CN109460932A - A kind of civil airport energy management system - Google Patents
A kind of civil airport energy management system Download PDFInfo
- Publication number
- CN109460932A CN109460932A CN201811371343.3A CN201811371343A CN109460932A CN 109460932 A CN109460932 A CN 109460932A CN 201811371343 A CN201811371343 A CN 201811371343A CN 109460932 A CN109460932 A CN 109460932A
- Authority
- CN
- China
- Prior art keywords
- energy
- equipment
- airport
- management system
- monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000012544 monitoring process Methods 0.000 claims abstract description 29
- 238000005265 energy consumption Methods 0.000 claims abstract description 18
- 238000007689 inspection Methods 0.000 claims abstract description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 6
- 239000000567 combustion gas Substances 0.000 claims description 3
- 230000005611 electricity Effects 0.000 claims description 3
- -1 electricity Substances 0.000 claims description 3
- 239000007788 liquid Substances 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 238000007726 management method Methods 0.000 abstract description 28
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000012423 maintenance Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012098 association analyses Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/40—Business processes related to the transportation industry
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/16—Energy services, e.g. dispersed generation or demand or load or energy savings aggregation
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of civil airport energy management systems, including center monitoring layer, submodule access layer and scene equipment level;The center monitoring layer realizes the Stateful Inspection of all devices in the energy and equipment management system, fault alarm, energy consumption monitoring, metering and billing, classification metering separate, equipment account management.Compared with prior art, the beneficial effects of the present invention are: the energy management system on airport is to integrate energy supply, energy delivery, energy consumption, energy auditing, Energy Saving Strategy, the closed loop digitlization operation platform of O&M strategy, equipment management, the energy and life period of an equipment management are realized;Reach and save manpower, save the energy, unified management, realizes the target of the whole O&M of the airport energy and equipment.
Description
Technical field
The invention belongs to civil aviation mangement technical fields, and in particular to a kind of civil airport energy management system.
Background technique
Currently, most of airport has been completed reducing energy consumption, but none is clear for the energy consumption on airport,
Efficiently, transparent system support, can not convenient, rapidly grasp current airport uses energy situation, all kinds of to airport can not use energy
The operating status of equipment and with can load situation of change concentrated, automatic and monitoring in real time, lack energy supply system
Operation monitoring and scheduling, lead to not the supervision of real-time monitoring energy situation, equipment operation condition and energy delivery, also not
It is easily able to go to formulate energy application plan from the angle of macroscopic view.
Summary of the invention
For above-mentioned the technical problems existing in the prior art, present invention technical solution used for the above purpose
It is:
A kind of civil airport energy management system, it is characterised in that: including center monitoring layer, submodule access layer and field device
Layer;The center monitoring layer realizes that the Stateful Inspection of all devices in the energy and equipment management system, fault alarm, energy consumption are supervised
The functions such as survey, metering and billing, classification metering separate, equipment account management, are provided additionally with other third party system access functions.
The submodule access layer will with airport power monitoring, monitoring boiler, central air-conditioner monitoring, intelligent lighting monitoring,
Elevator monitoring etc. is accessed in the energy and equipment management system with energy relevant sub-module by standard interface, convenient for being managed collectively,
Linkage between United Dispatching and each submodule.
Data collector is responsible for realizing to the real-time of the data such as end water, electricity, combustion gas, cold and hot amount in the scene equipment level
The functions such as acquisition, measurement, receive the instruction of central information layer, to scene equipment level equipment publication instruction, collect and handle from
The collected various information of infrastructure device, and will be live by modes such as wired, short-distance wireless, GPRS, OA networks by data
Device data real-time Transmission is to the energy and overall equipment management platform.
Further, system uses B/S framework, and user facilitates real time inspection devices in system and energy consumption by browser
Situation, and liquid crystal-spliced screen real-time exhibition status of energy consumption can be passed through.
Compared with prior art, the beneficial effects of the present invention are: the energy management system on airport is collection energy supply, the energy
Conveying, energy consumption, energy auditing, Energy Saving Strategy, O&M strategy, equipment management are flat in the closed loop digitlization O&M of one
Platform realizes the energy and life period of an equipment management;Reach and save manpower, save the energy, unified management, realizes airport energy
The target of the whole O&M of source and equipment.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described,
Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention
Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all
Belong to the scope of protection of the invention.
A kind of civil airport energy management system, it is characterised in that: including center monitoring layer, submodule access layer and scene
Mechanical floor;The center monitoring layer realizes Stateful Inspection, the fault alarm, energy consumption of all devices in the energy and equipment management system
The functions such as monitoring, metering and billing, classification metering separate, equipment account management, are provided additionally with other third party system access functions.
The submodule access layer will with airport power monitoring, monitoring boiler, central air-conditioner monitoring, intelligent lighting monitoring,
Elevator monitoring etc. is accessed in the energy and equipment management system with energy relevant sub-module by standard interface, convenient for being managed collectively,
Linkage between United Dispatching and each submodule.
Data collector is responsible for realizing to the real-time of the data such as end water, electricity, combustion gas, cold and hot amount in the scene equipment level
The functions such as acquisition, measurement, receive the instruction of central information layer, to scene equipment level equipment publication instruction, collect and handle from
The collected various information of infrastructure device, and will be live by modes such as wired, short-distance wireless, GPRS, OA networks by data
Device data real-time Transmission is to the energy and overall equipment management platform.
Further, system uses B/S framework, and user facilitates real time inspection devices in system and energy consumption by browser
Situation, and liquid crystal-spliced screen real-time exhibition status of energy consumption can be passed through.
This system part exemplary functions:
(1) with energy safe unit.Including to electric integrated monitoring function, meet the big region in airport, multi-Substation it is unattended,
Guarantee the demand with energy safety;To solving with water, water supply network real-time monitoring, airport water supply network is complicated, region is big, pipeline
The problems such as long.
(2) airport energy management unit.Including to airport energy consumption summary, energy consumption analysis, energy consumption comparison, energy consumption ranking and
The function of airport traffic, temperature, flight sortie of taking off and landing etc. and energy correlative factor association analysis, meets for airport energy
The demand of the systematization in source, fine-grained management.
(3) turn for charging function.Airport turn include for charge unit to the metering and billing function of airport unit in field and
The charge unit that a pre-payment is combined with post-paid to the pre paid functionality of airport building retail shop, be provided simultaneously with
Unionpay's system, the function of self-help charging docking.
(4) equipment Management Function.Device management unit includes that maintenance, maintenance, the foundation with energy equipment great to airport is set
Standby account establishes electronic achives to airport important equipment, carries out electronic management, realize the Life cycle pipe of substantial equipment
Reason, in order to which airport operation maintenance personnel accomplishes early discovery, early prevention, it is ensured that equipment operational safety.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (2)
1. a kind of civil airport energy management system, it is characterised in that: set including center monitoring layer, submodule access layer and scene
Standby layer;The center monitoring layer realizes that the Stateful Inspection of all devices in the energy and equipment management system, fault alarm, energy consumption are supervised
Survey, metering and billing, classification metering separate, equipment account management;The submodule access layer will be supervised with airport power monitoring, boiler
Control, central air-conditioner monitoring, intelligent lighting monitoring, elevator monitoring etc. and energy relevant sub-module by standard interface access the energy with
In equipment management system;Data collector is responsible for realizing to the number such as end water, electricity, combustion gas, cold and hot amount in the scene equipment level
According to it is real-time acquisition, measurement.
2. a kind of civil airport energy management system as described in claim 1, it is characterised in that: system uses B/S frame
Structure, user facilitates real time inspection devices in system and status of energy consumption by browser, and can pass through liquid crystal-spliced screen real-time exhibition
Status of energy consumption.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811371343.3A CN109460932A (en) | 2018-11-18 | 2018-11-18 | A kind of civil airport energy management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811371343.3A CN109460932A (en) | 2018-11-18 | 2018-11-18 | A kind of civil airport energy management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109460932A true CN109460932A (en) | 2019-03-12 |
Family
ID=65610854
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811371343.3A Withdrawn CN109460932A (en) | 2018-11-18 | 2018-11-18 | A kind of civil airport energy management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109460932A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111637942A (en) * | 2020-04-21 | 2020-09-08 | 武汉菲奥达物联科技有限公司 | Airport energy management device and system based on LoRaWAN agreement |
-
2018
- 2018-11-18 CN CN201811371343.3A patent/CN109460932A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111637942A (en) * | 2020-04-21 | 2020-09-08 | 武汉菲奥达物联科技有限公司 | Airport energy management device and system based on LoRaWAN agreement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201928476U (en) | Streetlamp remote management control system and front-end single-lamp controller | |
CN102520683B (en) | Energy source monitoring cloud platform for photovoltaic system | |
CN109038823A (en) | Distributed wind-light storage integration intelligent control system for microgrid | |
CN203147907U (en) | Urban centralized heating linkage optimal control system | |
CN107274303A (en) | City heat supply energy consumption wisdom management and control technology platform | |
CN205678547U (en) | A kind of Multifunctional smart street lamp | |
CN104216358A (en) | Two-stage energy management based intelligent community low-carbon energy management system | |
CN205992803U (en) | Intelligent power saving electric power system based on cloud computing technology | |
CN201887974U (en) | Remote management system of LED (light emitting diode) road lamp | |
CN202737585U (en) | Energy management system | |
CN109460932A (en) | A kind of civil airport energy management system | |
CN202817899U (en) | Orderly power utility precision management device | |
CN109146338B (en) | Hydropower station production scheduling system and method | |
CN104978631A (en) | Electric energy metering and management system for large-scale enterprise | |
CN110516983A (en) | Airport electrical equipment intelligent management platform and airport intelligence system based on Internet of Things | |
CN103699088B (en) | A kind of base station oil engine dispatching management information system based on dynamic environment monitoring and method | |
CN210669543U (en) | Transformer substation inspection robot system capable of achieving mobile charging | |
CN208351311U (en) | A kind of cooling equipment monitoring system of supervisor's net | |
CN205540231U (en) | Management and control system is synthesized in city | |
CN113596075A (en) | Multi-energy complementary comprehensive energy service system | |
CN113596163A (en) | Intelligent water affair management system based on internet and application thereof | |
CN209600307U (en) | A kind of charging pile device | |
CN209072514U (en) | A kind of intelligent power acquisition terminal detection device | |
CN203813529U (en) | Power distribution management system of intelligent terminal | |
CN102377187A (en) | Reactive compensation system on remote monitoring post |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190312 |
|
WW01 | Invention patent application withdrawn after publication |