CN109457570A - One kind crossing crossing device convenient for precasting yard portal jib crane - Google Patents
One kind crossing crossing device convenient for precasting yard portal jib crane Download PDFInfo
- Publication number
- CN109457570A CN109457570A CN201910003221.7A CN201910003221A CN109457570A CN 109457570 A CN109457570 A CN 109457570A CN 201910003221 A CN201910003221 A CN 201910003221A CN 109457570 A CN109457570 A CN 109457570A
- Authority
- CN
- China
- Prior art keywords
- jib crane
- portal jib
- cover plate
- fork
- activity cover
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
- E01C9/08—Temporary pavings
- E01C9/083—Temporary pavings made of metal, e.g. plates, network
Abstract
The invention belongs to one kind to cross crossing device convenient for precasting yard portal jib crane, including choosing fork structure and activity cover plate structure, choosing fork structure and being used to provoke to be covered on portal jib crane and set the activity cover plate of duct upper end enables the conducting wire of portal jib crane smoothly to pass through from activity cover plate lower end.Choose fork structural support by connecting bracket, fixing seat, stiffening plate, choose fork and tiltedly reinforcing bar formed.Activity cover plate structure, which is used to cooperate, chooses the upper surface that fork structure opening and closing portal jib crane sets duct.Activity cover plate structure is constituted by fixing bottom plate, fixing axle ear, hinge axis and activity cover plate.The present invention can make portal jib crane carry out lid portal jib crane automatically quickly through crossing and iron plate to set duct under not parking state, have simple and practical in structure, time saving and energy saving a, low manufacture cost, using effect and the good advantage of safety.
Description
Technical field
The invention belongs to one kind to cross crossing device convenient for precasting yard portal jib crane.
Background technique
The portal jib crane of precasting yard is precasting yard production necessary equipment, and portal jib crane passes through crane roll-out tray and its lower end
Rail wheel be located on track, portal jib crane can move to operating location by the rail wheel on crane roll-out tray in orbit, to life
Product money carries out handling.Crane, movement and the operating system of portal jib crane are power according to electricity, are usually set in the outer side edges of track
Portal jib crane sets duct, and the conducting wire for introducing power supply is put portal jib crane and set in duct, sets the corresponding side of duct with portal jib crane
Conducting wire fixing clip is set with the fixed conducting wire being located on portal jib crane in spacing distance on crane roll-out tray.Therefore, gantry
The conducting wire of crane lower end crouches to be set in duct in portal jib crane.Lane is set in precasting yard, vehicle pass-through is used for, when portal jib crane is set
Crossing is formed when duct intersects with lane, to guarantee that smoothly passage need to set line in the portal jib crane for passing across lane to vehicle in lane
Top iron and screw plate is carried out in the upper end of ditch, but portal jib crane sets duct upper end and carries out the operation that the iron plate covered seriously affects portal jib crane, gantry crane
When vehicle is expert to crossing section, need to stop, employment will carry out and cover and move away from the iron plate that portal jib crane sets duct upper end, wear to portal jib crane
It crosses and carries out top iron and screw plate behind crossing again again, this method is not only time-consuming and laborious, also seriously affects the operation and traffic peace of portal jib crane
Entirely.
Summary of the invention
The object of the present invention is to provide one kind to cross crossing device convenient for precasting yard portal jib crane, can make under not parking state
Portal jib crane carries out lid portal jib crane quickly through crossing and iron plate automatically and sets duct, has simple and practical in structure, time saving and energy saving, system
Make at low cost, using effect and the good advantage of safety.
For this purpose, the present invention includes choosing fork structure and activity cover plate structure, in which:
It chooses fork structure: keeping the conducting wire of portal jib crane suitable for provoking to be covered on portal jib crane and set the activity cover plate of duct upper end
Benefit passes through from activity cover plate lower end.Choose fork structural support by connecting bracket, fixing seat, stiffening plate, choose fork and tiltedly reinforcing bar institute
Composition.It chooses fork to be arc-shaped, chooses vent and set in duct in portal jib crane.It chooses the front and rear portions of fork and sets lower than being covered on portal jib crane
The lower end surface of each activity cover plate of duct upper end, the middle part for choosing fork are higher than the upper surface that portal jib crane sets duct.Between two are in
The upper end of connecting bracket of the gauge from setting passes through fixing seat and the crane roll-out tray that duct side is set positioned at portal jib crane
Side is connected.The middle part of connecting bracket is connected to oblique with middle part lower end that is choosing fork.The front of connecting bracket is downward
Vertically fold into.Oblique reinforcing bar is equipped between the front end of connecting bracket and the front lower ends for choosing fork.It is set between the front end of connecting bracket
There is stiffening plate.The conducting wire of portal jib crane is between connecting bracket.
