CN109444949A - A kind of nuclear power station seismic monitoring early warning network-building method and system - Google Patents

A kind of nuclear power station seismic monitoring early warning network-building method and system Download PDF

Info

Publication number
CN109444949A
CN109444949A CN201811170945.2A CN201811170945A CN109444949A CN 109444949 A CN109444949 A CN 109444949A CN 201811170945 A CN201811170945 A CN 201811170945A CN 109444949 A CN109444949 A CN 109444949A
Authority
CN
China
Prior art keywords
nuclear power
alarm signal
seismic monitoring
earthquake
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811170945.2A
Other languages
Chinese (zh)
Inventor
李敏
刘胜智
潘伟伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
CGN Power Co Ltd
Suzhou Nuclear Power Research Institute Co Ltd
Original Assignee
China General Nuclear Power Corp
CGN Power Co Ltd
Suzhou Nuclear Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, CGN Power Co Ltd, Suzhou Nuclear Power Research Institute Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201811170945.2A priority Critical patent/CN109444949A/en
Publication of CN109444949A publication Critical patent/CN109444949A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/01Measuring or predicting earthquakes
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • G08B21/10Alarms for ensuring the safety of persons responsive to calamitous events, e.g. tornados or earthquakes

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Engineering & Computer Science (AREA)
  • Acoustics & Sound (AREA)
  • Remote Sensing (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention discloses a kind of nuclear power station seismic monitoring early warning network-building methods, for the nuclear power base including multiple nuclear power stations, the following steps are included: seismic monitoring alarm signal is sent to other nuclear power stations in same nuclear power base when generating seismic monitoring alarm signal;When monitoring that multiple nuclear power stations in nuclear power base generate seismic monitoring alarm signal, alarm signal of initiating earthquake;Earthquake alarm signal is sent to the reactor protection system of nuclear power unit, one of the jump heap trigger signal as reactor protection system.The present invention fully considers the case where most of nuclear power bases of the current country are the operation of more power stations, the efficiency of decision-making of master control operator under earthquake operating condition can be improved, it avoids because of nuclear safety accident caused by responding not in time, while fully considering that spurious shutdown leads to unnecessary economic loss caused by measures are avoided because of false alarm.

