | Process for improving dynamic and static characteristic values in the case of reinforced-concrete floors |
JPH10220027A (en) * | 1997-02-03 | 1998-08-18 | Taisei Corp | Aseismatic reinforced construction |
CN101479487A (en) * | 2006-06-27 | 2009-07-08 | 威廉·亨利·奥利斯 | Fastener & fastening system |
CN101781936A (en) * | 2009-12-10 | 2010-07-21 | 中国建筑科学研究院 | Method and device for reinforcing beam by adopting prestressed carbon fiber plate |
CN106760607A (en) * | 2016-12-29 | 2017-05-31 | 华北水利水电大学 | A kind of pre-stress fibre plate stretching end anchor and its anchoring process |
CN207920136U (en) * | 2017-12-05 | 2018-09-28 | 广东国赢网络科技有限公司 | A kind of novel in vitro prestressed reinforcement device |
-
2018
- 2018-10-30 CN CN201811276041.8A patent/CN109469347B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3902401A1 (en) * | 1989-01-27 | 1990-08-02 | Karsten R | Process for improving dynamic and static characteristic values in the case of reinforced-concrete floors |
JPH10220027A (en) * | 1997-02-03 | 1998-08-18 | Taisei Corp | Aseismatic reinforced construction |
CN101479487A (en) * | 2006-06-27 | 2009-07-08 | 威廉·亨利·奥利斯 | Fastener & fastening system |
CN101781936A (en) * | 2009-12-10 | 2010-07-21 | 中国建筑科学研究院 | Method and device for reinforcing beam by adopting prestressed carbon fiber plate |
CN106760607A (en) * | 2016-12-29 | 2017-05-31 | 华北水利水电大学 | A kind of pre-stress fibre plate stretching end anchor and its anchoring process |
CN207920136U (en) * | 2017-12-05 | 2018-09-28 | 广东国赢网络科技有限公司 | A kind of novel in vitro prestressed reinforcement device |
Also Published As
Publication number | Publication date |
---|---|
CN109469347B (en) | 2021-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108612188B (en) | Assembled self-resetting prestressed concrete frame | |
CN111255065B (en) | Connection node of assembled beam column of pre-buried connecting element | |
CN103388408A (en) | External pre-stressed tendon reinforcing steering block for building structure | |
CN107419658A (en) | A kind of bridge expansion joint installation | |
KR102169029B1 (en) | Strength reinforced bridge inspection facility | |
JP2011074604A (en) | Bridge movement restraining apparatus and movement restraining method | |
CN109469347A (en) | A kind of "-" type end anchor applied to assembled external prestressing | |
CN103603507A (en) | Two-side or three-side wrapping type reinforced concrete column underpinning method | |
CN108442236A (en) | Assembled bridge pier and construction method, prefabricated assembled beam bridge | |
CN103981807B (en) | A kind of without bracket steel anchor beam | |
CN208869942U (en) | A kind of long-span continuous rigid-framed bridge external prestressing load system | |
CN111705623A (en) | Arch steel pipe central buckle structure of oversized span suspension bridge | |
KR100648046B1 (en) | Beam and Girder Reinforcing Apparatus using External Post-Tension and Reinforcing Method using the same | |
CN108086481B (en) | A kind of metro depot upper cover Estate Development Self-resetting integral structure and method | |
CN109469346A (en) | A kind of sickle end anchor applied to assembled external prestressing | |
CN212175846U (en) | Connecting structure of precast concrete column and precast base | |
CN113481885B (en) | Construction method of I-steel reinforced beam for bridge | |
CN210887654U (en) | Damping device for constructional engineering | |
CN215167210U (en) | Local connection and anchor effect reinforced steel concrete column | |
CN211498972U (en) | Improved foundation shockproof structure | |
CN210975502U (en) | Anchor box capable of self-adapting to angle of suspender | |
CN208105035U (en) | A kind of bridge pad with quick-replaceable and girder falling function | |
CN108149927A (en) | A kind of Cantilever Beams tension and compression constrainer and its application method | |
CN109826457A (en) | Concrete building structures and beams of concrete prestressed reinforcement device | |
CN220266318U (en) | Anchoring and adjusting device for catwalk bearing rope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 050000 No. 395 Huaian West Road, Shijiazhuang City, Hebei Province Applicant after: Hebei Academy of Architectural Sciences Co., Ltd. Address before: 050000 No. 395 Huaian West Road, Shijiazhuang City, Hebei Province Applicant before: Hebei Prov. Architecture Science Academy |
|
GR01 | Patent grant | ||
GR01 | Patent grant |