CN109440772A - A kind of interim power transmission reinforcement structure of foundation pit and construction method - Google Patents

A kind of interim power transmission reinforcement structure of foundation pit and construction method Download PDF

Info

Publication number
CN109440772A
CN109440772A CN201811472672.7A CN201811472672A CN109440772A CN 109440772 A CN109440772 A CN 109440772A CN 201811472672 A CN201811472672 A CN 201811472672A CN 109440772 A CN109440772 A CN 109440772A
Authority
CN
China
Prior art keywords
power transmission
shallow hole
interim power
dell
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811472672.7A
Other languages
Chinese (zh)
Inventor
逯相科
董鸽
罗永�
周智颖
王凯源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201811472672.7A priority Critical patent/CN109440772A/en
Publication of CN109440772A publication Critical patent/CN109440772A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Abstract

The invention discloses a kind of interim power transmission reinforcement structure of foundation pit and construction methods, belong to civil construction project technical field.For solving the problem of that there are dell concrete support constructions when depth hole to cause foundation pit deformation not in time in base pit engineering.The construction method of the interim power transmission reinforcement structure of foundation pit of the invention, comprising the following steps: step 1: building shallow hole building enclosure, dell building enclosure and the support of the road shallow hole head;Step 2: the earthwork of shallow hole construction area and shallow hole reinforcement cushion of constructing are excavated;Step 3: it when excavating dell construction area to designed elevation, while pouring interim power transmission and reinforcing bed course;Step 4: dell concrete support of constructing after dell is supported by work surface.The present invention can reduce before dell concrete support is constructed to the maximum extent and reach the deformation of foundation pit before intensity, realize the control action to foundation pit deformation caused by foundation pit exposure tau-effect, reduce influence of the foundation pit exposure tau-effect to surrounding enviroment.

Description

A kind of interim power transmission reinforcement structure of foundation pit and construction method
Technical field
The present invention relates to a kind of interim power transmission reinforcement structure of foundation pit and construction methods, refer in particular to, and there are depth, shallow holes to construct When, in the case where dell concrete support intensity not up to requires, a kind of reduction tau-effect causes the interim of foundation pit deformation Power transmission reinforcement structure and its construction method.Belong to civil construction project technical field of construction.
Background technique
With the needs that city continues to develop, land use is more and more nervous, in order to meet matching for original buildings or structures Utility function is covered, narrow space is also developed constantly between buildings or structures.The exploitation of small space certainly will cause Close on the deformation of buildings or structures, and the protection of buildings or structures require it is higher and higher, especially close on subway, magnetic suspension, The Foundation Pit Construction of runway, taxiway, tall and big buildings or structures, therefore, the control of foundation pit deformation becomes in work progress It obtains more and more important.
When, there are when depth hole, the construction of dell concrete support will cause foundation pit deformation not in time in base pit engineering.Mesh Before, base pit engineering has solved the excessive deformation of foundation pit by foundation pit enclosure supported design in principle, therefore, in work progress Foundation pit deformation caused by tau-effect becomes to get more and more attention, and especially can excavation of foundation pit rear support construct and apply in time It can play a role in time after work most important to deformation caused by the tau-effect of foundation pit is kept out.Therefore, in this feelings Reduce the technical problem that foundation pit deformation caused by tau-effect is engineers and technicians' urgent need to resolve under condition.
Summary of the invention
Technical problem to be solved by the present invention lies in a kind of interim power transmission reinforcement structure of foundation pit is provided, for there are the depths Hole construction when, dell concrete support intensity not up to require in the case where, can temporal limitation dell excavation shallow hole is enclosed The influence of watch box system.
To solve the above-mentioned problems, The technical solution adopted by the invention is as follows:
A kind of interim power transmission reinforcement structure of foundation pit, the dell construction including shallow hole construction area and in shallow hole construction area Area, the shallow hole construction area are equipped with shallow hole building enclosure, and the top of the shallow hole building enclosure is supported equipped with the road shallow hole head, described Shallow hole construction area has poured shallow hole reinforcement cushion, and the dell construction area is equipped with dell building enclosure, and dell construction area has poured Bed course is reinforced in interim power transmission, and the both ends that bed course is reinforced in the interim power transmission are connected as one with shallow hole reinforcement cushion by pouring, It is identical as the absolute altitude of shallow hole reinforcement cushion that bed course is reinforced in interim power transmission.
Further, reinforce the effect that bed course keeps out foundation pit deformation to increase interim power transmission, pad is reinforced in the interim power transmission The construction area of layer is several elongate in shape, and the construction area interval that bed course and dell concrete support are reinforced in interim power transmission is set It sets.
Further, the interim power transmission reinforce bed course with a thickness of 40-50cm.
The present invention also provides the construction methods of the interim power transmission reinforcement structure of foundation pit, comprising the following steps:
Step 1: building shallow hole building enclosure, dell building enclosure and the support of the road shallow hole head;
Step 2: after the intensity that shallow hole building enclosure and the road shallow hole head support reaches design requirement, shallow hole construction is excavated The earthwork in region and shallow hole reinforcement cushion of constructing;
Step 3: when excavating dell to designed elevation, interim power transmission is poured simultaneously in same construction plane and reinforces bed course;
Step 4: dell concrete support of constructing after dell is supported by work surface.
Further, in above-mentioned construction method, in step 2, reach to shallow hole building enclosure and the support of the road shallow hole head and set After counting desired intensity, the earthwork of shallow hole construction area is excavated;
In step 3, when excavating dell to designed elevation, while pouring interim power transmission and reinforcing bed course and shallow hole reinforcement pad Layer, and so that interim power transmission is reinforced bed course and be in same construction plane with shallow hole reinforcement cushion.
Tau-effect can be further decreased and become to foundation pit by pouring interim power transmission reinforcement bed course and shallow hole reinforcement cushion simultaneously The influence of shape.
Further, it is several elongate in shape that the construction area of bed course is reinforced in the interim power transmission, and bed course is reinforced in interim power transmission It is arranged with the construction area interval of dell concrete support.
Further, the interim power transmission reinforce bed course with a thickness of 40-50cm.
Further, construction method further includes step 5: after waiting the intensity of dells concrete support to meet design requirement, foundation pit Interim power transmission reinforcement bed course is excavated together with lower section cubic metre of earth in subsequent digging process, carries out next process construction.
Compared with prior art, the beneficial effects of the present invention are:
1, the interim power transmission reinforcement structure of foundation pit of the invention, for the foundation pit construction place cheated there are the depth, dell support Before construction and after construction before intensity backlog demand, realize that the control to foundation pit deformation caused by foundation pit exposure tau-effect is made With further reducing the influence to surrounding enviroment.
2, the interim power transmission reinforcement structure of foundation pit of the invention, is particularly suitable for that surrounding enviroment are complicated, soil property environment is poor, become Shape controls demanding construction environment.What working face carried out that interim power transmission reinforces bed course facility in time after coming out pours operation, fills Divide foundation pit deformation caused by reducing tau-effect.
3, the interim power transmission reinforcement structure of foundation pit of the invention can independently keep out foundation pit deformation and support before Construction of Supporting The deformation of foundation pit is kept out after construction jointly.
4, the construction method of the interim power transmission reinforcement structure of foundation pit of the invention, convenient to carry out, construction efficiency is high, convenient for being expert at It promotes the use in the industry.
Detailed description of the invention
Fig. 1 is the structure drawing in side sectional elevation of interim one preferred embodiment of power transmission reinforcement structure of foundation pit of the present invention.
Fig. 2 is the sectional view along Fig. 1 at A-A.
Specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.According to following explanation, originally The purposes, technical schemes and advantages of invention will be apparent from.It should be noted that described embodiment is of the invention preferred Embodiment, instead of all the embodiments.
Referring to figs. 1 and 2, the interim power transmission reinforcement structure of a kind of foundation pit, including shallow hole construction area 7 and applied positioned at shallow hole Dell construction area 6 in work area 7, the shallow hole construction area 7 are equipped with shallow hole building enclosure 1, the top of the shallow hole building enclosure 1 Equipped with the road shallow hole head support 8.Shallow hole reinforcement cushion 2 is poured in the shallow hole construction area 7, the dell construction area 6 is equipped with deep Pit enclosure structure 3, dell construction area 6 have poured interim power transmission and have reinforced bed course 5, the interim power transmission reinforce the both ends of bed course 5 with Shallow hole reinforcement cushion 2, which pours, to be connected as one, and it is identical as the absolute altitude of shallow hole reinforcement cushion 2 that bed course 5 is reinforced in interim power transmission.As excellent Choosing, the interim power transmission reinforce bed course 5 with a thickness of 40-50cm.
Reinforce the effect that bed course keeps out foundation pit deformation to increase interim power transmission, applying for bed course 5 is reinforced in the interim power transmission Work area domain is several elongate in shape, and bed course 5 is reinforced in interim power transmission and the construction area interval of dell concrete support 4 is arranged.
The interim power transmission reinforcement structure of foundation pit of the invention takes full advantage of interim power transmission reinforcement bed course 5 and reduces space-time with this Foundation pit deformation caused by effect.Present invention is particularly suitable for surrounding enviroment complexity, soil property environment is poor, Deformation control is demanding Construction environment;Foundation pit exposure duration is longer, and support together down it is not formed before, got over according to tau-effect theory foundation pit deformation Greatly.Interim power transmission provided by the invention reinforces that bed course can intensity be when dell concrete support 4 is not constructed and after construction It plays a significant role before reaching, reduces the deformation of foundation pit, further reduce the influence to surrounding enviroment.
The present invention also provides the construction methods of the interim power transmission reinforcement structure of above-mentioned foundation pit, comprising the following steps:
Step 1: building shallow hole building enclosure 1, dell building enclosure 3 and the road shallow hole head support 8;
Step 2: it after shallow hole building enclosure 1 and the road shallow hole head support 8 reach the intensity of design requirement, excavates shallow hole and applies The earthwork in work area domain and shallow hole reinforcement cushion 2 of constructing.
If shallow hole supporting, other than the road shallow hole head support 8, there are also other to support (being not limited to concrete support) for lower part When, then in this step, it is also necessary to carry out the excavation of the lower part soil body and the construction operation of other supports.
Step 3: when excavating dell construction area 6 to designed elevation, interim power transmission is poured simultaneously in same construction plane and is added Strong bed course 5.
Specifically, dell construction area is excavated to interim power transmission and reinforces pouring in time when the absolute altitude of bed course 5, and interim power transmission adds Strong 5 both ends of bed course are poured with shallow hole reinforcement cushion 2 to be connected to.It is passed in this way, bed course 5 is reinforced in interim power transmission by shallow hole reinforcement cushion 2 Power is in shallow hole building enclosure 1.
Step 4: dell concrete support 4 of constructing after dell is supported by work surface.
Specifically, after the operation surface treatment of dell concrete support 4 formwork carry out concrete support pouring construction.It is right When brace foundation soil layer is softer, to prevent support from settling, support counterdie is wanted using plain concrete cushion layer to meet underlying strength It asks.When supporting counterdie to use plain concrete cushion layer, reinforce the pouring construction together of bed course 5 with interim power transmission.
In above-mentioned construction method, in order to reduce influence of the tau-effect to foundation pit deformation to the greatest extent, in step 2 In, after shallow hole building enclosure 1 and the road shallow hole head support 8 reach the intensity of design requirement, excavate the earthwork of shallow hole construction area First shallow hole reinforcement cushion 2 is not poured, and in step 3, when waiting excavation dell construction area 6 to designed elevation, while pouring interim Bed course 5 and shallow hole reinforcement cushion 2 are reinforced in power transmission, and so that interim power transmission is reinforced bed course 5 and be in same construction with shallow hole reinforcement cushion 2 In plane, make the two power transmission in the same plane.
Reinforce the effect that bed course keeps out foundation pit deformation to increase interim power transmission, applying for bed course 5 is reinforced in the interim power transmission Work area domain is several elongate in shape, and bed course 5 is reinforced in interim power transmission and the construction area interval of dell concrete support 4 is arranged.
Further, construction method further includes step 5: after waiting the intensity of dells concrete support 4 to meet design requirement, base Cheat interim power transmission in subsequent digging process and reinforce bed course 5 and excavated together with lower section cubic metre of earth, carry out next process construction, i.e., into The excavation of the lower skin earthwork of row dell.That is, the principle that bed course 5 carries out block construction is reinforced in interim power transmission, give full play to The effect of bed course 5 is reinforced in interim power transmission, reduces foundation pit deformation caused by tau-effect to the greatest extent.
The above is only the description explanation of the preferred embodiment of the present invention, and not limiting the scope of the present invention, shows So, anyone skilled in the art based on the above embodiment, can readily occur in replacement or variation to obtain other implementations Example, these are covered by the protection scope of the present invention.

Claims (8)

1. a kind of interim power transmission reinforcement structure of foundation pit, the dell construction area including shallow hole construction area and in shallow hole construction area, The shallow hole construction area is equipped with shallow hole building enclosure, and the top of the shallow hole building enclosure is supported equipped with the road shallow hole head, feature It is:
The shallow hole construction area has poured shallow hole reinforcement cushion, and the dell construction area is equipped with dell building enclosure, dell construction Interim power transmission has been poured in area and has reinforced bed course, and the both ends of bed course are reinforced in the interim power transmission and shallow hole reinforcement cushion passes through the company of pouring It is connected in one, it is identical as the absolute altitude of shallow hole reinforcement cushion that bed course is reinforced in interim power transmission.
2. the interim power transmission reinforcement structure of foundation pit according to claim 1, it is characterised in that:
The construction area that bed course is reinforced in the interim power transmission is several elongate in shape, and bed course and dell concrete are reinforced in interim power transmission The construction area interval of support is arranged.
3. the interim power transmission reinforcement structure of foundation pit according to claim 1, it is characterised in that:
The interim power transmission reinforce bed course with a thickness of 40-50cm.
4. the construction method of the interim power transmission reinforcement structure of foundation pit as described in claims 1 to 3 any claim, feature exist In, comprising the following steps:
Step 1: building shallow hole building enclosure, dell building enclosure and the support of the road shallow hole head;
Step 2: after the intensity that shallow hole building enclosure and the road shallow hole head support reaches design requirement, shallow hole construction area is excavated The earthwork and shallow hole reinforcement cushion of constructing;
Step 3: when excavating dell to designed elevation, interim power transmission is poured simultaneously in same construction plane and reinforces bed course;
Step 4: dell concrete support of constructing after dell is supported by work surface.
5. the construction method of the interim power transmission reinforcement structure of foundation pit as claimed in claim 4, it is characterised in that:
In step 2, after shallow hole building enclosure and the support of the road shallow hole head reach the intensity of design requirement, shallow hole construction is excavated The earthwork in region;
In step 3, when excavating dell to designed elevation, while pouring interim power transmission and reinforcing bed course and shallow hole reinforcement cushion, and Make interim power transmission reinforce bed course to be in same construction plane with shallow hole reinforcement cushion.
6. the construction method of the interim power transmission reinforcement structure of foundation pit according to claim 4, it is characterised in that:
The construction area that bed course is reinforced in the interim power transmission is several elongate in shape, and bed course and dell concrete are reinforced in interim power transmission The construction area interval of support is arranged.
7. the construction method of the interim power transmission reinforcement structure of foundation pit according to claim 4 or 5, it is characterised in that:
The interim power transmission reinforce bed course with a thickness of 40-50cm.
8. the construction method of the interim power transmission reinforcement structure of foundation pit according to claim 4 or 5, which is characterized in that further include:
Step 5: after waiting the intensity of dells concrete support to meet design requirement, interim power transmission adds in the subsequent digging process of foundation pit Strong bed course is excavated together with lower section cubic metre of earth, carries out next process construction.
CN201811472672.7A 2018-12-04 2018-12-04 A kind of interim power transmission reinforcement structure of foundation pit and construction method Pending CN109440772A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811472672.7A CN109440772A (en) 2018-12-04 2018-12-04 A kind of interim power transmission reinforcement structure of foundation pit and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811472672.7A CN109440772A (en) 2018-12-04 2018-12-04 A kind of interim power transmission reinforcement structure of foundation pit and construction method

Publications (1)

Publication Number Publication Date
CN109440772A true CN109440772A (en) 2019-03-08

Family

ID=65556206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811472672.7A Pending CN109440772A (en) 2018-12-04 2018-12-04 A kind of interim power transmission reinforcement structure of foundation pit and construction method

Country Status (1)

Country Link
CN (1) CN109440772A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110735434A (en) * 2019-10-16 2020-01-31 中国建筑一局(集团)有限公司 Construction method for replacing traditional inner support by underground force transmission belt in long and narrow deep foundation pits
CN111411629A (en) * 2020-03-16 2020-07-14 徐州市城市轨道交通有限责任公司 Construction method for common pile excavation of long and narrow type wind pavilion structure and main body structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002188163A (en) * 2000-12-18 2002-07-05 Shimizu Corp First-story floor preceding underground construction method
CN204940296U (en) * 2015-07-28 2016-01-06 上海建工七建集团有限公司 A kind of horizontal struts system
CN106545019A (en) * 2016-10-12 2017-03-29 上海建工建集团有限公司 For the support-replacing system and construction method of stage differential style Underground Construction
CN106638612A (en) * 2015-10-28 2017-05-10 上海十三冶建设有限公司 Simple foundation pit supporting system and construction method thereof
CN107386296A (en) * 2017-06-14 2017-11-24 上海建工建集团有限公司 Close to the construction method of the deep big foundation pit of synchronous construction protection object
CN108755701A (en) * 2018-06-21 2018-11-06 腾达建设集团股份有限公司 The construction method of the support construction of deep basal pit
CN209620028U (en) * 2018-12-04 2019-11-12 上海建工七建集团有限公司 A kind of interim power transmission reinforcement structure of foundation pit

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002188163A (en) * 2000-12-18 2002-07-05 Shimizu Corp First-story floor preceding underground construction method
CN204940296U (en) * 2015-07-28 2016-01-06 上海建工七建集团有限公司 A kind of horizontal struts system
CN106638612A (en) * 2015-10-28 2017-05-10 上海十三冶建设有限公司 Simple foundation pit supporting system and construction method thereof
CN106545019A (en) * 2016-10-12 2017-03-29 上海建工建集团有限公司 For the support-replacing system and construction method of stage differential style Underground Construction
CN107386296A (en) * 2017-06-14 2017-11-24 上海建工建集团有限公司 Close to the construction method of the deep big foundation pit of synchronous construction protection object
CN108755701A (en) * 2018-06-21 2018-11-06 腾达建设集团股份有限公司 The construction method of the support construction of deep basal pit
CN209620028U (en) * 2018-12-04 2019-11-12 上海建工七建集团有限公司 A kind of interim power transmission reinforcement structure of foundation pit

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙志国: "软土地区深基坑"垫层换撑"体系的建立与施工技术研究", 建筑施工, vol. 40, no. 6, pages 847 - 849 *
陈秋旺: "坑中坑式内撑支护基坑围护结构变形特性研究", 福建建筑, no. 12, pages 39 - 43 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110735434A (en) * 2019-10-16 2020-01-31 中国建筑一局(集团)有限公司 Construction method for replacing traditional inner support by underground force transmission belt in long and narrow deep foundation pits
CN111411629A (en) * 2020-03-16 2020-07-14 徐州市城市轨道交通有限责任公司 Construction method for common pile excavation of long and narrow type wind pavilion structure and main body structure

Similar Documents

Publication Publication Date Title
CN104563128B (en) The asymmetric deep big foundation pit in soft clay area synchronizes support system and the implementation of excavation
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN109723085B (en) Deep foundation pit division construction rib wall support replacing structure and construction method thereof
CN103510520A (en) Sectionalized construction method of deep and large foundation pit
CN204371354U (en) The compound supporting and protection structure of a kind of Karst Tunnel
CN110485473A (en) Rectangle active well and its construction method can be recycled in a kind of assembled that presetting detachable door opening
CN107313431A (en) Close on not contour foundation ditch method for synchronously constructing
CN102828517B (en) Hierarchical control construction method of foundation pit excavation at entrance and exit of station
CN101509261B (en) Method for pile plate base for ultra-high voltage electric power line steel tower on soft foundation
CN102444143B (en) Construction method for cancelling operation channel for facades of basement
CN109440772A (en) A kind of interim power transmission reinforcement structure of foundation pit and construction method
CN108842820A (en) A kind of subway station transfer node section foundation ditch construction method
CN104806251A (en) Subsidiary inverted excavation construction method for urban subway station under complex environment
CN106013053A (en) Steel sheet pile support construction method for building underground garage open caisson
CN110106919A (en) A kind of lid digs the building enclosure and its construction method at station
CN104947681A (en) Super large super deep basement ground pit construction method
CN105155548A (en) Cable double-row pile (wall) supporting structure
CN105909256A (en) Large-span weak surrounding rock tunnel construction method adopting face pre-reinforcement core soil reserving three-step temporary inverted arch technology
CN209620028U (en) A kind of interim power transmission reinforcement structure of foundation pit
CN109403339A (en) The deep basal pit composite supporting construction and its method for protecting support of double-row pile combination method of center island
CN104196032A (en) Subway station supporting plate and inversed operation combined construction method
JP2002115260A (en) Extension method for basement
CN105386462A (en) Integral construction type small and medium-sized basement and construction method thereof
CN102465534A (en) Construction method for adjacent double ditches
CN109440790B (en) Comprehensive reinforcement method for deep unloading understable rock high slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination