CN103603507A - Two-side or three-side wrapping type reinforced concrete column underpinning method - Google Patents

Two-side or three-side wrapping type reinforced concrete column underpinning method Download PDF

Info

Publication number
CN103603507A
CN103603507A CN201310530831.5A CN201310530831A CN103603507A CN 103603507 A CN103603507 A CN 103603507A CN 201310530831 A CN201310530831 A CN 201310530831A CN 103603507 A CN103603507 A CN 103603507A
Authority
CN
China
Prior art keywords
steel plate
reinforced concrete
underpinning
column
thick pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310530831.5A
Other languages
Chinese (zh)
Other versions
CN103603507B (en
Inventor
吴二军
张芬芬
郭现收
陈幸
王芝云
李显
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201310530831.5A priority Critical patent/CN103603507B/en
Publication of CN103603507A publication Critical patent/CN103603507A/en
Application granted granted Critical
Publication of CN103603507B publication Critical patent/CN103603507B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a two-side or three-side wrapping type reinforced concrete column underpinning method. A steel plate (5) with a preformed hole is adhered to a spatially limited side of an underpinned reinforced concrete column (1), and reinforced concrete column embracing beams (2) are cast on the other surfaces. The length of the two ends of the steel plate stretching out of the underpinned column is as same as that of each column embracing beam; 2-4 layers of [-shaped horizontal reinforcing steel bars (3) are welded on the steel plate (5) along the height direction; the other un-welding end of the reinforcing steel bar (3) is anchored in the column embracing beam (2) which is connected to the reinforcing steel bar (3). A preformed hole is also formed in the steel plate (5) relative to the column embracing beams and corresponds to the preformed hole in the steel plate (5); a bolt (4) is used for pulling oppositely so as to apply a pre-pressure and increase integrality of column embracing nodes; a screwing nut anchorage device (7) is used for applying a pre-stress to a bolt beam end. As adhesive steel and the column embracing beams compose asymmetrical underpinning nodes, and a pre-stressed tendon is stretched and drawn to improve the integrity of the underpinning nodes and the underpinning bearing capacity, the two-side or three-side wrapping type reinforced concrete column underpinning method avoids limitation of a construction site efficiently, is high in underpinning reliability and convenient in construction.