Description

A kind of nuclear power station seismic monitoring early warning network-building method and system
Technical field
The present invention relates to nuclear power station technical fields, more specifically to a kind of nuclear power station seismic monitoring early warning networking side Method and system.
Background technique
Currently, domestic transporting or be by arranging in nuclear power plant in the nuclear power plant's earthquake instrument system (KIS system) built Related probes monitor the correlated characteristic variable (for example, peak accelerator, accumulation absolute velocity etc.) under earthquake operating condition, reach in variable Corresponding alarm signal is triggered when to particular value (for example, seismic events alarm (EVT) signal, operating basis earthquake alarm (OBE) Signal and safe shutdown earthquake alarm (SSE) signal) master control operator is given, judge whether that shutdown provides judgement for master control operator Foundation.
Therefore, under earthquake operating condition, master control operator must arrange work after seeing alarm personnel discuss make it is corresponding It can just decide whether to execute corresponding operation after decision, whole process is too long, and it is fast cannot to meet master control operator under earthquake operating condition The requirement of speed response.
Summary of the invention
The purpose of the present invention is to provide a kind of nuclear power station seismic monitoring early warning network-building method and systems.
The technical solution used to solve the technical problems of the present invention is that: a kind of nuclear power station seismic monitoring early warning networking side is provided Method, for the nuclear power base including multiple nuclear power stations, comprising the following steps:
When the seismic monitoring early warning system of any nuclear power station generates seismic monitoring alarm signal, by the seismic monitoring report Alert signal is sent to the safety level DCS system of other nuclear power stations in same nuclear power base;
Monitor that multiple nuclear power stations in nuclear power base generate seismic monitoring in the safety level DCS system of any nuclear power station When alarm signal, alarm signal of initiating earthquake;
The earthquake alarm signal is sent to the reactor protection system of nuclear power unit, as reactor protection system Jump one of heap trigger signal.
In nuclear power station seismic monitoring early warning network-building method provided by the invention, when generating seismic monitoring alarm signal, In the step for other nuclear power stations that the seismic monitoring alarm signal is sent in same nuclear power base, passed by optical fiber Defeated and hardwire transmits other nuclear power stations being sent to the seismic monitoring alarm signal in same nuclear power base.
In nuclear power station seismic monitoring early warning network-building method provided by the invention, multiple cores in nuclear power base are being monitored When power station generates seismic monitoring alarm signal, the step for alarm signal of initiating earthquake includes:
When monitoring that multiple nuclear power stations in nuclear power base generate seismic monitoring alarm signal, by multiple seismic monitorings Alarm signal is sent to safety level DCS system;
Delay sampling is carried out to multiple seismic monitoring alarm signals, if after the first default sampling period, it is described more A seismic monitoring alarm signal does not change, then triggers the earthquake alarm signal.
In nuclear power station seismic monitoring early warning network-building method provided by the invention, the earthquake alarm signal is sent to core The step of the reactor protection system of motor group, the jump heap trigger signal as reactor protection system includes:
The earthquake alarm signal is sent to the reactor protection system of nuclear power unit;
Delay sampling is carried out to the earthquake alarm signal, by the earthquake alarm after the second default sampling period Jump heap trigger signal one of of the signal as reactor protection system.
In nuclear power station seismic monitoring early warning network-building method provided by the invention, further includes:
Receive the seismic monitoring alarm signal from other nuclear power bases;
Seismic monitoring alarm signal from other nuclear power bases is sent to safety level as seismic monitoring pre-warning signal DCS system.
In nuclear power station seismic monitoring early warning network-building method provided by the invention, received by optical fiber transmitting and satellite transmitting Seismic monitoring alarm signal from other nuclear power bases.
Correspondingly, the present invention also provides a kind of nuclear power station seismic monitoring early warning group network systems, for the multiple of nuclear power base In nuclear power station, the nuclear power station seismic monitoring early warning group network system includes:
Seismic monitoring alarm signal generation module, for when an earthquake occurs, generating seismic monitoring alarm signal;
Seismic monitoring alarm signal sending module, for the seismic monitoring alarm signal to be sent to same nuclear power base Other interior nuclear power stations;
Seismic monitoring alarm signal receiving module, for receiving the earthquake of other nuclear power stations in same nuclear power base Monitoring, alarming signal;
Earthquake alarm signal generation module, for monitoring that multiple nuclear power stations in nuclear power base generate seismic monitoring When alarm signal, alarm signal of initiating earthquake;
Earthquake alarm signal transmitting module, for the earthquake alarm signal to be sent to the reactor protection of nuclear power unit System, one of the jump heap trigger signal as reactor protection system.
In nuclear power station seismic monitoring early warning group network system provided by the invention, the earthquake alarm signal generation module packet It includes:
Monitoring unit, for when monitoring that multiple nuclear power stations in nuclear power base generate seismic monitoring alarm signal, Multiple seismic monitoring alarm signals are sent to safety level DCS system;
Sampling unit, for carrying out delay sampling to multiple seismic monitoring alarm signals, if by the first default sampling After period, the multiple seismic monitoring alarm signal does not change, then triggers the earthquake alarm signal.
In nuclear power station seismic monitoring early warning group network system provided by the invention, the earthquake alarm signal transmitting module will The earthquake alarm signal is sent to the reactor protection system of nuclear power unit;The reactor protection system is to the earthquake report Alert signal carries out delay sampling, using the earthquake alarm signal after the second default sampling period as reactor protection system One of jump heap trigger signal of system.
In nuclear power station seismic monitoring early warning group network system provided by the invention, the seismic monitoring alarm signal receives mould Block is also used to receive the seismic monitoring alarm signal from other nuclear power bases;The nuclear power station seismic monitoring early warning group network system It further include seismic monitoring pre-warning signal sending module, for that will be used as ground from the seismic monitoring alarm signal in other nuclear power bases Shake monitoring and warning signal is sent to safety level DCS system.
Nuclear power station seismic monitoring early warning network-building method of the invention and system, which have the advantages that, to be fully considered at present The case where domestic most of nuclear power bases are the operation of more power stations, when any nuclear power station generates seismic monitoring alarm signal, All transmit the signal to other nuclear power stations in same nuclear power base;All nuclear power stations only in nuclear power base all trigger When seismic monitoring alarm signal, the just earthquake alarm signal as the nuclear power base, and the earthquake alarm signal is sent to The reactor protection system of nuclear power unit, one of the jump heap signal as reactor protection system, thus, it is possible to improve earthquake work The efficiency of decision-making of master control operator under condition avoids because of nuclear safety accident caused by responding not in time, while fully considering measures Spurious shutdown leads to unnecessary economic loss caused by avoiding because of false alarm.
Detailed description of the invention
Fig. 1 is the flow chart for the nuclear power station seismic monitoring early warning network-building method that one embodiment of the invention provides;
Fig. 2 is the schematic diagram for the nuclear power station seismic monitoring early warning group network system that one embodiment of the invention provides;
Fig. 3 is the structural schematic diagram of a kind of electronic equipment provided in an embodiment of the present invention.
Specific embodiment
In order to make those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work It encloses.
Description and claims of this specification and term " first ", " second ", " third " and " in above-mentioned attached drawing Four " etc. are not use to describe a particular order for distinguishing different objects.In addition, term " includes " and " having " and it Any deformation, it is intended that cover and non-exclusive include.Such as it contains the process, method of a series of steps or units, be System, product or equipment are not limited to listed step or unit, but optionally further comprising the step of not listing or list Member, or optionally further comprising other step or units intrinsic for these process, methods, product or equipment.
Below in conjunction with drawings and examples the present invention will be further explained explanation.
Fig. 1 is the flow chart for the nuclear power station seismic monitoring early warning network-building method that one embodiment of the invention provides;Such as Fig. 1 institute Show, nuclear power station seismic monitoring early warning network-building method provided by the invention the following steps are included:
S11, any nuclear power station seismic monitoring early warning system generate seismic monitoring alarm signal when, the earthquake is supervised Survey the safety level DCS system that alarm signal is sent to other nuclear power stations in same nuclear power base;
S12, monitor that multiple nuclear power stations in nuclear power base generate earthquake in the safety level DCS system of any nuclear power station When monitoring, alarming signal, alarm signal of initiating earthquake;
S13, the reactor protection system that the earthquake alarm signal is sent to nuclear power unit, as reactor protection system One of jump heap trigger signal of system.
In step s 11, it monitors whether that earthquake occurs by the related probes that nuclear power plant arranges, it is when an earthquake occurs, raw Other nuclear power stations in same nuclear power base are sent at seismic monitoring alarm signal, and by the seismic monitoring alarm signal.Example It such as, include two nuclear power stations of Daya Bay nuclear power plant and Ling'ao nuclear power plant in Daya Gulf nuclear power base, when an earthquake occurs, greatly Sub- gulf nuclear power station and Ling'ao nuclear power plant can all generate seismic monitoring alarm signal, and the seismic monitoring alarm signal is sent to pair Side.Existing nuclear power earthquake monitoring system is all the seismic monitoring alarm signal for only showing this nuclear power station, and in the present embodiment, When any nuclear power station in same nuclear power base generates seismic monitoring alarm signal, other nuclear powers for being all sent in same base It stands, this way it is possible to avoid a certain power station earthquake monitoring system failure can not be successfully the situation for monitoring, alarming signal of initiating earthquake.
Specifically, in this step, the seismic monitoring alarm signal is sent by optical fiber transmission and hardwire transmission Other nuclear power stations in same nuclear power base, to realize redundancy, it is ensured that under earthquake operating condition, alarm signal can smoothly be sent out Come.
Further, in the seismic monitoring alarm signal for receiving other nuclear power stations in this nuclear power station or same base Afterwards, by the seismic monitoring alarm signal received be sent into safety level DCS system in, with cause at the first time operator's note that Convenient for operator at the first time grasp earthquake monitoring system state, it is ensured that a certain power station earthquake monitoring system failure can not be suitable Benefit initiate earthquake monitoring, alarming signal when intervene in time.
In step s 12, after all nuclear power stations in same nuclear power base all trigger seismic monitoring alarm signal, The earthquake alarm signal for triggering this nuclear power base thinks that earthquake all has occurred in all nuclear power stations in the nuclear power base.Into one Step ground, in order to avoid because caused by false alarm spurious shutdown lead to unnecessary economic loss, need to earthquake monitoring and warning signal into Line delay sampling, does not change and just thinks to trigger earthquake alarm signal, therefore, step S12 includes following sub-step:
When monitoring that multiple nuclear power stations in nuclear power base generate seismic monitoring alarm signal, by multiple seismic monitorings Alarm signal is sent to safety level DCS system;
Delay sampling is carried out to multiple seismic monitoring alarm signals, if after the first default sampling period, it is described more A seismic monitoring alarm signal does not change, then triggers the earthquake alarm signal.
In the present embodiment, the earthquake monitoring system in the only all power stations in this nuclear power base triggers alarm signal, and in DCS The signal still remained after the sampling period delay of system, just the earthquake alarm as all power stations in this nuclear power base is believed Number.
In step s 13, the earthquake alarm signal for combining formation need to be sent into the safety level DCS of all units in this power station Reactor protection system, participate in reactor jump heap relay protective scheme, convenient for ensuring reactor at the first time under earthquake operating condition Safety.Further, in order to avoid because caused by false alarm spurious shutdown lead to unnecessary economic loss, after the sampling that need to be delayed True triggering.Therefore, this step includes following sub-step:
The earthquake alarm signal is sent to the reactor protection system of nuclear power unit;
Delay sampling is carried out to the earthquake alarm signal, by the earthquake alarm after the second default sampling period Jump heap trigger signal one of of the signal as reactor protection system.
Nuclear power station seismic monitoring early warning network-building method provided by the invention fully considers most of nuclear power bases of the current country The case where ground is the operation of more power stations all transmits the signal to same when any nuclear power station generates seismic monitoring alarm signal Other nuclear power stations in one nuclear power base;All nuclear power stations only in nuclear power base all trigger seismic monitoring alarm signal When, the just earthquake alarm signal as the nuclear power base, and the reactor that the earthquake alarm signal is sent to nuclear power unit is protected Protecting system, one of the jump heap signal as reactor protection system, thus, it is possible to improve master control operator under earthquake operating condition certainly Plan efficiency avoids because of nuclear safety accident caused by responding not in time, while fully considering that measures avoid missing caused by because of false alarm Shutdown leads to unnecessary economic loss.
