CN109441141A - A kind of yurt spliced by EPS building template - Google Patents
A kind of yurt spliced by EPS building template Download PDFInfo
- Publication number
- CN109441141A CN109441141A CN201811262021.5A CN201811262021A CN109441141A CN 109441141 A CN109441141 A CN 109441141A CN 201811262021 A CN201811262021 A CN 201811262021A CN 109441141 A CN109441141 A CN 109441141A
- Authority
- CN
- China
- Prior art keywords
- spliced
- yurt
- skeleton
- building
- support plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/02—Dwelling houses; Buildings for temporary habitation, e.g. summer houses
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
Abstract
The invention discloses a kind of yurts spliced by EPS building template, it is related to yurt technical field, its key points of the technical solution are that: including chassis, skeleton and building block, the left and right sides of the building block and upper and lower two sides are respectively arranged with connection structure and splicing construction, multiple building blocks are horizontally-spliced and vertically accumulate composition yurt wall, multiple skeletons are laid out in umbrella frame shape, the skeleton includes the support plate being connected on chassis and limit plate, the fixation kit for being fixed on support plate on chassis is provided between the bottom end and chassis of the support plate, pottery brain is connected at the top of the support plate, the two sides of support plate are divided into two support portions by the limit plate, two laterally adjacent building blocks are connected to respectively on two support portions.By building building block on two support portions, makes to build in back skeleton involvement building block, keep yurt wall stress-bearing capability stronger, realize the effect for improving structural strength.
Description
Technical field
The present invention relates to yurt technical fields, more specifically, it relates to a kind of Mongolia spliced by EPS building template
Packet.
Background technique
Yurt is a kind of house that Mongolian dresses are lived, and is suitable for animal husbandry production and nomadism, in real life,
Many scenic spots can all arrange the house that tourist lives using yurt.The yurt at general scenic spot can use reinforced concrete civil engineering
It builds, heat preservation, heat-proof quality are poor after whole construction, and winter is cold, summer heat, and the comfort of inhabitation is poor.The prior art as a result,
Middle proposition carries out construction yurt by EPS module.Polystyrene foam (Expanded Polystyrene abbreviation EPS) is a kind of
Light polymer.It is foaming agent to be added using polystyrene resin, while heating is softened, and gas, shape are generated
At a kind of foamed plastics of rigid closed cell structure, this material can heat-insulation and heat-preservation, thus solve yurt heat-insulation and heat-preservation
The problem of energy difference.
Chinese patent as Authorization Notice No. is CN206752682U, publication date is 2017-12-15 discloses a kind of EPS
The modularization assemble house of material.Including be spliced by wallboard wall, be fixedly connected on the bottom plate of wall lower end, wall
Upper end is reserved with skylight hole, and skylight is equipped in skylight hole, and wallboard includes fan-shaped global shell, is fixedly connected under fan-shaped global shell
The tubular cylinder at end, the two sides of the wallboard are provided with tongue and groove, and multiple wallboards are arranged in a ring and by tongue and groove connection in closed loop
Shape forms board house main structure.
It is assembled by multiple fan-shaped global shells, a complete Loadings On Hemispherical Shell is become with splicing, to constitute board house
Roof parts, multiple tubular cylinders can be spliced into a complete annular tube shaped body, constitute the exterior wall body portion of board house, real
Existing yurt is built, and fan-shaped global shell and tubular cylinder are made of the light fire-proofs material such as foamed plastic, polyethylene, have
Light-weight, good heat-insulation effect, the feature that elasticity is big, easily assembled, so that the house insulation performance after assembly is good.But only rely on enterprise
Mouth splices each fan-shaped global shell and tubular cylinder, and stress-bearing capability is limited, if splicing construction damages, each shell
Just without supporting point, not enough securely and it may cause and collapse, cause the structural strength of yurt weaker.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of illiteracy spliced by EPS building template
Gu packet has the advantages that improve yurt structural strength.
