CN109450746A CN201811209917.7A CN201811209917A CN109450746A CN 109450746 A CN109450746 A CN 109450746A CN 201811209917 A CN201811209917 A CN 201811209917A CN 109450746 A CN109450746 A CN 109450746A
Authority
CN
China
Prior art keywords
gateway
equipment
peak regulation
optimal
power peak
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811209917.7A
Other languages
Chinese (zh)
Inventor
吴妙瑜
罗晓
卢扬渐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201811209917.7A priority Critical patent/CN109450746A/en
Publication of CN109450746A publication Critical patent/CN109450746A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • H04L12/2854Wide area networks, e.g. public data networks
    • H04L12/2856Access arrangements, e.g. Internet access
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W48/00Access restriction; Network selection; Access point selection
    • H04W48/16Discovering, processing access restriction or access information
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W48/00Access restriction; Network selection; Access point selection
    • H04W48/18Selecting a network or a communication service
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Abstract

The present invention provides method of network entry, device, server and the storage mediums of a kind of power peak regulation system equipment, wherein the method for network entry of the power peak regulation system equipment includes the location information for obtaining equipment, the gateway unit where equipment is determined according to the location information, detect the signal strength and/or signal quality of all gateways in gateway unit, selection signal intensity and/or the strongest gateway of signal quality are networked the equipment by optimal gateway as optimal gateway.By implementing the present invention, first according to the gateway unit of the location determining device of equipment, then optimal gateway is selected according to the signal strength of gateway in the gateway unit and/or signal quality, then by the optimal gateway equipment is networked, the problem of method of network entry for solving existing power peak regulation system equipment is unreasonable, will lead to power peak regulation low efficiency.

Description

Method of network entry, device, server and the storage medium of power peak regulation system equipment
Technical field
The present invention relates to power peak regulation technical fields, and in particular to a kind of method of network entry of power peak regulation system equipment, dress It sets, server and storage medium.
Background technique
Generally there are thousands of equipment, such as air-heater in the power grid of power peak regulation system.Existing power peak regulation system System generallys use the mode of barcode scanning networking when equipment networks.
Since usually equipment being networked by gateway at random when networking, so that after equipment networking, to equipment tune When peak, continue that the subsequent peak regulation low efficiency for equipment can be made by the way of unified peak regulation.
Summary of the invention
The embodiment of the invention provides a kind of method of network entry of power peak regulation system equipment, device, server and storages to be situated between Matter, it is unreasonable with the method for network entry for solving power peak regulation system equipment in the prior art, it will lead to asking for power peak regulation low efficiency Topic.
According in a first aspect, the embodiment of the invention provides a kind of method of network entry of power peak regulation system equipment, comprising: obtain Take the location information of equipment;The gateway unit where the equipment is determined according to the positional information;Detect institute in gateway unit There are the signal strength and/or signal quality of gateway;Selection signal intensity and/or the strongest gateway of signal quality are as optimal Gateway;The equipment is networked by the optimal gateway.The networking of power peak regulation system equipment through the embodiment of the present invention Method, first according to the gateway unit of the location determining device of equipment, then according to the signal strength of gateway in the gateway unit And/or signal quality selects optimal gateway, then by the optimal gateway equipment is networked, solves existing power peak regulation The problem of method of network entry of system equipment is unreasonable, will lead to power peak regulation low efficiency.
With reference to first aspect, in first aspect first embodiment, the equipment is passed through into the optimal net described After the step of closing networking, further includes: be grouped according to pre-defined rule to multiple equipment;To multiple described after grouping Equipment is grouped peak regulation.
With reference to first aspect, in first aspect second embodiment, the strongest gateway of selection signal intensity The step of as optimal gateway, further includes: obtain the corresponding gateway collection of the strongest gateway of the signal strength;Wherein, institute Stating gateway concentrates the quantity of the corresponding gateway to be greater than 1;The gateway is selected to concentrate the smallest gateway of capacity as institute State optimal gateway;Wherein, the capacity is used to indicate the quantity of the equipment of the gateway connection.
With reference to first aspect, described that the equipment is passed through into the optimal gateway in first aspect third embodiment The step of networking, comprising: obtain the identification information of the equipment;Wherein, the identification information is used to indicate the control of the equipment Device information processed;The equipment and the optimal gateway are associated with according to the identification information.
Any embodiment with reference to first aspect, it is described according to pre-defined rule pair in the 4th embodiment of first aspect The step of multiple equipment are grouped, comprising: by the equipment of the gateway association in the same gateway unit It is divided into one group.
Any embodiment with reference to first aspect, it is described according to pre-defined rule pair in the 5th embodiment of first aspect The step of multiple equipment are grouped, comprising: electricity consumption is chosen from gateway unit described at least one in preset range The corresponding gateway of interior multiple equipment forms gateway group.
According to second aspect, the embodiment of the invention provides a kind of method of network entry of power peak regulation system equipment, comprising: hair It send location information to server, so that the server determines the gateway unit where equipment according to the positional information, and examines Survey the signal strength and/or signal quality of all gateways in gateway unit, selection signal intensity and/or the strongest institute of signal quality Gateway is stated as optimal gateway;Instruction information is received from the server;Wherein, the instruction information is for indicating described optimal Gateway;The optimal gateway is connected to according to the instruction information.
In conjunction with second aspect, in second aspect first embodiment, it is described be connected to according to the instruction information it is described The step of optimal gateway includes: the identification information for sending the equipment;Wherein, the identification information is for indicating the equipment Controller information;The optimal gateway is associated with by the identification information.
According to the third aspect, the embodiment of the invention provides a kind of networking devices of power peak regulation system equipment, comprising: obtains Modulus block, for obtaining the location information of equipment;First processing module, for determining the equipment institute according to the positional information Gateway unit;Detection module, for detecting the signal strength and/or signal quality of all gateways in gateway unit;Selection Module, for selection signal intensity and/or the strongest gateway of signal quality as optimal gateway;Second processing module is used It networks in the equipment is passed through the optimal gateway.
In conjunction with the third aspect, in third aspect first embodiment, the networking device of the power peak regulation system equipment Further include: third processing module, for being grouped according to pre-defined rule to multiple equipment;Peak regulation module, for point Multiple equipment after group are grouped peak regulation.
In conjunction with the third aspect, in third aspect second embodiment, the selecting module further include: acquiring unit is used In obtaining the corresponding gateway collection of the strongest gateway of the signal strength;Wherein, the gateway concentrates the corresponding gateway Quantity be greater than 1;Selecting unit, for selecting the gateway to concentrate the smallest gateway of capacity as the optimal gateway; Wherein, the capacity is used to indicate the quantity of the equipment of the gateway connection.
