CN109468420A - A kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method - Google Patents

A kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method Download PDF

Info

Publication number
CN109468420A
CN109468420A CN201811540710.8A CN201811540710A CN109468420A CN 109468420 A CN109468420 A CN 109468420A CN 201811540710 A CN201811540710 A CN 201811540710A CN 109468420 A CN109468420 A CN 109468420A
Authority
CN
China
Prior art keywords
steel
hydraulic
lifting
cantilever
furnace body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811540710.8A
Other languages
Chinese (zh)
Inventor
隋新
杨俊刚
林会明
杨光
杨志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201811540710.8A priority Critical patent/CN109468420A/en
Publication of CN109468420A publication Critical patent/CN109468420A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The art of this patent is mainly used for solving industrial system Blast Furnace Push replacement furnace body, it can be by blast-furnace body structure in the new furnace body of passage quick-replaceable, it does not influence blast-furnace body frame structure stability utmostly, reduces structural demolition for furnace body passage, save replacement and save the time.This method replaces furnace structure suitable for big volume blast furnace maintenance, solves the problems, such as that the last furnace shell replacement cycle is long, the off-time is long.

Description

A kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method
Technical field
The present invention relates to blast furnace technical field of construction, and in particular to a kind of last furnace shell passage segmentation hydraulic synchronizing lifting group Dress method.
Background technique
With the development of modern industry, equipment all develops to enlargement, high efficiency, low energy consumption.The volume of blast furnace is also got over Come bigger, but blast furnace is continuous operation at high temperature, and furnace structure and equipment life are shorter, and traditional method is typically all Blast furnace Divisional carries out maintenance replacement, also has and elapses replacement furnace structure offline using blast furnace, but traditional replacing options blowing out Time is long, is locally overhauled, big to Influence of production.The method of offline passage replacement furnace structure, need to destroy part body frame Frame structural beams impact the stability of main structure, and frame structural beam is repaired in high-altitude, and security risk is big.
Summary of the invention
It is hydraulic same that the present invention provides a kind of last furnace shell passage segmentation to solve technical problem present in well-known technique Step promotes assemble method, and the quantity for removing blast-furnace body Vierendeel girder during blast furnace elapses offline can be reduced using this method, is mentioned High blast-furnace body frame reduces industrial accident, accelerates speed of application.
The purpose of the present invention is what is be achieved through the following technical solutions:
A kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method, includes the following steps:
(1) in the steel structure frame of original old blast furnace frame on four corner posts, horizontal direction welding hydraulic synchronization is mentioned System cantilever steel girder is risen, four corner posts of cantilever steel girder and frame must guarantee welding quality when welding, and reinforce welding with stiffener; Cantilever steel girder length will exceed furnace body frame platform, it is ensured that hydraulic lifting apparatus is vertical with furnace body hoist point;
(2) in Cantilever Beams lower weld support column, it is mounted on main beam in frame, it is ensured that can will bear to promote pulling force effect;Branch Dagger is selectively mounted at the 1/3 of cantilever steel girder;
(3) the reserved installation hydraulic lifting device installation position of cantilever steel girder and support column front end position is being located at, because of cantilever steel girder It is made of H profile steel, flexible steel twisted wire is used when hydraulic lifting device is promoted, and flexible steel twisted wire is in cantilever steel girder end Center is worn by H profile steel to upper of furnace body point;
(4) in the position of above-mentioned cantilever steel girder end hydraulic lifting device by upper and lower flange plate center making circular hole, Upper and lower hole site ensures vertical correspondence;Round hole aperture is greater than flexible steel twisted wire diameter, and installs moccasin in hole inner wall, prevents Flexible steel twisted wire and circular-hole internal-wall friction damage flexible steel twisted wire.
(5) weld bearing diagonal beam in the side of Cantilever Beams and support column, one end and landing beam weld, one end and Cantilever Beams and The welding of support column junction, soldering angle are in 45 degree;
(6) hydraulic synchronizing lifting system is installed on platform, including hydraulic station, control platform, flexible steel twisted wire and hydraulic is mentioned Rise equipment;
(7) put more energy into ring flat-plate lower part setting bracket structure in upper furnace body, using bracket structure as promoting time suspension centre, bracket The position of setting is corresponding with the hydraulic synchronizing lifting system that upper brace is arranged;
(8) divide furnace body to put more energy into making circular hole on ring flat-plate and bracket in upper of furnace body, and moccasin is installed in hole inner wall, it is ensured that is soft Property steel strand wires put more energy into ring flat-plate and bracket in same vertical line from top hydraulic synchronizing lifting system to furnace body;
(9) flexible steel twisted wire is worn into put more energy into ring flat-plate and bracket circular hole from hydraulic synchronizing lifting system, and fixed;
(10) start Synchronous lifting, until promotion is to designed elevation and Synchronous Radio lower furnace body is docked with lower portion of furnace body point, remove Hydraulic synchronous system.
Moreover, the cantilever steel girder uses H profile steel, model HN700x300x13x24.
Moreover, the support column uses H profile steel, model HM488x300x11x18.
It passes through, hydraulic pressure lift need to be set moreover, the cantilever steel girder H profile steel web is in center influence flexible steel twisted wire The cantilever steel girder web of standby installed position is cut off, and to guarantee to promote safety, is cut off position two sides in web and is respectively welded with thickness Web is spent, welding position ensures that steel strand wires pass through, while flange plate is divided into trisection, it is ensured that uniform force when promotion.
Moreover, the bearing diagonal uses hot rolling HW300x300x10x15 section steel manufacture.
Moreover, when the cantilever steel girder and frame column weld, while flange plate welds stiffener, stiffener above and below fashioned iron Steel plate thickness cannot be less than web thickness, guarantee fusion length.
Moreover, the bearing diagonal beam is welded on the side of cantilever steel girder and support column, but the oblique branch in symmetry angle Support the opposite to that direction of beam, the corresponding installation of four bearing diagonal beams.
Moreover, first checking whether four flexible steel twisted wire length are identical, it is ensured that in lifting process not before the Synchronous lifting Weight offset occurs;And examination is first carried out in lifting process to mention, can be promoted after acceptance(check).
Advantages of the present invention and economic effect are:
The quantity for removing blast-furnace body Vierendeel girder during blast furnace elapses offline can be reduced using this method, improve blast furnace sheet Body frame reduces industrial accident, accelerates speed of application, by using lifting steel structural bracket, bracket and blast-furnace body frame Trestle and Main Girder Welding form stable structure, and bracket is made of H profile steel, for placing hydraulic synchronizing lifting equipment, bracket 4 top suspension centres, uniform branch in 360 degree are set altogether with hydraulic synchronizing lifting equipment;Lower part suspension centre makes bracket using steel plate, It is welded on furnace shell stiffening ring lower part, is coexisted on a vertical plane with bracket and hydraulic synchronizing lifting equipment, it is ensured that promotes furnace body knot The Synchronous lifting of the safety and stability of structure.After upper of furnace body separation structure is promoted to designed elevation, by lower portion of furnace body point passage to furnace It is welded in body frame with upper part.It is realization is safe, accurate in place using this Synchronous lifting method, reduction dismounting, repair Amount.This method occupies little space, is easy to make, is promoted and stablizes, is conducive to lower step constructing operation, creates the bigger output value for construction.
Detailed description of the invention
Fig. 1 is blast furnace hydraulic Synchronous lifting plan view of the present invention;
Fig. 2 is blast furnace hydraulic Synchronous lifting sectional view of the present invention.
In figure: 1 blast-furnace body frame column, 2 cantilever steel girder, 3 bearing diagonal beam, 4 support column, 5 hydraulic synchronizing lifting system 6 7 upper of furnace body of flexible steel twisted wire point 8 furnace bodies are put more energy into 9 bracket of ring flat-plate
Specific embodiment
For that can further appreciate that the contents of the present invention, feature and effect, the following examples are hereby given, and cooperates attached drawing detailed It is described as follows.It should be noted that the present embodiment be it is descriptive, be not restrictive, cannot thus limit guarantor of the invention Protect range.
A kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method, includes the following steps:
(1) in the steel structure frame of original old blast furnace frame on four corner posts, horizontal direction welding hydraulic synchronization is mentioned System cantilever steel girder is risen, cantilever steel girder is made of H profile steel (HN700x300x13x24), cantilever steel girder and four corner posts of frame It must guarantee welding quality when welding, and reinforce welding with stiffener;Cantilever steel girder length will exceed furnace body frame platform, it is ensured that liquid Press lifting device vertical with furnace body hoist point;
(2), in Cantilever Beams lower weld support column, support column is made of H profile steel (HM488x300x11x18), is mounted on On main beam in frame, it is ensured that can will bear to promote pulling force effect;Support column is selectively mounted at the 1/3 of cantilever steel girder;
(3) the reserved installation hydraulic lifting device installation position of cantilever steel girder and support column front end position is being located at, because of cantilever steel girder It is made of H profile steel, flexible steel twisted wire is used when hydraulic lifting device is promoted, and flexible steel twisted wire is in cantilever steel girder end Center is worn by H profile steel to upper of furnace body point;
(4) in the position of above-mentioned cantilever steel girder end hydraulic lifting device by upper and lower flange plate center making circular hole, Upper and lower hole site ensures vertical correspondence;Round hole aperture is greater than flexible steel twisted wire diameter, and installs moccasin in hole inner wall, prevents Flexible steel twisted wire and circular-hole internal-wall friction damage flexible steel twisted wire.
(5) weld bearing diagonal beam in the side of Cantilever Beams and support column, one end and landing beam weld, one end and Cantilever Beams and The welding of support column junction, soldering angle are in 45 degree;
(6) hydraulic synchronizing lifting system is installed on platform, including hydraulic station, control platform, flexible steel twisted wire and hydraulic is mentioned Rise equipment;
(7) put more energy into ring flat-plate lower part setting bracket structure in upper furnace body, using bracket structure as promoting time suspension centre, bracket The position of setting is corresponding with the hydraulic synchronizing lifting system that upper brace is arranged;
(8) divide furnace body to put more energy into making circular hole on ring flat-plate and bracket in upper of furnace body, and moccasin is installed in hole inner wall, it is ensured that is soft Property steel strand wires put more energy into ring flat-plate and bracket in same vertical line from top hydraulic synchronizing lifting system to furnace body;
(9) flexible steel twisted wire is worn into put more energy into ring flat-plate and bracket circular hole from hydraulic synchronizing lifting system, and fixed;
(10) start Synchronous lifting, until promotion is to designed elevation and Synchronous Radio lower furnace body is docked with lower portion of furnace body point, remove Hydraulic synchronous system.
The cantilever steel girder H profile steel web is in center influence flexible steel twisted wire and passes through, and need to pacify hydraulic lifting device Cantilever steel girder web at holding position is cut off, and to guarantee to promote safety, cuts off position two sides in web and stack pile abdomen is respectively welded Plate, welding position ensures that steel strand wires pass through, while flange plate is divided into trisection, it is ensured that uniform force when promotion.
The bearing diagonal uses hot rolling HW300x300x10x15 section steel manufacture.
When the cantilever steel girder and frame column weld, while flange plate welds stiffener, stiffener steel plate above and below fashioned iron Thickness cannot be less than web thickness, guarantee fusion length.
The bearing diagonal beam is welded on the side of cantilever steel girder and support column, but the bearing diagonal beam in symmetry angle with Its opposite direction, the corresponding installation of four bearing diagonal beams.
Before the Synchronous lifting, first check whether four flexible steel twisted wire length are identical, it is ensured that do not occur in lifting process Weight offset;And examination is first carried out in lifting process to mention, can be promoted after acceptance(check).
The operation principle of the present invention is that:
Last furnace shell passage segmentation hydraulic synchronizing lifting assemble method, be blast furnace passage when by new furnace body be segmented into Row passage installation utilizes the principal post and girder of blast-furnace body frame in new upper of furnace body point passage to blast-furnace body frame Structural behaviour welds hydraulic synchronization lifting system in four corner post positions of body frame and overhangs support steel beam, installs on girder steel Hydraulic synchronization equipment, and hydraulic system is installed on body frame platform.By the soft of hydraulic synchronizing lifting system after installation is in place Property steel strand wires and new upper of furnace body point suspension centre connect and synchronize promotion furnace body.Hydraulic synchronizing lifting system uses hydraulic pressure lift Device is as lifting machinery, and flexible steel twisted wire is as load-bearing rigging.Hydraulic rockshaft is core-theaded type structure, using steel strand wires as promotion Rigging, having safe and reliable, supporting part own wt, light, easy to transportation and installation, intermediate a series of uniquenesses such as need not to splice excellent Point.
Hydraulic pressure lift process is that a process is one stroke of hydraulic rockshaft.When the repetitive operation of hydraulic rockshaft period When, it is elevated weight and then moves up step by step.
Although the preferred embodiment of the present invention is described above in conjunction with attached drawing, the invention is not limited to upper The specific embodiment stated, the above mentioned embodiment is only schematical, be not it is restrictive, this field it is common Technical staff under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, may be used also By make it is many in the form of, within these are all belonged to the scope of protection of the present invention.

Claims (8)

1. a kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method, characterized by the following steps:
(1) in the steel structure frame of original old blast furnace frame on four corner posts, horizontal direction welds hydraulic synchronizing lifting system System cantilever steel girder, four corner posts of cantilever steel girder and frame must guarantee welding quality when welding, and reinforce welding with stiffener;Overhanging Girder steel length will exceed furnace body frame platform, it is ensured that hydraulic lifting apparatus is vertical with furnace body hoist point;
(2) in Cantilever Beams lower weld support column, it is mounted on main beam in frame, it is ensured that can will bear to promote pulling force effect;Support column It is selectively mounted at the 1/3 of cantilever steel girder;
(3) the reserved installation hydraulic lifting device installation position of cantilever steel girder and support column front end position is being located at, because cantilever steel girder uses H profile steel production, uses flexible steel twisted wire, and flexible steel twisted wire is in cantilever steel girder end center when hydraulic lifting device is promoted Position is worn by H profile steel to upper of furnace body point;
(4) in the position of above-mentioned cantilever steel girder end hydraulic lifting device by upper and lower flange plate center making circular hole, above and below Hole site ensures vertical correspondence;Round hole aperture is greater than flexible steel twisted wire diameter, and installs moccasin in hole inner wall, prevents flexible steel Twisted wire and circular-hole internal-wall friction damage flexible steel twisted wire.
(5) bearing diagonal beam is welded in the side of Cantilever Beams and support column, one end and landing beam weld, one end and Cantilever Beams and support The welding of column junction, soldering angle are in 45 degree;
(6) hydraulic synchronizing lifting system is installed on platform, including hydraulic station, control platform, flexible steel twisted wire and hydraulic pressure lift are set It is standby;
(7) put more energy into ring flat-plate lower part setting bracket structure in upper furnace body, be arranged using bracket structure as lower suspension centre, bracket is promoted Position it is corresponding with the hydraulic synchronizing lifting system that upper brace is arranged;
(8) divide furnace body to put more energy into making circular hole on ring flat-plate and bracket in upper of furnace body, and moccasin is installed in hole inner wall, it is ensured that flexible steel Twisted wire puts more energy into ring flat-plate and bracket in same vertical line from top hydraulic synchronizing lifting system to furnace body;
(9) flexible steel twisted wire is worn into put more energy into ring flat-plate and bracket circular hole from hydraulic synchronizing lifting system, and fixed;
(10) start Synchronous lifting, until promotion is to designed elevation and Synchronous Radio lower furnace body is docked with lower portion of furnace body point, remove hydraulic Synchronization system.
2. a kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method according to claim 1, it is characterised in that: The cantilever steel girder uses H profile steel, model HN700x300x13x24.
3. a kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method according to claim 1, it is characterised in that: The support column uses H profile steel, model HM488x300x11x18.
4. a kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method according to claim 1, it is characterised in that: The cantilever steel girder H profile steel web is in center influence flexible steel twisted wire and passes through, need to be by hydraulic lifting device installed position Cantilever steel girder web cut off, for guarantee promoted safety, cut off position two sides in web and stack pile web, welding position be respectively welded Setting ensures that steel strand wires pass through, while flange plate is divided into trisection, it is ensured that uniform force when promotion.
5. a kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method according to claim 1, it is characterised in that: The bearing diagonal uses hot rolling HW300x300x10x15 section steel manufacture.
6. a kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method according to claim 1, it is characterised in that: When the cantilever steel girder and frame column weld, while flange plate welds stiffener above and below fashioned iron, and stiffener steel plate thickness must not Less than web thickness, guarantee fusion length.
7. a kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method according to claim 1, it is characterised in that: The bearing diagonal beam is welded on the side of cantilever steel girder and support column, but the opposite to that side of bearing diagonal beam in symmetry angle To the corresponding installation of four bearing diagonal beams.
8. a kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method according to claim 1, it is characterised in that: Before the Synchronous lifting, first check whether four flexible steel twisted wire length are identical, it is ensured that weight offset does not occur in lifting process; And examination is first carried out in lifting process to mention, can be promoted after acceptance(check).
CN201811540710.8A 2018-12-17 2018-12-17 A kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method Pending CN109468420A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811540710.8A CN109468420A (en) 2018-12-17 2018-12-17 A kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811540710.8A CN109468420A (en) 2018-12-17 2018-12-17 A kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method

Publications (1)

Publication Number Publication Date
CN109468420A true CN109468420A (en) 2019-03-15

Family

ID=65676061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811540710.8A Pending CN109468420A (en) 2018-12-17 2018-12-17 A kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method

Country Status (1)

Country Link
CN (1) CN109468420A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114058750A (en) * 2021-11-30 2022-02-18 中国十九冶集团有限公司 Lapping method for new and old foundations of blast furnace integrally and horizontally pushed
CN114480758A (en) * 2021-12-23 2022-05-13 中国华冶科工集团有限公司 Modular dismantling method for blast furnace frame

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2866514Y (en) * 2006-02-22 2007-02-07 宝山钢铁股份有限公司 Blast furnace body frame
CN203079579U (en) * 2012-11-16 2013-07-24 河南省耕生耐火材料有限公司 Steel ladle hydraulic rod suspending device
CN206769354U (en) * 2017-05-10 2017-12-19 中城投集团第八工程局有限公司 A kind of steel structure hoisting platform
CN108996385A (en) * 2018-09-17 2018-12-14 安徽马钢设备检修有限公司 A kind of last furnace shell lifting lifting device and its it is set using method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2866514Y (en) * 2006-02-22 2007-02-07 宝山钢铁股份有限公司 Blast furnace body frame
CN203079579U (en) * 2012-11-16 2013-07-24 河南省耕生耐火材料有限公司 Steel ladle hydraulic rod suspending device
CN206769354U (en) * 2017-05-10 2017-12-19 中城投集团第八工程局有限公司 A kind of steel structure hoisting platform
CN108996385A (en) * 2018-09-17 2018-12-14 安徽马钢设备检修有限公司 A kind of last furnace shell lifting lifting device and its it is set using method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114058750A (en) * 2021-11-30 2022-02-18 中国十九冶集团有限公司 Lapping method for new and old foundations of blast furnace integrally and horizontally pushed
CN114058750B (en) * 2021-11-30 2022-10-14 中国十九冶集团有限公司 Lap joint method for new and old foundations of whole horizontal moving of blast furnace
CN114480758A (en) * 2021-12-23 2022-05-13 中国华冶科工集团有限公司 Modular dismantling method for blast furnace frame

Similar Documents

Publication Publication Date Title
CN103669832B (en) A kind of standard type Bailey bracket assembled jacking formwork system
CN104070316B (en) A kind of assembled group of welded H section steel is to device and using method thereof
CN105442866B (en) Protective demolition and installation method for large-scale highrise steel structure
CN104310165A (en) Guide rail type adhesion construction lifter and construction method thereof
CN109468420A (en) A kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method
CN210164286U (en) Support arrangement for high altitude large-span steel structure truss installation usefulness
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
CN104668933B (en) Disassembling and assembling method for rotating arm and pivot of turbine runner
CN101899540A (en) Construction method for overhauling blast furnace and keeping furnace shell and cooling wall
CN202963332U (en) Device for manufacturing pile foundation reinforcement cage by using simple portal frame
CN107150110A (en) A kind of fan-shaped section extracts guide rail installation method
CN101774516B (en) Lifting device and construction method for replacing rake crane bridge
CN108625292B (en) Template assembling platform of prefabricated stand column
CN102926330A (en) Installation method of hanging basket suitable for bridge construction
CN215593700U (en) Construction platform for welding steel box girder support by using method
CN211420889U (en) Temporary limiting device for linear adjustment of PC track beam
CN209288575U (en) A kind of tooled joint welding trolley suitable for the installation of penstock curved segment
CN112049017A (en) Bailey frame integral frame falling device for cast-in-place box girder and construction process
CN111441782A (en) Shield translation station-passing method
CN208761967U (en) A kind of embedded lifting lug node structure
CN207277893U (en) A kind of section steel platform formwork erecting structure for high-altitude overhanging
CN110374006A (en) A kind of construction method for removing space opposite sex large-tonnage steel beam bracket
CN205764593U (en) Pipe cat ladder forming frock
CN205077876U (en) Prestressed steel strand pulling machine and tensioning jack suspension device
CN220645967U (en) Round support frame is protected to subway tunnel segment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190315

RJ01 Rejection of invention patent application after publication