Description

A kind of two sides or three packaging type steel concrete column underpinning methods
Technical field
Patent of the present invention relates to a kind of support and change method of reinforced concrete post and underpins joint structure, belongs to the ambit of Reinforcement of Engineering Structure transformation and prestressing technique application.
Background technology
Reinforced concrete structure is domestic and international application one of form of structure the most widely, due to design, constructional deficiency, and the reasons such as the damage of the various physics of nature, chemistry and biological agent or lifting instructions for use, a large amount of engineering structuress need to be carried out strengthening reconstruction.Structure underpinning technique is to underpin safely by changing the mode implementation structure of load bang path, and this technology fields such as engineering, building large-space rebuilding engineering, whole building displacement engineering of rectifying a deviation at building jacking are widely used.Modal engineering underpins and comprises that column bracket changes with body of wall and underpin.The support and change method of post has that steel concrete packaging type underpins at present, wear reinforcing bar in post or screw rod underpins.Underpin post surface adopts the processing methods such as dabbing, cut-in groove to improve the roughness at interface more.The four sides packaging type that conventional steel concrete column underpinning method all adopts substantially at present.
In recent years, along with existing building anti-seismic performance promotes and the improvement project of functional promotion increases day by day, under post, underpinning technique application is increasingly extensive, but due to adjacent structure next-door neighbour, the clear distance that is underpined post and adjacent structure in many houses is about 10cm only, and the support and change methods such as the conventional thick pillar of reinforced concrete post, bar planting do not possess execution conditions.
Summary of the invention
While the object of the invention is to be restricted for reinforced concrete post construction plant, conventional support and change method inconvenience application or construction risk are higher, develop a kind of applicable narrow and small construction plant, safe and reliable, easy construction, column underpinning method that cost is low.
The present invention is achieved through the following technical solutions goal of the invention:
Adopting in small space affixing steel plate method to realize this side vertical load wears and passs; Its lap adopts the conventional support and change method of embracing.Employing welds on steel plate that " method of [" steel bar connects into integral body by steel plate and thick pillar beam.Employing and steel plate opposite between wear prestressing force screw rod method increase the whole globality that underpins node, improve and underpin bearing capacity.
When a side narrow space, form the form that underpins of a steel plate-tri-thick pillar beam, when the narrow space of two sides, form the form that underpins of steel plate-two sides, two sides thick pillar beam.
Two sides or three packaging type steel concrete column underpinning methods, is characterized in that: at quilt, underpined reinforced concrete post (1) limited space one side and adopt structure glue to be pasted with the steel plate (5) of preformed hole, other faces are built reinforced concrete mount post beam (2).Steel plate (5) two ends stretch out that to be underpined column length identical with connected thick pillar beam, arrange L shaped horizontal reinforcement (3) steel plate (5) is upper along short transverse welding 2-3, and the other end of the non-welding of reinforcing bar (3) anchors into embracing in beam (2) of being attached thereto.Steel plate (5) is also preformed hole in thick pillar beam relatively, corresponding with steel plate (5), with bolt (4), to drawing, applies precompression increase thick pillar node globality, and bolt beam-ends applies prestressing force with screwing nut anchor (7).
Described reinforced concrete post adopts two sides or three thick pillar beams, the underpinning technique of narrow space face affixing steel plate.Steel plate (5) adopts structure glue bonding with post interface.Steel plate height is not less than 2/3 of thick pillar depth of beam, and thickness is not less than 16mm.
The cylinder that described thick pillar beam (2) contacts is answered dabbing, and the concavo-convex degree of depth of its dabbing is not less than 6mm.
Effect of the present invention and benefit are:
This contrive equipment utilizes that thick pillar underpins, affixing steel plate reinforcement and prestressing technique is integrated changes node with column bracket, completes reliably underpining of reinforced concrete post under narrow space condition.
The method underpins that reliability is high, easy construction, has not yet to see about solving technical measures and the pertinent literature thereof of this type of key issue.
This support and change method is not only applicable to the column bracket of local space when narrow and small and changes, and when operating space is enough, can adopt this support and change method yet, and because assembling reinforcement amount is less, its speed of application changes than steel bar concrete four sides thick pillar corbel soon.
Accompanying drawing explanation
Fig. 1 is three packaging type underpinning device plan views in the present invention
Fig. 2 is two sides packaging type underpinning device plan view in the present invention
Fig. 3 is three packaging type underpinning device A-A elevation in the present invention
Fig. 4 is three packaging type underpinning device B-B elevation in the present invention
Fig. 5 is two sides packaging type underpinning device C-C elevation in the present invention
Fig. 6 is two sides packaging type underpinning device D-D elevation in the present invention
In Fig. 1-6, (1) is underpined reinforced concrete post; (2) thick pillar beam; (3) " [" or " L " steel bar; (4) prestressing force Screw arbor with nut at both-ends; (5) direction one steel plate; (6) direction two steel plates; (7) nut anchor. the specific embodiment
Adopt two sides or three methods that packaging type technology underpins reinforced concrete post, at the two sides or three faces that are underpined reinforced concrete post (1), build thick pillar beam, avoided the restriction in place, completed underpining of reinforced concrete post.
Adopting in small space affixing steel plate method to realize this side vertical load wears and passs; Its lap adopts the conventional support and change method of embracing.Employing welds on steel plate that " method of [" steel bar (3) connects into integral body by steel plate and thick pillar beam (2).Employing and steel plate opposite between wear prestressing force screw rod method increase the whole globality that underpins node, improve and underpin bearing capacity.
When a side narrow space, form the form that underpins of a steel plate-tri-thick pillar beam, when the narrow space of two sides, form the form that underpins of steel plate-two sides, two sides thick pillar beam.
Two sides or three packaging type steel concrete column underpinning methods, is characterized in that: underpined the steel plate (5) that reinforced concrete post (1) limited space one side is pasted with preformed hole, other faces are built reinforced concrete mount post beam (2).Steel plate (5) two ends stretch out that to be underpined column length identical with connected thick pillar beam, arrange L shaped horizontal reinforcement (3) steel plate (5) is upper along short transverse welding 2-3, and the non-welding ends of reinforcing bar (3) anchors into embracing in beam (2) of being attached thereto.Steel plate (5) is also preformed hole in thick pillar beam relatively, corresponding with steel plate (5), with bolt (4), to drawing, applies precompression increase thick pillar node globality, and bolt beam-ends applies prestressing force with screwing nut anchor (7).
Described reinforced concrete post adopts two sides or three thick pillar beams, the underpinning technique of narrow space face affixing steel plate.Steel plate (5) adopts structure glue bonding with post interface.Steel plate height is not less than 2/3 of thick pillar depth of beam, and thickness is not less than 16mm.
The cylinder of described thick pillar beam (2) is answered dabbing, and the concavo-convex degree of depth of its dabbing is not less than 6mm.
Concrete grammar step:
(1) in underpining altitude range by three about 6mm of equal dabbing of reinforced concrete post (1), narrow space facet wheel polishing, wash down.
(2) steel plate (5) with the reserved circular hole of structure glue bonding at narrow space one lateral column face
(3) at steel plate (5), above along short transverse welding layer 2-4, " [" or " L " reinforcing bar (3), the reinforcing bar other end anchors in the thick pillar beam being attached thereto, and guarantees enough anchorage lengths.
(4) colligation thick pillar beam steel, the steel concrete thick pillar beam (2) of building at three faces.Corresponding steel plate perforate reserving hole channel in thick pillar beam, guarantees that corresponding steel plate reserves circular hole, Bao Zhuliang reserving hole channel on same straight line, in order to penetrating Screw arbor with nut at both-ends (4).
(5) in steel plate opposite thick pillar beam outside, penetrate screw rod (4), adopt nut (7) to tighten.
(6) adopt torque spanner to apply prestressing force according to setting value.

