CN109469221A - Connector and preparation method thereof - Google Patents
Connector and preparation method thereof Download PDFInfo
- Publication number
- CN109469221A CN109469221A CN201811265927.2A CN201811265927A CN109469221A CN 109469221 A CN109469221 A CN 109469221A CN 201811265927 A CN201811265927 A CN 201811265927A CN 109469221 A CN109469221 A CN 109469221A
- Authority
- CN
- China
- Prior art keywords
- connector
- section
- reinforcing bar
- column
- preparation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21F—WORKING OR PROCESSING OF METAL WIRE
- B21F1/00—Bending wire other than coiling; Straightening wire
Abstract
Invention describes a kind of building elements, i.e. a kind of connector and preparation method thereof, the connector is made of one section of bar bending, wallboard for various steel mesh frame sandwich structures uses when installing and connect with building girder, column, floor edge and wall end, solve the problems, such as that the wallboard of current steel mesh frame sandwich structure is connect with building girder, column, floor edge and wall end, connector shape is reasonable, production is simple.
Description
Technical field
The present invention relates to various construction(al)steel screen frame Sandwich structure wallboards and building girder, column, floor edge and wall end
A kind of component used when connection and preparation method thereof, espespecially connector and preparation method thereof.
Background technique
Between the wallboard and building girder, column, floor edge and wall end for building upper various steel mesh frame sandwich structures at present
When installation, distinct issues are that no force structure is reasonable, make simple connector.
Summary of the invention
Technical problem to be solved by the invention is to provide connector and preparation method thereof, this method is made with one section of reinforcing bar
Based on use material, carrying out bending machining to one section of reinforcing bar with machining tool makes one section of reinforcing bar as connector, for building
The connection of construction site various steel mesh frame sandwich structural wall boards and building girder, column, floor edge and wall end.
For this purpose, the technical solution that the present invention solves described problem is: connector and preparation method thereof, comprising steps of reorganizing and outfit
Machining tool reorganizes and outfit one section of reinforcing bar, carries out bending machining to one section of reinforcing bar with machining tool, and one section of reinforcing bar is made to become " Z "
The shape of word, i.e. completion connector and production, can be used to the various steel mesh frame sandwich structural wall boards of construction site with
The connection of building girder, column, floor edge and wall end.
Preferably, the diameter of one section of reinforcing bar is 3mm to 10mm.
Preferably, the length of one section of reinforcing bar is greater than 150mm.
The good effect that the present invention has is: the connector of this method production is used for the various steel wire net racks of construction site
When Sandwich structure wallboard and building girder, column, floor edge and the connection at wall end, effect is it will be apparent that it has shape
Shape is reasonable, meets mechanics principle, the feature that production is simple.
Detailed description of the invention
Fig. 1 is the process flow diagram for being connector of the present invention and preparation method thereof;
Fig. 2 is the schematic diagram of one be related to section reinforcing bar of the invention;
Fig. 3 is the schematic diagram of connector of the invention;
Fig. 4 is the schematic diagram of one embodiment of the present of invention;
Fig. 5 is the schematic diagram of another embodiment of the invention;
In figure: 1- connector, 2- steel mesh frame sandwich structural wall board, 3- building girder, column, floor edge and wall end.
Specific embodiment
By Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, the present invention relates to connector 1 and preparation methods, comprising steps of reorganizing and outfit processing work
Tool, reorganizes and outfit one section of reinforcing bar, carries out bending machining to one section of reinforcing bar with machining tool, and one section of reinforcing bar is made to become the shape of " Z " word
Shape completes the production and its method of connector 1, can be used to the various steel mesh frame sandwich structural wall boards of construction site
2 with the connection of building girder, column, floor edge and wall end 3.
It further says, so that one section of reinforcing bar is become " Z " word when carrying out bending machining to one section of reinforcing bar with machining tool
The connector 1 of shape, that is, complete the production and production method of connector 1, and connector 1 can be used to the various steel wires of construction site
The connection of rack Sandwich structure wallboard 2 and building girder, column, floor edge and wall end 3.The different length in the both ends of connector 1, makes
When with connector 1, a shorter length of connector 1 is that 50mm to 100mm connects with building girder, column, floor edge and wall end 3
It connects, can be connected using the method implantation building girder of bar planting, column, floor 3,1 longer length of connector arrives for 280mm
1200mm is connect with various steel mesh frame sandwich structural wall boards 2, more meets mechanics principle.
Claims (4)
1. connector and preparation method thereof reorganizes and outfit one section of reinforcing bar comprising steps of reorganizing and outfit machining tool, with machining tool to one section
Reinforcing bar carries out bending machining, and one section of reinforcing bar is made to become the shape of " Z " word, i.e. completion connector and production.
2. connector according to claim 1, it is characterized in that the diameter of one section of reinforcing bar is 3mm to 10mm.
3. connector according to claim 1, it is characterized in that the length of one section of reinforcing bar is greater than 150mm.
4. connector according to claim 1, it is characterized in that the connector is the shape in " Z " word.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811265927.2A CN109469221A (en) | 2018-10-27 | 2018-10-27 | Connector and preparation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811265927.2A CN109469221A (en) | 2018-10-27 | 2018-10-27 | Connector and preparation method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109469221A true CN109469221A (en) | 2019-03-15 |
Family
ID=65666716
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811265927.2A Pending CN109469221A (en) | 2018-10-27 | 2018-10-27 | Connector and preparation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109469221A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203654709U (en) * | 2013-11-29 | 2014-06-18 | 深圳市工勘岩土工程有限公司 | Side slope scaffold connecting part |
CN203654563U (en) * | 2013-11-25 | 2014-06-18 | 辽宁工业大学 | Bidirectional composite floor slab with cross-shaped ribs |
CN204984161U (en) * | 2015-08-11 | 2016-01-20 | 中建二局第一建筑工程有限公司 | Connecting piece between outer construction elevator platform guard gate and platform pole setting |
CN205636826U (en) * | 2016-03-12 | 2016-10-12 | 中天建设集团有限公司 | A rag bolt stagnant water protection section of thick bamboo |
CN207878695U (en) * | 2017-11-07 | 2018-09-18 | 山东斯米特节能科技有限公司 | Composite thermal-insulating wall |
CN108625882A (en) * | 2018-07-10 | 2018-10-09 | 长沙理工大学 | A kind of deformed bar skeleton spray concrete arch rib supporting construction and construction method |
-
2018
- 2018-10-27 CN CN201811265927.2A patent/CN109469221A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203654563U (en) * | 2013-11-25 | 2014-06-18 | 辽宁工业大学 | Bidirectional composite floor slab with cross-shaped ribs |
CN203654709U (en) * | 2013-11-29 | 2014-06-18 | 深圳市工勘岩土工程有限公司 | Side slope scaffold connecting part |
CN204984161U (en) * | 2015-08-11 | 2016-01-20 | 中建二局第一建筑工程有限公司 | Connecting piece between outer construction elevator platform guard gate and platform pole setting |
CN205636826U (en) * | 2016-03-12 | 2016-10-12 | 中天建设集团有限公司 | A rag bolt stagnant water protection section of thick bamboo |
CN207878695U (en) * | 2017-11-07 | 2018-09-18 | 山东斯米特节能科技有限公司 | Composite thermal-insulating wall |
CN108625882A (en) * | 2018-07-10 | 2018-10-09 | 长沙理工大学 | A kind of deformed bar skeleton spray concrete arch rib supporting construction and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103669655A (en) | Construction technology for pouring concrete of walls on two sides of deformation joint | |
CN105569271A (en) | Composite shear connection piece of steel-concrete structure and manufacturing and installing method thereof | |
CN205421722U (en) | Steel - concrete structure's compound shear force connecting piece | |
CN110258511A (en) | The construction method of steel reinforcement cage unit, system and construction method and diaphram wall | |
CN102425099A (en) | Large cantilever wave-purlin combined PC bridge and manufacture method thereof | |
CN104763103B (en) | A kind of construction method of prefabricated concrete collar tie beam | |
CN109469221A (en) | Connector and preparation method thereof | |
CN206408951U (en) | A kind of architectural industrialization project conversion layer position level ladder muscle | |
CN204899108U (en) | Node structure is hung futilely to marble | |
CN206091355U (en) | Post structure is taken out to concrete plant's pillars of a house | |
CN204164106U (en) | A kind of " L " font connects building materials and discrete thereof | |
CN106284978A (en) | A kind of movement joint both sides shear wall synchronous construction technique and canalization template | |
CN203403511U (en) | Steel section reinforced concrete structure based on cold-formed thin-walled steel sections | |
CN202644989U (en) | Form erecting cradle for outer wall outer cornice | |
CN210944511U (en) | Turning tool for turning flexible reinforcing mesh | |
CN209429552U (en) | A kind of vertical type concrete member steel bar cage mould | |
CN210002280U (en) | road and bridge crack reinforcing structure | |
CN110805141B (en) | Connecting device and method for steel pipe column and shock insulation support after jacking of building | |
CN207032631U (en) | A kind of stable type hollow heat-insulation building block | |
CN202391086U (en) | Positioning device for stair steps of buildings | |
CN207892016U (en) | A kind of H profile steel combination pedestal in house | |
CN208168417U (en) | A kind of frame column seismic reinforcing structure | |
CN201268918Y (en) | Concealed column vertical reinforced bar with frame structure | |
CN105569326A (en) | Handling frame without support and exterior wall construction method thereof | |
CN206542151U (en) | A kind of adjustable height bus duct erecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190315 |