According to fourth aspect, the embodiment of the invention provides a kind of networking device of power peak regulation system equipment, the electric power The networking device of peak regulation system equipment includes: sending module, for sending location information to server, so that the server root The gateway unit where equipment is determined according to the location information, and detect in gateway unit the signal strength of all gateways and/or Signal quality, selection signal intensity and/or the strongest gateway of signal quality are as optimal gateway;Receiving module, for from The server receives instruction information;Wherein, the instruction information is for indicating the optimal gateway;Fourth processing module is used In being connected to the optimal gateway according to the instruction information.
According to the 5th aspect, the embodiment of the invention provides a kind of servers, comprising: including at least one processor;With And the memory being connect at least one described processor communication;Wherein, the memory be stored with can by it is described at least one The computer program that processor executes, the computer program is executed by least one described processor, so that described at least one A processor executes the method for network entry of the power peak regulation system equipment as described in above-mentioned first aspect any embodiment.
According to the 6th aspect, the embodiment of the invention provides a kind of computer readable storage mediums, are stored thereon with calculating Machine program realizes the electric power tune as described in above-mentioned first aspect any embodiment when the computer program is executed by processor The method of network entry of peak system equipment.
Technical solution of the embodiment of the present invention has the advantages that
1. the embodiment of the invention provides a kind of method of network entry of power peak regulation system equipment, the power peak regulation system equipment Method of network entry include the location information for obtaining equipment, determine the gateway unit where equipment according to the location information, detect net The signal strength and/or signal quality of all gateways in unit are closed, selection signal intensity and/or the strongest gateway of signal quality are made For optimal gateway, which is networked by optimal gateway.The networking of power peak regulation system equipment through the embodiment of the present invention Method, first according to the gateway unit of the location determining device of equipment, then according to the signal strength of gateway in the gateway unit And/or signal quality selects optimal gateway, then by the optimal gateway equipment is networked, solves existing power peak regulation The problem of method of network entry of system equipment is unreasonable, will lead to power peak regulation low efficiency.
2. equipment is being passed through optimal net the embodiment of the invention provides a kind of method of network entry of power peak regulation system equipment It closes after networking, further includes being grouped according to pre-defined rule to multiple equipment, tune is grouped to the multiple equipment after grouping Each equipment is grouped by peak, such peak regulation method, and can make rational planning for grouping according to the demand of user, improves electric power Peak regulation efficiency.
3. the embodiment of the invention provides a kind of method of network entry of power peak regulation system equipment, wherein selection signal intensity is most Strong gateway is as optimal gateway, further includes: detects the signal strength of all gateways in the gateway unit, selection signal intensity is most Strong gateway, the quantity of such gateway is in the case where being greater than 1, using these gateways as gateway collection, the gateway is selected to concentrate The smallest gateway of capacity is as optimal gateway, and wherein the capacity is used to indicate the quantity of the equipment of gateway connection, i.e. selection connection The least gateway of equipment not only can guarantee that the gateway signal intensity of equipment connection was good as optimal gateway in this way, but also can be all Gateway reasonable distribution connects the quantity of equipment, rationally utilizes each gateway.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is a flow chart of the method for network entry of power peak regulation system equipment according to an embodiment of the present invention;
Fig. 2 is the flow chart of the method for network entry of power peak regulation system equipment according to the preferred embodiment of the invention;
Fig. 3 is another flow chart of the method for network entry of power peak regulation system equipment according to an embodiment of the present invention;
Fig. 4 is the structural block diagram of the networking device of power peak regulation system equipment according to an embodiment of the present invention;
Fig. 5 is the equipment networking flow chart of power peak regulation system according to an embodiment of the present invention;
Fig. 6 is the process flow diagram of the server of power peak regulation system according to an embodiment of the present invention;
Fig. 7 is that the hardware configuration of the server of the method for network entry of power peak regulation system equipment according to an embodiment of the present invention shows It is intended to.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those skilled in the art are not having Every other embodiment obtained under the premise of creative work is made, shall fall within the protection scope of the present invention.
The embodiment of the invention provides a kind of method of network entry of power peak regulation system equipment, applied to power peak regulation system Server end, as shown in Figure 1, the method for network entry of the power peak regulation system equipment includes:
Step S101: the location information of equipment is obtained;Specifically, when equipment is mounted on presumptive area by worker, scanning is set The two dimensional code of standby upper stickup, while the region where the equipment is input to server.
Step S102: the gateway unit where equipment is determined according to the location information;Server obtains where the equipment Behind region, the gateway unit where equipment can be obtained, i.e., plans the implementation region of the good power peak regulation system, an area in advance Domain becomes a gateway unit, and then the region where the equipment is sent to server, server when installing equipment by worker Gateway unit of the equipment and place can be associated according to the two-dimensional barcode information of the equipment and the position where it.
Step S103: the signal strength and/or signal quality of all gateways in the gateway unit are detected;Specifically, every There are several gateways in a gateway unit, when equipment is connected networking, first detects the signal of all gateways in gateway unit Intensity and/or signal quality, wherein signal quality is related with signal strength and degree of disturbance, and signal quality is often referred to signal strength With the ratio of degree of disturbance.
Step S104: selection signal intensity and/or the strongest gateway of signal quality are as optimal gateway;Specifically, in electricity In power peak regulation system, many concentrators are usually provided with very much in different regions, gateway unit here can be understood as one Region, the concentrator in the region can be understood as the gateway in the gateway unit.Such as it is somebody's turn to do " region " and can be understood as one One area in village or a city, each area can be used as a region, referred to as a gateway unit, install in the area Concentrator be known as the gateway in the gateway unit.In embodiments of the present invention, it when equipment is connected to concentrator, first examines The signal strength indication for surveying all gateways in gateway unit, i.e., first detect the signal strength indication of all concentrators in the region, then Select the smallest gateway of the absolute value of the signal strength indication as optimal gateway, the absolute value of selection signal intensity value is minimum here Gateway be because wireless signal indicates that the value of signal strength is usually negative value, such as -40dbm, and signal strength indication is absolute Value is minimum, illustrates that the signal strength is better, therefore, selects the smallest gateway of the absolute value for changing signal strength indication as optimal net It closes, that is, selects the concentrator that signal strength is best in the region as optimal gateway.
Step S105: the equipment is networked by optimal gateway;Specifically, equipment is networked by the optimal gateway, energy It is enough rationally to utilize each gateway.
The method of network entry of power peak regulation system equipment through the embodiment of the present invention, obtains the location information of equipment, according to The location information determines the gateway unit where equipment, then detects the signal strength of all gateways in the gateway unit, selection The strongest gateway of signal strength is networked as optimal gateway, by the equipment by optimal gateway, and each net can be reasonably utilized The problem of pass, the method for network entry for solving existing power peak regulation system equipment is unreasonable, will lead to power peak regulation low efficiency.
Above-mentioned steps S105 is related to networking the equipment by optimal gateway, in a preferred embodiment, such as Fig. 2 It is shown, after this step, the method for network entry of the power peak regulation system equipment further include:
S106: multiple equipment is grouped according to pre-defined rule;Specific pre-defined rule can there are many, according to electric power The demand of office or user formulate rule of classification;
S107: peak regulation is grouped to the multiple equipment after grouping.Such peak regulation method is divided each equipment Group, can make rational planning for grouping according to the demand of user, improve power peak regulation efficiency.
Above-mentioned steps S106 is related to being grouped multiple equipment according to pre-defined rule, in a specific embodiment In, which includes: that the equipment of the gateway association in same gateway unit is divided into one group.Specifically, under normal circumstances, it is Facilitate management, the equipment of the gateway association in same gateway unit is divided into one group, i.e., is associated with area's intradomain gateway Equipment be divided into one group, such as power office manages for convenience, using all air-heaters of the installation of Dongcheng District as a group It is unified to carry out power peak regulation.
As an alternative embodiment, the packet mode in above-mentioned specific embodiment be can also be from multiple nets It closes and chooses the corresponding gateway of electricity consumption multiple equipment within a preset range in unit and form gateway group, to belonging to same gateway group Equipment carry out power peak regulation.Specifically, it in grouping, can not be grouped by gateway unit, power office can be according to setting Standby specific electricity consumption situation, such as Dongcheng District, Xicheng District are two gateway units respectively, but have in the two gateway units Equipment component electricity consumption is more, then gateway associated by these equipment can be formed gateway group, in power peak regulation, low ebb The power supply volume of these equipment in the gateway group can be increased when the phase, power peak regulation is carried out to equipment with convenient and reasonable.Setting here Standby electricity consumption can be determined according to the actual use situation of equipment, such as air-heater heating load is big, then its electricity consumption is inevitable more, There may be the electricity consumptions of multiple air-heaters within the scope of higher one in a gateway unit, then by these air-heaters pair The gateway answered forms a gateway group and carries out power peak regulation.The mode for carrying out power peak regulation to the equipment in gateway group is also possible to It is a variety of, such as power office can switch related air-heater, the unified setting of mode, temperature, wind speed, peak regulation duration etc., Total power load is maintained a stable frequency as far as possible, carries out stable matching with generated energy.
Above-mentioned steps S104 is related to the strongest gateway of selection signal intensity as optimal gateway, in a preferable embodiment party In formula, the step further include: obtain the corresponding gateway collection of the strongest gateway of signal strength;Wherein the gateway concentrates corresponding gateway Quantity be greater than 1, select the gateway concentrate the smallest gateway of capacity as optimal gateway, wherein the capacity for indicate gateway connect The quantity of the equipment connect.Specifically, when detecting the signal strength indication of all gateways in the gateway unit, it is possible that signal The quantity of the smallest gateway of the absolute value of intensity value more than 1, then at this time using these gateways as a gateway collection;Then after The quantity for the gateway connection equipment that continuous relatively gateway is concentrated, selects gateway to concentrate the least gateway of equipment of connection as optimal Gateway, i.e., for example in embodiments of the present invention, the equipment are air-heater, then just in the strongest several concentrators of signal strength The concentrator of the minimum number of the air-heater of connection is selected, then using the concentrator as optimal gateway, equipment is passed through into the collection Middle device networks, to reach the optimum utilization of gateway.If gateway concentrates the capacity of all gateways also equal, one is randomly choosed Gateway makes equipment network as optimal gateway.
Through the above steps, reasonably select optimal gateway that equipment is made to network, to avoid a gateway carry is occurred in which Equipment it is too many, the problem of influencing power peak regulation.
Above-mentioned steps S105 is related to networking equipment by optimal gateway, in a specific embodiment, the step It include: the identification information for obtaining equipment, according to the identification information associate device and optimal gateway.Specifically, which uses In the controller information for indicating equipment, controller here, e.g. the Lora module of air-heater can be with before equipment factory By the MAC Address pasted in scanning device, the two dimensional code is scanned, the Lora module of equipment can be obtained, the equipment is corresponding Two-dimensional barcode information storage in the server, then server control the Lora module can control the air-heater work, entering When net, by the equipment and optimal gateway association, the network access testing of the equipment then is issued as a result, the test with the more optimal gateway It mainly include that 1. server matches facility informations are correct;2. server communicates successfully with gateway unit;3. server and equipment are logical Believe successfully;4. device activation networks successfully, if this 4 steps can be successful, it could illustrate to be successfully tested, otherwise indicate that this sets It is standby not to be successfully associated with gateway, it cannot achieve and control equipment work.
In conclusion the method for network entry of the power peak regulation system equipment of the embodiment of the present invention, first according to the position of equipment It determines the gateway unit of equipment, optimal gateway is then selected according to the signal strength of gateway in the gateway unit, then by being somebody's turn to do Optimal gateway makes equipment network, and the method for network entry for solving existing power peak regulation system equipment is unreasonable, will lead to electric power The problem of peak regulation low efficiency.
The embodiment of the invention also provides a kind of method of network entry of power peak regulation system equipment, are applied to power peak regulation system Equipment end, as shown in figure 3, the method for network entry of the power peak regulation system equipment includes:
Step S201: sending location information to server, so where server determines the equipment according to location information Gateway unit, and detect the signal strength and/or signal quality of all gateways in gateway unit, selection signal intensity and/or letter Number strongest gateway of quality is as optimal gateway;
Step S202: instruction information is received from server, wherein the instruction information is for indicating optimal gateway;
Step S203: optimal gateway is connected to according to the instruction information.
The method of network entry of power peak regulation system equipment through the embodiment of the present invention, equipment first believe position when networking Breath is sent to server, enables the server to determine that the gateway unit where the equipment, server detect the gateway unit After interior optimal gateway, instruction information is sent, equipment is networked by the instruction information by optimal gateway, equipment energy when networking It is enough rationally to utilize each gateway, while being convenient for the subsequent grouping peak regulation for equipment.
Above-mentioned steps S203 is related to being connected to optimal gateway according to the instruction information, in a preferred embodiment, The step includes the identification information of sending device, and wherein the identification information is used to indicate the controller information of equipment, passes through the mark Know the optimal gateway of information association.Through the above steps, so that the controller of equipment is networked with server by optimal gateway.
The embodiment of the invention also provides a kind of networking devices of power peak regulation system equipment, and the device is for realizing above-mentioned Embodiment and preferred embodiment, the descriptions that have already been made will not be repeated.As used below, term " module " can be real The combination of the software and/or hardware of existing predetermined function.Although device described in following embodiment is preferably realized with software, But the realization of the combination of hardware or software and hardware is also that may and be contemplated.
The embodiment of the present invention provides a kind of networking device of power peak regulation system equipment, is applied to server end, such as Fig. 4 institute Show, which includes: to obtain module 41, first processing module 42, detection module 43, selecting module 44 and Second processing module 45, wherein obtain the location information that module 41 is used to obtain equipment, first processing module 42 is used to determine according to the location information Gateway unit where the equipment, detection module 43 are used to detect the signal strength and/or signal of all gateways in gateway unit Quality, selecting module 44 is for selection signal intensity and/or the strongest gateway of signal quality as optimal gateway, second processing mould Block 45 is for networking equipment by optimal gateway.The networking device of power peak regulation system equipment through the embodiment of the present invention, Equipment is networked by optimal gateway, each gateway can be reasonably utilized, solve existing power peak regulation system equipment The problem of method of network entry is unreasonable, will lead to power peak regulation low efficiency.
In a preferred embodiment, the networking device of the power peak regulation system equipment further include: third processing module And peak regulation module, wherein third processing module is for being grouped multiple equipment according to pre-defined rule, peak regulation module for pair Multiple equipment after grouping is grouped peak regulation.
Specifically, selecting module further include: acquiring unit and selecting unit, wherein the selecting unit is for obtaining signal The corresponding gateway collection of the strongest gateway of intensity, wherein the gateway concentrates the quantity of corresponding gateway to be greater than 1, and selecting unit is for selecting Selecting the gateway concentrates the smallest gateway of capacity as optimal gateway, which is used to indicate the quantity of the equipment of gateway connection.
The embodiment of the invention also provides a kind of networking devices of power peak regulation system equipment, are applied to equipment end, the electricity The networking device of power peak regulation system equipment includes: sending module, receiving module and fourth processing module, wherein sending module is used In sending location information to server, so that the server determines the gateway unit where equipment according to the location information, and examine Survey the signal strength and/or signal quality of all gateways in gateway unit, selection signal intensity and/or the strongest net of signal quality It closes and is used as optimal gateway, receiving module is used to receive instruction information from server, and wherein the instruction information is for indicating that this is optimal Gateway, fourth processing module are used to be connected to optimal gateway according to the instruction information.
The further function description of above-mentioned modules is identical as above-mentioned corresponding embodiment, and details are not described herein.
The embodiment of the invention also provides a kind of server, the power peak regulation system of the embodiment of the present invention include server, Concentrator, air-heater wherein realize wireless communication, hot wind in the power peak regulation system between server and concentrator and air-heater The specific networking process of machine judges whether APP is connect with server correct as shown in figure 5, be first turned on APP, correct in connection In the case where, select equipment to network, i.e., air-heater networks, and is scanned to air-heater, selects the Lora module of air-heater institute band The gateway unit at place, then judges whether scanning succeeds, if success, uploads bar code to server, server parses this Code judges that the signal strength of which gateway and capacity are optimal in the gateway unit where the Lora module, are made according to agreement For optimal gateway, equipment network access testing result is issued by the optimal gateway.And processing logic in server as shown in fig. 6, Obtain engineering information (such as position of the power peak regulation engineering, installation device type), (installation of such as concentrator of concentrator information Position, capacity, the number of channel, signal strength etc.), and to air-heater barcode scanning and select gateway where the Lora module of air-heater Unit, then the bar code information of server parsing air-heater selects signal in gateway unit strong according to agreement and concentrator information Degree is most strong, the maximum gateway of capacity is as optimal gateway, by the optimal gateway issue air-heater network access testing as a result, if It networks successfully, then the air-heater is hung over and be grouped management under the gateway unit.
Fig. 7 is that the hardware configuration of the server of the method for network entry of power peak regulation system equipment according to an embodiment of the present invention shows It is intended to, as shown in fig. 7, the server includes one or more processors 710 and memory 720, with a processor in Fig. 7 For 710.
The equipment for executing the method for network entry of power peak regulation system equipment can also include: input unit 730 and output device 740。
Processor 710, memory 720, input unit 730 and output device 740 can pass through bus or other modes It connects, in Fig. 7 for being connected by bus.
Processor 710 can be central processing unit (Central Processing Unit, CPU).Processor 710 may be used also Think other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), field programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, The combination of the chips such as discrete hardware components or above-mentioned all kinds of chips.General processor can be microprocessor or the processing Device is also possible to any conventional processor etc..
Memory 720 is used as a kind of non-transient computer readable storage medium, can be used for storing non-transient software program, non- Transient computer executable program and module, the method for network entry such as the power peak regulation system equipment in the embodiment of the present application are corresponding Program instruction/module.Non-transient software program, instruction and the mould that processor 710 is stored in memory 720 by operation Block, thereby executing the various function application and data processing of server, i.e. power peak regulation in realization above method embodiment The method of network entry of system equipment.
Memory 720 may include storing program area and storage data area, wherein storing program area can store operation system Application program required for system, at least one function;Storage data area can store the networking device of power peak regulation system equipment Use created data etc..In addition, memory 720 may include high-speed random access memory, it can also include non-transient Memory, for example, at least a disk memory, flush memory device or other non-transient solid-state memories.In some implementations In example, optional memory 720 includes the memory remotely located relative to processor 710, these remote memories can pass through It is connected to the network to the processing unit of the networking device of power peak regulation system equipment.The example of above-mentioned network includes but is not limited to interconnect Net, intranet, local area network, mobile radio communication and combinations thereof.
Input unit 730 can receive the number or character information of input, and generates and enter with power peak regulation system equipment The related key signals input of the user setting and function control of the processing unit of net device.Output device 740 may include display The display equipment such as screen.
One or more of modules are stored in the memory 720, when by one or more of processors When 710 execution, method as shown in Figure 1 or 2 is executed.
Method provided by the embodiment of the present invention can be performed in the said goods, has the corresponding functional module of execution method and has Beneficial effect and the not technical detail of detailed description in embodiments of the present invention, for details, reference can be made to implementations as shown in Figures 1 to 6 Associated description in example.
The embodiment of the invention also provides a kind of computer readable storage medium, the computer storage medium is stored with meter The power peak regulation system equipment in above-mentioned any means embodiment can be performed in calculation machine executable instruction, the computer executable instructions Method of network entry.Wherein, the storage medium can for magnetic disk, CD, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), flash memory (Flash Memory), hard disk (Hard Disk Drive, abbreviation: HDD) or solid state hard disk (Solid-State Drive, SSD) etc.;The storage medium is also It may include the combination of the memory of mentioned kind.
Obviously, the above embodiments are merely examples for clarifying the description, and does not limit the embodiments.It is right For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of variation or It changes.There is no necessity and possibility to exhaust all the enbodiments.And it is extended from this it is obvious variation or It changes still within the protection scope of the invention.

Claims (14)

1. a kind of method of network entry of power peak regulation system equipment characterized by comprising
Obtain the location information of equipment;
The gateway unit where the equipment is determined according to the positional information;
Detect the signal strength and/or signal quality of all gateways in the gateway unit;
Selection signal intensity and/or the strongest gateway of signal quality are as optimal gateway;
The equipment is networked by the optimal gateway.
2. the method for network entry of power peak regulation system equipment according to claim 1, which is characterized in that set described by described After standby the step of being networked by the optimal gateway, further includes:
Multiple equipment are grouped according to pre-defined rule;
Peak regulation is grouped to multiple equipment after grouping.
3. the method for network entry of power peak regulation system equipment according to claim 1, which is characterized in that the selection signal is strong Spend the step of strongest gateway is as optimal gateway, further includes:
Obtain the corresponding gateway collection of the strongest gateway of the signal strength;Wherein, the gateway concentrates the corresponding net The quantity of pass is greater than 1;
The gateway is selected to concentrate the smallest gateway of capacity as the optimal gateway;Wherein, the capacity is for indicating The quantity of the equipment of the gateway connection.
4. the method for network entry of power peak regulation system equipment according to claim 1, which is characterized in that described by the equipment The step of being networked by the optimal gateway, comprising:
Obtain the identification information of the equipment;Wherein, the identification information is used to indicate the controller information of the equipment;
The equipment and the optimal gateway are associated with according to the identification information.
5. according to the method for network entry of the described in any item power peak regulation system equipments of claim 2-4, which is characterized in that described to press The step of multiple equipment are grouped according to pre-defined rule, comprising:
The equipment of the gateway association in the same gateway unit is divided into one group.
6. according to the method for network entry of the described in any item power peak regulation system equipments of claim 2-4, which is characterized in that described to press The step of multiple equipment are grouped according to pre-defined rule, comprising:
The corresponding net of multiple equipment of electricity consumption within a preset range is chosen from gateway unit described at least one Close composition gateway group.
7. a kind of method of network entry of power peak regulation system equipment characterized by comprising
Location information is sent to server, so that the server determines the gateway list where equipment according to the positional information Member, and detect the signal strength and/or signal quality of all gateways in gateway unit, selection signal intensity and/or signal quality The strongest gateway is as optimal gateway;
Instruction information is received from the server;Wherein, the instruction information is for indicating the optimal gateway;
The optimal gateway is connected to according to the instruction information.
8. the method for network entry of power peak regulation system equipment according to claim 7, which is characterized in that described according to the finger Show that the step of information is connected to the optimal gateway includes:
Send the identification information of the equipment;Wherein, the identification information is used to indicate the controller information of the equipment;
The optimal gateway is associated with by the identification information.
9. a kind of networking device of power peak regulation system equipment characterized by comprising
Module is obtained, for obtaining the location information of equipment;
First processing module, for determining the gateway unit where the equipment according to the positional information;
Detection module, for detecting the signal strength and/or signal quality of all gateways in the gateway unit;
Selecting module, for selection signal intensity and/or the strongest gateway of signal quality as optimal gateway;
Second processing module, for the equipment to be networked by the optimal gateway.
10. the networking device of power peak regulation system equipment according to claim 9, which is characterized in that further include:
Third processing module, for being grouped according to pre-defined rule to multiple equipment;
Peak regulation module, for being grouped peak regulation to multiple equipment after grouping.
11. the networking device of power peak regulation system equipment according to claim 9, which is characterized in that the selecting module Further include:
Acquiring unit, for obtaining the corresponding gateway collection of the strongest gateway of the signal strength;Wherein, the gateway is concentrated The quantity of the corresponding gateway is greater than 1;
Selecting unit, for selecting the gateway to concentrate the smallest gateway of capacity as the optimal gateway;Wherein, described Capacity is used to indicate the quantity of the equipment of the gateway connection.
12. a kind of networking device of power peak regulation system equipment characterized by comprising
Sending module, for sending location information to server, so that the server determines equipment according to the positional information The gateway unit at place, and detect the signal strength and/or signal quality of all gateways in gateway unit, selection signal intensity And/or the strongest gateway of signal quality is as optimal gateway;
Receiving module, for receiving instruction information from the server;Wherein, the instruction information is for indicating the optimal net It closes;
Fourth processing module, for being connected to the optimal gateway according to the instruction information.
13. a kind of server characterized by comprising
Including at least one processor;
And the memory being connect at least one described processor communication;Wherein, the memory be stored with can by it is described extremely The computer program that a few processor executes, the computer program is executed by least one described processor, so that described At least one processor executes the method for network entry of power peak regulation system equipment as claimed in any one of claims 1 to 6.
14. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program The method of network entry of power peak regulation system equipment as claimed in any one of claims 1 to 6 is realized when being executed by processor.
CN201811209917.7A 2018-10-17 2018-10-17 Method of network entry, device, server and the storage medium of power peak regulation system equipment Pending CN109450746A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811209917.7A CN109450746A (en) 2018-10-17 2018-10-17 Method of network entry, device, server and the storage medium of power peak regulation system equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811209917.7A CN109450746A (en) 2018-10-17 2018-10-17 Method of network entry, device, server and the storage medium of power peak regulation system equipment

Publications (1)

Publication Number Publication Date
CN109450746A true CN109450746A (en) 2019-03-08

Family

ID=65547074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811209917.7A Pending CN109450746A (en) 2018-10-17 2018-10-17 Method of network entry, device, server and the storage medium of power peak regulation system equipment

Country Status (1)

Country Link
CN (1) CN109450746A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112055366A (en) * 2020-09-04 2020-12-08 北京自如信息科技有限公司 Method and device for determining gateway position and computer equipment
CN112532382A (en) * 2020-11-17 2021-03-19 广州技象科技有限公司 Internet of things gateway selection method and device based on signal transmission safety management
CN113131971A (en) * 2021-03-03 2021-07-16 中国电力科学研究院有限公司 Networking transmission method and system of power line carrier communication gateway device based on IPv6
CN113473406A (en) * 2021-07-06 2021-10-01 江苏智冷物联技术有限公司 Method, device, computer storage medium and terminal for realizing equipment management
CN113746725A (en) * 2020-05-28 2021-12-03 美的集团股份有限公司 Gateway selection method and device in multi-gateway environment and storage medium
CN113796050A (en) * 2019-05-07 2021-12-14 萨基姆能源电信公司 Gateway selection method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102946586A (en) * 2012-11-08 2013-02-27 中兴通讯股份有限公司 Access network information notification, access method and device based on position information
CN103973501A (en) * 2014-05-28 2014-08-06 深圳市金立通信设备有限公司 Method and device for managing wireless local area network access point
US20150215892A1 (en) * 2014-01-29 2015-07-30 Elitegroup Computer Systems (Sip) Co., Ltd. Method for Determining a Position of a Wireless Access Point, Self-moving Wireless Access Point, and Self-moving Wireless Access Point Combination
CN104913434A (en) * 2015-04-29 2015-09-16 国家电网公司 Large-scale air conditioner load virtual load peaking unit construction method based on air conditioner grouping and clustering
CN107018049A (en) * 2017-03-09 2017-08-04 广东美的制冷设备有限公司 Home appliance distribution methods, devices and systems
CN108307483A (en) * 2017-09-28 2018-07-20 努比亚技术有限公司 wireless network connecting method and mobile terminal
CN108599162A (en) * 2018-07-27 2018-09-28 珠海格力电器股份有限公司 Peak regulation control method, device and system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102946586A (en) * 2012-11-08 2013-02-27 中兴通讯股份有限公司 Access network information notification, access method and device based on position information
US20150215892A1 (en) * 2014-01-29 2015-07-30 Elitegroup Computer Systems (Sip) Co., Ltd. Method for Determining a Position of a Wireless Access Point, Self-moving Wireless Access Point, and Self-moving Wireless Access Point Combination
CN103973501A (en) * 2014-05-28 2014-08-06 深圳市金立通信设备有限公司 Method and device for managing wireless local area network access point
CN104913434A (en) * 2015-04-29 2015-09-16 国家电网公司 Large-scale air conditioner load virtual load peaking unit construction method based on air conditioner grouping and clustering
CN107018049A (en) * 2017-03-09 2017-08-04 广东美的制冷设备有限公司 Home appliance distribution methods, devices and systems
CN108307483A (en) * 2017-09-28 2018-07-20 努比亚技术有限公司 wireless network connecting method and mobile terminal
CN108599162A (en) * 2018-07-27 2018-09-28 珠海格力电器股份有限公司 Peak regulation control method, device and system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113796050A (en) * 2019-05-07 2021-12-14 萨基姆能源电信公司 Gateway selection method
CN113796050B (en) * 2019-05-07 2023-06-06 萨基姆能源电信公司 Gateway selection method
CN113746725A (en) * 2020-05-28 2021-12-03 美的集团股份有限公司 Gateway selection method and device in multi-gateway environment and storage medium
CN113746725B (en) * 2020-05-28 2023-03-31 美的集团股份有限公司 Gateway selection method and device in multi-gateway environment and storage medium
CN112055366A (en) * 2020-09-04 2020-12-08 北京自如信息科技有限公司 Method and device for determining gateway position and computer equipment
CN112055366B (en) * 2020-09-04 2023-08-25 北京自如信息科技有限公司 Gateway position determining method and device and computer equipment
CN112532382A (en) * 2020-11-17 2021-03-19 广州技象科技有限公司 Internet of things gateway selection method and device based on signal transmission safety management
CN112532382B (en) * 2020-11-17 2021-08-13 广州技象科技有限公司 Internet of things gateway selection method and device based on signal transmission safety management
CN113131971A (en) * 2021-03-03 2021-07-16 中国电力科学研究院有限公司 Networking transmission method and system of power line carrier communication gateway device based on IPv6
CN113131971B (en) * 2021-03-03 2022-10-25 中国电力科学研究院有限公司 Networking transmission method and system of power line carrier communication gateway device based on IPv6
CN113473406A (en) * 2021-07-06 2021-10-01 江苏智冷物联技术有限公司 Method, device, computer storage medium and terminal for realizing equipment management

Similar Documents

Publication Publication Date Title
CN109450746A (en) Method of network entry, device, server and the storage medium of power peak regulation system equipment
US20130103795A1 (en) Methods of establishing communication in a sensor network and apparatus
CN107015892A (en) A kind of method for testing pressure, device and system
CN107404740B (en) Method for switching network, device and the terminal device of safety
WO2020052133A1 (en) Gateway communication method, gateway, and energy system
CN101369933A (en) Automatic test method and system
CN106304325A (en) A kind of localization method, device and location terminal
CN107800554A (en) Collecting method, device and system
CN107069345A (en) A kind of domestic intelligent jack system and its control method
WO2020160383A1 (en) Real-time validation of distributed energy resource device commitments
CN105956322B (en) The process corner detection device and method of digital circuit
JP2017513284A (en) Techniques for optimizing mesh networks
WO2014117212A1 (en) Controlling operation of power consuming devices in an electrical grid
CN104426881A (en) Method and device for detecting malicious behavior
CN106877904B (en) Method and device for controlling meter equipment access
CN112382006A (en) Electricity price adjusting method, device and equipment
CN104683186A (en) Network resource scheduling method and device
CN108353069A (en) It is established via the communication link of identifier
Liu et al. Efficient detection of cloned attacks for large-scale RFID systems
WO2012009901A1 (en) Data acquisition method in network resource estimation and system thereof
JP2012170073A (en) Systems and methods for adaptive error thresholds or adaptive modulation schemes based on atmospheric conditions
CN107277815A (en) Wifi hotspot management method, device and terminal device
CN103024097A (en) Method, device and system for detecting network address translation server aging time
WO2020227476A1 (en) Apparatus and method for dynamic forecasting, aggregation, and validation
CN105554852A (en) Method for switching WIFI signal sources

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190308

RJ01 Rejection of invention patent application after publication