Claims (3)

1. a two sides or three packaging type steel concrete column underpinning methods, it is characterized in that: at quilt, underpined reinforced concrete post (1) limited space one side and adopt structure glue to be pasted with the steel plate (5) of preformed hole, other faces are built reinforced concrete mount post beam (2), steel plate (5) two ends stretch out that to be underpined column length identical with connected thick pillar beam, at steel plate (5), above along short transverse welding 2-3, arrange L shaped horizontal reinforcement (3), the other end of the non-welding of reinforcing bar (3) anchors into embracing in beam (2) of being attached thereto, steel plate (5) is also preformed hole in thick pillar beam relatively, corresponding with steel plate (5), with bolt (4) to drawing, apply precompression and increase thick pillar node globality, bolt beam-ends applies prestressing force with screwing nut anchor (7).
2. a kind of two sides as claimed in claim 1 or three packaging type steel concrete column underpinning methods, is characterized in that: described steel plate (5) is highly not less than 2/3 of thick pillar depth of beam, and thickness is not less than 16mm.
3. a kind of two sides as described in claim 1 or three packaging type steel concrete column underpinning methods, is characterized in that: the cylinder that described thick pillar beam (2) contacts is answered dabbing, and the concavo-convex degree of depth of its dabbing is not less than 6mm.
CN201310530831.5A 2013-11-01 2013-11-01 A kind of two sides or three packaging type steel concrete column underpinning methods Active CN103603507B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310530831.5A CN103603507B (en) 2013-11-01 2013-11-01 A kind of two sides or three packaging type steel concrete column underpinning methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310530831.5A CN103603507B (en) 2013-11-01 2013-11-01 A kind of two sides or three packaging type steel concrete column underpinning methods

Publications (2)

Publication Number Publication Date
CN103603507A true CN103603507A (en) 2014-02-26
CN103603507B CN103603507B (en) 2015-11-25

Family

ID=50121762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310530831.5A Active CN103603507B (en) 2013-11-01 2013-11-01 A kind of two sides or three packaging type steel concrete column underpinning methods

Country Status (1)

Country Link
CN (1) CN103603507B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104846750A (en) * 2015-04-20 2015-08-19 上海同罡建筑工程有限公司 Underpinning method for prestress friction type massive pillar girders with seams
CN105155868A (en) * 2015-09-16 2015-12-16 项剑锋 Method for pulling pillar through prestress using non-binding steel strands
CN105863292A (en) * 2016-04-24 2016-08-17 江苏省华建建设股份有限公司 Clamped beam device used for masonry structure wall backward-formed hole and installation method of clamped beam device
CN109914697A (en) * 2019-04-18 2019-06-21 中民筑友房屋科技集团有限公司 A kind of assembling frame structural construction prefabricated post
CN110761579A (en) * 2019-09-24 2020-02-07 同济大学建筑设计研究院(集团)有限公司 Section steel stay bar type column underpinning node and application method thereof
CN111794440A (en) * 2020-07-15 2020-10-20 同济大学建筑设计研究院(集团)有限公司 Underpinning node for concrete filled steel tubular column