In an alternative embodiment of the invention, in order to further increase the efficiency of decision-making of master control operator under earthquake operating condition, only The alarm signal of the nuclear power station seismic monitoring in any adjacent nuclear power base is triggered, all power stations in this nuclear power base will the letter Pre-warning signal number as this base power station seismic monitoring, therefore, further includes:
Receive the seismic monitoring alarm signal from other nuclear power bases;
Seismic monitoring alarm signal from other nuclear power bases is sent to safety level as seismic monitoring pre-warning signal DCS system.
It is specifically, same to cross the seismic monitoring alarm signal of optical fiber transmitting or satellite transmitting reception from other nuclear power bases, To realize redundancy, it is ensured that under earthquake operating condition, alarm signal can smoothly be sent out.
Further, after receiving the seismic monitoring alarm signal from other nuclear power bases, the seismic monitoring that will receive Alarm signal as seismic monitoring pre-warning signal be sent into safety level DCS system in, with cause at the first time operator's note that Convenient for operator at the first time grasp earthquake monitoring system state, it is ensured that a certain power station earthquake monitoring system failure can not be suitable Benefit initiate earthquake monitoring, alarming signal when intervene in time.The present embodiment passes through the seismic monitoring report using any adjacent nuclear power base Seismic monitoring pre-warning signal of the alert signal as this nuclear power base, can further provide for the efficiency of decision-making of operator
Fig. 2 is the schematic diagram of nuclear power station seismic monitoring early warning group network system provided in an embodiment of the present invention;The seismic monitoring Early warning system is used in multiple nuclear power stations in nuclear power base, as shown in Fig. 2, nuclear power station seismic monitoring early warning networking system of the invention System includes:
Seismic monitoring alarm signal generation module 210, for when an earthquake occurs, generating seismic monitoring alarm signal;
Seismic monitoring alarm signal sending module 220, for the seismic monitoring alarm signal to be sent to same nuclear power Other nuclear power stations in base;
Seismic monitoring alarm signal receiving module 230, for receiving other nuclear power stations in same nuclear power base Seismic monitoring alarm signal;
Earthquake alarm signal generation module 240, for monitoring that multiple nuclear power stations in nuclear power base generate earthquake When monitoring, alarming signal, alarm signal of initiating earthquake;
Earthquake alarm signal transmitting module 250, for the earthquake alarm signal to be sent to the reactor of nuclear power unit Protection system, one of the jump heap trigger signal as reactor protection system.
Specifically, the earthquake alarm signal generation module includes:
Monitoring unit, for when monitoring that multiple nuclear power stations in nuclear power base generate seismic monitoring alarm signal, Multiple seismic monitoring alarm signals are sent to safety level DCS system;
Sampling unit, for carrying out delay sampling to multiple seismic monitoring alarm signals, if by the first default sampling After period, the multiple seismic monitoring alarm signal does not change, then triggers the earthquake alarm signal.
Further, the earthquake alarm signal is sent to the anti-of nuclear power unit by the earthquake alarm signal transmitting module Heap is answered to protect system;The reactor protection system carries out delay sampling to the earthquake alarm signal, will preset by second Jump heap trigger signal of the earthquake alarm signal as reactor protection system after sampling period.
Further, the seismic monitoring alarm signal receiving module is also used to receive the earthquake from other nuclear power bases Monitoring, alarming signal;The nuclear power station seismic monitoring early warning group network system further includes seismic monitoring pre-warning signal sending module 260, For being sent to safety level DCS system for the seismic monitoring alarm signal from other nuclear power bases as seismic monitoring pre-warning signal System.
Nuclear power station seismic monitoring early warning group network system provided by the invention fully considers most of nuclear power bases of the current country The case where ground is the operation of more power stations all transmits the signal to same when any nuclear power station generates seismic monitoring alarm signal Other nuclear power stations in one nuclear power base;All nuclear power stations only in nuclear power base all trigger seismic monitoring alarm signal When, the just earthquake alarm signal as the nuclear power base, and the reactor that the earthquake alarm signal is sent to nuclear power unit is protected Protecting system, one of the jump heap signal as reactor protection system, thus, it is possible to improve master control operator under earthquake operating condition certainly Plan efficiency avoids because of nuclear safety accident caused by responding not in time, while fully considering that measures avoid missing caused by because of false alarm Shutdown leads to unnecessary economic loss.
About the system in above-described embodiment, wherein modules execute the concrete mode of operation in related this method Embodiment in be described in detail, no detailed explanation will be given here.
Referring to Fig. 3, Fig. 3 is the structural schematic diagram of a kind of electronic equipment provided in an embodiment of the present invention, the electronic equipment 300, may include:
Processor 310, memory 320, communication interface 330 and bus 340;
The processor 310, the memory 320 and the communication interface 330 are connected and are completed by the bus 340 Mutual communication;
The memory 320 stores executable program code;
The processor 310 run by reading the executable program code stored in the memory 320 with it is described The corresponding program of executable program code, for executing a kind of nuclear power station seismic monitoring early warning network-building method;Wherein, a seed nucleus Power station seismic monitoring early warning network-building method, for the nuclear power base including multiple nuclear power stations, comprising the following steps:
When generating seismic monitoring alarm signal, the seismic monitoring alarm signal is sent in same nuclear power base Other nuclear power stations;
When monitoring that multiple nuclear power stations in nuclear power base generate seismic monitoring alarm signal, alarm signal of initiating earthquake Number;
The earthquake alarm signal is sent to the reactor protection system of nuclear power unit, as reactor protection system Jump heap trigger signal.
The embodiment of the invention also provides a kind of storage mediums, wherein the storage medium is described for storing application program Application program for executing a kind of intelligent machine for the hybrid channel IPV4 and IPV6 described in the embodiment of the present invention at runtime The domain name analytic method of top box.
The embodiment of the invention also provides a kind of application programs, wherein the application program for executing this hair at runtime A kind of nuclear power station seismic monitoring early warning network-building method described in bright embodiment.
It should be noted that for the various method embodiments described above, for simple description, therefore, it is stated as a series of Combination of actions, but those skilled in the art should understand that, the present invention is not limited by the sequence of acts described because According to the present invention, some steps may be performed in other sequences or simultaneously.Secondly, those skilled in the art should also know It knows, the embodiments described in the specification are all preferred embodiments, and related actions and modules is not necessarily of the invention It is necessary.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, there is no the portion being described in detail in some embodiment Point, reference can be made to the related descriptions of other embodiments.
In several embodiments provided herein, it should be understood that disclosed device, it can be by another way It realizes.For example, the apparatus embodiments described above are merely exemplary, such as the division of the unit, it is only a kind of Logical function partition, there may be another division manner in actual implementation, such as multiple units or components can combine or can To be integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual Coupling, direct-coupling or communication connection can be through some interfaces, the indirect coupling or communication connection of device or unit, It can be electrical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a storage medium, including some instructions are used so that a computer Equipment (can for personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or Part steps.And storage medium above-mentioned includes: that USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic or disk etc. be various to can store program code Medium.
The above, above embodiments are only to illustrate technical solution of the present invention, rather than its limitations;Although referring to aforementioned Invention is explained in detail for embodiment, wherein those skilled in the art should understand that: it still can be right Technical solution documented by foregoing embodiments is modified or equivalent replacement of some of the technical features;And this It modifies or replaces, the range for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should be included within scope of the presently claimed invention.

Claims (10)

1. a kind of nuclear power station seismic monitoring early warning network-building method, for the nuclear power base including multiple nuclear power stations, which is characterized in that The following steps are included:
When the seismic monitoring early warning system of any nuclear power station generates seismic monitoring alarm signal, by the seismic monitoring alarm signal Number it is sent to the safety level DCS system of other nuclear power stations in same nuclear power base;
Monitor that multiple nuclear power stations in nuclear power base generate seismic monitoring alarm in the safety level DCS system of any nuclear power station When signal, alarm signal of initiating earthquake;
The earthquake alarm signal is sent to the reactor protection system of nuclear power unit, the jump heap as reactor protection system One of trigger signal.
2. nuclear power station seismic monitoring early warning network-building method according to claim 1, which is characterized in that generating seismic monitoring When alarm signal, the seismic monitoring alarm signal is sent to the step of other nuclear power stations in same nuclear power base In, other cores seismic monitoring alarm signal being sent in same nuclear power base are transmitted by optical fiber transmission and hardwire Power station.
3. nuclear power station seismic monitoring early warning network-building method according to claim 1, which is characterized in that monitoring nuclear power base When multiple nuclear power stations in ground generate seismic monitoring alarm signal, the step for alarm signal of initiating earthquake includes:
When monitoring that multiple nuclear power stations in nuclear power base generate seismic monitoring alarm signal, multiple seismic monitorings are alarmed Signal is sent to safety level DCS system;
Delay sampling is carried out to multiple seismic monitoring alarm signals, if after the first default sampling period, the multiplely Shake monitoring, alarming signal does not change, then triggers the earthquake alarm signal.
4. nuclear power station seismic monitoring early warning network-building method according to claim 1, which is characterized in that by the earthquake alarm Signal is sent to the reactor protection system of nuclear power unit, described in one of jump heap trigger signal as reactor protection system Step includes:
The earthquake alarm signal is sent to the reactor protection system of nuclear power unit;
Delay sampling is carried out to the earthquake alarm signal, by the earthquake alarm signal after the second default sampling period One of jump heap trigger signal as reactor protection system.
5. nuclear power station seismic monitoring early warning network-building method according to claim 1, which is characterized in that further include:
Receive the seismic monitoring alarm signal from other nuclear power bases;
Safety level DCS system is sent to using the seismic monitoring alarm signal from other nuclear power bases as seismic monitoring pre-warning signal System.
6. nuclear power station seismic monitoring early warning network-building method according to claim 5, which is characterized in that by optical fiber transmitting and Satellite transmitting receives the seismic monitoring alarm signal from other nuclear power bases.
7. a kind of nuclear power station seismic monitoring early warning group network system, in multiple nuclear power stations in nuclear power base, which is characterized in that institute Stating nuclear power station seismic monitoring early warning group network system includes:
Seismic monitoring alarm signal generation module, for when an earthquake occurs, generating seismic monitoring alarm signal;
Seismic monitoring alarm signal sending module, for the seismic monitoring alarm signal to be sent in same nuclear power base Other nuclear power stations;
Seismic monitoring alarm signal receiving module, for receiving the seismic monitoring of other nuclear power stations in same nuclear power base Alarm signal;
Earthquake alarm signal generation module, for monitor multiple nuclear power stations in nuclear power base generate seismic monitoring alarm When signal, alarm signal of initiating earthquake;
Earthquake alarm signal transmitting module, for the earthquake alarm signal to be sent to the reactor protection system of nuclear power unit System, one of the jump heap trigger signal as reactor protection system.
8. nuclear power station seismic monitoring early warning group network system according to claim 7, which is characterized in that the earthquake alarm letter Number generation module includes:
Monitoring unit will be more for when monitoring that multiple nuclear power stations in nuclear power base generate seismic monitoring alarm signal A seismic monitoring alarm signal is sent to safety level DCS system;
Sampling unit, for carrying out delay sampling to multiple seismic monitoring alarm signals, if by the first default sampling period Afterwards, the multiple seismic monitoring alarm signal does not change, then triggers the earthquake alarm signal.
9. nuclear power station seismic monitoring early warning group network system according to claim 7, which is characterized in that the earthquake alarm letter The earthquake alarm signal is sent to the reactor protection system of nuclear power unit by number sending module;The reactor protection system Delay sampling is carried out to the earthquake alarm signal, using the earthquake alarm signal after the second default sampling period as One of jump heap trigger signal of reactor protection system.
10. nuclear power station seismic monitoring early warning group network system according to claim 7, which is characterized in that the seismic monitoring Alarm signal receiving module is also used to receive the seismic monitoring alarm signal from other nuclear power bases;The nuclear power station earthquake prison Surveying early warning group network system further includes seismic monitoring pre-warning signal sending module, for will be from the seismic monitoring in other nuclear power bases Alarm signal is sent to safety level DCS system as seismic monitoring pre-warning signal.
CN201811170945.2A 2018-10-09 2018-10-09 A kind of nuclear power station seismic monitoring early warning network-building method and system Pending CN109444949A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811170945.2A CN109444949A (en) 2018-10-09 2018-10-09 A kind of nuclear power station seismic monitoring early warning network-building method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811170945.2A CN109444949A (en) 2018-10-09 2018-10-09 A kind of nuclear power station seismic monitoring early warning network-building method and system

Publications (1)

Publication Number Publication Date
CN109444949A true CN109444949A (en) 2019-03-08

Family

ID=65544594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811170945.2A Pending CN109444949A (en) 2018-10-09 2018-10-09 A kind of nuclear power station seismic monitoring early warning network-building method and system

Country Status (1)

Country Link
CN (1) CN109444949A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021097897A1 (en) * 2019-11-18 2021-05-27 中广核工程有限公司 Earthquake early-warning and monitoring system and method for nuclear power plant

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102385787A (en) * 2010-09-30 2012-03-21 秦皇岛开发区前景电子科技有限公司 Early warning method for regional earthquake monitoring net
WO2013152200A1 (en) * 2012-04-04 2013-10-10 Cornell University System and methods for risk prediction and assessment
CN104181580A (en) * 2014-08-20 2014-12-03 中广核工程有限公司 Nuclear power station earthquake monitoring method and system
CN104700524A (en) * 2014-12-31 2015-06-10 大亚湾核电运营管理有限责任公司 Comprehensive security response system and device for multi-unit nuclear power bases
CN106920579A (en) * 2015-12-28 2017-07-04 上海核工程研究设计院 A kind of automatic reactor shut-off system of nuclear power plant's digital seismic and method
CN107003422A (en) * 2014-11-21 2017-08-01 阿海珐核能公司 Seismic sensor unit and corresponding nuclear power station emergency shutdown system
CN107784791A (en) * 2016-08-25 2018-03-09 苏州热工研究院有限公司 A kind of earthquake monitoring warning system and method for nuclear power plant

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102385787A (en) * 2010-09-30 2012-03-21 秦皇岛开发区前景电子科技有限公司 Early warning method for regional earthquake monitoring net
WO2013152200A1 (en) * 2012-04-04 2013-10-10 Cornell University System and methods for risk prediction and assessment
CN104181580A (en) * 2014-08-20 2014-12-03 中广核工程有限公司 Nuclear power station earthquake monitoring method and system
CN107003422A (en) * 2014-11-21 2017-08-01 阿海珐核能公司 Seismic sensor unit and corresponding nuclear power station emergency shutdown system
CN104700524A (en) * 2014-12-31 2015-06-10 大亚湾核电运营管理有限责任公司 Comprehensive security response system and device for multi-unit nuclear power bases
CN106920579A (en) * 2015-12-28 2017-07-04 上海核工程研究设计院 A kind of automatic reactor shut-off system of nuclear power plant's digital seismic and method
CN107784791A (en) * 2016-08-25 2018-03-09 苏州热工研究院有限公司 A kind of earthquake monitoring warning system and method for nuclear power plant

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021097897A1 (en) * 2019-11-18 2021-05-27 中广核工程有限公司 Earthquake early-warning and monitoring system and method for nuclear power plant

Similar Documents

Publication Publication Date Title
CN104967588A (en) Protection method, apparatus and system for distributed denial of service DDoS (distributed denial of service) attack
CN104063987B (en) Master control room of nuclear power station back-up disk alarm method and system thereof
CN104518826B (en) A kind of method, equipment and system for monitoring fiber failure
CN106773933A (en) Intelligent electric meter and its control method, device, system
CN105513245B (en) 35kV transformer substation multi-layer safety protection system
CN105717786A (en) Diagnostics and enhanced functionality for single-wire safety communication
CN109444949A (en) A kind of nuclear power station seismic monitoring early warning network-building method and system
CN106274797A (en) The warning system of a kind of vehicle abnormality, method, car-mounted terminal and mobile terminal
CN102752289A (en) Master station for power utilization information collecting system
CN101409638A (en) Method, system and apparatus for warning distributed business system fault
CN112822209A (en) Industrial network system for unidirectional data transmission
CN105281824A (en) Method and device for detecting constant light-emitting optical network unit (ONU) and network management equipment
CN102201927A (en) Alarm information processing method and device
CN102136922B (en) Correlation analysis method, equipment and system
DE102017219028A1 (en) System for detecting critical operating states of electrical energy storage
CN105353713A (en) Computer room monitoring system
CN109507512A (en) Relay protection data transmission system and method
CN102842960A (en) Local monitoring apparatus, monitoring system and method of digital protective relay
CN109733831A (en) Control the method and device of feeder
CN105182812A (en) Network monitoring system of electric vehicle charging station
CN106772076B (en) Battery group method for determining running state and device
Dimitrova et al. Contemporary Trends for Increasing the Reliability of the SCADA systems Communication Level
CN106559247A (en) Alarm management method and NMS in NMS
US20130086680A1 (en) System and method for communication in a network
CN104299379A (en) Short message warning system of intelligent comprehensive online monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190308