CN109450746A - Method of network entry, device, server and the storage medium of power peak regulation system equipment - Google Patents
Method of network entry, device, server and the storage medium of power peak regulation system equipment Download PDFInfo
- Publication number
- CN109450746A CN109450746A CN201811209917.7A CN201811209917A CN109450746A CN 109450746 A CN109450746 A CN 109450746A CN 201811209917 A CN201811209917 A CN 201811209917A CN 109450746 A CN109450746 A CN 109450746A
- Authority
- CN
- China
- Prior art keywords
- gateway
- equipment
- peak regulation
- optimal
- power peak
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/28—Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
- H04L12/2854—Wide area networks, e.g. public data networks
- H04L12/2856—Access arrangements, e.g. Internet access
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W48/00—Access restriction; Network selection; Access point selection
- H04W48/16—Discovering, processing access restriction or access information
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W48/00—Access restriction; Network selection; Access point selection
- H04W48/18—Selecting a network or a communication service
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Abstract
The present invention provides method of network entry, device, server and the storage mediums of a kind of power peak regulation system equipment, wherein the method for network entry of the power peak regulation system equipment includes the location information for obtaining equipment, the gateway unit where equipment is determined according to the location information, detect the signal strength and/or signal quality of all gateways in gateway unit, selection signal intensity and/or the strongest gateway of signal quality are networked the equipment by optimal gateway as optimal gateway.By implementing the present invention, first according to the gateway unit of the location determining device of equipment, then optimal gateway is selected according to the signal strength of gateway in the gateway unit and/or signal quality, then by the optimal gateway equipment is networked, the problem of method of network entry for solving existing power peak regulation system equipment is unreasonable, will lead to power peak regulation low efficiency.
Description
Technical field
The present invention relates to power peak regulation technical fields, and in particular to a kind of method of network entry of power peak regulation system equipment, dress
It sets, server and storage medium.
Background technique
Generally there are thousands of equipment, such as air-heater in the power grid of power peak regulation system.Existing power peak regulation system
System generallys use the mode of barcode scanning networking when equipment networks.
Since usually equipment being networked by gateway at random when networking, so that after equipment networking, to equipment tune
When peak, continue that the subsequent peak regulation low efficiency for equipment can be made by the way of unified peak regulation.
Summary of the invention
The embodiment of the invention provides a kind of method of network entry of power peak regulation system equipment, device, server and storages to be situated between
Matter, it is unreasonable with the method for network entry for solving power peak regulation system equipment in the prior art, it will lead to asking for power peak regulation low efficiency
Topic.
According in a first aspect, the embodiment of the invention provides a kind of method of network entry of power peak regulation system equipment, comprising: obtain
Take the location information of equipment;The gateway unit where the equipment is determined according to the positional information;Detect institute in gateway unit
There are the signal strength and/or signal quality of gateway;Selection signal intensity and/or the strongest gateway of signal quality are as optimal
Gateway;The equipment is networked by the optimal gateway.The networking of power peak regulation system equipment through the embodiment of the present invention
Method, first according to the gateway unit of the location determining device of equipment, then according to the signal strength of gateway in the gateway unit
And/or signal quality selects optimal gateway, then by the optimal gateway equipment is networked, solves existing power peak regulation
The problem of method of network entry of system equipment is unreasonable, will lead to power peak regulation low efficiency.
With reference to first aspect, in first aspect first embodiment, the equipment is passed through into the optimal net described
After the step of closing networking, further includes: be grouped according to pre-defined rule to multiple equipment;To multiple described after grouping
Equipment is grouped peak regulation.
With reference to first aspect, in first aspect second embodiment, the strongest gateway of selection signal intensity
The step of as optimal gateway, further includes: obtain the corresponding gateway collection of the strongest gateway of the signal strength;Wherein, institute
Stating gateway concentrates the quantity of the corresponding gateway to be greater than 1;The gateway is selected to concentrate the smallest gateway of capacity as institute
State optimal gateway;Wherein, the capacity is used to indicate the quantity of the equipment of the gateway connection.
With reference to first aspect, described that the equipment is passed through into the optimal gateway in first aspect third embodiment
The step of networking, comprising: obtain the identification information of the equipment;Wherein, the identification information is used to indicate the control of the equipment
Device information processed;The equipment and the optimal gateway are associated with according to the identification information.
Any embodiment with reference to first aspect, it is described according to pre-defined rule pair in the 4th embodiment of first aspect
The step of multiple equipment are grouped, comprising: by the equipment of the gateway association in the same gateway unit
It is divided into one group.
Any embodiment with reference to first aspect, it is described according to pre-defined rule pair in the 5th embodiment of first aspect
The step of multiple equipment are grouped, comprising: electricity consumption is chosen from gateway unit described at least one in preset range
The corresponding gateway of interior multiple equipment forms gateway group.
According to second aspect, the embodiment of the invention provides a kind of method of network entry of power peak regulation system equipment, comprising: hair
It send location information to server, so that the server determines the gateway unit where equipment according to the positional information, and examines
Survey the signal strength and/or signal quality of all gateways in gateway unit, selection signal intensity and/or the strongest institute of signal quality
Gateway is stated as optimal gateway;Instruction information is received from the server;Wherein, the instruction information is for indicating described optimal
Gateway;The optimal gateway is connected to according to the instruction information.
In conjunction with second aspect, in second aspect first embodiment, it is described be connected to according to the instruction information it is described
The step of optimal gateway includes: the identification information for sending the equipment;Wherein, the identification information is for indicating the equipment
Controller information;The optimal gateway is associated with by the identification information.
According to the third aspect, the embodiment of the invention provides a kind of networking devices of power peak regulation system equipment, comprising: obtains
Modulus block, for obtaining the location information of equipment;First processing module, for determining the equipment institute according to the positional information
Gateway unit;Detection module, for detecting the signal strength and/or signal quality of all gateways in gateway unit;Selection
Module, for selection signal intensity and/or the strongest gateway of signal quality as optimal gateway;Second processing module is used
It networks in the equipment is passed through the optimal gateway.
In conjunction with the third aspect, in third aspect first embodiment, the networking device of the power peak regulation system equipment
Further include: third processing module, for being grouped according to pre-defined rule to multiple equipment;Peak regulation module, for point
Multiple equipment after group are grouped peak regulation.
In conjunction with the third aspect, in third aspect second embodiment, the selecting module further include: acquiring unit is used
In obtaining the corresponding gateway collection of the strongest gateway of the signal strength;Wherein, the gateway concentrates the corresponding gateway
Quantity be greater than 1;Selecting unit, for selecting the gateway to concentrate the smallest gateway of capacity as the optimal gateway;
Wherein, the capacity is used to indicate the quantity of the equipment of the gateway connection.
According to fourth aspect, the embodiment of the invention provides a kind of networking device of power peak regulation system equipment, the electric power
The networking device of peak regulation system equipment includes: sending module, for sending location information to server, so that the server root
The gateway unit where equipment is determined according to the location information, and detect in gateway unit the signal strength of all gateways and/or
Signal quality, selection signal intensity and/or the strongest gateway of signal quality are as optimal gateway;Receiving module, for from
The server receives instruction information;Wherein, the instruction information is for indicating the optimal gateway;Fourth processing module is used
In being connected to the optimal gateway according to the instruction information.
According to the 5th aspect, the embodiment of the invention provides a kind of servers, comprising: including at least one processor;With
And the memory being connect at least one described processor communication;Wherein, the memory be stored with can by it is described at least one
The computer program that processor executes, the computer program is executed by least one described processor, so that described at least one
A processor executes the method for network entry of the power peak regulation system equipment as described in above-mentioned first aspect any embodiment.
According to the 6th aspect, the embodiment of the invention provides a kind of computer readable storage mediums, are stored thereon with calculating
Machine program realizes the electric power tune as described in above-mentioned first aspect any embodiment when the computer program is executed by processor
The method of network entry of peak system equipment.
Technical solution of the embodiment of the present invention has the advantages that
1. the embodiment of the invention provides a kind of method of network entry of power peak regulation system equipment, the power peak regulation system equipment
Method of network entry include the location information for obtaining equipment, determine the gateway unit where equipment according to the location information, detect net
The signal strength and/or signal quality of all gateways in unit are closed, selection signal intensity and/or the strongest gateway of signal quality are made
For optimal gateway, which is networked by optimal gateway.The networking of power peak regulation system equipment through the embodiment of the present invention
Method, first according to the gateway unit of the location determining device of equipment, then according to the signal strength of gateway in the gateway unit
And/or signal quality selects optimal gateway, then by the optimal gateway equipment is networked, solves existing power peak regulation
The problem of method of network entry of system equipment is unreasonable, will lead to power peak regulation low efficiency.
2. equipment is being passed through optimal net the embodiment of the invention provides a kind of method of network entry of power peak regulation system equipment
It closes after networking, further includes being grouped according to pre-defined rule to multiple equipment, tune is grouped to the multiple equipment after grouping
Each equipment is grouped by peak, such peak regulation method, and can make rational planning for grouping according to the demand of user, improves electric power
Peak regulation efficiency.
3. the embodiment of the invention provides a kind of method of network entry of power peak regulation system equipment, wherein selection signal intensity is most
Strong gateway is as optimal gateway, further includes: detects the signal strength of all gateways in the gateway unit, selection signal intensity is most
Strong gateway, the quantity of such gateway is in the case where being greater than 1, using these gateways as gateway collection, the gateway is selected to concentrate
The smallest gateway of capacity is as optimal gateway, and wherein the capacity is used to indicate the quantity of the equipment of gateway connection, i.e. selection connection
The least gateway of equipment not only can guarantee that the gateway signal intensity of equipment connection was good as optimal gateway in this way, but also can be all
Gateway reasonable distribution connects the quantity of equipment, rationally utilizes each gateway.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art
Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below
Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor
It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is a flow chart of the method for network entry of power peak regulation system equipment according to an embodiment of the present invention;
Fig. 2 is the flow chart of the method for network entry of power peak regulation system equipment according to the preferred embodiment of the invention;
Fig. 3 is another flow chart of the method for network entry of power peak regulation system equipment according to an embodiment of the present invention;
Fig. 4 is the structural block diagram of the networking device of power peak regulation system equipment according to an embodiment of the present invention;
Fig. 5 is the equipment networking flow chart of power peak regulation system according to an embodiment of the present invention;
Fig. 6 is the process flow diagram of the server of power peak regulation system according to an embodiment of the present invention;
Fig. 7 is that the hardware configuration of the server of the method for network entry of power peak regulation system equipment according to an embodiment of the present invention shows
It is intended to.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those skilled in the art are not having
Every other embodiment obtained under the premise of creative work is made, shall fall within the protection scope of the present invention.
The embodiment of the invention provides a kind of method of network entry of power peak regulation system equipment, applied to power peak regulation system
Server end, as shown in Figure 1, the method for network entry of the power peak regulation system equipment includes:
Step S101: the location information of equipment is obtained;Specifically, when equipment is mounted on presumptive area by worker, scanning is set
The two dimensional code of standby upper stickup, while the region where the equipment is input to server.
Step S102: the gateway unit where equipment is determined according to the location information;Server obtains where the equipment
Behind region, the gateway unit where equipment can be obtained, i.e., plans the implementation region of the good power peak regulation system, an area in advance
Domain becomes a gateway unit, and then the region where the equipment is sent to server, server when installing equipment by worker
Gateway unit of the equipment and place can be associated according to the two-dimensional barcode information of the equipment and the position where it.
Step S103: the signal strength and/or signal quality of all gateways in the gateway unit are detected;Specifically, every
There are several gateways in a gateway unit, when equipment is connected networking, first detects the signal of all gateways in gateway unit
Intensity and/or signal quality, wherein signal quality is related with signal strength and degree of disturbance, and signal quality is often referred to signal strength
With the ratio of degree of disturbance.
Step S104: selection signal intensity and/or the strongest gateway of signal quality are as optimal gateway;Specifically, in electricity
In power peak regulation system, many concentrators are usually provided with very much in different regions, gateway unit here can be understood as one
Region, the concentrator in the region can be understood as the gateway in the gateway unit.Such as it is somebody's turn to do " region " and can be understood as one
One area in village or a city, each area can be used as a region, referred to as a gateway unit, install in the area
Concentrator be known as the gateway in the gateway unit.In embodiments of the present invention, it when equipment is connected to concentrator, first examines
The signal strength indication for surveying all gateways in gateway unit, i.e., first detect the signal strength indication of all concentrators in the region, then
Select the smallest gateway of the absolute value of the signal strength indication as optimal gateway, the absolute value of selection signal intensity value is minimum here
Gateway be because wireless signal indicates that the value of signal strength is usually negative value, such as -40dbm, and signal strength indication is absolute
Value is minimum, illustrates that the signal strength is better, therefore, selects the smallest gateway of the absolute value for changing signal strength indication as optimal net
It closes, that is, selects the concentrator that signal strength is best in the region as optimal gateway.
Step S105: the equipment is networked by optimal gateway;Specifically, equipment is networked by the optimal gateway, energy
It is enough rationally to utilize each gateway.
The method of network entry of power peak regulation system equipment through the embodiment of the present invention, obtains the location information of equipment, according to
The location information determines the gateway unit where equipment, then detects the signal strength of all gateways in the gateway unit, selection
The strongest gateway of signal strength is networked as optimal gateway, by the equipment by optimal gateway, and each net can be reasonably utilized
The problem of pass, the method for network entry for solving existing power peak regulation system equipment is unreasonable, will lead to power peak regulation low efficiency.
Above-mentioned steps S105 is related to networking the equipment by optimal gateway, in a preferred embodiment, such as Fig. 2
It is shown, after this step, the method for network entry of the power peak regulation system equipment further include:
S106: multiple equipment is grouped according to pre-defined rule;Specific pre-defined rule can there are many, according to electric power
The demand of office or user formulate rule of classification;
S107: peak regulation is grouped to the multiple equipment after grouping.Such peak regulation method is divided each equipment
Group, can make rational planning for grouping according to the demand of user, improve power peak regulation efficiency.
Above-mentioned steps S106 is related to being grouped multiple equipment according to pre-defined rule, in a specific embodiment
In, which includes: that the equipment of the gateway association in same gateway unit is divided into one group.Specifically, under normal circumstances, it is
Facilitate management, the equipment of the gateway association in same gateway unit is divided into one group, i.e., is associated with area's intradomain gateway
Equipment be divided into one group, such as power office manages for convenience, using all air-heaters of the installation of Dongcheng District as a group
It is unified to carry out power peak regulation.
As an alternative embodiment, the packet mode in above-mentioned specific embodiment be can also be from multiple nets
It closes and chooses the corresponding gateway of electricity consumption multiple equipment within a preset range in unit and form gateway group, to belonging to same gateway group
Equipment carry out power peak regulation.Specifically, it in grouping, can not be grouped by gateway unit, power office can be according to setting
Standby specific electricity consumption situation, such as Dongcheng District, Xicheng District are two gateway units respectively, but have in the two gateway units
Equipment component electricity consumption is more, then gateway associated by these equipment can be formed gateway group, in power peak regulation, low ebb
The power supply volume of these equipment in the gateway group can be increased when the phase, power peak regulation is carried out to equipment with convenient and reasonable.Setting here
Standby electricity consumption can be determined according to the actual use situation of equipment, such as air-heater heating load is big, then its electricity consumption is inevitable more,
There may be the electricity consumptions of multiple air-heaters within the scope of higher one in a gateway unit, then by these air-heaters pair
The gateway answered forms a gateway group and carries out power peak regulation.The mode for carrying out power peak regulation to the equipment in gateway group is also possible to
It is a variety of, such as power office can switch related air-heater, the unified setting of mode, temperature, wind speed, peak regulation duration etc.,
Total power load is maintained a stable frequency as far as possible, carries out stable matching with generated energy.
Above-mentioned steps S104 is related to the strongest gateway of selection signal intensity as optimal gateway, in a preferable embodiment party
In formula, the step further include: obtain the corresponding gateway collection of the strongest gateway of signal strength;Wherein the gateway concentrates corresponding gateway
Quantity be greater than 1, select the gateway concentrate the smallest gateway of capacity as optimal gateway, wherein the capacity for indicate gateway connect
The quantity of the equipment connect.Specifically, when detecting the signal strength indication of all gateways in the gateway unit, it is possible that signal
The quantity of the smallest gateway of the absolute value of intensity value more than 1, then at this time using these gateways as a gateway collection;Then after
The quantity for the gateway connection equipment that continuous relatively gateway is concentrated, selects gateway to concentrate the least gateway of equipment of connection as optimal
Gateway, i.e., for example in embodiments of the present invention, the equipment are air-heater, then just in the strongest several concentrators of signal strength
The concentrator of the minimum number of the air-heater of connection is selected, then using the concentrator as optimal gateway, equipment is passed through into the collection
Middle device networks, to reach the optimum utilization of gateway.If gateway concentrates the capacity of all gateways also equal, one is randomly choosed
Gateway makes equipment network as optimal gateway.
Through the above steps, reasonably select optimal gateway that equipment is made to network, to avoid a gateway carry is occurred in which
Equipment it is too many, the problem of influencing power peak regulation.
Above-mentioned steps S105 is related to networking equipment by optimal gateway, in a specific embodiment, the step
It include: the identification information for obtaining equipment, according to the identification information associate device and optimal gateway.Specifically, which uses
In the controller information for indicating equipment, controller here, e.g. the Lora module of air-heater can be with before equipment factory
By the MAC Address pasted in scanning device, the two dimensional code is scanned, the Lora module of equipment can be obtained, the equipment is corresponding
Two-dimensional barcode information storage in the server, then server control the Lora module can control the air-heater work, entering
When net, by the equipment and optimal gateway association, the network access testing of the equipment then is issued as a result, the test with the more optimal gateway
It mainly include that 1. server matches facility informations are correct;2. server communicates successfully with gateway unit;3. server and equipment are logical
Believe successfully;4. device activation networks successfully, if this 4 steps can be successful, it could illustrate to be successfully tested, otherwise indicate that this sets
It is standby not to be successfully associated with gateway, it cannot achieve and control equipment work.
In conclusion the method for network entry of the power peak regulation system equipment of the embodiment of the present invention, first according to the position of equipment
It determines the gateway unit of equipment, optimal gateway is then selected according to the signal strength of gateway in the gateway unit, then by being somebody's turn to do
Optimal gateway makes equipment network, and the method for network entry for solving existing power peak regulation system equipment is unreasonable, will lead to electric power
The problem of peak regulation low efficiency.
The embodiment of the invention also provides a kind of method of network entry of power peak regulation system equipment, are applied to power peak regulation system
Equipment end, as shown in figure 3, the method for network entry of the power peak regulation system equipment includes:
Step S201: sending location information to server, so where server determines the equipment according to location information
Gateway unit, and detect the signal strength and/or signal quality of all gateways in gateway unit, selection signal intensity and/or letter
Number strongest gateway of quality is as optimal gateway;
Step S202: instruction information is received from server, wherein the instruction information is for indicating optimal gateway;
Step S203: optimal gateway is connected to according to the instruction information.
The method of network entry of power peak regulation system equipment through the embodiment of the present invention, equipment first believe position when networking
Breath is sent to server, enables the server to determine that the gateway unit where the equipment, server detect the gateway unit
After interior optimal gateway, instruction information is sent, equipment is networked by the instruction information by optimal gateway, equipment energy when networking
It is enough rationally to utilize each gateway, while being convenient for the subsequent grouping peak regulation for equipment.
Above-mentioned steps S203 is related to being connected to optimal gateway according to the instruction information, in a preferred embodiment,
The step includes the identification information of sending device, and wherein the identification information is used to indicate the controller information of equipment, passes through the mark
Know the optimal gateway of information association.Through the above steps, so that the controller of equipment is networked with server by optimal gateway.
The embodiment of the invention also provides a kind of networking devices of power peak regulation system equipment, and the device is for realizing above-mentioned
Embodiment and preferred embodiment, the descriptions that have already been made will not be repeated.As used below, term " module " can be real
The combination of the software and/or hardware of existing predetermined function.Although device described in following embodiment is preferably realized with software,
But the realization of the combination of hardware or software and hardware is also that may and be contemplated.
The embodiment of the present invention provides a kind of networking device of power peak regulation system equipment, is applied to server end, such as Fig. 4 institute
Show, which includes: to obtain module 41, first processing module 42, detection module 43, selecting module 44 and Second processing module
45, wherein obtain the location information that module 41 is used to obtain equipment, first processing module 42 is used to determine according to the location information
Gateway unit where the equipment, detection module 43 are used to detect the signal strength and/or signal of all gateways in gateway unit
Quality, selecting module 44 is for selection signal intensity and/or the strongest gateway of signal quality as optimal gateway, second processing mould
Block 45 is for networking equipment by optimal gateway.The networking device of power peak regulation system equipment through the embodiment of the present invention,
Equipment is networked by optimal gateway, each gateway can be reasonably utilized, solve existing power peak regulation system equipment
The problem of method of network entry is unreasonable, will lead to power peak regulation low efficiency.
In a preferred embodiment, the networking device of the power peak regulation system equipment further include: third processing module
And peak regulation module, wherein third processing module is for being grouped multiple equipment according to pre-defined rule, peak regulation module for pair
Multiple equipment after grouping is grouped peak regulation.
Specifically, selecting module further include: acquiring unit and selecting unit, wherein the selecting unit is for obtaining signal
The corresponding gateway collection of the strongest gateway of intensity, wherein the gateway concentrates the quantity of corresponding gateway to be greater than 1, and selecting unit is for selecting
Selecting the gateway concentrates the smallest gateway of capacity as optimal gateway, which is used to indicate the quantity of the equipment of gateway connection.
The embodiment of the invention also provides a kind of networking devices of power peak regulation system equipment, are applied to equipment end, the electricity
The networking device of power peak regulation system equipment includes: sending module, receiving module and fourth processing module, wherein sending module is used
In sending location information to server, so that the server determines the gateway unit where equipment according to the location information, and examine
Survey the signal strength and/or signal quality of all gateways in gateway unit, selection signal intensity and/or the strongest net of signal quality
It closes and is used as optimal gateway, receiving module is used to receive instruction information from server, and wherein the instruction information is for indicating that this is optimal
Gateway, fourth processing module are used to be connected to optimal gateway according to the instruction information.
The further function description of above-mentioned modules is identical as above-mentioned corresponding embodiment, and details are not described herein.
The embodiment of the invention also provides a kind of server, the power peak regulation system of the embodiment of the present invention include server,
Concentrator, air-heater wherein realize wireless communication, hot wind in the power peak regulation system between server and concentrator and air-heater
The specific networking process of machine judges whether APP is connect with server correct as shown in figure 5, be first turned on APP, correct in connection
In the case where, select equipment to network, i.e., air-heater networks, and is scanned to air-heater, selects the Lora module of air-heater institute band
The gateway unit at place, then judges whether scanning succeeds, if success, uploads bar code to server, server parses this
Code judges that the signal strength of which gateway and capacity are optimal in the gateway unit where the Lora module, are made according to agreement
For optimal gateway, equipment network access testing result is issued by the optimal gateway.And processing logic in server as shown in fig. 6,
Obtain engineering information (such as position of the power peak regulation engineering, installation device type), (installation of such as concentrator of concentrator information
Position, capacity, the number of channel, signal strength etc.), and to air-heater barcode scanning and select gateway where the Lora module of air-heater
Unit, then the bar code information of server parsing air-heater selects signal in gateway unit strong according to agreement and concentrator information
Degree is most strong, the maximum gateway of capacity is as optimal gateway, by the optimal gateway issue air-heater network access testing as a result, if
It networks successfully, then the air-heater is hung over and be grouped management under the gateway unit.
Fig. 7 is that the hardware configuration of the server of the method for network entry of power peak regulation system equipment according to an embodiment of the present invention shows
It is intended to, as shown in fig. 7, the server includes one or more processors 710 and memory 720, with a processor in Fig. 7
For 710.
The equipment for executing the method for network entry of power peak regulation system equipment can also include: input unit 730 and output device
740。
Processor 710, memory 720, input unit 730 and output device 740 can pass through bus or other modes
It connects, in Fig. 7 for being connected by bus.
Processor 710 can be central processing unit (Central Processing Unit, CPU).Processor 710 may be used also
Think other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit
(Application Specific Integrated Circuit, ASIC), field programmable gate array (Field-
Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,
The combination of the chips such as discrete hardware components or above-mentioned all kinds of chips.General processor can be microprocessor or the processing
Device is also possible to any conventional processor etc..
Memory 720 is used as a kind of non-transient computer readable storage medium, can be used for storing non-transient software program, non-
Transient computer executable program and module, the method for network entry such as the power peak regulation system equipment in the embodiment of the present application are corresponding
Program instruction/module.Non-transient software program, instruction and the mould that processor 710 is stored in memory 720 by operation
Block, thereby executing the various function application and data processing of server, i.e. power peak regulation in realization above method embodiment
The method of network entry of system equipment.
Memory 720 may include storing program area and storage data area, wherein storing program area can store operation system
Application program required for system, at least one function;Storage data area can store the networking device of power peak regulation system equipment
Use created data etc..In addition, memory 720 may include high-speed random access memory, it can also include non-transient
Memory, for example, at least a disk memory, flush memory device or other non-transient solid-state memories.In some implementations
In example, optional memory 720 includes the memory remotely located relative to processor 710, these remote memories can pass through
It is connected to the network to the processing unit of the networking device of power peak regulation system equipment.The example of above-mentioned network includes but is not limited to interconnect
Net, intranet, local area network, mobile radio communication and combinations thereof.
Input unit 730 can receive the number or character information of input, and generates and enter with power peak regulation system equipment
The related key signals input of the user setting and function control of the processing unit of net device.Output device 740 may include display
The display equipment such as screen.
One or more of modules are stored in the memory 720, when by one or more of processors
When 710 execution, method as shown in Figure 1 or 2 is executed.
Method provided by the embodiment of the present invention can be performed in the said goods, has the corresponding functional module of execution method and has
Beneficial effect and the not technical detail of detailed description in embodiments of the present invention, for details, reference can be made to implementations as shown in Figures 1 to 6
Associated description in example.
The embodiment of the invention also provides a kind of computer readable storage medium, the computer storage medium is stored with meter
The power peak regulation system equipment in above-mentioned any means embodiment can be performed in calculation machine executable instruction, the computer executable instructions
Method of network entry.Wherein, the storage medium can for magnetic disk, CD, read-only memory (Read-Only Memory,
ROM), random access memory (Random Access Memory, RAM), flash memory (Flash Memory), hard disk
(Hard Disk Drive, abbreviation: HDD) or solid state hard disk (Solid-State Drive, SSD) etc.;The storage medium is also
It may include the combination of the memory of mentioned kind.
Obviously, the above embodiments are merely examples for clarifying the description, and does not limit the embodiments.It is right
For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of variation or
It changes.There is no necessity and possibility to exhaust all the enbodiments.And it is extended from this it is obvious variation or
It changes still within the protection scope of the invention.
Claims (14)
1. a kind of method of network entry of power peak regulation system equipment characterized by comprising
Obtain the location information of equipment;
The gateway unit where the equipment is determined according to the positional information;
Detect the signal strength and/or signal quality of all gateways in the gateway unit;
Selection signal intensity and/or the strongest gateway of signal quality are as optimal gateway;
The equipment is networked by the optimal gateway.
2. the method for network entry of power peak regulation system equipment according to claim 1, which is characterized in that set described by described
After standby the step of being networked by the optimal gateway, further includes:
Multiple equipment are grouped according to pre-defined rule;
Peak regulation is grouped to multiple equipment after grouping.
3. the method for network entry of power peak regulation system equipment according to claim 1, which is characterized in that the selection signal is strong
Spend the step of strongest gateway is as optimal gateway, further includes:
Obtain the corresponding gateway collection of the strongest gateway of the signal strength;Wherein, the gateway concentrates the corresponding net
The quantity of pass is greater than 1;
The gateway is selected to concentrate the smallest gateway of capacity as the optimal gateway;Wherein, the capacity is for indicating
The quantity of the equipment of the gateway connection.
4. the method for network entry of power peak regulation system equipment according to claim 1, which is characterized in that described by the equipment
The step of being networked by the optimal gateway, comprising:
Obtain the identification information of the equipment;Wherein, the identification information is used to indicate the controller information of the equipment;
The equipment and the optimal gateway are associated with according to the identification information.
5. according to the method for network entry of the described in any item power peak regulation system equipments of claim 2-4, which is characterized in that described to press
The step of multiple equipment are grouped according to pre-defined rule, comprising:
The equipment of the gateway association in the same gateway unit is divided into one group.
6. according to the method for network entry of the described in any item power peak regulation system equipments of claim 2-4, which is characterized in that described to press
The step of multiple equipment are grouped according to pre-defined rule, comprising:
The corresponding net of multiple equipment of electricity consumption within a preset range is chosen from gateway unit described at least one
Close composition gateway group.
7. a kind of method of network entry of power peak regulation system equipment characterized by comprising
Location information is sent to server, so that the server determines the gateway list where equipment according to the positional information
Member, and detect the signal strength and/or signal quality of all gateways in gateway unit, selection signal intensity and/or signal quality
The strongest gateway is as optimal gateway;
Instruction information is received from the server;Wherein, the instruction information is for indicating the optimal gateway;
The optimal gateway is connected to according to the instruction information.
8. the method for network entry of power peak regulation system equipment according to claim 7, which is characterized in that described according to the finger
Show that the step of information is connected to the optimal gateway includes:
Send the identification information of the equipment;Wherein, the identification information is used to indicate the controller information of the equipment;
The optimal gateway is associated with by the identification information.
9. a kind of networking device of power peak regulation system equipment characterized by comprising
Module is obtained, for obtaining the location information of equipment;
First processing module, for determining the gateway unit where the equipment according to the positional information;
Detection module, for detecting the signal strength and/or signal quality of all gateways in the gateway unit;
Selecting module, for selection signal intensity and/or the strongest gateway of signal quality as optimal gateway;
Second processing module, for the equipment to be networked by the optimal gateway.
10. the networking device of power peak regulation system equipment according to claim 9, which is characterized in that further include:
Third processing module, for being grouped according to pre-defined rule to multiple equipment;
Peak regulation module, for being grouped peak regulation to multiple equipment after grouping.
11. the networking device of power peak regulation system equipment according to claim 9, which is characterized in that the selecting module
Further include:
Acquiring unit, for obtaining the corresponding gateway collection of the strongest gateway of the signal strength;Wherein, the gateway is concentrated
The quantity of the corresponding gateway is greater than 1;
Selecting unit, for selecting the gateway to concentrate the smallest gateway of capacity as the optimal gateway;Wherein, described
Capacity is used to indicate the quantity of the equipment of the gateway connection.
12. a kind of networking device of power peak regulation system equipment characterized by comprising
Sending module, for sending location information to server, so that the server determines equipment according to the positional information
The gateway unit at place, and detect the signal strength and/or signal quality of all gateways in gateway unit, selection signal intensity
And/or the strongest gateway of signal quality is as optimal gateway;
Receiving module, for receiving instruction information from the server;Wherein, the instruction information is for indicating the optimal net
It closes;
Fourth processing module, for being connected to the optimal gateway according to the instruction information.
13. a kind of server characterized by comprising
Including at least one processor;
And the memory being connect at least one described processor communication;Wherein, the memory be stored with can by it is described extremely
The computer program that a few processor executes, the computer program is executed by least one described processor, so that described
At least one processor executes the method for network entry of power peak regulation system equipment as claimed in any one of claims 1 to 6.
14. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program
The method of network entry of power peak regulation system equipment as claimed in any one of claims 1 to 6 is realized when being executed by processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811209917.7A CN109450746A (en) | 2018-10-17 | 2018-10-17 | Method of network entry, device, server and the storage medium of power peak regulation system equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811209917.7A CN109450746A (en) | 2018-10-17 | 2018-10-17 | Method of network entry, device, server and the storage medium of power peak regulation system equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109450746A true CN109450746A (en) | 2019-03-08 |
Family
ID=65547074
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811209917.7A Pending CN109450746A (en) | 2018-10-17 | 2018-10-17 | Method of network entry, device, server and the storage medium of power peak regulation system equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109450746A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112055366A (en) * | 2020-09-04 | 2020-12-08 | 北京自如信息科技有限公司 | Method and device for determining gateway position and computer equipment |
CN112532382A (en) * | 2020-11-17 | 2021-03-19 | 广州技象科技有限公司 | Internet of things gateway selection method and device based on signal transmission safety management |
CN113131971A (en) * | 2021-03-03 | 2021-07-16 | 中国电力科学研究院有限公司 | Networking transmission method and system of power line carrier communication gateway device based on IPv6 |
CN113473406A (en) * | 2021-07-06 | 2021-10-01 | 江苏智冷物联技术有限公司 | Method, device, computer storage medium and terminal for realizing equipment management |
CN113746725A (en) * | 2020-05-28 | 2021-12-03 | 美的集团股份有限公司 | Gateway selection method and device in multi-gateway environment and storage medium |
CN113796050A (en) * | 2019-05-07 | 2021-12-14 | 萨基姆能源电信公司 | Gateway selection method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102946586A (en) * | 2012-11-08 | 2013-02-27 | 中兴通讯股份有限公司 | Access network information notification, access method and device based on position information |
CN103973501A (en) * | 2014-05-28 | 2014-08-06 | 深圳市金立通信设备有限公司 | Method and device for managing wireless local area network access point |
US20150215892A1 (en) * | 2014-01-29 | 2015-07-30 | Elitegroup Computer Systems (Sip) Co., Ltd. | Method for Determining a Position of a Wireless Access Point, Self-moving Wireless Access Point, and Self-moving Wireless Access Point Combination |
CN104913434A (en) * | 2015-04-29 | 2015-09-16 | 国家电网公司 | Large-scale air conditioner load virtual load peaking unit construction method based on air conditioner grouping and clustering |
CN107018049A (en) * | 2017-03-09 | 2017-08-04 | 广东美的制冷设备有限公司 | Home appliance distribution methods, devices and systems |
CN108307483A (en) * | 2017-09-28 | 2018-07-20 | 努比亚技术有限公司 | wireless network connecting method and mobile terminal |
CN108599162A (en) * | 2018-07-27 | 2018-09-28 | 珠海格力电器股份有限公司 | Peak regulation control method, device and system |
-
2018
- 2018-10-17 CN CN201811209917.7A patent/CN109450746A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102946586A (en) * | 2012-11-08 | 2013-02-27 | 中兴通讯股份有限公司 | Access network information notification, access method and device based on position information |
US20150215892A1 (en) * | 2014-01-29 | 2015-07-30 | Elitegroup Computer Systems (Sip) Co., Ltd. | Method for Determining a Position of a Wireless Access Point, Self-moving Wireless Access Point, and Self-moving Wireless Access Point Combination |
CN103973501A (en) * | 2014-05-28 | 2014-08-06 | 深圳市金立通信设备有限公司 | Method and device for managing wireless local area network access point |
CN104913434A (en) * | 2015-04-29 | 2015-09-16 | 国家电网公司 | Large-scale air conditioner load virtual load peaking unit construction method based on air conditioner grouping and clustering |
CN107018049A (en) * | 2017-03-09 | 2017-08-04 | 广东美的制冷设备有限公司 | Home appliance distribution methods, devices and systems |
CN108307483A (en) * | 2017-09-28 | 2018-07-20 | 努比亚技术有限公司 | wireless network connecting method and mobile terminal |
CN108599162A (en) * | 2018-07-27 | 2018-09-28 | 珠海格力电器股份有限公司 | Peak regulation control method, device and system |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113796050A (en) * | 2019-05-07 | 2021-12-14 | 萨基姆能源电信公司 | Gateway selection method |
CN113796050B (en) * | 2019-05-07 | 2023-06-06 | 萨基姆能源电信公司 | Gateway selection method |
CN113746725A (en) * | 2020-05-28 | 2021-12-03 | 美的集团股份有限公司 | Gateway selection method and device in multi-gateway environment and storage medium |
CN113746725B (en) * | 2020-05-28 | 2023-03-31 | 美的集团股份有限公司 | Gateway selection method and device in multi-gateway environment and storage medium |
CN112055366A (en) * | 2020-09-04 | 2020-12-08 | 北京自如信息科技有限公司 | Method and device for determining gateway position and computer equipment |
CN112055366B (en) * | 2020-09-04 | 2023-08-25 | 北京自如信息科技有限公司 | Gateway position determining method and device and computer equipment |
CN112532382A (en) * | 2020-11-17 | 2021-03-19 | 广州技象科技有限公司 | Internet of things gateway selection method and device based on signal transmission safety management |
CN112532382B (en) * | 2020-11-17 | 2021-08-13 | 广州技象科技有限公司 | Internet of things gateway selection method and device based on signal transmission safety management |
CN113131971A (en) * | 2021-03-03 | 2021-07-16 | 中国电力科学研究院有限公司 | Networking transmission method and system of power line carrier communication gateway device based on IPv6 |
CN113131971B (en) * | 2021-03-03 | 2022-10-25 | 中国电力科学研究院有限公司 | Networking transmission method and system of power line carrier communication gateway device based on IPv6 |
CN113473406A (en) * | 2021-07-06 | 2021-10-01 | 江苏智冷物联技术有限公司 | Method, device, computer storage medium and terminal for realizing equipment management |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109450746A (en) | Method of network entry, device, server and the storage medium of power peak regulation system equipment | |
US20130103795A1 (en) | Methods of establishing communication in a sensor network and apparatus | |
CN107015892A (en) | A kind of method for testing pressure, device and system | |
CN107404740B (en) | Method for switching network, device and the terminal device of safety | |
WO2020052133A1 (en) | Gateway communication method, gateway, and energy system | |
CN101369933A (en) | Automatic test method and system | |
CN106304325A (en) | A kind of localization method, device and location terminal | |
CN107800554A (en) | Collecting method, device and system | |
CN107069345A (en) | A kind of domestic intelligent jack system and its control method | |
WO2020160383A1 (en) | Real-time validation of distributed energy resource device commitments | |
CN105956322B (en) | The process corner detection device and method of digital circuit | |
JP2017513284A (en) | Techniques for optimizing mesh networks | |
WO2014117212A1 (en) | Controlling operation of power consuming devices in an electrical grid | |
CN104426881A (en) | Method and device for detecting malicious behavior | |
CN106877904B (en) | Method and device for controlling meter equipment access | |
CN112382006A (en) | Electricity price adjusting method, device and equipment | |
CN104683186A (en) | Network resource scheduling method and device | |
CN108353069A (en) | It is established via the communication link of identifier | |
Liu et al. | Efficient detection of cloned attacks for large-scale RFID systems | |
WO2012009901A1 (en) | Data acquisition method in network resource estimation and system thereof | |
JP2012170073A (en) | Systems and methods for adaptive error thresholds or adaptive modulation schemes based on atmospheric conditions | |
CN107277815A (en) | Wifi hotspot management method, device and terminal device | |
CN103024097A (en) | Method, device and system for detecting network address translation server aging time | |
WO2020227476A1 (en) | Apparatus and method for dynamic forecasting, aggregation, and validation | |
CN105554852A (en) | Method for switching WIFI signal sources |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190308 |
|
RJ01 | Rejection of invention patent application after publication |