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2440890Y (en) * 2000-08-16 2001-08-01 广州市鲁班建筑防水补强专业公司 Construction tool style sectional steel coated column bearing stage
JP2003166352A (en) * 2001-11-30 2003-06-13 Nippon Telegraph & Telephone West Corp Method for reinforcing concrete column, and reinforced concrete column
CN101429819A (en) * 2007-11-07 2009-05-13 上海天演建筑物移位工程有限公司 Wall and column underpinning method
CN102661056A (en) * 2012-03-12 2012-09-12 河海大学 Apparatus for underpinning reinforced concrete column by adopting prestress technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2440890Y (en) * 2000-08-16 2001-08-01 广州市鲁班建筑防水补强专业公司 Construction tool style sectional steel coated column bearing stage
JP2003166352A (en) * 2001-11-30 2003-06-13 Nippon Telegraph & Telephone West Corp Method for reinforcing concrete column, and reinforced concrete column
CN101429819A (en) * 2007-11-07 2009-05-13 上海天演建筑物移位工程有限公司 Wall and column underpinning method
CN102661056A (en) * 2012-03-12 2012-09-12 河海大学 Apparatus for underpinning reinforced concrete column by adopting prestress technology

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104846750A (en) * 2015-04-20 2015-08-19 上海同罡建筑工程有限公司 Underpinning method for prestress friction type massive pillar girders with seams
CN105155868A (en) * 2015-09-16 2015-12-16 项剑锋 Method for pulling pillar through prestress using non-binding steel strands
CN105863292A (en) * 2016-04-24 2016-08-17 江苏省华建建设股份有限公司 Clamped beam device used for masonry structure wall backward-formed hole and installation method of clamped beam device
CN105863292B (en) * 2016-04-24 2018-05-18 江苏省华建建设股份有限公司 A kind of clamping boom device and its installation method for punching after Masonry Wall
CN109914697A (en) * 2019-04-18 2019-06-21 中民筑友房屋科技集团有限公司 A kind of assembling frame structural construction prefabricated post
CN109914697B (en) * 2019-04-18 2023-07-14 中民筑友房屋科技集团有限公司 Prefabricated column for assembled frame structure building
CN110761579A (en) * 2019-09-24 2020-02-07 同济大学建筑设计研究院(集团)有限公司 Section steel stay bar type column underpinning node and application method thereof
CN110761579B (en) * 2019-09-24 2023-08-08 同济大学建筑设计研究院(集团)有限公司 Profile steel stay bar type column underpinning node and application method thereof
CN111794440A (en) * 2020-07-15 2020-10-20 同济大学建筑设计研究院(集团)有限公司 Underpinning node for concrete filled steel tubular column

Also Published As

Publication number Publication date
CN103603507B (en) 2015-11-25

Similar Documents

Publication Publication Date Title
CN103603507B (en) A kind of two sides or three packaging type steel concrete column underpinning methods
KR102055436B1 (en) Prefabricated pier column member with steel-concrete composite structure
CN104790424B (en) The hardened system on generation power foundation of wind power ring basis and reinforcement means thereof
US20150167332A1 (en) Repair and strengthening system for reinforced concrete structure
CN104405041B (en) The prefabricated floor connector of steel building and mounting method thereof
CN103388408A (en) External pre-stressed tendon reinforcing steering block for building structure
CN203701334U (en) Reinforced and prefabricated type shear wall structure
CN103790267A (en) Reinforcement type prefabricated assembly type shear wall structure and construction method thereof
CN103711330A (en) Method for using prefabricated reinforced concrete frame to reinforce existing structure through prestressing assembly
CN205046677U (en) Assembled concrete frame nodal connection structure
CN204225277U (en) The prefabricated floor connector of steel building
CN102493448B (en) Assembling anchor rod or anchor cable frame
CN110924552A (en) Prefabricated double-steel-plate concrete combined energy-dissipation coupling beam
CN103397787B (en) The two-way X intersection of a kind of reinforced column underpinning technique
CN202323717U (en) Cantilever type pre-stress hoop and special tensioning device thereof
CN106930436B (en) Reinforced concrete shear wall with built-in prestressed steel diagonal bracing
KR20150093523A (en) Joint Structure of Pile-to-Pile cap Connection for Concrete Structure
CN201433509Y (en) Prestressed steel girder
JP2014181507A (en) Joining structure between pile and footing
CN203403402U (en) Upright pile
CN101311482B (en) Bolt reinforced structure for steel column foot
JP2014227754A (en) Bridge girder and construction method of bridge girder
CN102493465A (en) Anchorage type anchor pile retaining structure for soil filling field
CN101105077A (en) Method for connecting reinforced concrete structures
CN106567500A (en) High-strength steel and high-strength grouting material combined ultrahigh-strength column structure and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant