CN109441575A - The method of steam combined cycle power generating unit heat supply period heat network system operation - Google Patents

The method of steam combined cycle power generating unit heat supply period heat network system operation Download PDF

Info

Publication number
CN109441575A
CN109441575A CN201811153771.9A CN201811153771A CN109441575A CN 109441575 A CN109441575 A CN 109441575A CN 201811153771 A CN201811153771 A CN 201811153771A CN 109441575 A CN109441575 A CN 109441575A
Authority
CN
China
Prior art keywords
steam
heat
pressure
heat supply
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811153771.9A
Other languages
Chinese (zh)
Other versions
CN109441575B (en
Inventor
张利
王梓越
鄂志君
周连升
张宇
陈天恒
杨晓静
王坤
甘智勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Electric Power Research Institute of State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Electric Power Research Institute of State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd, Electric Power Research Institute of State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811153771.9A priority Critical patent/CN109441575B/en
Publication of CN109441575A publication Critical patent/CN109441575A/en
Application granted granted Critical
Publication of CN109441575B publication Critical patent/CN109441575B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • F01K13/02Controlling, e.g. stopping or starting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/32Collecting of condensation water; Drainage ; Removing solid particles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C6/00Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The present invention relates to a kind of methods of gas-steam combined circulating generation unit heat supply period heat network system operation, pass through the control to high pressure turbine by and intermediate pressure by-pass valve, desuperheating water, steam parameter, give full play to the effect of steam turbine " high pressure turbine by " and " intermediate pressure by-pass ", high temperature and high pressure steam is set to pass through bypass " bypass " steam turbine, realize that 900MW grades of gas-steam combined cycle sets under the operating condition for cutting steam turbine entirely, are realized and carry out heat supply to heat supply network.The present invention solves the problems, such as that gas-steam combined cycle set steam turbine leads to not carry out safety and stability heat supply to heat supply network in heat supply period because cause specific (during capital construction do not complete the system debug of steam turbine whole, there are major defects to run for turbine system) can not be passed through high temperature and high pressure steam, operations staff is helped to cut off steam turbine in heat supply period " safety ", the safe and stable operation for gas-steam combined cycle set heat supply period heat network system provides technical support and reference.

Description

The method of steam combined cycle power generating unit heat supply period heat network system operation
Technical field
The invention belongs to gas-steam combined cycle sets to be safely operated technical field, and especially a kind of Steam Combined is followed The method of ring generating set heat supply period heat network system operation.
Technical background
Gas-steam Combined Cycle device (abbreviation combined cycle power plant) can combine the advantages of the two.It is followed Ring had not only had the heating high temperature of gas turbine, but also the heat release low temperature with Steam Power Equipment, to have the higher thermal efficiency, greatly Amplitude improves the thermal efficiency in thermal power plant, and pollution problem is made to achieve a solution, and promotes " clean combustion of coal ", is before having development The generation technology on way.
The heat supply steam extraction of 900MW gas-steam combined cycle set heat supply period heat exchangers for district heating comes from extracted steam from turbine, mesh Preceding there are no gas-steam combined cycle sets to carry out heat supply to heat supply network under the operating condition that steam turbine is cut entirely, causes combustion gas-steaming Vapour combined cycle unit steam turbine (does not complete the system debug of steam turbine whole during capital construction, turbine system is deposited because of cause specific Should not be run in major defect) it can not be passed through high temperature and high pressure steam, but still need to the operating condition that safety and stability heat supply is carried out to heat supply network Lack necessary technical support.
Summary of the invention
The present invention overcomes the deficiencies in the prior art, provide by high pressure turbine by and intermediate pressure by-pass valve, desuperheating water, steaming The control of vapour parameter gives full play to the effect of steam turbine " high pressure turbine by " and " intermediate pressure by-pass ", high temperature and high pressure steam is made to pass through side Road " bypass " steam turbine realizes that 900MW grades of gas-steam combined cycle sets under the operating condition for cutting steam turbine entirely, are realized to heat The method that net carries out a kind of steam combined cycle power generating unit heat supply period heat network system operation of heat supply.
The technical proposal adopted by the invention to solve the above technical problems is that:
A kind of method of steam combined cycle power generating unit heat supply period heat network system operation, it is characterised in that: including following Step:
(1) investment is configured to the main logic protection of each system of gas-steam combined cycle set;
(2) gas-steam combined cycle set auxiliary system and its equipment are normally put into;
(3) heat supply network circulation puts into operation;
(4) turbine by-pass puts into operation, and heat exchangers for district heating vapour side is put into operation;
(5) heat network system is hydrophobic puts into operation.
Further more, the main logic protection of each system of gas-steam combined cycle set is configured throwing in the step (1) Enter to specifically include:
The protection of 1.1 heat exchangers for district heating liquid levels needs to put into, and protection value is put by design is operated normally;
The liquid level protection (high level and low value) of 1.2 hot wells needs to put into, and protection value is put by design is operated normally;
The normal investment of pressure minimum living shield of 1.3 condensate pump entrances;
The body temperature of 1.4 condenser hydrophobic development units needs to put into, and condenser hydrophobic development unit desuperheating water is adjustable;
1.5 condenser body temperatures need to put into, and the water curtain water spray of condenser is adjustable;
1.6 when four heat exchangers for district heatings close entirely into vapour entrance electrically operated gate, waste heat boiler tripping, interlocking combustion engine tripping;
1.7 when four circulation pump of heat-supply network full cut-ofves, waste heat boiler tripping, interlocking combustion engine tripping;
1.8 when four water circulating pump full cut-ofves, waste heat boiler tripping, interlocking combustion engine tripping;
Other in 1.9 to open to condenser electrically operated gate and (take and close disappearance of signal), water curtain desuperheating water pitch 50% is opened in interlocking, together Shi Liansuo opens low pressure cylinder spray pitch 50%;
Low side decompression valve opening is greater than 5% in 1.10, and water curtain desuperheating water pitch 50% is opened in interlocking, while it is low to interlock unlatching Cylinder pressure water spray pitch 50%.
Further more, gas-steam combined cycle set auxiliary system and its equipment normally put into specific packet in the step (2) It includes:
2.1 put into operation compressed air system, confirm system pressure within the scope of 0.45-0.8MPa;
2.2 put into operation circulation, open cooling water system;
2.3 put into operation closed cooling water system, confirm system pressure within the scope of 0.45-0.6MPa;
2.4 put into operation lubricating oil, Seal Oil, jacking oil system, and confirmation lubrication pressure, oil temperature, Seal Oil oil hydrogen differential pressure etc. are just Often, the spare investment of equipment;
2.5 investment jiggering operations, confirmation jiggering electric current is normal, stablizes, and inside is without abnormal sound;
Compressed air is filled in 2.6 generators, maintains internal engine pressures 0.05MPa, is checked sealing oil system operation, is guaranteed Sealing oil pressure is higher than pressure 0.035MPa in machine;
2.7 starting furnace ignitings are normal, auxiliary vapour header steam-supplying system normal operation input;
2.8 investment condensate systems, do starting for water on waste heat boiler low-pressure drum and prepare;
2.9 successively put into gland seal system and vacuum system;
After 2.10 condenser vacuums are established, the hydrophobic manual, electric valve on all steam turbine ontologies of steam turbine is gradually opened;
2.11 main, reheaing steam pipes and low-pressure steam pipeline draining system: when master, reheaing steam pipe and low-pressure steam After pipeline plays pressure, before successively opening pipeline non-return valve, electronic main gate valve is forward and backward, the manual, electric drain valve before regulating valve;
2.12 check high pressure cylinder steam discharges to cold reentrancy cut-off gate, adjustment door open, high pressure live steam piping bypass to it is cold again Inlet duct without hit, without leakage, bypass manually, automatically engage normal operation;
Pressure live steam piping, which is bypassed to heat supply network steam extraction electrically operated valve, in 2.13 inspections opens, until condenser electrically operated valve is closed, Pipeline without hit, without leakage, intermediate pressure by-pass automatically engages normal operation;
2.14 inspection low pressure live steam piping to auxiliary vapour header motor-driven valves are closed.It is opened to heat supply network steam extraction motor-driven valve.To condensing Device bypass duct without hit, without leakage, low voltage bypass is closed;
2.15DCS picture checks that high pressure, middle pressure, each valve location of low-pressure bypass system are correct, and state is normal;Bypass desuperheat Water has been connected, and has investment condition;Bypath system investment automatically controls.
Further more, in the step (3) after circulation pump of heat-supply network starting, after checking circulation pump of heat-supply network normal operation, manually Increase its scoop tube aperture, checks that circulation pump of heat-supply network revolving speed rises, heat supply network circulating water flow increases;Optionally start second heat Net water circulating pump after being incorporated to operation, adjusts two water pump torque equilibriums, meets Thermal Corp's heat supply network circulating water flow demand.
Further more, in the step (4) turbine bypass system the concrete operations requirement that puts into operation are as follows:
4.1 bypath system parameters are according to by 10% load of gas-steam combined cycle set #1 gas turbine, #2 combustion gas wheel 0% load of machine, the full cutting condition of #3 steam turbine are designed control;
After 4.2 high pressure main steams depressurize desuperheat by No. 1 high side valve, into cold section of vapour system of reheating, high other control master Steam pressure 0.9MPa, 240 DEG C -340 DEG C of temperature after desuperheat;
4.3 reheating hot arc steam come out rear heating network system, middle collateral line system control hot re-compaction power from side valve in No. 1 0.5MPa, after desuperheat between 220 DEG C -320 DEG C of temperature, middle side to turbine condenser electrically operated gate is closed, if heat exchangers for district heating Initial steam pressure is greater than 0.56MPa, and side controls heat exchangers for district heating initial steam pressure and be less than to turbine condenser electrically operated gate in crawl 0.56MPa;
It is closed in 4.4 low collateral line system operations, the main vapour of low pressure to heat supply network electrically operated gate is opened, the main vapour heating network system of low pressure.
Further more, it is to check that high, medium and low voltage is steamed before combustion engine igniting that the vapour side of heat exchangers for district heating, which is put into operation, in the step (4) The drain valve of vapour system is opened, and for heat exchangers for district heating by the way of random start, two groups are respectively thrown a heater;Combustion engine igniting, After each jet chimney heating coil is completed, each drain valve is progressively closed off, while adjusting high, intermediate pressure by-pass system, to heat exchangers for district heating Warm body heating is carried out with drain cooler;Heat exchangers for district heating initial operation stage notices that opening starting is vented, after normal operation, switching It is vented to operation;
During putting into operation, adjustment thermic load slowly uniformly should guarantee that heat exchangers for district heating inlet pressure is less than 0.57MPa, enter Between 220-320 DEG C of temperature of mouth, each heat exchangers for district heating outlet temperature pace of change≤1~3 DEG C/min, heat network system circulating water temperature ≤ 1 DEG C/min of degree variation.
Further more, heat supply network draining system puts into operation when requiring heat exchangers for district heating water level 500 to 600mm or so in the step (5), Recirculating line conducting, heat supply network drainage pump variable frequency starting;As evaporation capacity for engine increases, heat exchangers for district heating water level is increased, appropriate to open The hydrophobic outer recirculated water that drains into carries out hot flushing;After heat supply network drain water quality is qualified, by adjusting recirculating line pitch and heat supply network It is hydrophobic to be matched to condensate system pitch aperture maintenance heat supply network is hydrophobic with the preposition pump discharge pressure of condensed water;Spare heat supply network drainage pump It optionally puts into spare.
What the present invention obtained has the technical effect that
The present invention gives full play to steamer by the control to high pressure turbine by and intermediate pressure by-pass valve, desuperheating water, steam parameter The effect of machine " high pressure turbine by " and " intermediate pressure by-pass " makes high temperature and high pressure steam by bypass " bypass " steam turbine, realizes 900MW grades Gas-steam combined cycle set is realized under the operating condition for cutting steam turbine entirely and carries out heat supply to heat supply network.The present invention solves combustion Gas-Steam Combined Cycle power generator turbine (does not complete the system debug of steam turbine whole, steam turbine system because of cause specific during capital construction System there are major defects to run) can not be passed through high temperature and high pressure steam lead to not heat supply period to heat supply network carry out safety it is steady Determine the problem of heat supply, operations staff is helped to cut off steam turbine in heat supply period " safety ", is gas-steam combined cycle set heat supply The safe and stable operation of phase heat network system provides technical support and reference.
Detailed description of the invention
Fig. 1 is system connection schematic diagram of the invention.
Specific embodiment
Below by case study on implementation and comparative example, the present invention is further elaborated, but is not limited to the present embodiment.
Heat network system is run under a kind of full cutting condition of 900MW grades of gas-steam combined cycle set heat supply period steam turbine The innovation of method, invention is: specific step is as follows for this method:
(1) investment is configured to the main logic protection of each system of gas-steam combined cycle set;
(2) gas-steam combined cycle set auxiliary system and its equipment are normally put into;
(3) heat supply network circulation puts into operation;
(4) turbine by-pass puts into operation, and heat exchangers for district heating vapour side is put into operation;
(5) heat network system is hydrophobic puts into operation.
Wherein, the main logic protection of each system of gas-steam combined cycle set is configured throwing in the step (1) Enter to specifically include:
The protection of 1.1 heat exchangers for district heating liquid levels needs to put into, and protection value is put by design is operated normally;
The liquid level protection (high level and low value) of 1.2 hot wells needs to put into, and protection value is put by design is operated normally;
The normal investment of pressure minimum living shield of 1.3 condensate pump entrances;
The body temperature of 1.4 condenser hydrophobic development units needs to put into, and condenser hydrophobic development unit desuperheating water is adjustable;
1.5 condenser body temperature needs to put into, the water curtain water spray of condenser is adjustable;
1.6 when four heat exchangers for district heatings close entirely into vapour entrance electrically operated gate, waste heat boiler tripping, interlocking combustion engine tripping;
1.7 when four circulation pump of heat-supply network full cut-ofves, waste heat boiler tripping, interlocking combustion engine tripping;
1.8 when four water circulating pump full cut-ofves, waste heat boiler tripping, interlocking combustion engine tripping;
Other in 1.9 to open to condenser electrically operated gate and (take and close disappearance of signal), water curtain desuperheating water pitch 50% is opened in interlocking, together Shi Liansuo opens low pressure cylinder spray pitch 50%;
Low side decompression valve opening is greater than 5% in 1.10, and water curtain desuperheating water pitch 50% is opened in interlocking, while it is low to interlock unlatching Cylinder pressure water spray pitch 50%.
Wherein, gas-steam combined cycle set auxiliary system and its equipment normally put into specific packet in the step (2) It includes:
2.1 put into operation compressed air system, confirm system pressure within the scope of 0.45-0.8MPa;
2.2 put into operation circulation, open cooling water system;
2.3 put into operation closed cooling water system, confirm system pressure within the scope of 0.45-0.6MPa;
2.4 put into operation lubricating oil, Seal Oil, jacking oil system, and confirmation lubrication pressure, oil temperature, Seal Oil oil hydrogen differential pressure etc. are just Often, the spare investment of equipment;
2.5 investment jiggering operations, confirmation jiggering electric current is normal, stablizes, and inside is without abnormal sound;
Compressed air is filled in 2.6 generators, maintains internal engine pressures 0.05MPa, is checked sealing oil system operation, is guaranteed Sealing oil pressure is higher than pressure 0.035MPa in machine;
2.7 starting furnace ignitings are normal, auxiliary vapour header steam-supplying system normal operation input;
2.8 investment condensate systems, do starting for water on waste heat boiler low-pressure drum and prepare;
2.9 successively put into gland seal system and vacuum system;
After 2.10 condenser vacuums are established, the hydrophobic manual, electric valve on all steam turbine ontologies of steam turbine is gradually opened.
2.11 main, reheaing steam pipes and low-pressure steam pipeline draining system: when master, reheaing steam pipe and low-pressure steam After pipeline plays pressure, before successively opening pipeline non-return valve, electronic main gate valve is forward and backward, the manual, electric drain valve before regulating valve.
2.12 check high pressure cylinder steam discharges to cold reentrancy cut-off gate, adjustment door open, high pressure live steam piping bypass to it is cold again Inlet duct without hit, without leakage, bypass manually, automatically engage normal operation.
Pressure live steam piping, which is bypassed to heat supply network steam extraction electrically operated valve, in 2.13 inspections opens, until condenser electrically operated valve is closed, Pipeline without hit, without leakage, intermediate pressure by-pass automatically engages normal operation.
2.14 inspection low pressure live steam piping to auxiliary vapour header motor-driven valves are closed.It is opened to heat supply network steam extraction motor-driven valve.To condensing Device bypass duct without hit, without leakage, low voltage bypass is closed.
2.15DCS picture checks that high pressure, middle pressure, each valve location of low-pressure bypass system are correct, and state is normal.Bypass desuperheat Water has been connected, and has investment condition.Bypath system investment automatically controls.
Wherein, in the step (3) after circulation pump of heat-supply network starting, after checking circulation pump of heat-supply network normal operation, manually Increase its scoop tube aperture, checks that circulation pump of heat-supply network revolving speed rises, heat supply network circulating water flow increases.Optionally start second heat Net water circulating pump after being incorporated to operation, adjusts two water pump torque equilibriums, meets Thermal Corp's heat supply network circulating water flow demand.
Wherein, in the step (4) turbine bypass system the concrete operations requirement that puts into operation are as follows:
4.1 bypath system parameters are according to by 10% load of gas-steam combined cycle set #1 gas turbine, #2 combustion gas wheel 0% load of machine, the full cutting condition of #3 steam turbine are designed control;
After 4.2 high pressure main steams depressurize desuperheat by No. 1 high side valve, into cold section of vapour system of reheating, high other control master Steam pressure 0.9MPa, 240 DEG C -340 DEG C of temperature after desuperheat;
4.3 reheating hot arc steam come out rear heating network system, middle collateral line system control hot re-compaction power from side valve in No. 1 0.5MPa, after desuperheat between 220 DEG C -320 DEG C of temperature, middle side to turbine condenser electrically operated gate is closed, if heat exchangers for district heating Initial steam pressure is greater than 0.56MPa, and side controls heat exchangers for district heating initial steam pressure and be less than to turbine condenser electrically operated gate in crawl 0.56MPa;
It is closed in 4.4 low collateral line system operations, the main vapour of low pressure to heat supply network electrically operated gate is opened, the main vapour heating network system of low pressure.
Wherein, it is to check that high, medium and low voltage is steamed before combustion engine igniting that the vapour side of heat exchangers for district heating, which is put into operation, in the step (4) The drain valve of vapour system is opened, heat exchangers for district heating (two groups are respectively thrown a heater) by the way of random start.Combustion engine igniting, After each jet chimney heating coil is completed, each drain valve is progressively closed off, while adjusting high, intermediate pressure by-pass system, to heat exchangers for district heating Warm body heating is carried out with drain cooler.Heat exchangers for district heating initial operation stage notices that opening starting is vented, after normal operation, switching It is vented to operation.
During putting into operation, adjustment thermic load slowly uniformly should guarantee that heat exchangers for district heating inlet pressure is less than 0.57MPa, enter Between 220-320 DEG C of temperature of mouth, each heat exchangers for district heating outlet temperature pace of change≤1~3 DEG C/min, heat network system circulating water temperature ≤ 1 DEG C/min of degree variation.
Wherein, heat supply network draining system puts into operation when requiring heat exchangers for district heating water level 500 to 600mm or so in the step (5), Recirculating line conducting, heat supply network drainage pump variable frequency starting.As evaporation capacity for engine increases, heat exchangers for district heating water level is increased, appropriate to open The hydrophobic outer recirculated water that drains into carries out hot flushing.After heat supply network drain water quality is qualified, by adjusting recirculating line pitch and heat supply network It is hydrophobic to be matched to condensate system pitch aperture maintenance heat supply network is hydrophobic with the preposition pump discharge pressure of condensed water.Spare heat supply network drainage pump It optionally puts into spare.
The advantages and positive effects of the present invention are:
The present invention gives full play to steamer by the control to high pressure turbine by and intermediate pressure by-pass valve, desuperheating water, steam parameter The effect of machine " high pressure turbine by " and " intermediate pressure by-pass " makes high temperature and high pressure steam by bypass " bypass " steam turbine, realizes 900MW grades Gas-steam combined cycle set is realized under the operating condition for cutting steam turbine entirely and carries out heat supply to heat supply network.The present invention solves combustion Gas-Steam Combined Cycle power generator turbine (does not complete the system debug of steam turbine whole, steam turbine system because of cause specific during capital construction System there are major defects to run) can not be passed through high temperature and high pressure steam lead to not heat supply period to heat supply network carry out safety it is steady Determine the problem of heat supply, operations staff is helped to cut off steam turbine in heat supply period " safety ", is gas-steam combined cycle set heat supply The safe and stable operation of phase heat network system provides technical support and reference.

Claims (7)

1. a kind of method of steam combined cycle power generating unit heat supply period heat network system operation, it is characterised in that: including following step It is rapid:
(1) investment is configured to the main logic protection of each system of gas-steam combined cycle set;
(2) gas-steam combined cycle set auxiliary system and its equipment are normally put into;
(3) heat supply network circulation puts into operation;
(4) turbine by-pass puts into operation, and heat exchangers for district heating vapour side is put into operation;
(5) heat network system is hydrophobic puts into operation.
2. the method for steam combined cycle power generating unit heat supply period heat network system operation according to claim 1, feature Be: the main logic protection of each system of gas-steam combined cycle set is configured the specific packet of investment in the step (1) It includes:
The protection of 1.1 heat exchangers for district heating liquid levels needs to put into, and protection value is put by design is operated normally;
The liquid level protection (high level and low value) of 1.2 hot wells needs to put into, and protection value is put by design is operated normally;
The normal investment of pressure minimum living shield of 1.3 condensate pump entrances;
The body temperature of 1.4 condenser hydrophobic development units needs to put into, and condenser hydrophobic development unit desuperheating water is adjustable;
1.5 condenser body temperatures need to put into, and the water curtain water spray of condenser is adjustable;
1.6 when four heat exchangers for district heatings close entirely into vapour entrance electrically operated gate, waste heat boiler tripping, interlocking combustion engine tripping;
1.7 when four circulation pump of heat-supply network full cut-ofves, waste heat boiler tripping, interlocking combustion engine tripping;
1.8 when four water circulating pump full cut-ofves, waste heat boiler tripping, interlocking combustion engine tripping;
Other in 1.9 to open to condenser electrically operated gate and (take and close disappearance of signal), water curtain desuperheating water pitch 50% is opened in interlocking, is joined simultaneously Lock opens low pressure cylinder spray pitch 50%;
Low other decompression valve opening is greater than 5% in 1.10, and water curtain desuperheating water pitch 50% is opened in interlocking, while interlocking unlatching low pressure (LP) cylinder Water spray pitch 50%.
3. the method for steam combined cycle power generating unit heat supply period heat network system operation according to claim 1, feature Be: gas-steam combined cycle set auxiliary system and its equipment normally put into and specifically include in the step (2):
2.1 put into operation compressed air system, confirm system pressure within the scope of 0.45-0.8MPa;
2.2 put into operation circulation, open cooling water system;
2.3 put into operation closed cooling water system, confirm system pressure within the scope of 0.45-0.6MPa;
2.4 put into operation lubricating oil, Seal Oil, jacking oil system, and confirmation lubrication pressure, oil temperature, Seal Oil oil hydrogen differential pressure etc. are normal, if Standby spare investment;
2.5 investment jiggering operations, confirmation jiggering electric current is normal, stablizes, and inside is without abnormal sound;
Compressed air is filled in 2.6 generators, maintains internal engine pressures 0.05MPa, is checked sealing oil system operation, is guaranteed sealing Oil pressure is higher than pressure 0.035MPa in machine;
2.7 starting furnace ignitings are normal, auxiliary vapour header steam-supplying system normal operation input;
2.8 investment condensate systems, do starting for water on waste heat boiler low-pressure drum and prepare;
2.9 successively put into gland seal system and vacuum system;
After 2.10 condenser vacuums are established, the hydrophobic manual, electric valve on all steam turbine ontologies of steam turbine is gradually opened;
2.11 main, reheaing steam pipes and low-pressure steam pipeline draining system: when master, reheaing steam pipe and low-pressure steam pipeline After playing pressure, before successively opening pipeline non-return valve, electronic main gate valve is forward and backward, the manual, electric drain valve before regulating valve;
2.12 check that high pressure cylinder steam discharge to cold reentrancy cut-off gate, adjustment door is opened, and high pressure live steam piping is bypassed to cold reentrancy Pipeline without hit, without leakage, bypass manually, automatically engage normal operation;
Pressure live steam piping, which is bypassed to heat supply network steam extraction electrically operated valve, in 2.13 inspections opens, until condenser electrically operated valve is closed, pipeline Without hit, without leakage, intermediate pressure by-pass automatically engages normal operation;
2.14 inspection low pressure live steam piping to auxiliary vapour header motor-driven valves are closed.It is opened to heat supply network steam extraction motor-driven valve.To by condenser Road pipeline without hit, without leakage, low voltage bypass is closed;
2.15DCS picture checks that high pressure, middle pressure, each valve location of low-pressure bypass system are correct, and state is normal;Bypass desuperheating water Conducting, has investment condition;Bypath system investment automatically controls.
4. the method for steam combined cycle power generating unit heat supply period heat network system operation according to claim 1, feature It is: in the step (3) after circulation pump of heat-supply network starting, after checking circulation pump of heat-supply network normal operation, increases its spoon manually Pipe aperture checks that circulation pump of heat-supply network revolving speed rises, and heat supply network circulating water flow increases;Optionally start second heat supply network recirculated water Pump, after being incorporated to operation, adjusts two water pump torque equilibriums, meets Thermal Corp's heat supply network circulating water flow demand.
5. the method for steam combined cycle power generating unit heat supply period heat network system operation according to claim 1, feature It is: the concrete operations requirement that puts into operation of turbine bypass system in the step (4) are as follows:
4.1 bypath system parameters are according to by 10% load of gas-steam combined cycle set #1 gas turbine, #2 gas turbine 0% load, the full cutting condition of #3 steam turbine are designed control;
After 4.2 high pressure main steams depressurize desuperheat by No. 1 high side valve, into cold section of vapour system of reheating, the high other main vapour pressure of control Power 0.9MPa, 240 DEG C -340 DEG C of temperature after desuperheat;
4.3 reheating hot arc steam come out rear heating network system from side valve in No. 1, and middle collateral line system control hot re-compaction power 0.5MPa subtracts After temperature between 220 DEG C -320 DEG C of temperature, middle side to turbine condenser electrically operated gate is closed, if heat exchangers for district heating initial steam pressure is big It is other to turbine condenser electrically operated gate in 0.56MPa, crawl, it controls heat exchangers for district heating initial steam pressure and is less than 0.56MPa;
It is closed in 4.4 low collateral line system operations, the main vapour of low pressure to heat supply network electrically operated gate is opened, the main vapour heating network system of low pressure.
6. the method for steam combined cycle power generating unit heat supply period heat network system operation according to claim 1, feature Be: it is to check high, medium and low voltage vapour system before combustion engine igniting that the vapour side of heat exchangers for district heating, which is put into operation, in the step (4) Drain valve is opened, and for heat exchangers for district heating by the way of random start, two groups are respectively thrown a heater;Combustion engine igniting, each steam pipe After road heating coil is completed, each drain valve is progressively closed off, while adjusting high, intermediate pressure by-pass system, to heat exchangers for district heating and hydrophobic cold But device carries out warm body heating;Heat exchangers for district heating initial operation stage notices that opening starting is vented, after normal operation, switches to operation row Gas;
During putting into operation, adjustment thermic load slowly uniformly should guarantee that heat exchangers for district heating inlet pressure is less than 0.57MPa, entrance temperature Between 220-320 DEG C of degree, each heat exchangers for district heating outlet temperature pace of change≤1~3 DEG C/min, heat network system circulating water temperature becomes Change≤1 DEG C/min.
7. the method for steam combined cycle power generating unit heat supply period heat network system operation according to claim 1, feature Be: heat supply network draining system puts into operation in the step (5) when requiring heat exchangers for district heating water level 500 to 600mm or so, recirculation pipe Road conducting, heat supply network drainage pump variable frequency starting;As evaporation capacity for engine increases, heat exchangers for district heating water level is increased, and suitably opens hydrophobic outlet Hot flushing is carried out to recirculated water;It is hydrophobic to solidifying by adjusting recirculating line pitch and heat supply network after heat supply network drain water quality is qualified Bearing water system pitch aperture maintains heat supply network hydrophobic and the preposition pump discharge pressure matching of condensed water;Spare heat supply network drainage pump is optionally thrown Enter spare.
CN201811153771.9A 2018-09-30 2018-09-30 Method for operating heat supply network system of steam combined cycle generator set in heat supply period Active CN109441575B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811153771.9A CN109441575B (en) 2018-09-30 2018-09-30 Method for operating heat supply network system of steam combined cycle generator set in heat supply period

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811153771.9A CN109441575B (en) 2018-09-30 2018-09-30 Method for operating heat supply network system of steam combined cycle generator set in heat supply period

Publications (2)

Publication Number Publication Date
CN109441575A true CN109441575A (en) 2019-03-08
CN109441575B CN109441575B (en) 2022-02-22

Family

ID=65545484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811153771.9A Active CN109441575B (en) 2018-09-30 2018-09-30 Method for operating heat supply network system of steam combined cycle generator set in heat supply period

Country Status (1)

Country Link
CN (1) CN109441575B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043335A (en) * 2019-04-30 2019-07-23 北京龙威发电技术有限公司 A kind of matched annular multistage reducing-and-cooling plant of turbine bypass system
CN110159360A (en) * 2019-06-11 2019-08-23 中国电力工程顾问集团西北电力设计院有限公司 A kind of Gas-steam Combined Cycle power plant shaft seal steam supply system and steam supplying method
CN110848124A (en) * 2019-09-30 2020-02-28 国电浙能宁东发电有限公司 Automatic switching control method and device for electric pump and steam pump and storage medium
CN111472853A (en) * 2020-05-11 2020-07-31 中国电力工程顾问集团西南电力设计院有限公司 Auxiliary engine cooling water system of gas-steam combined cycle unit
CN111895488A (en) * 2019-05-06 2020-11-06 河北大唐国际张家口热电有限责公司 Steam inlet regulating valve applied to heat supply network system and control method
CN112664817A (en) * 2020-12-17 2021-04-16 杭州英集动力科技有限公司 Active drainage system based on steam pipe network model
CN112902203A (en) * 2021-03-05 2021-06-04 西安热工研究院有限公司 Power station boiler steam soot blowing system and intelligent leakage detection identification method thereof
CN113606003A (en) * 2021-08-05 2021-11-05 国网天津市电力公司电力科学研究院 Method for quickly starting F-grade gas-steam combined cycle unit to rated load
CN113756898A (en) * 2021-09-06 2021-12-07 贵州电网有限责任公司 Steam turbine constant-speed standby operation method for boiler shutdown of thermal power plant
CN113882919A (en) * 2021-08-17 2022-01-04 大唐七台河发电有限责任公司 Heat supply system of cogeneration unit and heat preservation and supply disposal method
CN114811562A (en) * 2021-01-28 2022-07-29 华能北京热电有限责任公司 Interlocking control method for boiler drum water level of gas-steam combined cycle unit
CN114893385A (en) * 2022-04-26 2022-08-12 中国电建集团河南工程有限公司 Method for starting and debugging condensing steam-driven air compressor for solid waste furnace

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10299421A (en) * 1997-04-21 1998-11-10 Mitsubishi Heavy Ind Ltd Combined cycle power generating plant
CN203374332U (en) * 2013-07-26 2014-01-01 华能北京热电有限责任公司 Gas-steam combined cycle unit with automatic starting-stopping control system
CN104594964A (en) * 2014-12-01 2015-05-06 河南省电力勘测设计院 Novel single-shaft natural gas combined cycle heat supply unit system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10299421A (en) * 1997-04-21 1998-11-10 Mitsubishi Heavy Ind Ltd Combined cycle power generating plant
CN203374332U (en) * 2013-07-26 2014-01-01 华能北京热电有限责任公司 Gas-steam combined cycle unit with automatic starting-stopping control system
CN104594964A (en) * 2014-12-01 2015-05-06 河南省电力勘测设计院 Novel single-shaft natural gas combined cycle heat supply unit system

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043335B (en) * 2019-04-30 2023-09-01 北京国能龙威发电技术有限公司 Annular multistage temperature and pressure reducing device matched with turbine bypass system
CN110043335A (en) * 2019-04-30 2019-07-23 北京龙威发电技术有限公司 A kind of matched annular multistage reducing-and-cooling plant of turbine bypass system
CN111895488A (en) * 2019-05-06 2020-11-06 河北大唐国际张家口热电有限责公司 Steam inlet regulating valve applied to heat supply network system and control method
CN110159360A (en) * 2019-06-11 2019-08-23 中国电力工程顾问集团西北电力设计院有限公司 A kind of Gas-steam Combined Cycle power plant shaft seal steam supply system and steam supplying method
CN110159360B (en) * 2019-06-11 2023-12-26 中国电力工程顾问集团西北电力设计院有限公司 Shaft seal steam supply system and method for gas-steam combined cycle power plant
CN110848124A (en) * 2019-09-30 2020-02-28 国电浙能宁东发电有限公司 Automatic switching control method and device for electric pump and steam pump and storage medium
CN110848124B (en) * 2019-09-30 2021-07-16 国电浙能宁东发电有限公司 Automatic switching control method and device for electric pump and steam pump and storage medium
CN111472853A (en) * 2020-05-11 2020-07-31 中国电力工程顾问集团西南电力设计院有限公司 Auxiliary engine cooling water system of gas-steam combined cycle unit
CN111472853B (en) * 2020-05-11 2024-04-12 中国电力工程顾问集团西南电力设计院有限公司 Auxiliary machine cooling water system of gas-steam combined cycle unit
CN112664817A (en) * 2020-12-17 2021-04-16 杭州英集动力科技有限公司 Active drainage system based on steam pipe network model
CN114811562A (en) * 2021-01-28 2022-07-29 华能北京热电有限责任公司 Interlocking control method for boiler drum water level of gas-steam combined cycle unit
CN114811562B (en) * 2021-01-28 2023-08-29 华能北京热电有限责任公司 Interlocking control method for boiler drum water level of gas-steam combined cycle unit
CN112902203B (en) * 2021-03-05 2022-03-22 西安热工研究院有限公司 Power station boiler steam soot blowing system and intelligent leakage detection identification method thereof
CN112902203A (en) * 2021-03-05 2021-06-04 西安热工研究院有限公司 Power station boiler steam soot blowing system and intelligent leakage detection identification method thereof
CN113606003A (en) * 2021-08-05 2021-11-05 国网天津市电力公司电力科学研究院 Method for quickly starting F-grade gas-steam combined cycle unit to rated load
CN113882919A (en) * 2021-08-17 2022-01-04 大唐七台河发电有限责任公司 Heat supply system of cogeneration unit and heat preservation and supply disposal method
CN113882919B (en) * 2021-08-17 2023-09-22 大唐七台河发电有限责任公司 Heat supply system of cogeneration unit and heat-preserving treatment method
CN113756898A (en) * 2021-09-06 2021-12-07 贵州电网有限责任公司 Steam turbine constant-speed standby operation method for boiler shutdown of thermal power plant
CN113756898B (en) * 2021-09-06 2023-12-15 贵州电网有限责任公司 Steam turbine constant-speed standby operation method for shutdown of thermal power plant
CN114893385A (en) * 2022-04-26 2022-08-12 中国电建集团河南工程有限公司 Method for starting and debugging condensing steam-driven air compressor for solid waste furnace

Also Published As

Publication number Publication date
CN109441575B (en) 2022-02-22

Similar Documents

Publication Publication Date Title
CN109441575A (en) The method of steam combined cycle power generating unit heat supply period heat network system operation
CN105157007B (en) Steam pipe washing method for 1000MW ultra-supercritial double reheat boiler
CN106016230B (en) A kind of Start-up Systems for Direct-through Boilers and method
CN103382860B (en) Steam turbine power generation heating system controlling method
CN205717153U (en) A kind of Start-up Systems for Direct-through Boilers
CN107120149B (en) The method and system of newly-built supercritical unit is debugged using external activated vapor
CN110454769B (en) Control system and control method for high-backpressure steam-driven feed pump of large generator set
CN105352361B (en) For steam-line blowing method of the ultra supercritical without stove water pump direct current cooker
CN106887265B (en) The start and stop shut-down system of one bulb bed modular high temperature gas cooled reactor
CN106285796B (en) The auxiliary steam intermediate pressure cylinder start-up method of steam turbine
CN106981322A (en) A kind of system and method for being used to verify HTGR start and stop heaping equipment function
CN108870372A (en) Once-through Boiler drained water recovery system and method based on high-low pressure hydrophobic development unit
CN104612763B (en) Starting method of device for starting intermediate-pressure cylinder device by using neighbor turbine steam in unitized unit
JP5183305B2 (en) Startup bypass system in steam power plant
CN205876402U (en) Gas and steam combined cycle generating set's supplementary warm jar mechanism of steam turbine
CN105276564A (en) Deaerator-free reheating system of supercritical (ultra-supercritical) unit
CN112325267B (en) Pressure-stabilizing steam blowing pipe system and method for double reheat boiler
CN209295088U (en) Steam turbine of thermal power plant bypass, boiler is hydrophobic, empties automatic control device
CN108301882A (en) A kind of generating set three-level series-parallel connection bypath system and its adjusting method
CN206190339U (en) Two branch road heating system of cogeneration steam turbine
CN210069816U (en) Power plant boiler high temperature steam pipeline cinder sweeps structure
CN108317500A (en) Shut down the system and method for not blowing out in low-heat value gas power plant
CN108692308B (en) A kind of starting control method of power station dum boiler
CN111911252A (en) Supercritical heat supply unit and cold-state starting method thereof
CN207989087U (en) A kind of generating set three-level series-parallel connection bypath system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: No. 8, Haitai Huake 4th Road, Huayuan Industrial Zone, High tech Zone, Binhai New Area, Tianjin, 300384

Patentee after: ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF STATE GRID TIANJIN ELECTRIC POWER Co.

Patentee after: STATE GRID TIANJIN ELECTRIC POWER Co.

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: No.8, Haitai Huake 4th Road, Xiqing District, Tianjin 300384

Patentee before: ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF STATE GRID TIANJIN ELECTRIC POWER Co.

Patentee before: STATE GRID TIANJIN ELECTRIC POWER Co.

Patentee before: STATE GRID CORPORATION OF CHINA

CP02 Change in the address of a patent holder