Activity cover plate structure: for cooperating the upper surface chosen fork structure opening and closing portal jib crane and set duct.Activity cover plate
Structure is constituted by fixing bottom plate, fixing axle ear, hinge axis and activity cover plate.Fixed bottom plate is fixed on the gantry crane of outboard end
Vehicle is set on the bank of duct.The upper surface of fixed bottom plate is equipped with fixing axle ear in spacing distance, and the rear end of activity cover plate passes through
Hinge axis is linked between two adjacent fixing axle ears.The portal jib crane that the front of activity cover plate rides upon inner end sets line
On the bank of ditch.
The upper surface for choosing fork is transversely provided with beaming roller slot in spacing distance, and beaming roller slot inner shaft is equipped with beaming roller.Described
The longitudinal axis for choosing fork is parallel with the longitudinal axis that portal jib crane sets duct.The front and rear portions for choosing fork are bent downward.The work
Dynamic cover plate is rectangular strip steel plate, and several piece activity cover plate, which carries out to cover side by side, sets the upper surface of duct in portal jib crane.Described
The forward and backward end for choosing fork with end in contact under activity cover plate is inclined-plane.Between being equipped between the adjacent activity cover plate
Gap.
Above structure has reached the purpose of the present invention.
The present invention can make portal jib crane carry out lid portal jib crane automatically quickly through crossing and iron plate to set under not parking state
Duct has simple and practical in structure, time saving and energy saving, low manufacture cost, using effect and the good advantage of safety.
Compared with the prior art the present invention has the advantages that:
(1) present invention can make portal jib crane quickly through crossing, transport to lane traffic in the state of not influencing communications and transportation
Without influence, it is slow to solve the problems, such as that the vehicle time is spent at crossing.
(2) present invention can realize that portal jib crane is carried out lid portal jib crane quickly through crossing and activity cover plate automatically and set automatically
Duct, no attricist are time saving and energy saving.
(3) safety of the present invention is good, low manufacture cost, and the safety of construction personnel can be effectively ensured.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the schematic diagram of another structure and its use state of the invention.
Specific embodiment
Embodiment 1: as depicted in figs. 1 and 2, one kind crossing crossing device convenient for precasting yard portal jib crane, including chooses fork structure
With activity cover plate structure, portal jib crane is located on track 4 by the rail wheel 19 of crane roll-out tray 5 and its lower end, in which:
It chooses fork structure: making the conducting wire of portal jib crane for provoking to be covered on portal jib crane and set the activity cover plate 12 of 7 upper end of duct
10 can smoothly pass through from activity cover plate lower end.Choose fork structural support by connecting bracket 2, fixing seat 3, stiffening plate 11, choose fork 8 and
Oblique reinforcing bar 9 is formed.It chooses fork to be arc-shaped, chooses vent and set in duct in portal jib crane.The front and rear portions for choosing fork, which are lower than, to be covered on
Portal jib crane sets the lower end surface of each activity cover plate of duct upper end.
The middle part for choosing fork is higher than the upper surface that portal jib crane sets duct.When each activity cover plate is located at the middle part for choosing fork,
The space that activity cover plate is opened can be such that connecting bracket and conducting wire passes through.The longitudinal axis for choosing fork and portal jib crane sets duct
Longitudinal axis it is parallel.The front and rear portions for choosing fork are bent downward, and end in contact chooses fork under the cover plate with activity
Forward and backward end is inclined-plane, is pushed up upwards in order to choosing the front and rear portions of fork and holds activity cover plate.
The upper end of two connecting brackets in spacing distance setting duct side is set with portal jib crane is located at by fixing seat
The side of crane roll-out tray be connected.The middle part of connecting bracket is connected to oblique with middle part lower end that is choosing fork.Even
The front for connecing bracket folds into downward vertically.Oblique reinforcing bar is equipped between the front end of connecting bracket and the front lower ends for choosing fork, to add
The intensity between the front of fork and connecting bracket is chosen by force.Stiffening plate is equipped between the front end of connecting bracket, for reinforcing two connections
Bonding strength between bracket and the lower end for choosing fork.The conducting wire of portal jib crane is between connecting bracket.Positioned at connecting bracket it
Between conducting wire can to pass through conducting wire fixing clip 1 with connecting bracket fixed.