To achieve the above object, the present invention provides the following technical scheme that
A kind of yurt spliced by EPS building template, including chassis, multiple skeletons being set on chassis and multiple settings
In the building block on skeleton, the left and right sides of the building block and upper and lower two sides are separately provided for building mould for two
The splicing construction that block carries out horizontally-spliced connection structure and vertically accumulates, multiple mutually transverse splicings of building block are simultaneously
Vertical accumulation composition yurt wall, multiple skeletons are laid out in umbrella frame shape, and the skeleton includes the branch being connected on chassis
Fagging and the limit plate being vertically installed in support plate surface, are provided with for inciting somebody to action between the bottom end and chassis of the support plate
Support plate is fixed on the fixation kit on chassis, is connected with pottery brain at the top of the support plate, and the limit plate is by support plate
Two sides are divided into two support portions, and the building block of laterally adjacent two is connected to respectively on two support portions.
So set, by the skeleton of setting, so that the support plate in each skeleton is installed on bottom using fixation kit
On frame, to be formed and the consistent profile of yurt walls shape after each skeleton is installed on chassis.Pass through the limit of setting
The two sides of support plate can be divided into two support portions by position plate, thus after adjacent two building block is connected on support portion, then into
Row splicing, to carry out the horizontally-spliced and vertical of building block on skeleton using the cooperation of connection structure and splicing construction
Accumulation, to form yurt wall, so that yurt wall not only has a cooperation of connection structure and splicing construction, and can be by
To the support of skeleton, total is stronger.Brain of making pottery is installed on to the top of each support plate later, thus by each skeleton
Top be combined, the stability after improving the installation of each skeleton, thus after whole yurt building, skeleton, with connect
Structure and splicing construction cooperate, and keep yurt structural strength higher, realize the effect for improving yurt structural strength.
Further setting: the skeleton is set to the junction between adjacent two horizontally-spliced building blocks, and adjacent
Junction between two horizontally-spliced building blocks has gap, and the limit plate contraposition is plugged between two building blocks
In gap.
So set, during installation, limit plate is plugged in the gap of adjacent two building block junction, thus utilizing
Connection structure splicing after, the cooperation intensity between two building blocks is higher, and skeleton by the horizontally-spliced place of each building block into
Row support, can consolidate the junction of each building block, improve the structural strength of whole yurt after installation.
Further setting: the fixation kit include be fed through chassis and support plate fixing bolt and with fixed spiral shell
The fixture nut that bolt is threadedly engaged.
So set, fixing bolt is passed through chassis and support plate, fixture nut is recycled to cooperate fixing bolt when installation
Locking, thus can skeleton be fixed on chassis, the dismounting between entire skeleton and chassis is very convenient, and install after cooperate limit
Position slot can be improved the stability being fixed on chassis, improve the structural strength of yurt after installation.
Further setting: connection frame is provided between multiple support plates, multiple connection frames are set to skeleton in a ring
On, and the both ends of the connection frame pass through clamping screw respectively and are fixed in the support plate of adjacent two skeleton.
So set, clamping screw further progress can will be utilized to connect between each skeleton by the connection frame of setting
It connects, the stability after improving skeleton installation, to improve the structural strength after yurt is built.
Further setting: the top of the support plate extend to pottery brain centre point at have connecting plate, multiple supports
The connecting plate of plate forms mounting base, and the pottery brain is placed in mounting base, and is provided between pottery brain and the mounting base multiple
The installation bolt for being fed through mounting base and being threadedly coupled with pottery brain, circumferentially shape is evenly arranged multiple installation bolts.
So set, by the connecting plate of setting, so that multiple connecting plates form mounting base, so that pottery brain is installed on
It fills on seat, and pottery brain is locked in mounting base using installation bolt, so that pottery brain is installed at the top of yurt, and make pottery
Brain will be attached at the top of each skeleton, promote the structural strength connected between each skeleton.
Further setting: the longitudinal section of the chassis is set as U-shaped, and the bottom of the support plate is installed on the U-shaped of chassis
In slot.
So set, so that U-lag is provided installation space to the bottom of building block by setting U-shaped for chassis,
And the bottom of support plate is equally installed in U-lag, is easily installed.
Further setting: the building block is towards the resigning being provided on the surface inside yurt for accommodating skeleton
Slot.
So set, after building block is assembled, skeleton is dissolved into recessing groove, to make by the recessing groove of setting
It is smooth to obtain yurt surface of wall, it is whole more aesthetically pleasing.
Further setting: the connection structure includes the clamping block being respectively arranged on building block two sides and clamping
Slot, the clamping block is corresponding with clamping groove, and when adjacent two building block is horizontally-spliced, the clamping block is plugged in clamping
In slot, the splicing construction includes the link block and link slot being respectively arranged on building block top and bottom, the company
It is corresponding with link slot to connect block, when adjacent two building block is vertically spliced, the link block is plugged in link slot.
So set, clamping block on building block side is plugged in another building when building block is horizontally-spliced
Clamping groove on module side can carry out each building block horizontally-spliced;When vertically being accumulated, by building block
The link block at top is plugged in the link slot of another building block bottom, and the vertical accumulation of each building block can be completed,
Entire installation is very easy, improves the convenience of yurt dismounting.
Further setting: the building block includes the first module, the second module and third module, by multiple described the
The lower wall body of the horizontally-spliced composition yurt of one module, by multiple horizontally-spliced middle parts for forming yurt of second module
Wall, by the horizontally-spliced top wall for forming yurt of multiple third modules, first module, the second module and
Spliced between third module using splicing construction.
So set, the size of building block can be reduced by the way that building block is divided into three modules, it is easy to produce
With carrying;And is spliced between three modules using splicing construction, the damage for a wherein module, need to only be substituted corresponding
Module at position, convenient for the maintenance of yurt, and in maintenance process yurt overall structural strength it is higher.
Further setting: the skeleton is set as steel skeleton, and the surface of the skeleton is provided with erosion resistant coating.
So set, the structural strength of Steel material is high, skeleton, which is set as steel skeleton, can be improved the structural strength after installing;
The erosion resistant coating of setting can prevent steel skeleton from being corroded, and guarantee the structural strength of steel skeleton, improve its service life.
By using above-mentioned technical proposal, the present invention compares compared with the prior art, has the advantage that
1, by the skeleton of setting, building block can be built on skeleton, make the yurt wall after building by skeleton branch
Support, overall structure is stronger, has and improves structural strength effect;
2, by the connection frame of setting, connection frame is fixed on skeleton using clamping screw, to improve the knot of skeleton entirety
Structure intensity has the effect of improving yurt structural strength;
3, by the way that the two sides of support plate are divided into two support portions by limit plate using support plate and limit plate composition skeleton, thus
Building block is built on two support portions, convenient for building and the supporting role of building block can be provided by support portion, is improved
Structural strength after building;
4, it by the recessing groove of setting, since support plate itself is than relatively thin, is contained in recessing groove building rear bearing sheet, thus
So that the surface of yurt wall is smooth, overall aesthetic is higher.
Detailed description of the invention
Fig. 1 is the spliced structural schematic diagram of yurt spliced by EPS building template;
Fig. 2 is the bottom view of Fig. 1;
Fig. 3 is structural schematic diagram when building skeleton and connection frame;
Fig. 4 is the structural schematic diagram of chassis, single skeleton and connection frame;
Fig. 5 is the enlarged diagram in Fig. 4 at A;
Fig. 6 is the structural schematic diagram of single skeleton and two groups of building blocks;
Fig. 7 is the structural schematic diagram after building block explosion.
In figure: 1, chassis;2, skeleton;21, support plate;211, support portion;212, connecting plate;22, limit plate;23, it connects
Frame;231, clamping screw;3, building block;31, recessing groove;32, the first module;33, the second module;34, third module;4, even
Binding structure;41, clamping block;42, clamping groove;5, splicing construction;51, link block;52, link slot;6, fixation kit;61, fixed
Bolt;62, fixture nut;7, pottery brain;8, mounting base;9, bolt is installed;10, access door;11, transom.
Specific embodiment
The yurt spliced by EPS building template is described further referring to Figure 1 to Figure 7.
A kind of yurt spliced by EPS building template as depicted in figs. 1 and 2, including chassis 1, multiple is set to chassis
Skeleton 2 and multiple building blocks 3 being set on skeleton 2 on 1, multiple building blocks 3 carry out horizontally-spliced and vertical heap
Product is to form yurt wall.The installation position of prefabricated access door 10, transom 11 in 3 splicing of building block, from
And after building block 3 is spliced into yurt wall, install access door 10 and transom 11.
As shown in Figure 3 and Figure 4, multiple skeletons 2 are laid out in umbrella frame shape, and monnolithic case and illiteracy after the installation of multiple skeletons 2
The shape of Gu packet is consistent.Further, skeleton 2 includes the support plate 21 being connected on chassis 1 and is vertically installed in support plate
Limit plate 22 on 21 surfaces, support plate 21 are set as and the consistent arc shape of the radian of yurt wall.As shown in connection with fig. 6,
The two sides of support plate 21 are divided into two support portions 211 by limit plate 22, and two laterally adjacent building blocks 3 are connected to two supports respectively
In portion 211, so that building block 3 be spliced on skeleton 2, skeleton 2 is combined to improve whole structural strength after splicing.Two
The setting of support portion 211 is capable of providing 3 support platform of building block, carries out component by support portion 211 in stress, thus
The load ability for improving yurt, improves its structural strength.Further, skeleton 2 is set as steel skeleton 2, improves structural strength,
And the surface of skeleton 2 is provided with erosion resistant coating, erosion resistant coating can be epoxy-phenolic aldehyde paint layer or epoxy coating, improve service life.
As shown in Figure 2 and Figure 4, the bottom of support plate 21 is installed on chassis 1, and top is equipped with pottery brain 7, and pottery brain 7 covers
The skylight of Gu packet is capable of providing bright inside yurt, raising comfortable for living.The top of support plate 21 extends to pottery brain 7
There is connecting plate 212 at centre point, the connecting plate 212 of multiple support plates 21 forms mounting base 8, and pottery brain 7 is placed in mounting base 8.
Multiple installation bolts 9 for being fed through mounting base 8 and being threadedly coupled with pottery brain 7 are provided between pottery brain 7 and mounting base 8, it is multiple
Circumferentially shape is evenly arranged installation bolt 9, pottery brain 7 to be fixed in mounting base 8 using multiple installation bolts 9, is utilized simultaneously
The top of each support plate 21 is connected with each other by the combination of pottery brain 7, the stability after improving installation.
As shown in Figure 4 and Figure 5, the longitudinal section of chassis 1 is set as U-shaped, and the bottom of support plate 21 is installed on the U-shaped of chassis 1
In slot, the bottom of the first module 32 is also installed in the U-lag of chassis 1, and is provided with and is used between support plate 21 and chassis 1
The fixation kit 6 skeleton 2 being fixed on chassis 1.Specifically, fixation kit 6 includes being fed through limiting slot and limiting section
Fixing bolt 61 and the fixture nut 62 being threadedly engaged with fixing bolt 61, fixing bolt 61 run through chassis 1.Utilize fixed spiral shell
Bolt 61 is threadedly engaged and locks with fixture nut 62, and support plate 21 can be stably fixed on chassis 1, convenient for disassembly and assembly, and
Stability is strong.
As shown in Figure 6 and Figure 7, building block 3 is made of EPS material, not only environmental protection portable, and has yurt and protect
The heat-insulated effect of temperature, it is cool in summer and warm in winter, improve residence comfort.Wherein, building block 3 includes the first module 32, the second module 33
And third module 34, by the horizontally-spliced lower wall body for forming yurt of multiple first modules 32, by multiple second modules 33
The middle part body of wall of horizontally-spliced composition yurt, by the horizontally-spliced top wall for forming yurt of multiple third modules 34.The
It is provided on the two sides of one module 32, the second module 33 and third module 34 for two building blocks 3 are horizontally-spliced
Connection structure 4.It is provided between first module 32 and the second module 33 for splicing the second module 33 in the first module 32
Splicing construction 5, the vertical accumulation between the second module 33 and third module 34 is equally attached using splicing construction 5.
As shown in Figure 6 and Figure 7, specifically, connection structure 4 includes the clamping block being respectively arranged on 3 two sides of building block
41 and clamping groove 42, clamping block 41 is corresponding with clamping groove 42, and when adjacent two building block 3 is horizontally-spliced, clamping block 41 is inserted
It is connected in clamping groove 42.Likewise, splicing construction 5 includes the link block 51 being respectively arranged on 3 top and bottom of building block
And link slot 52, link block 51 is corresponding with link slot 52, when adjacent two building block 3 is vertically spliced, link block 51
It is plugged in link slot 52.Using clamping block 41 and clamping groove 42, mating, link block 51 and link slot 52 are mating
Mode carries out horizontally-spliced and vertical accumulation to building block 3, and installation process is very convenient.Wherein clamping block 41 and clamping groove
42 may be configured as trapezoidal shape, and the trapezoidal longer bottom edge of clamping block 41 is set on the one end of clamping block 41 far from building block 3, card
Access slot 42 is correspondingly arranged, to be capable of forming cross spacing when clamping block 41 and clamping groove 42 cooperate, prevents adjacent two building
Module 3 is laterally detached from, the structural strength after improving installation.Similarly, link block 51 and link slot 52 are likewise provided as trapezoidal shape, even
It connects trapezoidal longer bottom edge in block 51 to be set on the one end of link block 51 far from building block 3, link slot 52 and link block 51
Corresponding, after the two combination, the limit being capable of forming on vertical prevents the first module 32 and the second module 33 or the second mould
Block 33 is vertically detached from third module 34, the structural strength after improving installation.
As shown in fig. 6, each skeleton 2 is respectively arranged at the junction between adjacent two horizontally-spliced building blocks 3, and
Junction between adjacent two horizontally-spliced building blocks 3 has gap, and the contraposition of limit plate 22 in skeleton 2 is plugged in two and builds
In gap between built module 3, so that overall co-ordination when building block 3 is spliced using connection structure 4 is stronger, peace is improved
Structural strength after dress.In order to further increase the structural strength between each skeleton 2, in conjunction with shown in Fig. 4 and Fig. 5, multiple
Multiple connection frames 23 are provided between support plate 21, multiple connection frames 23 are set in a ring on skeleton 2, and the two of connection frame 23
End is fixed in the support plate 21 of adjacent two skeleton 2 by clamping screw 231 respectively.
As shown in Figures 6 and 7, it in order to promote aesthetic feeling, is used in building block 3 towards being provided on the surface inside yurt
The recessing groove 31 of skeleton 2 is accommodated, so that the surface of yurt presents smooth without convex after building block 3 is installed on skeleton 2
It rises, the cleaning of yurt entirety is promoted, to improve yurt aesthetic feeling.
As shown in Figure 1, being equipped with mesh enclosure (not shown), mesh enclosure material on yurt wall after the accumulation of building block 3
Material is that glass fibre or PVC coat waterproof material in its outer surface, usually concrete material after the completion of mesh enclosure arrangement,
Be coated with outside it later paint and can pattern-making, improve the overall aesthetic of yurt.
Working principle: during installation, skeleton 2 being installed on chassis 1, utilizes matching for fixing bolt 61 and fixture nut 62
Support plate 21 is fixed on chassis 1 by conjunction.Being formed after multiple skeletons 2 are fixed then will be each with the consistent shape of yurt wall
A connection frame 23 is built on skeleton 2, and it is whole in completing on skeleton 2 using clamping screw 231 connection frame 23 to be locked
Frame is built.Later that the first module 32 is horizontally-spliced on the support portion 211 of support plate 21, each first module 32 is spliced
Afterwards, in stitching portion, coated with adhesive is bonded, to improve spliced stability between each building block 3.Then
Splice the second module 33 on the basis of one module 32, is erected between the second module 33 and the first module 32 using splicing construction 5
It is carried out to accumulation, between each second module 33 using connection structure 4 horizontally-spliced.It is adopted on the basis of the second module 33 later
In the same way, horizontally-spliced and vertical accumulation is carried out to third module 34.Then pottery brain 7 is installed in mounting base 8,
And pottery brain 7 is fixed on connecting plate 212 using installation bolt 9.It finally is laid with mesh enclosure in outside, and is coated with concrete layer, with
The paint layer that oils is coated with outside concrete layer afterwards, completes building for yurt.Through the above scheme, the top of each skeleton 2 is tied
Together on pottery brain 7, the top of each skeleton 2 is fixed on chassis 1, the stability after each skeleton 2 is installed is improved, thus whole
After body yurt building, skeleton 2, connection structure 4 and splicing construction 5 cooperate, and keep yurt structural strength higher, realize
Improve the effect of yurt structural strength.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation
Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art
Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications
It should be regarded as protection scope of the present invention.
Claims (10)
1. a kind of yurt spliced by EPS building template, it is characterised in that: including chassis (1), multiple be set to chassis (1)
On skeleton (2) and multiple building blocks (3) being set on skeleton (2), the left and right sides of the building block (3) and
Upper and lower two sides are separately provided for carrying out two building blocks (3) into horizontally-spliced connection structure (4) and vertically accumulate
Splicing construction (5), the mutually transverse splicing of the multiple building blocks (3) and vertically accumulation composition yurt wall, it is multiple described in
Skeleton (2) is laid out in umbrella frame shape, and the skeleton (2) includes the support plate (21) being connected on chassis (1) and is vertically installed in
Limit plate (22) on support plate (21) surface is provided with for that will prop up between the bottom end and chassis (1) of the support plate (21)
Fagging (21) is fixed on the fixation kit (6) on chassis (1), and pottery brain (7), the limit are connected at the top of the support plate (21)
The two sides of support plate (21) are divided into two support portions (211) by position plate (22), and the building block of laterally adjacent two (3) supports respectively
It is connected on two support portions (211).
2. a kind of yurt spliced by EPS building template according to claim 1, it is characterised in that: the skeleton (2)
Be set to the junction between adjacent two horizontally-spliced building blocks (3), and adjacent two horizontally-spliced building block (3) it
Between junction there is gap, the limit plate (22) contraposition is plugged in the gap between two building blocks (3).
3. a kind of yurt spliced by EPS building template according to claim 2, it is characterised in that: described fixed group
Part (6) includes being fed through the fixing bolt (61) of chassis (1) and support plate (21) and being threadedly engaged with fixing bolt (61)
Fixture nut (62).
4. a kind of yurt spliced by EPS building template according to claim 1, it is characterised in that: multiple support plates
(21) it is provided between connection frame (23), multiple connection frames (23) are set in a ring on skeleton (2), and the connection frame
(23) both ends pass through clamping screw (231) respectively and are fixed in the support plate (21) of adjacent two skeleton (2).
5. a kind of yurt spliced by EPS building template according to claim 1, it is characterised in that: the support plate
(21) top extend to pottery brain (7) centre point at have connecting plate (212), the connecting plate of multiple support plates (21)
(212) mounting base (8) are formed, the pottery brain (7) is placed on mounting base (8), and between the pottery brain (7) and mounting base (8)
It is provided with multiple installation bolts (9) for being fed through mounting base (8) and being threadedly coupled with pottery brain (7), multiple installation bolts (9)
Circumferentially shape is evenly arranged.
6. a kind of yurt spliced by EPS building template according to claim 1, it is characterised in that: the chassis (1)
Longitudinal section be set as U-shaped, the bottom of the support plate (21) is installed in the U-lag of chassis (1).
7. a kind of yurt spliced by EPS building template according to claim 1, it is characterised in that: the building mould
Block (3) is towards the recessing groove (31) being provided on the surface inside yurt for accommodating skeleton (2).
8. a kind of yurt spliced by EPS building template according to claim 1, it is characterised in that: the connection knot
Structure (4) includes the clamping block (41) and clamping groove (42) being respectively arranged on building block (3) two sides, the clamping block (41)
Corresponding with clamping groove (42), when adjacent two building block (3) is horizontally-spliced, the clamping block (41) is plugged in clamping groove
(42) in, the splicing construction (5) includes the link block (51) being respectively arranged on building block (3) top and bottom and connects
Access slot (52), the link block (51) is corresponding with link slot (52), and adjacent two building block (3) is vertically spliced
When, the link block (51) is plugged in link slot (52).
9. a kind of yurt spliced by EPS building template according to claim 8, it is characterised in that: the building mould
Block (3) includes the first module (32), the second module (33) and third module (34), laterally by multiple first modules (32)
The lower wall body of splicing composition yurt, by multiple horizontally-spliced middle part body of wall for forming yurt of second module (33),
By multiple horizontally-spliced top walls for forming yurt of third module (34), first module (32), the second module
(33) and between third module (34) spliced using splicing construction (5).
10. a kind of yurt spliced by EPS building template according to claim 1, it is characterised in that: the skeleton
(2) it is set as steel skeleton (2), and the surface of the skeleton (2) is provided with erosion resistant coating.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811262021.5A CN109441141A (en) | 2018-10-27 | 2018-10-27 | A kind of yurt spliced by EPS building template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811262021.5A CN109441141A (en) | 2018-10-27 | 2018-10-27 | A kind of yurt spliced by EPS building template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109441141A true CN109441141A (en) | 2019-03-08 |
Family
ID=65548820
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811262021.5A Pending CN109441141A (en) | 2018-10-27 | 2018-10-27 | A kind of yurt spliced by EPS building template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109441141A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110105684A (en) * | 2019-05-31 | 2019-08-09 | 谢宜环 | A kind of self-extinguishing type eps foam plastics and house |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW200905047A (en) * | 2007-07-24 | 2009-02-01 | Japan Tsusyo Yk | Arched shielding member |
CN206737491U (en) * | 2017-05-17 | 2017-12-12 | 通辽市茂源农业科技有限公司 | A kind of yurt |
CN206752682U (en) * | 2017-05-10 | 2017-12-15 | 潍坊金宝旅游装备有限公司 | The modularization assemble house of EPS materials |
CN206874033U (en) * | 2017-06-12 | 2018-01-12 | 呼和浩特市博洋可再生能源有限责任公司 | A kind of heat-insulated yurt of novel heat insulation |
CN207017686U (en) * | 2017-04-26 | 2018-02-16 | 苏德毕力格 | Easy disassembly and the yurt skeleton of transport |
-
2018
- 2018-10-27 CN CN201811262021.5A patent/CN109441141A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW200905047A (en) * | 2007-07-24 | 2009-02-01 | Japan Tsusyo Yk | Arched shielding member |
CN207017686U (en) * | 2017-04-26 | 2018-02-16 | 苏德毕力格 | Easy disassembly and the yurt skeleton of transport |
CN206752682U (en) * | 2017-05-10 | 2017-12-15 | 潍坊金宝旅游装备有限公司 | The modularization assemble house of EPS materials |
CN206737491U (en) * | 2017-05-17 | 2017-12-12 | 通辽市茂源农业科技有限公司 | A kind of yurt |
CN206874033U (en) * | 2017-06-12 | 2018-01-12 | 呼和浩特市博洋可再生能源有限责任公司 | A kind of heat-insulated yurt of novel heat insulation |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110105684A (en) * | 2019-05-31 | 2019-08-09 | 谢宜环 | A kind of self-extinguishing type eps foam plastics and house |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106349446B (en) | A kind of high microsteping fibres in amounts enhancing hard polyurethane foam synthetic plate and preparation method thereof | |
CN103979016B (en) | Lightweight electric vehicle body skeleton | |
CN1195135C (en) | Structure formed of foaming cement and lightweight steel, and structure system and method of forming structure system | |
CN101914948A (en) | Novel composite material fabricated movable house | |
CN105857536A (en) | Composite waterborne floating-body rack system for photovoltaic power generation and manufacturing process of composite waterborne floating-body rack system for photovoltaic power generation | |
CN207512933U (en) | A kind of assembled architecture wall | |
CN207739388U (en) | It builds prefabricated house | |
CN109441141A (en) | A kind of yurt spliced by EPS building template | |
CN110892638A (en) | Photovoltaic panel | |
CN103343573B (en) | Can factorial praluction the quick disassembled dress of high-bearing modular building | |
CN103922663B (en) | Packing material and there is the combined wall of this packing material | |
CN202299394U (en) | Combined building side template system | |
CN201738448U (en) | Novel composite material assembly type mobile house | |
CN201762986U (en) | Permanent cast-in-situ concrete composite heat-insulating formwork with heat-insulating transition layer | |
CN103850439A (en) | Modular house construction method | |
CN203475605U (en) | High-bearing performance modular building capable of being produced in industrialized manner and rapidly disassembled and assembled | |
CN212689310U (en) | Self-insulation building block outer wall body | |
CN104652695A (en) | Waterproof heat-preservation wall panel for fabricated building and application thereof | |
CN113309263A (en) | Assembled steel construction wall structure | |
CN208310293U (en) | Removable multi-functional villa | |
KR20130090991A (en) | Fiber reinforcement plastic industrialization house and the manufacturing method | |
CN205171450U (en) | Modular template structure | |
CN110409666A (en) | A kind of heat insulation decoration integrated molding external wall panel connecting node of reinforcement with ribbing | |
CN104120791A (en) | Method for constructing building through structural body jointing assemblies | |
CN103758278A (en) | Laminboard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20191031 Address after: 361000 no.1069-6-102 Chaoyang Road, Datong Street, Tong'an District, Xiamen City, Fujian Province Applicant after: Xiamen Yushan industry and Trade Co., Ltd Address before: 361000 baishalun farm (3 workshop), Tong'an District, Xiamen City, Fujian Province Applicant before: Xiamen Yihua Feng Plastic Technology Co., Ltd. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190308 |