Activity cover plate structure: for cooperating the upper surface chosen fork structure opening and closing portal jib crane and set duct.Activity cover plate
Structure is constituted by fixing bottom plate 18, fixing axle ear 14, hinge axis 13 and activity cover plate 12.Fixed bottom plate is fixed on outboard end
Portal jib crane set on the bank of duct.The upper surface of fixed bottom plate is equipped with fixing axle ear in spacing distance.Activity cover plate
Rear end is linked between two adjacent fixing axle ears by hinge axis.The front of activity cover plate rides upon gantry of inner end
Crane is set on the bank 6 of duct, so that so that activity cover plate is opened and closed portal jib crane from front as axis using hinge axis sets duct
Upper end.The activity cover plate is rectangular strip steel plate, and several piece activity cover plate carries out to cover side by side sets duct in portal jib crane
Upper surface.Gap is equipped between the adjacent activity cover plate, in order to avoid interact.
When portal jib crane crosses crossing, choose fork structure with portal jib crane move ahead or retreat, positioned at choose fork structure on choosing fork before,
Rear end, which contacts to carry out to set first, sets the activity cover plate of duct upper end side in portal jib crane, with moving ahead or retreating for fork is chosen, chooses
Fork provokes each activity cover plate from its front by each upwards, is covered for the conducting wire between connecting bracket by each activity
The lower end of plate, each activity cover plate loses support force after choosing fork, falls closing using hinge axis as axis again and closes portal jib crane and sets
The upper end of duct, for vehicle pass-through.
As shown in Fig. 2, unlike 1 structure of embodiment: the upper surface for choosing fork is transversely provided in spacing distance
Beaming roller slot 15, beaming roller slot inner shaft are equipped with beaming roller 16, and the both ends of beaming roller can set roll shaft 17, and the both ends of beaming roller are located at axis by roll shaft axis
In roller slot, is contacted so that the upper surface for choosing fork be made to become bearing element with the CONTACT WITH FRICTION of each activity cover plate, be more convenient for choosing fork
Each activity cover plate is provoked upwards from its front by each.Remaining structure is identical, therefore is not repeated.
In short, the present invention can make portal jib crane carry out lid gantry crane automatically quickly through crossing and iron plate under not parking state
Vehicle sets duct, has simple and practical in structure, time saving and energy saving, low manufacture cost, using effect and the good advantage of safety.
Claims (7)
1. one kind crosses crossing device convenient for precasting yard portal jib crane, including choose fork structure and activity cover plate structure, feature exist
In:
It chooses fork structure: keeping the conducting wire of portal jib crane suitable for provoking to be covered on portal jib crane and set the activity cover plate of duct upper end
Benefit passes through from activity cover plate lower end, choose fork structural support by connecting bracket, fixing seat, stiffening plate, choose fork and tiltedly reinforcing bar institute
Composition, chooses fork and is arc-shaped, choose vent and set in duct in portal jib crane, chooses the front and rear portions of fork and sets lower than being covered on portal jib crane
The lower end surface of each activity cover plate of duct upper end, the middle part for choosing fork is higher than the upper surface that portal jib crane sets duct, between two are in
The upper end of connecting bracket of the gauge from setting passes through fixing seat and the crane roll-out tray that duct side is set positioned at portal jib crane
Side is connected, and the middle part of connecting bracket is connected to oblique with middle part lower end that is choosing fork, and the front of connecting bracket is downward
It vertically folds into, oblique reinforcing bar is equipped between the front end of connecting bracket and the front lower ends for choosing fork, is set between the front end of connecting bracket
There is stiffening plate, the conducting wire of portal jib crane is between connecting bracket;
Activity cover plate structure: for cooperating the upper surface chosen fork structure opening and closing portal jib crane and set duct, activity cover plate structure
It is made of fixed bottom plate, fixing axle ear, hinge axis and activity cover plate, the portal jib crane that fixed bottom plate is fixed on outboard end is set
On the bank of duct, the upper surface of fixed bottom plate is equipped with fixing axle ear in spacing distance, and the rear end of activity cover plate passes through hinge
For Spindle Links between two adjacent fixing axle ears, the portal jib crane that the front of activity cover plate rides upon inner end sets duct
On bank.
2. one kind according to claim 1 crosses crossing device convenient for precasting yard portal jib crane, it is characterised in that: described chooses
The upper surface of fork is transversely provided with beaming roller slot in spacing distance, and beaming roller slot inner shaft is equipped with beaming roller.
3. one kind according to claim 1 crosses crossing device convenient for precasting yard portal jib crane, it is characterised in that: described chooses
The longitudinal axis of fork is parallel with the longitudinal axis that portal jib crane sets duct.
4. one kind according to claim 1 crosses crossing device convenient for precasting yard portal jib crane, it is characterised in that: described chooses
The front and rear portions of fork are bent downward.
5. one kind according to claim 1 crosses crossing device convenient for precasting yard portal jib crane, it is characterised in that: the work
Dynamic cover plate is rectangular strip steel plate, and several piece activity cover plate, which carries out to cover side by side, sets the upper surface of duct in portal jib crane.
A kind of cross crossing device 6. according to claim 1 convenient for precasting yard portal jib crane, it is characterised in that: it is described with
The forward and backward end for choosing fork of end in contact is inclined-plane under activity cover plate.
7. one kind according to claim 1 crosses crossing device convenient for precasting yard portal jib crane, it is characterised in that: the phase
Gap is equipped between adjacent activity cover plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910003221.7A CN109457570A (en) | 2019-01-03 | 2019-01-03 | One kind crossing crossing device convenient for precasting yard portal jib crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910003221.7A CN109457570A (en) | 2019-01-03 | 2019-01-03 | One kind crossing crossing device convenient for precasting yard portal jib crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109457570A true CN109457570A (en) | 2019-03-12 |
Family
ID=65616071
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910003221.7A Pending CN109457570A (en) | 2019-01-03 | 2019-01-03 | One kind crossing crossing device convenient for precasting yard portal jib crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109457570A (en) |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN85203403U (en) * | 1985-08-12 | 1986-08-13 | 中国人民解放军总参谋部工程兵技术装备研究所 | Temporary paving |
CN200940074Y (en) * | 2006-09-09 | 2007-08-29 | 阮曙峰 | Automatic burning plate device for slip conducting wire trench for portal crane |
CN201010444Y (en) * | 2007-02-09 | 2008-01-23 | 上海港机重工有限公司 | Electric cable reversing device used for crane commercial power supply |
CN201427839Y (en) * | 2009-05-13 | 2010-03-24 | 中船澄西船舶修造有限公司 | Berth 40T overhead crane plate turnover device |
CN101837927A (en) * | 2010-04-20 | 2010-09-22 | 上海多为电子科技有限公司 | Power supply system of sliding contact line of trench of tyre crane of container yard |
TW201206816A (en) * | 2010-06-08 | 2012-02-16 | Mitsubishi Heavy Ind Ltd | Crane system |
CN103052588A (en) * | 2011-01-19 | 2013-04-17 | 三菱重工机械科技株式会社 | Crane power-feed cable reel device and crane provided therewith |
CN203033672U (en) * | 2013-01-24 | 2013-07-03 | 曲靖市中泰新型墙材有限公司 | Gantry crane cable operation mechanism |
CN203638983U (en) * | 2013-12-20 | 2014-06-11 | 重庆起重机厂有限责任公司 | Trench conductive device for crane |
CN203682926U (en) * | 2014-01-21 | 2014-07-02 | 海阳中集来福士海洋工程有限公司 | Power supply cable overturning protection device of portal crane |
WO2014131826A1 (en) * | 2013-02-27 | 2014-09-04 | Ipalco Bv | A device for automatically connecting a vehicle to an electric power supply |
CN105883619A (en) * | 2014-12-09 | 2016-08-24 | 常州市恒基港口机械厂 | Trench conductive device for crane |
CN207149835U (en) * | 2017-09-01 | 2018-03-27 | 华东交通大学 | A kind of crane trench electric installation |
CN209368612U (en) * | 2019-01-03 | 2019-09-10 | 中交一公局第一工程有限公司 | One kind crossing crossing device convenient for precasting yard portal jib crane |
-
2019
- 2019-01-03 CN CN201910003221.7A patent/CN109457570A/en active Pending
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN85203403U (en) * | 1985-08-12 | 1986-08-13 | 中国人民解放军总参谋部工程兵技术装备研究所 | Temporary paving |
CN200940074Y (en) * | 2006-09-09 | 2007-08-29 | 阮曙峰 | Automatic burning plate device for slip conducting wire trench for portal crane |
CN201010444Y (en) * | 2007-02-09 | 2008-01-23 | 上海港机重工有限公司 | Electric cable reversing device used for crane commercial power supply |
CN201427839Y (en) * | 2009-05-13 | 2010-03-24 | 中船澄西船舶修造有限公司 | Berth 40T overhead crane plate turnover device |
CN101837927A (en) * | 2010-04-20 | 2010-09-22 | 上海多为电子科技有限公司 | Power supply system of sliding contact line of trench of tyre crane of container yard |
TW201206816A (en) * | 2010-06-08 | 2012-02-16 | Mitsubishi Heavy Ind Ltd | Crane system |
CN103052588A (en) * | 2011-01-19 | 2013-04-17 | 三菱重工机械科技株式会社 | Crane power-feed cable reel device and crane provided therewith |
CN203033672U (en) * | 2013-01-24 | 2013-07-03 | 曲靖市中泰新型墙材有限公司 | Gantry crane cable operation mechanism |
WO2014131826A1 (en) * | 2013-02-27 | 2014-09-04 | Ipalco Bv | A device for automatically connecting a vehicle to an electric power supply |
CN105073623A (en) * | 2013-02-27 | 2015-11-18 | 伊帕尔科公司 | A device for automatically connecting a vehicle to an electric power supply |
CN203638983U (en) * | 2013-12-20 | 2014-06-11 | 重庆起重机厂有限责任公司 | Trench conductive device for crane |
CN203682926U (en) * | 2014-01-21 | 2014-07-02 | 海阳中集来福士海洋工程有限公司 | Power supply cable overturning protection device of portal crane |
CN105883619A (en) * | 2014-12-09 | 2016-08-24 | 常州市恒基港口机械厂 | Trench conductive device for crane |
CN207149835U (en) * | 2017-09-01 | 2018-03-27 | 华东交通大学 | A kind of crane trench electric installation |
CN209368612U (en) * | 2019-01-03 | 2019-09-10 | 中交一公局第一工程有限公司 | One kind crossing crossing device convenient for precasting yard portal jib crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103935694B (en) | A kind of heavy suspended chain conveyer and delivery system | |
CN103010688A (en) | Trolley type steel coil transport system | |
CN104176633A (en) | Double-track trolley group running mechanism for ultra-large gantry crane | |
CN209368612U (en) | One kind crossing crossing device convenient for precasting yard portal jib crane | |
CN101973485A (en) | Novel electric hoist mono-beam bridge type crane | |
CN204847993U (en) | Double girder overhead crane | |
CN203045267U (en) | Device for on-line installation of paper sleeve | |
CN201567186U (en) | Forklift truck mast with middle guide rail structure | |
CN202935878U (en) | Trolley type steel coil transport system | |
CN207997892U (en) | A kind of construction steel pipe transmission trolley | |
CN109457570A (en) | One kind crossing crossing device convenient for precasting yard portal jib crane | |
CN204800244U (en) | Rail train bogie wheel pair withdrawal machine | |
US8056483B2 (en) | Cable or pipeline trolley for traveling along a carrier rail | |
CN205632430U (en) | Power wheel counter gear case strutting arrangement | |
CN206218664U (en) | The travelling dolly of belt feeder storage cassette holder | |
AT504497B1 (en) | Storage cart is equipped with loading container and with transfer conveyor belt, where loading container has rear wall which is modified according to position in relation to floor conveyor belt | |
CN201553557U (en) | Broken rail passing single-beam bridge crane | |
CN106672811A (en) | Novel lightweight bridge crane | |
CN205571371U (en) | A propelling movement machine for continuous casting square billet is carried | |
CN207670173U (en) | A kind of installation guide frame of battery pack | |
CN214280128U (en) | Storage battery trolley chute structure lower box | |
CN203227677U (en) | Flat feeding machine for cold-rolled ribbed bars | |
CN207106512U (en) | A kind of new guiding and secondary mousing rail safety device | |
CN205973663U (en) | Slitter edge hoist mechanism | |
CN206873615U (en) | A kind of packaged type door frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |