CN109417791A - Semi-static scheduling method, base station and user equipment - Google Patents
Semi-static scheduling method, base station and user equipment Download PDFInfo
- Publication number
- CN109417791A CN109417791A CN201780021810.7A CN201780021810A CN109417791A CN 109417791 A CN109417791 A CN 109417791A CN 201780021810 A CN201780021810 A CN 201780021810A CN 109417791 A CN109417791 A CN 109417791A
- Authority
- CN
- China
- Prior art keywords
- semi
- persistent scheduling
- user equipment
- control signaling
- mark
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 110
- 230000011664 signaling Effects 0.000 claims abstract description 261
- 230000004913 activation Effects 0.000 claims description 63
- 230000005540 biological transmission Effects 0.000 claims description 37
- 238000009826 distribution Methods 0.000 claims description 26
- 238000013468 resource allocation Methods 0.000 claims description 10
- 230000004044 response Effects 0.000 claims description 10
- 230000003068 static effect Effects 0.000 claims 1
- 208000034188 Stiff person spectrum disease Diseases 0.000 description 373
- 229920010524 Syndiotactic polystyrene Polymers 0.000 description 373
- 208000012112 ischiocoxopodopatellar syndrome Diseases 0.000 description 373
- 238000002490 spark plasma sintering Methods 0.000 description 373
- 101000587820 Homo sapiens Selenide, water dikinase 1 Proteins 0.000 description 371
- 102100031163 Selenide, water dikinase 1 Human genes 0.000 description 371
- 238000010586 diagram Methods 0.000 description 14
- 238000004891 communication Methods 0.000 description 8
- 230000015654 memory Effects 0.000 description 7
- 238000003860 storage Methods 0.000 description 6
- 230000008569 process Effects 0.000 description 5
- 238000011144 upstream manufacturing Methods 0.000 description 5
- 230000006855 networking Effects 0.000 description 4
- 238000012545 processing Methods 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000002085 persistent effect Effects 0.000 description 3
- 101000701815 Homo sapiens Spermidine synthase Proteins 0.000 description 2
- 230000000712 assembly Effects 0.000 description 2
- 238000000429 assembly Methods 0.000 description 2
- 238000012790 confirmation Methods 0.000 description 2
- 125000004122 cyclic group Chemical group 0.000 description 2
- 230000000977 initiatory effect Effects 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 230000009191 jumping Effects 0.000 description 2
- 239000000178 monomer Substances 0.000 description 2
- 101000828738 Homo sapiens Selenide, water dikinase 2 Proteins 0.000 description 1
- 102100023522 Selenide, water dikinase 2 Human genes 0.000 description 1
- 238000013475 authorization Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000004438 eyesight Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000012163 sequencing technique Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses the methods of semi-persistent scheduling.This method comprises: configuring message to the semi-persistent scheduling that user equipment sends semi-persistent scheduling, wherein semi-persistent scheduling configuration message includes at least two semi-persistent scheduling information, and each semi-persistent scheduling information includes at least the semi-persistent scheduling radio network temporary identifier of semi-persistent scheduling;It sends to user equipment and is indexed by the scrambled control signal of semi-persistent scheduling radio network temporary identifier and target, wherein target index includes at least the mark of a user equipment, so that the corresponding user equipment of the mark executes corresponding operating according to the semi-persistent scheduling that control signaling is directed to corresponding semi-persistent scheduling radio network temporary identifier.The invention also discloses relevant base station and user equipmenies.
Description
Technical field
The present embodiments relate to the communications fields, more particularly to a kind of Semi-static scheduling method, base station and user equipment.
Background technique
Using the shared scheduling of resource of dynamic in LTE/LTE-A.During uplink, user equipment (User
Equipment, UE) will use running time-frequency resource send data, need first to base station carry out resource bid, obtain base station authorization it
After can send data.
Although dynamically shared scheduling of resource greatly optimizes the distribution of resource, opening for control signaling is also brought
Pin.To reduce control signaling expense, the size for data packet is relatively fixed and the time interval between data packet also meets
The business of certain regularity introduces semi-persistent scheduling (Semi-Persistent Scheduling, SPS).
For example, it includes SPS cellular radio temporary identifier that base station is sent to UE in uplink (Uplink, UL) SPS
(Cell Radio Network Temporary Identity, C-RNTI) and the SPS in SPS period configure message, then send
SPS activate message including SPS resource allocation information (resource allocation).UE makes according to the SPS period after activation
Upstream data is sent without dispatching with the resource of distribution.
However, in the certain systems for needing a variety of data of timing transmission, such as car networking (Vehicle-to-
Everything, V2X) in, scheduling bring control signaling expense is very big, in some instances it may even be possible to cause the limited of power system capacity.Although
Multiple SPS are a kind of effective means for reducing control signaling expense, and one SPS of only support primary in the prior art, can not
Meets the needs of multiple SPS.
Summary of the invention
Based on above content, in order to support multiple SPS, the embodiment of the present invention provides Semi-static scheduling method, base station and use
Family equipment.
Provide a kind of Semi-static scheduling method, comprising: send SPS to user equipment and configure message, wherein the SPS is configured
Message includes at least two SPS information, and each SPS information includes at least the SPS C-RNTI of the SPS;To user equipment send by
The scrambled control signaling of SPS C-RNTI and target index, wherein target index includes the mark of at least one user equipment
Know so that the corresponding user equipment of the mark according to the SPS that the control signaling is directed to corresponding SPS C-RNTI execute one or
Multiple operations.
The step of sending control signaling scrambled by the SPS C-RNTI to user equipment includes at least: passing through physical down
Control channel (Physical Downlink Control Channel, PDCCH) is sent to user equipment by the SPS C-RNTI
Scrambled control signaling;Either pass through PDCCH or uses wireless heterogeneous networks (Radio Resource Control, RRC)
Message is sent to user equipment by the scrambled release signaling of SPS C-RNTI.
The step of sending control signaling scrambled by the SPS C-RNTI to user equipment includes: that response user equipment is sent
The operation requests for corresponding SPS and send corresponding control signaling to user equipment, wherein the operation requests include activation
Request and/or release request.
Corresponding control signaling is sent to user equipment in response to the release request for corresponding SPS that user equipment is sent
The step of include: do not receive user equipment using corresponding SPS resource send data read-around ratio be greater than preset threshold when,
The control signaling of corresponding release request is sent to user equipment.
The step of sending control signaling scrambled by the SPS C-RNTI to user equipment includes: with multicast or broadcast
Mode sends control signaling to multiple user equipmenies.
In taking a step forward for the step of sending the control signaling to multiple user equipmenies in a manner of multicast or broadcast
It include: to receive the operation requests from user equipment, wherein the number of the operation requests in specified duration from user equipment
Amount is greater than specified threshold.
The control signaling includes target index, and being sent control signaling in a manner of multicast to multiple user equipmenies includes: point
It is repeatedly at least sent control signaling to the user equipment for sending operation requests in a manner of multicast, wherein time to send control signaling
It is several minimum with the sum of the maximum quantity of mark for including in target index.
Target index is included in control signaling.
Sending the step of being indexed by the scrambled control signaling of SPS C-RNTI and target to user equipment further comprises:
For user equipment assignment flag.
The mark includes: group mark and user equipment mark.
The operation requests that user equipment is sent are responded at least to send out to the user equipment for sending operation requests in a manner of multicast
When sending control signaling, if the group mark of sending object is identical and has sent operation requests, target index in include mark
For group mark.
SPS information further comprises period and the resource allocation of SPS.
SPS information further comprises the release command of SPS.
Provide a kind of Semi-static scheduling method, comprising: receive the semi-persistent scheduling (Semi- that base station is sent
Persistent Scheduling, SPS) configuration message, it includes at least two SPS information in message that SPS, which is configured, each SPS letter
SPS radio network temporary identifier (Cell Radio Network the Temporary Identity, C- of SPS are included at least in breath
RNTI);Receive being indexed by the scrambled control signaling of SPS C-RNTI and target for base station transmission;If including itself in target index
Mark, then execute corresponding operating according to the SPS that control signaling is directed to corresponding SPS C-RNTI, the operation include activation and/or
Release.
Receive base station transmission includes: in Physical Downlink Control Channel by the scrambled control signaling of SPS C-RNTI
It receives on (Physical Downlink Control Channel, PDCCH) by the scrambled activation signaling of SPSC-RNTI;With/
Or by SPS C- on PDCCH or using wireless heterogeneous networks (Radio Resource Control, RRC) message sink
The scrambled release signaling of RNTI.
In the transmission of reception base station from further comprising before the scrambled control signaling of SPS C-RNTI and target index: to
Base station sends the operation requests for corresponding SPS, which includes activation request and/or release request.
The step of sending the release request for corresponding SPS to base station includes: to ask to the operation that base station sends corresponding SPS
It asks.
The step of sending the release request for corresponding SPS to base station includes: that continuous n times stop using corresponding SPS to provide
Source sends data to base station, and N is greater than preset threshold.
Control signaling include target index, receive base station send by the scrambled control signaling of SPS C-RNTI and target rope
Further comprise after the step of drawing: attempting to be decoded control signaling using the SPS C-RNTI in SPS configuration message;If
Whether successfully decoded then judges in target index to include itself mark.
Control signaling do not include target index, receive base station send by the scrambled control signaling of SPS C-RNTI and target
Further comprise after the step of index: whether judge in target index including itself mark;If including being matched using SPS
The SPS C-RNTI set in message is decoded control signaling.
Receive the packet that takes a step forward the step of index by the scrambled control signaling of SPS C-RNTI and target that base station is sent
It includes: receiving the mark of base station distribution.
The mark includes group mark and user equipment mark.
A kind of base station is provided, comprising: the first sending module, for sending semi-persistent scheduling (Semi- to user equipment
Persistent Scheduling, SPS) configuration message, it includes at least two SPS information in message that SPS, which is configured, each SPS letter
SPS radio network temporary identifier (Cell Radio Network the Temporary Identity, C- of SPS are included at least in breath
RNTI);Second sending module is indexed for sending to user equipment by the scrambled control signaling of SPS C-RNTI and target, mesh
It include the mark of at least one user equipment in mark index, so that the corresponding user equipment of the mark is directed to according to control signaling
The SPS of corresponding SPS C-RNTI executes corresponding operating.
Second sending module is used to send to user equipment and ask with SPS operation in response to the operation requests that user equipment is sent
Corresponding control signaling is sought, which includes activation request and/or release request.
It is big using the read-around ratio of the data of corresponding SPS resource transmission that second sending module is used to not receive user equipment
When preset threshold, control signaling corresponding with release request is sent to user equipment.
Second sending module in a manner of multicast or broadcast to multiple user equipmenies for being sent control signaling.
The base station further comprises: distribution module, for being user equipment assignment flag.
A kind of user equipment is provided, comprising: the first receiving module, for receiving the semi-persistent scheduling (Semi- of base station transmission
Persistent Scheduling, SPS) configuration message, it includes at least two SPS information in message that SPS, which is configured, each SPS letter
SPS radio network temporary identifier (Cell Radio Network the Temporary Identity, C- of SPS are included at least in breath
RNTI);Second receiving module, for receiving being indexed by the scrambled control signaling of SPS C-RNTI and target for base station transmission;It holds
Row module in the case where for including the mark of user equipment itself in target indexes, is directed to corresponding SPS according to control signaling
The SPS of C-RNTI executes corresponding operating, which includes activation and/or release.
Second receiving module be used for Physical Downlink Control Channel (Physical Downlink Control Channel,
PDCCH it receives on) by the scrambled activation signaling of SPS C-RNTI;And/or on PDCCH or use wireless heterogeneous networks
(Radio Resource Control, RRC) message sink is by the scrambled release signaling of SPS C-RNTI.
Control signaling includes target index, which further comprises: decoder module, is matched for attempting using SPS
The SPS C-RNTI set in message is decoded control signaling;Judgment module, for judging in target index whether to include certainly
The mark of body.
Control signaling does not include target index, which further comprises: judgment module, for judging that target indexes
In whether include itself mark;Decoder module uses SPS in the case where for including the mark of itself in target indexes
SPS C-RNTI in configuration message is decoded control signaling.
There is provided a kind of base station, comprising: processor and the transceiver for being coupled to the processor.Processor is for passing through transceiver
Semi-persistent scheduling (Semi-Persistent Scheduling, SPS) is sent to user equipment and configures message, and SPS configures message
In include at least two SPS information, the SPS radio network temporary identifier (Cell of SPS is included at least in each SPS information
Radio Network Temporary Identity, C-RNTI);It is sent to user equipment by SPS C-RNTI by transceiver
Scrambled control signaling and target index, and include the mark of at least one user equipment in target index, so that the mark pair
The user equipment answered executes corresponding operating according to the SPS that control signaling is directed to corresponding SPS C-RNTI.
Processor is used for through transceiver in Physical Downlink Control Channel (Physical Downlink Control
Channel, PDCCH) on to user equipment send by the scrambled activation signaling of SPS C-RNTI;And/or on PDCCH or make
It is sent with wireless heterogeneous networks (Radio Resource Control, RRC) message to user equipment and is scrambled by SPS C-RNTI
Release signaling.
Processor is used to send out in response to the operation requests for SPS that user equipment is sent by transceiver to user equipment
Control signaling corresponding with the operation requests is sent, which includes activation request and/or release request.
The read-around ratio that processor is used to not receive the data that user equipment is sent using corresponding SPS resource is greater than default
When threshold value, corresponding control signaling is sent to user equipment by transceiver.
Processor in a manner of multicast or broadcast transceiver to multiple user equipmenies for being sent control signaling.
Processor is further used for receiving the respective operations request that user equipment is sent by transceiver, wherein specified
The quantity of the operation requests from user equipment is greater than specified threshold in duration.
It include that target indexes in control signaling, processor is used for through transceiver several times in a manner of multicast at least to hair
Send the user equipment of operation requests to send control signaling, and send the control signaling number and target index in include mark
The sum of maximum quantity minimum.
Control signaling includes target index.
Processor is further used for through transceiver being user equipment assignment flag.
The mark includes group mark and user equipment mark.
When processor is used to respond the operation requests of user equipment, transceiver in a manner of multicast at least to send should
When the user equipment of operation requests sends control signaling, if the group mark of sending object is identical and has sent operation requests,
The mark for including in target index is group mark.
SPS information further comprises period and the resource allocation of SPS.
SPS information further comprises the release command of SPS.
There is provided a kind of user equipment, comprising: processor and the telecommunication circuit for being coupled to processor.Processor is used for by logical
Believe that circuit receives the semi-persistent scheduling (Semi-Persistent Scheduling, SPS) that base station is sent and configures message, SPS matches
Setting includes at least two SPS information in message, and the SPS radio network temporary identifier of SPS is included at least in each SPS information
(Cell Radio Network Temporary Identity, C-RNTI);By telecommunication circuit receive base station send by
The scrambled control signaling of SPS C-RNTI and target index;If in target index including the mark of user equipment itself, according to
The SPS that control signaling is directed to corresponding SPS C-RNTI executes corresponding operating, which includes activation and/or release.
Processor is used for through telecommunication circuit in Physical Downlink Control Channel (Physical Downlink Control
Channel, PDCCH) on receive by the scrambled activation signaling of SPS C-RNTI;And/or on PDCCH or use radio resource
(Radio Resource Control, RRC) message sink is controlled by the scrambled release signaling of SPS C-RNTI.
Processor is used to send to base station for the operation requests for corresponding to SPS by telecommunication circuit, which includes
Activation request and/or release request.
Processor is used to send the operation requests for corresponding SPS to base station by telecommunication circuit.
Processor stops using corresponding SPS resource to send data to base station for continuous n times, and N is greater than preset threshold.
Control signaling includes target index, and processor is further used for attempting the SPS C- using in SPS configuration message
RNTI is decoded control signaling;If successfully decoded, judge in target index whether to include itself mark.
Control signaling does not include target index, and whether processor is further used for judge in target index including itself mark
Will;If including being decoded using the SPS C-RNTI in SPS configuration message to control signaling.
Processor is further used for receiving the mark of base station distribution by telecommunication circuit.
The mark includes group mark and user equipment mark.
Beneficial effects of the present invention are as follows: firstly, including at least two SPS information, different SPS in SPS configuration message
It can be distinguished with SPS C-RNTI.Secondly, also being sent to user equipment other than by the scrambled control signaling of SPS C-RNTI
Target index, allows user equipment to judge whether oneself needs to be implemented control instruction according to target index, can be realized
It supports to reduce signaling overheads while more SPSs.
Detailed description of the invention
Fig. 1 is the flow chart of Semi-static scheduling method first embodiment of the present invention;
Fig. 2 is the flow chart of Semi-static scheduling method second embodiment of the present invention;
Fig. 3 is the flow chart of Semi-static scheduling method 3rd embodiment of the present invention;
Fig. 4 is the flow chart of Semi-static scheduling method fourth embodiment of the present invention;
Fig. 5 is the flow chart of the 5th embodiment of Semi-static scheduling method of the present invention;
Fig. 6 is the flow chart of Semi-static scheduling method sixth embodiment of the present invention;
Fig. 7 is the flow chart of the 7th embodiment of Semi-static scheduling method of the present invention;
Fig. 8 is the flow chart of the 8th embodiment of Semi-static scheduling method of the present invention;
Fig. 9 is the flow chart of the 9th embodiment of Semi-static scheduling method of the present invention;
Figure 10 is the flow chart of single SPS operation example in Semi-static scheduling method of the present invention;
Figure 11 is the flow chart of group SPS operation example in Semi-static scheduling method of the present invention;
Figure 12 is the structural schematic diagram of base station first embodiment of the present invention;
Figure 13 is the structural schematic diagram of base station second embodiment of the present invention;
Figure 14 is the structural schematic diagram of base station 3rd embodiment of the present invention;
Figure 15 is the structural schematic diagram of user equipment first embodiment of the present invention;
Figure 16 is the structural schematic diagram of user equipment second embodiment of the present invention;
Figure 17 is the structural schematic diagram of user equipment 3rd embodiment of the present invention;
Figure 18 is the structural schematic diagram of user equipment fourth embodiment of the present invention.
The present invention include to " one embodiment ", " specific embodiment ", " some embodiments ", " various embodiments " or
The reference of " one embodiment ".The phrase " in one embodiment ", " In a particular embodiment ", " in some embodiments
In ", the appearance of " in various embodiments " or " in one embodiment " not necessarily refer to the same embodiment.Special characteristic, knot
Structure or characteristic can be combined with any appropriate ways consistent with the present invention.
Various modules, unit, circuit or other assemblies can be described or claimed protection be " being configured as " execute one or
Multiple tasks.In such context, " being configured as " be used for by included by indicating module/unit/circuit/component
Structure (for example, circuit) Lai Shixian structure of task is executed during operation.In this way, even if when specified module/unit/circuit/
When component current inoperable (for example, being not switched on), it may also be said to which module/unit/circuit/component is configured as execution task.
Module/unit/circuit/the component being used together with " being configured as " further includes hardware --- for example, circuit, storage it is executable with
Realize the memory etc. of the program instruction of operation.For the module/unit/circuit/component, logging modle/unit/circuit/group
Part is that the one or more task-awares of " being configured as " execution not quote 35USC § 112 (f).In addition, " being configured as " can be with
Including the universal architecture by software and/or firmware (for example, FPGA or execute general processor of software) manipulation (for example, general
Circuit), can be operated in a manner of executable inter-related task." being configured as " can also include adjustment manufacturing process (for example,
Semiconductor manufacturing facility) to manufacture the equipment (for example, integrated circuit) for being adapted for carrying out or executing one or more tasks.
As used herein, term "based" describes the one or more factors for influencing to determine.The term is not arranged
Except the other factors that may influence decision.That is, a decision may be based only on these factors, or at least partly base
In these factors.Consider phrase " A is determined based on B ".Although in this case, B is a factor for influencing the determination of A,
The determination of A is not precluded also based on C in such phrase.In other cases, A can determine based entirely on B.
Specific embodiment
In order to fully understand the present invention, many details are listed in the following description, such as system structure is special
Property, interface, technology etc., illustrate and not to the limitation present invention.However, it should be appreciated by those skilled in the art do not having
In the case where having these details, the present invention can also be carried out by other embodiments.In other cases, in order to avoid
Unnecessary details interferes description of the invention, and the detailed description to known device, circuit and method is omitted.
With reference to Fig. 1, the flow chart of Semi-static scheduling method first embodiment of the present invention is described.In the present embodiment, it holds
Row main body is base station, and the SPS discussed is uplink SPS.The base station can connect core network, and can be with multiple user equipmenies
It carries out wireless communication, to provide communication overlay for relevant 6th region.The base station can include but is not limited to macro base station, micro- base
It stands or femto base station.In various embodiments, base station is also interchangeably referred to as wireless base station, access point, node B, evolution node B
(eNodeB or eNB) etc..For ease of description, this method illustrates in order.But the part of this method can be with other
Sequence or parallel mode execute (for example, being performed simultaneously).This method may comprise steps of:
S11: sending SPS to UE and configure message, and it includes at least two SPS information that wherein the SPS, which configures message,.
Base station can send SPS to UE during UE enters after its coverage area is completed to be initially accessed or is initially accessed
Configure message.SPS configures the information in message including at least two SPS.In general, each SPS corresponds to a kind of service.Each
The SPS C-RNTI of SPS is included at least in SPS information, wherein the SPS C-RNTI of difference SPS is different.
It may further include period and the resource allocation of the SPS in each SPS information.The resource allocation may include frequency
Domain distribution and/or time domain distribution.Frequency domain distribution, which specifies UE, to use which subcarrier to upload data.Time domain distribution specifies
UE should upload data at the TTI of which in the period (Transmission Time Interval, Transmission Time Interval).It is different
The period of SPS can be the same or different, but resource allocation is different.In addition to this, it is supporting to release using RRC information transmission
It may include the release command of the SPS in the case where putting signaling, in each SPS information.The release command of different SPS is different.
S12: it sends to UE and is indexed by the scrambled control signaling of SPS C-RNTI and target.
Control signaling and target index can be separated, be also possible to integrate.For example, target index can be with
It is included in control signaling.The transmission of control signaling and target index can be by UE initiation, the i.e. request of base station in response UE
And it sends;It is also possible to base station initiation, i.e., base station is voluntarily sent.
It include the mark of at least one UE in target index, the UE in the mark and coverage area is corresponded, wherein not
It is different with the mark of UE.Mark can be the identification code of UE itself, and being also possible to base station is UE distribution.It is sent due to base station
Control signaling may be received by other UE, it is therefore desirable to the transmission target of the control signaling is indicated using target index.
By the number for adjusting UE mark in target index, thus it is possible to vary UE number for executing SPS operation, so that the control once sent
Signaling is responded by single or multiple UE.
It is to indicate which SPS is the control signaling be for using SPS C-RNTI scrambling.Include in target index
The corresponding UE of mark need to attempt to carry out the control signaling received using multiple SPS C-RNTI in the SPS information of preservation
It decodes, it is corresponding for used SPS C-RNTI is successfully decoded to can determine the SPS that the control signaling is directed to after successfully decoded
Then SPS executes corresponding operating for the SPS according to control signaling.
In general, control signaling includes activation signaling and/or release signaling, the operation that corresponding UE is executed includes activation
And/or release.UE will start to send upstream data, UE after release using the SPS resource of distribution according to the SPS period after activation
It will stop sending upstream data using the SPS resource of distribution according to the SPS period.
In an embodiment of the invention, base station can be in Physical Downlink Control Channel (Physical Downlink
Control Channel, PDCCH) on to UE send by the scrambled activation signaling of SPS C-RNTI and/or release signaling, can also
To use wireless heterogeneous networks (Radio Resource Control, RRC) message scrambled by SPS C-RNTI to UE transmission
Release signaling.Base station also can be used RRC information and directly send release command to UE, at this time should be including SPS's in SPS information
Release command, and the release command of difference SPS is different.Cyclic redundancy check can be used in the control signaling sent on PDCCH
(Cyclic Redundancy Check, CRC).
The field for including without scrambled activation signaling sent using PDCCH is as shown in table 1, the word that release signaling includes
Section is as shown in table 2.If target index is included in activation signaling, activate need to increase in signaling it is new for indicating target
The field of index.
Table 1:
Table 2:
List SPS is only supported in the prior art, therefore base station only needs to configure a SPS C-RNTI for each UE.UE is received
It only needs to attempt decoding using the SPS C-RNTI of oneself after SPS control signaling, corresponding SPS is executed if successfully decoded
Operation.If distributing different SPS C-RNTI respectively for every kind of SPS of each UE, then needing the technically simple extension of existing SPS
The SPS C-RNTIs quantity wanted is UE sum multiplied by SPS type, and quantity is excessively huge, and practicability is lower.
In the present embodiment, it includes at least two SPS information, the area SPS C-RNTI different SPS in message that SPS, which is configured,
Point, more SPSs are supported to realize.Other than by the scrambled control signaling of SPS C-RNTI, base station also sends target rope to UE
Draw, allows UE to judge whether oneself needs to be implemented control instruction according to target index, judged according to SPS C-RNTI
It which SPS should execute operation for, therefore signaling overheads can be reduced while supporting more SPSs realizing.
With reference to Fig. 2, the flow chart of Semi-static scheduling method second embodiment of the present invention is described.The present embodiment is such as to scheme
On the basis of Semi-static scheduling method first embodiment shown in 1, the transmission of control signaling and target index is initiated by UE.This reality
Apply example be Semi-static scheduling method first embodiment of the present invention is further expanded, therefore for semi-persistent scheduling of the present invention
The identical content of method first embodiment is not repeated herein.For ease of description, this method illustrates in order.But
The part of this method can execute (for example, being performed simultaneously) with other sequences or parallel mode.This method may include following step
It is rapid:
S111: sending SPS to UE and configure message, and it includes at least two SPS information that wherein the SPS, which configures message,.
S112: the operation requests for corresponding SPS from UE are received.
Operation requests include activation request and/or release request.Operation requests are in addition to indicating action type (activation/release)
Except, also it should indicate which SPS (s) be directed to.UE can send operation requests to base station according to the state of itself.
For example, UE can choose whether to enable certain service (example according to the state of itself in car networking (V2X)
Such as speed monitoring).If enabling the service, activation request is sent to activate corresponding SPS, starts periodically to upload the service
Status data (real-time speed).When the variation of UE oneself state (such as parking), it can choose and deactivate the service, sent out to base station
It send release request to discharge corresponding SPS, and stops uploading status data.
It should be noted that the transmission of release request may include dominant and recessive two types.Dominance type refers to UE
It directly transmits and releases order to base station, and recessive type refers to UE in a manner of stopping using SPS resource to send data to base station
To propose release request.It is that SPS resource indicates to be discharged by which SPS.Release request for recessive type, base station needs
UE is not received uses the read-around ratio of the data of corresponding SPS resource transmission and the size of preset threshold.When this continuous time
Number is greater than the preset threshold, then judgement has received the release request of recessive type.
S113: response operation requests send corresponding control signaling and target index to UE.
Wherein, control signaling should action type corresponding with operation requests it is consistent, and target index in should include hair
Give the mark of the UE of the operation requests.
In other embodiments, base station directly can also send control letter to UE in the case where not receiving operation requests
It enables and directory index is operated with controlling UE execution SPS, such as control UE in the case where bad channel quality and discharge SPS.
As shown in figure 3, describing the flow chart of Semi-static scheduling method 3rd embodiment of the present invention.The present embodiment is such as
On the basis of Semi-static scheduling method first embodiment shown in FIG. 1, sent control signaling in a manner of multicast or broadcast.In order to
Convenient for explanation, this method illustrates in order.But the part of this method can be executed with other sequences or parallel mode
(for example, being performed simultaneously).This method may comprise steps of:
S121: it is sent control signaling in a manner of multicast or broadcast to multiple UE and target indexes.
Due to scramble the SPS C-RNTI that uses be used to refer to show different SPS rather than different UE, can will
Same control signaling is sent to multiple UE simultaneously, to further decrease signaling overheads.Receive control signaling and target index
UE quantity can be greater than the quantity of target UE (UE for needing to execute SPS operation according to control signaling).For example, in one group of 4 UE
There are three being target UE, then base station, which can choose, is sent simultaneously to 4 UE in a manner of multicast and indexes middle finger improving eyesight with target
UE is marked, rather than is sent three times to three UE respectively.
If including that target indexes in control signaling, in a fairly large number of situation of the UE to be sent, base station be can choose
It sends several times.Preferably, adjustable transmission times with send every time target index in include mark maximum quantity,
So that sum of the two is minimum.
The present embodiment can be combined with Semi-static scheduling method second embodiment as shown in Figure 2, in conjunction with later, base station
In the case that the quantity of the operation requests received in specified duration T is greater than specified threshold (0 or positive integer), with multicast or
The mode of person's broadcast sends control signaling and target index.It should include at least the UE's for sending operation requests in target index at this time
Mark;If the quantity of the operation requests obtained is less than or equal to specified threshold, sent control signaling in a manner of unicast
And target index.For example, when blocking up, may there is multiple UE (vehicle) to send release request, base in car networking (V2X)
Multiple UE release SPS can be notified in a manner of multicast or broadcast by standing.
As shown in figure 4, describing the flow chart of Semi-static scheduling method fourth embodiment of the present invention.The present embodiment is to be based on
Semi-static scheduling method first embodiment as shown in Figure 1.For ease of description, this method illustrates in order.But it should
The part of method can execute (for example, being performed simultaneously) with other sequences or parallel mode.This method may comprise steps of:
S13: for UE assignment flag.
The execution of this step should be before step S12, can be before step S11, later or be performed simultaneously, certainly
It include the mark of distribution in the SPS configuration message that can also be sent in step s 11.
Base station can according to preset strategy, such as into the sequencing of overlay area, into overlay area when where
Position, the direction of motion etc., be UE assignment flag.
In a fairly large number of situation of UE, for that UE can be grouped convenient for management.The mark for distributing to UE at this time includes group
Mark and UE mark, wherein UE mark refers to number of the UE in group.
The present embodiment can be combined with any of the above embodiment.It should be noted that if distributing to the mark packet of UE
Group mark and UE mark are included, and base station is sent control signaling with multicast mode and indexed with target, and certain sending object, i.e., one
The group mark of UE in multicast group is identical and is target UE (such as having sent same operation requests), then in target index
Group mark can be only included and save UE mark, to further decrease signaling overheads.
As shown in figure 5, describing the flow chart of the 5th embodiment of Semi-static scheduling method of the present invention.The execution master of this method
Body is UE.UE can be fixed, and be also possible to mobile, including but not limited to mobile phone, personal digital assistant (PDA), wireless
Modem, tablet computer, laptop, wireless phone etc..For ease of description, this method is to illustrate in order
's.But the part of this method can execute (for example, being performed simultaneously) with other sequences or parallel mode.This method can be with
The following steps are included:
S21: receiving the SPS that base station is sent and configure message, and it includes at least two SPS information that wherein the SPS, which configures message,.
In general, UE receives SPS after the coverage area for entering base station configures message.UE can save SPS information with
For subsequent SPS operation and data transmission.
S22: being indexed by the scrambled control signaling of SPS C-RNTI and target for base station transmission is received.
S23: if including the mark of itself in target index, the SPS of corresponding SPS C-RNTI is directed to according to control signaling
Execute corresponding operating.
Mark can be the identification code of UE itself, and being also possible to base station is UE distribution.It include itself in target index
Mark indicates that the UE is the transmission target of this control signaling, i.e. target UE should execute corresponding operating.
The control signaling is used to indicate for which SPS using SPS C-RNTI scrambling.UE can be successively using guarantor
SPS C-RNTI trial in the SPS information deposited is decoded the control signaling received, can determine the control after successfully decoded
The SPS that signaling is directed to is that the corresponding SPS of used SPS C-RNTI is successfully decoded.
In general, control signaling is divided into activation signaling and two class of release signaling.UE includes itself in target index
Indicate and be successfully decoded in the case that two conditions of control signaling are all satisfied, can be confirmed that control signaling is activation signaling or releases
Put signaling.For example, UE carries out the control signaling of successfully decoded and Tables 1 and 2 for the control signaling for using PDCCH to send
The type to confirm control signaling is checked, then executes corresponding operating for corresponding SPS, including activate and/or discharge.Activation
UE will start to send upstream data using the SPS resource of distribution according to the SPS period later, and UE will stop according to SPS after release
Period sends upstream data using the SPS resource of distribution.
Implementation through the foregoing embodiment, it includes at least two SPS information, different SPS SPS in message that SPS, which is configured,
C-RNTI is distinguished, and supports more SPSs to realize.Other than receiving by the scrambled control signaling of SPS C-RNTI, UE is also received
Target index, allows UE to judge whether oneself needs to be implemented control instruction according to target index, according to SPS C-RNTI
Operation is executed to judge be directed to which SPS, therefore signaling overheads can be reduced while supporting more SPSs realizing.
As shown in fig. 6, describing the flow chart of Semi-static scheduling method sixth embodiment of the present invention.The present embodiment is based on such as
The 5th embodiment of Semi-static scheduling method shown in fig. 5.For ease of description, this method illustrates in order.But the party
The part of method can execute (for example, being performed simultaneously) with other sequences or parallel mode.This method can be with before step S22
The following steps are included:
S24: the operation requests for corresponding SPS are sent to base station.
UE can send operation requests to base station according to the state of itself.Operation requests include activation request and/or release
Request.Operation requests should also indicate which SPS (s) be directed to other than action type (activation/release) in addition to indicating.Generally
For, for UE after this SPS uploads end of data, the forward direction base station that next SPS uploads end of data sends release request.
It should be noted that the release request sent may include dominant and recessive two types, dominance type refers to
UE is directly transmitted to base station and is released order, and recessive type refers to UE to stop using SPS resource to the side of base station transmission data
Formula proposes release request, i.e., continuous n times stop using corresponding SPS resource to send data to base station, and N is greater than default threshold
Value, it is that SPS resource indicates to be discharged by which SPS.
Certainly in other embodiments, UE can not also send operation requests and directly receive the control signaling that base station is sent
And target index.
As shown in fig. 7, describing the flow chart of the 7th embodiment of Semi-static scheduling method of the present invention.The present embodiment is such as
On the basis of the 5th embodiment of Semi-static scheduling method shown in fig. 5, in the case where target index includes in control signaling
Judge whether to execute SPS operation, wherein part identical with the 5th embodiment of Semi-static scheduling method of the present invention is no longer superfluous herein
It states.For ease of description, this method illustrates in order.But the part of this method can be with other sequences or parallel side
Formula executes (for example, being performed simultaneously).This method may also comprise the following steps::
S211: receiving the SPS that base station is sent and configure message, and it includes at least two SPS information that wherein the SPS, which configures message,.
S212: receive base station send by the scrambled control signaling of SPS C-RNTI, wherein the control signaling includes target
Index.
S213: it attempts to be decoded control signaling using the SPS C-RNTI in SPS configuration message.
If successfully decoded, step S214 is jumped to: if decoding failure, terminates process.
S214: judge in target index whether to include itself mark.
If including jumping to step S215: if not including, terminating process.
S215: confirmation control signaling type simultaneously executes corresponding SPS operation.
In the present embodiment, first attempts decoding and read target rope in control signaling with the corresponding SPS of determination, after successfully decoded
Draw and judge whether include wherein itself mark, without confirming control signaling type if not including, to reduce UE needs
The operation of progress.Certainly in other embodiments, UE can also first confirm control signaling type, then judge target index in whether
Including the mark of itself.
As shown in figure 8, describing the flow chart of the 8th embodiment of Semi-static scheduling method of the present invention.The present embodiment is such as
It does not include the situation in control signaling in target index on the basis of the 5th embodiment of Semi-static scheduling method shown in fig. 5
Under judge whether to execute SPS operation, wherein part identical with the 5th embodiment of Semi-static scheduling method of the present invention is herein no longer
It repeats.For ease of description, this method illustrates in order.But the part of this method can be sequentially or parallel with other
Mode executes (for example, being performed simultaneously).This method may comprise steps of:
S221: receiving the SPS that base station is sent and configure message, and it includes at least two SPS information that wherein the SPS, which configures message,.
S222: being indexed by the scrambled control signaling of SPS C-RNTI and target for base station transmission is received, wherein control signaling
It does not include target index.
S223: judge in target index whether to include itself mark.
If including jumping to step S224: if not including, terminating process.
S224: control signaling is decoded using the SPS C-RNTI in SPS configuration message.
If successfully decoded, step S225 is jumped to: if decoding failure, terminates process.
S225: confirmation control signaling type simultaneously executes corresponding SPS operation.
In the present embodiment, first reads the target in control signaling and index and judge wherein whether including itself mark, if
It does not include, to reduce the operation that UE needs to carry out, reducing power consumption then without attempting decoding.Certainly in other embodiments, UE
Decoding can also be first attempted to judge in target index whether to include itself mark again.
As shown in figure 9, describing the flow chart of the 9th embodiment of Semi-static scheduling method of the present invention.The present embodiment is to be based on
The 5th embodiment of Semi-static scheduling method as shown in Figure 5.For ease of description, this method illustrates in order.But it should
The part of method can execute (for example, being performed simultaneously) with other sequences or parallel mode.This method can also include step S22
Following steps before:
S25: the mark of base station distribution is received.
The execution of this step should before step S22, either can before step S21, later or be performed simultaneously,
And mark also may include in the SPS configuration message sent in the step s 21.
According to target index in UE number, activation/release of SPS can be divided into monomer activation/release and group swashs
Work/release, group's activation/release need base station to send control signaling with multicast or broadcast mode and target index, but base station
It is sent control signaling with multicast or broadcast mode and target indexes not necessarily group's activation/release, it is also possible to which monomer swashs
Work/release.It illustrates respectively with reference to the accompanying drawing.
As shown in Figure 10, the flow chart of single SPS operational instances in Semi-static scheduling method of the present invention is described.Base station point
It Kong Zhi not the single SPS operation of UE1 and UE2 progress.For ease of description, this method illustrates in order.But this method
Part can execute (for example, being performed simultaneously) with other sequences or parallel mode.This method may comprise steps of:
S301: base station sends SPS to UE1 and UE2 respectively and configures message.
Issuing in the SPS configuration message of UE1 includes at least two SPS information (including SPS C-RNTI, period and resource)
And the mark 1 for UE1 distribution, and issuing in the SPS configuration message of UE2 includes at least two SPS information (including SPS C-
RNTI, period and resource) and for UE2 distribution mark 2.
S302:UE1 sends the activation request for SPS 1 to base station.
S303: base station sends PDCCH to UE1 and UE2 by CRC with multicast mode and activates signaling, and the activation signaling is by SPS
C-RNTI 1 is scrambled and including mark 1.
S304:UE1 activates SPS 1 after PDCCH activation signaling is successfully decoded using SPS C-RNTI 1.
S305:UE2 does not activate SPS 1 after PDCCH activation signaling is successfully decoded using SPS C-RNTI 1.
S306:UE1 starts to upload data using SPS resource 1 according to the SPS period 1.
S307: base station is determined as UE2 activation SPS2.
S308: base station by CRC to UE2 send PDCCH activate signaling, the activation signaling by SPS C-RNTI 2 scramble and
Including mark 2.
S309:UE2 activates SPS 2 after PDCCH activation signaling is successfully decoded using SPS C-RNTI 2.
S310:UE2 starts to upload data using SPS resource 2 according to the SPS period 2
S311: base station is determined as UE1 release SPS1.
S312: base station by CRC to UE1 send PDCCH release signaling, the release signaling by SPS C-RNTI 1 scramble and
Including mark 1.
S313:UE1 discharges SPS 1 and its resource 1 after the PDCCH release signaling is successfully decoded using SPS C-RNTI 1,
And stop uploading.
S314:UE2 sends the activation request (dominant or recessive) for SPS 2 to base station.
S315: base station by CRC to UE2 send PDCCH release signaling, the release signaling by SPS C-RNTI 2 scramble and
Including mark 2.
S316:UE2 discharges SPS 2 and its resource 2 after the PDCCH release signaling is successfully decoded using SPS C-RNTI 2,
And stop uploading.
It should be noted that left-half (interaction between base station and UE1) and right half part in figure (base station and UE2 it
Between interaction) other than step S303 multicast is sent, precedence relationship between other steps is only to illustrate.
As shown in figure 11, the flow chart of group SPS operational instances in Semi-static scheduling method of the present invention is described.Base station is same
When control UE1 and UE2 carry out group SPS operation.For ease of description, this method illustrates in order.But this method
Part can execute (for example, being performed simultaneously) with other sequences or parallel mode.This method may comprise steps of:
S401: base station sends SPS to UE1 and UE2 respectively and configures message.
Issuing in the SPS configuration message of UE1 includes at least two SPS information (including SPS C-RNTI, period and resource)
And the mark 1 for UE1 distribution, and issuing in the SPS configuration message of UE2 includes at least two SPS information (including SPS C-
RNTI, period and resource) and for UE2 distribution mark 2.
S402:UE1 sends the activation request for SPS 1 to base station.
S403:UE2 sends the activation request for SPS 1 to base station.
Time interval between step S402 and S403 is less than specified duration T, and the specified threshold of operation requests quantity
It is 1.
S404: base station sends PDCCH to UE1 and UE2 by CRC with multicast mode and activates signaling, and the activation signaling is by SPS
C-RNTI 1 is scrambled and including mark 1 and mark 2.
S405:UE1 activates SPS 1 after PDCCH activation signaling is successfully decoded using SPS C-RNTI 1.
S406:UE1 starts to upload data using SPS resource 1 according to the SPS period 1.
S407:UE2 activates SPS 1 after PDCCH activation signaling is successfully decoded using SPS C-RNTI 1.
S408:UE2 starts to upload data using SPS resource 1 according to the SPS period 1.
S409: base station is determined as UE1 and UE2 release SPS1.
S410: base station sends PDCCH release signaling to UE1 and UE2 by CRC with multicast mode, and the release signaling is by SPS
C-RNTI 1 is scrambled and including mark 1 and mark 2.
S411:UE1 discharges SPS 1 and its resource 1 after the PDCCH release signaling is successfully decoded using SPS C-RNTI 1,
And stop uploading.
S412:UE2 discharges SPS 1 and its resource 1 after the PDCCH release signaling is successfully decoded using SPS C-RNTI 1,
And stop uploading.
As shown in figure 12, the structural schematic diagram of base station first embodiment of the present invention is described.Base station includes the first transmission mould
Block 11 and the second sending module 12.
First sending module 11, which is used to send SPS to UE, configures message.It includes at least two SPS in message that the SPS, which is configured,
Information includes at least the SPS C-RNTI (radio network temporary identifier) of SPS in each SPS information.
Second sending module 12 is used to send to UE and be indexed by the scrambled control signaling of SPS C-RNTI and target.Target rope
It include the mark of at least one UE in drawing, so that the corresponding UE of the mark is directed to corresponding SPS C-RNTI's according to control signaling
SPS executes corresponding operating.
Specifically, the second sending module 12 is used to send control signaling corresponding with SPS operation requests to UE, with response
Operation requests from UE, wherein operation requests include at least activation request or release request.
Specifically, second of sending module 12 is used to not receive the continuous of the data that UE uses corresponding SPS resource to send
When number is greater than preset threshold, control signaling corresponding with release request is sent to UE.
Specifically, the second sending module 12 in a manner of multicast or broadcast to multiple UE for being sent control signaling.
Refering to fig. 13, describe the structural schematic diagram of base station second embodiment of the present invention.The present embodiment is in base station first
It further comprise for the distribution module 13 for UE allocation identification on the basis of embodiment.
Refering to fig. 14, describe the structural schematic diagram of base station 3rd embodiment of the present invention.Base station may include processor 110
With the transceiver 120 for being coupled to processor 110 by bus.
Transceiver 120 is for sending and receiving data, and the interface as base station and other communication apparatus communications.
Processor 110 can control the operation of base station, be referred to as central processing unit (Central Processing
Unit, CPU).Processor 110 can be the IC chip with signal handling capacity, such as general processor, digital signal
Processor (Digital Signal Processor, DSP), application specific integrated circuit (Application Specific
Integrated Circuit, ASIC), field programmable gate array (Field Programmable Gate Array, FPGA)
Or any other programmable logic device, discrete gate, transistor logic or discrete hardware elements.General processor can be
Microprocessor or any conventional processors.
Base station can also include the memory (not shown) that required order and data are operated for storage processor 110.
Memory can also store the data that transceiver 120 receives.
Processor 110 is used to configure message to the SPS that UE sends SPS by transceiver 120, wherein SPS configuration information packet
At least two SPS information are included, the information of each SPS includes at least SPS C-RNTI;Control letter is sent to UE by transceiver 120
It enables and is indexed by the scrambled target of SPS C-RNTI, target index includes at least the mark of UE, so as to corresponding with the mark
UE executes operation according to the SPS that control signaling is directed to corresponding SPS C-RNTI.
Specifically, processor 110 can be used for sending on PDCCH to UE by transceiver 120 and be added by SPS C-RNTI
The activation signaling disturbed;And/or it sends on PDCCH or using RRC information to UE by the scrambled release signaling of SPS C-RNTI.
Specifically, processor 110 can be used in response to UE send operation requests and by transceiver 120 to UE send with
The corresponding control signaling of the operation requests of SPS, wherein the operation requests include activation request and/or release request.
Specifically, processor 110 can be used for not receiving the read-around ratio for the data that UE is sent using corresponding SPS resource
When greater than preset threshold, corresponding control signaling is sent to UE by transceiver 120.
Specifically, processor 110 can be used for sending in a manner of multicast or broadcast to multiple UE transceiver 120
Control signaling.
Specifically, processor 110 can be further used for receiving the operation requests from UE by transceiver 120, wherein
The quantity of the received operation requests from UE is greater than specified threshold in specified duration.
Specifically, in control signaling include target index, processor 110 can be used for by transceiver 120 several times with
The mode of multicast at least sends control signaling to the UE for sending operation requests, and the mark for including in transmission times and target index
The sum of maximum quantity minimum.
Specifically, control signaling includes target index.
Specifically, processor 110 can be further used for through transceiver 120 being UE assignment flag.
Specifically, which includes group mark and UE mark.
Specifically, when processor 110 is used to respond the operation requests of UE, transceiver 120 in a manner of multicast at least
When sending control signaling to the UE for sending the operation requests, if the group mark of sending object is identical and has sent operation requests,
The mark for then including in target index is group mark.
Specifically, SPS information further comprises period and the resource allocation of SPS.
Specifically, SPS information further comprises the release command of SPS.
The function of various components or module for the base station of the present embodiment can refer to the correlation of correlation method embodiment
Illustrate, is no longer described in detail herein.
Refering to fig. 15, describe the structural schematic diagram of UE first embodiment of the present invention.UE may include the first receiving module
21, the second receiving module 22 and execution module 23.
First receiving module 21 is used to receive the SPS configuration message of base station transmission.It includes at least two in message that the SPS, which is configured,
A SPS information includes at least the SPS C-RNTI of SPS in each SPS information.
Second receiving module 22 is used to receive being indexed by the scrambled control signaling of SPS C-RNTI and target for base station transmission.
Execution module 23 be used for target index in include UE itself mark in the case where, according to control signaling for pair
The SPS of SPS C-RNTI is answered to execute corresponding operating, which includes activation and/or release.
Specifically, the second receiving module 22 is used to receive on PDCCH by the scrambled activation signaling of SPS C-RNTI;With/
Or it receives on PDCCH or using RRC information by the scrambled release signaling of SPS C-RNTI.
Refering to fig. 16, describe the structural schematic diagram of UE second embodiment of the present invention.The present embodiment is implemented in UE first
It further comprise decoder module 24 and judgment module 25 on the basis of example.
Control signaling includes target index.Decoder module 24 is used to attempt using the SPS C-RNTI in SPS configuration message
Control signaling is decoded.Judgment module 25 is used to judge in target index whether including itself mark.
Refering to fig. 17, describe the structural schematic diagram of UE 3rd embodiment of the present invention.The present embodiment is implemented in UE first
It further comprise judgment module 26 and decoder module 27 on the basis of example.
Control signaling does not include target index.Judgment module 26 is used to judge in target index whether including itself mark
Will.In the case that decoder module 27 is used in target index including the mark of itself, the SPS C- in SPS configuration message is used
RNTI is decoded control signaling.
Refering to fig. 18, describe the structural schematic diagram of UE fourth embodiment of the present invention.UE includes processor 210 and passes through total
Line is coupled to the telecommunication circuit 220 of processor 210.
Telecommunication circuit 220 is for sending and receiving data, and the interface as UE and other communication apparatus communications.
Processor 210 can control the operation of UE, be referred to as CPU.Processor 210 can be with signal processing energy
The IC chip of power.The processor 210 is also possible to general processor, DSP, ASIC, FPGA or any other is programmable
Logical device, discrete gate, transistor logic or discrete hardware elements.General processor can be microprocessor or any normal
Advise processor.
UE, which may further include, to be operated the memories of required order and data for storage processor 210 and (does not show
Show).Memory can also store the data that telecommunication circuit 220 receives.
Processor 210 can be used for receiving the SPS that base station is sent by telecommunication circuit 220 and configure message, and wherein the SPS matches
Setting includes at least two SPS information in message, and the SPS C-RNTI of SPS is included at least in each SPS information;Pass through telecommunication circuit
220 receive being indexed by the scrambled control signaling of SPS C-RNTI and target for base station transmission;If including UE itself in target index
Mark, then execute corresponding operating according to the SPS that control signaling is directed to corresponding SPS C-RNTI, the operation include activation and/or
Release.
Specifically, processor 210 is used to receive on PDCCH by telecommunication circuit 220 is swashed by SPS C-RNTI is scrambled
Signaling living;And/or it receives on PDCCH or using RRC information by the scrambled release signaling of SPS C-RNTI.
Specifically, processor 210 is used to send to base station for the operation requests for corresponding to SPS by telecommunication circuit 220, should
Operation requests include activation request and/or release request.
Specifically, processor 210 is used to send the operation requests for corresponding SPS to base station by telecommunication circuit 220.
Specifically, processor 210 stops using corresponding SPS resource to send data to base station for continuous n times, wherein N
Greater than preset threshold.
Specifically, control signaling includes target index, and processor 210 is further used for attempting using in SPS configuration message
SPS C-RNTI control signaling is decoded, if successfully decoded, judge in target index whether to include itself mark.
Specifically, control signaling does not include target index, and processor 210 is further used for judging whether wrap in target index
The mark of itself is included, if in target index including the mark of itself, using the SPS C-RNTI in SPS configuration message to control
Signaling is decoded.
Specifically, processor 210 is further used for receiving the mark of base station distribution by telecommunication circuit 220.
Specifically, which includes group mark and UE mark.
The function of various assemblies or module for the UE of the present embodiment, can mutually speaking on somebody's behalf with reference to correlation method embodiment
It is bright, it is no longer described in detail herein.
It should be understood that base station disclosed in this invention, UE and method can also be realized otherwise.As described above
Base station and UE are merely illustrative, for example, the division of module or unit is based only upon logic function, therefore in practical implementations may be used
There are other division methods for energy, for example, multiple units or components can combine or be integrated into another system or certain spies
Sign can be ignored or not execute.In addition, display or discuss intercouple, direct-coupling or communication connection can be by some
Interface, equipment or unit are realized, and can be realized with electricity, mechanical or other forms.
Described separative unit can be physically separated, and can not also be separated.The component for being shown as unit can be
It can not be physical unit, may reside within a position, may be distributed over multiple networking units.Part or all of unit can
Selectivity uses according to actual needs, to reach disclosed purpose.
In addition, the various functional units discussed in the present invention are desirably integrated into a processing unit, can also be used as each
Kind physical separation unit indicates that two or more units are desirably integrated into a unit.Integrated unit can be by hardware or software
Functional unit is realized.
If integrated unit is implemented as SFU software functional unit and is sold or used as stand-alone product, they
It may be stored in a computer readable storage medium.Based on this understanding, Substantial technical solution of the invention or
All or part of technical solution can be presented as software product.Computer software product can store in storage medium,
It and may include multiple instruction, so that calculating equipment (for example, personal computer, server, network equipment etc.) or processor
It is able to carry out all or part of method described in the present invention.Storage medium may include can store program code various
Medium, such as USB flash drive, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory
(Random Access Memory, RAM), disk or CD.
Foregoing description only describes some exemplary embodiments of the invention, but is not intended to limit model of the invention
It encloses.To any equivalent structure for making of the present invention or process conversion or the present invention other related fieldss it is any directly or
Use is scooped out, it should all be in the scope of the present invention.
Claims (53)
1. a kind of Semi-static scheduling method characterized by comprising
Semi-persistent scheduling is sent to user equipment and configures message, includes at least two half quiet in the semi-persistent scheduling configuration message
State scheduling information, the semi-persistent scheduling wireless network that semi-persistent scheduling is included at least in each semi-persistent scheduling information are interim
Mark;
It sends to the user equipment by the scrambled control signaling of the semi-persistent scheduling radio network temporary identifier and target rope
Draw, include the mark of at least one user equipment in target index so that the corresponding user equipment of the mark according to
The control signaling executes corresponding operating for the semi-persistent scheduling of the corresponding semi-persistent scheduling radio network temporary identifier.
2. the method according to claim 1, wherein
It is described to include: by the scrambled control signaling of semi-persistent scheduling radio network temporary identifier to user equipment transmission
It sends on Physical Downlink Control Channel to the user equipment and is added by the semi-persistent scheduling radio network temporary identifier
The activation signaling disturbed;And/or
It sends on the Physical Downlink Control Channel or using radio resource control information to the user equipment by described
The scrambled release signaling of semi-persistent scheduling radio network temporary identifier.
3. the method according to claim 1, wherein
It is described to include: by the scrambled control signaling of semi-persistent scheduling radio network temporary identifier to user equipment transmission
It responds the operation requests for corresponding semi-persistent scheduling that the user equipment is sent and is sent pair to the user equipment
The control signaling answered, the operation requests include activation request and/or release request.
4. according to the method described in claim 3, it is characterized in that,
The release for corresponding semi-persistent scheduling that the response user equipment is sent is requested and is sent out to the user equipment
The corresponding control signaling is sent to include:
The read-around ratio for not receiving the data that the user equipment is sent using corresponding semi-static scheduling resources is greater than default threshold
When value, Xiang Suoshu user equipment sends the control signaling of the corresponding release request.
5. the method according to claim 1, wherein
It is described to include: by the scrambled control signaling of semi-persistent scheduling radio network temporary identifier to user equipment transmission
The control signaling is sent to multiple user equipmenies in a manner of multicast or broadcast.
6. according to the method described in claim 5, it is characterized in that,
It is described to further comprise before to multiple user equipmenies transmissions control signaling in a manner of multicast or broadcast:
The operation requests from the user equipment are received, wherein from the behaviour of the user equipment in specified duration
Make the quantity requested and is greater than specified threshold.
7. according to the method described in claim 6, it is characterized in that,
It include that the target indexes in the control signaling;
It is described to include: to multiple user equipmenies transmissions control signaling in a manner of multicast
The control signaling at least is sent to the user equipment for sending the operation requests in a manner of multicast several times, wherein sending out
Send the sum of maximum quantity of the mark for including in the number of the control signaling and target index minimum.
8. method according to claim 1 to 6, which is characterized in that
The target index is included in the control signaling.
9. method according to any one of claims 1-7, which is characterized in that
It is described to send to the user equipment by the scrambled control signaling of the semi-persistent scheduling radio network temporary identifier and mesh
Further comprise before mark index:
For the user equipment assignment flag.
10. according to the method described in claim 9, it is characterized in that,
The mark includes group mark and user equipment mark.
11. according to the method described in claim 10, it is characterized in that,
When the operation requests that response user equipment is sent in a manner of multicast at least to the user equipment for sending the operation requests
When sending the control signaling, if the group mark of sending object is identical and has sent the operation requests, the target rope
The mark for including in drawing is the group mark.
12. method according to any one of claims 1-7, which is characterized in that
The semi-persistent scheduling information further comprises period and the resource allocation of the semi-persistent scheduling.
13. according to the method for claim 12, which is characterized in that
The semi-persistent scheduling information further comprises the release command of the semi-persistent scheduling.
14. a kind of Semi-static scheduling method characterized by comprising
It receives the semi-persistent scheduling that base station is sent and configures message, include at least two half quiet in the semi-persistent scheduling configuration message
State scheduling information, the semi-persistent scheduling wireless network that semi-persistent scheduling is included at least in each semi-persistent scheduling information are interim
Mark;
Receive that the base station sends by the scrambled control signaling of the semi-persistent scheduling radio network temporary identifier and target rope
Draw;
If in target index including the mark of itself, according to the control signaling for the corresponding semi-persistent scheduling without
The semi-persistent scheduling of line Network Temporary Identifier executes corresponding operating, and the operation includes activation and/or release.
15. according to the method for claim 14, which is characterized in that
It is described receive that the base station sends include: by the scrambled control signaling of semi-persistent scheduling radio network temporary identifier
It receives on Physical Downlink Control Channel by the scrambled activation signaling of the semi-persistent scheduling radio network temporary identifier;
And/or
It receives on Physical Downlink Control Channel or using radio resource control information by the semi-persistent scheduling wireless network
The scrambled release signaling of temporary identifier.
16. according to the method for claim 14, which is characterized in that
It is described receive that the base station sends by the scrambled control signaling of the semi-persistent scheduling radio network temporary identifier and mesh
Further comprise before mark index:
Send the operation requests for corresponding semi-persistent scheduling to the base station, the operation requests include activation request and/or
Release request.
17. according to the method for claim 16, which is characterized in that
It is described to include: for the release request for corresponding to semi-persistent scheduling to base station transmission
The operation requests of corresponding semi-persistent scheduling are sent to the base station.
18. according to the method for claim 16, which is characterized in that
It is described to include: for the release request for corresponding to semi-persistent scheduling to base station transmission
Continuous n times stop using corresponding semi-static scheduling resources to send data to the base station, wherein the N is greater than default threshold
Value.
19. method described in any one of 4-18 according to claim 1, which is characterized in that
The target index is included in the control signaling;
It is described receive that the base station sends by the scrambled control signaling of the semi-persistent scheduling radio network temporary identifier and mesh
Further comprise after mark index:
It attempts to believe the control using the semi-persistent scheduling radio network temporary identifier in semi-persistent scheduling configuration message
Order is decoded;
If successfully decoded, judge in target index whether to include itself mark.
20. method described in any one of 4-18 according to claim 1, which is characterized in that
The target index is not included in the control signaling;
It is described receive that the base station sends by the scrambled control signaling of the semi-persistent scheduling radio network temporary identifier and mesh
Further comprise after mark index:
Judge in target index whether to include itself mark;
If the mark of itself described in including in the target index, using semi-static in semi-persistent scheduling configuration message
Scheduling radio network temporary identifier is decoded the control signaling.
21. method described in any one of 4-18 according to claim 1, which is characterized in that
It is described receive that the base station sends by the scrambled control signaling of the semi-persistent scheduling radio network temporary identifier and mesh
Further comprise before mark index:
Receive the mark of the base station distribution.
22. according to the method for claim 21, which is characterized in that
The mark includes group mark and user equipment mark.
23. a kind of base station characterized by comprising
First sending module configures message for sending semi-persistent scheduling to user equipment, and the semi-persistent scheduling configures message
In include at least two semi-persistent scheduling information, half that semi-persistent scheduling is included at least in each semi-persistent scheduling information is quiet
State dispatches radio network temporary identifier;
Second sending module, it is scrambled by the semi-persistent scheduling radio network temporary identifier for being sent to the user equipment
Control signaling and target index, and include the mark of at least one user equipment in the target index, so that the mark pair
The user equipment answered is according to the control signaling for the semi-static tune of the corresponding semi-persistent scheduling radio network temporary identifier
Degree executes corresponding operating.
24. base station according to claim 23, which is characterized in that
Second sending module be used to respond the operation requests for corresponding semi-persistent scheduling that the user equipment is sent and
The corresponding control signaling is sent to the user equipment, the operation requests include activation request and/or release request.
25. base station according to claim 24, which is characterized in that
Second sending module is not for receiving the data that the user equipment is sent using corresponding semi-static scheduling resources
Read-around ratio when being greater than preset threshold, Xiang Suoshu user equipment sends corresponding with the release request control signaling.
26. base station according to claim 23, which is characterized in that
Second sending module is used to send the control letter to multiple user equipmenies in a manner of multicast or broadcast
It enables.
27. the base station according to any one of claim 23-26, which is characterized in that further comprise:
Distribution module, for being the user equipment assignment flag.
28. a kind of user equipment characterized by comprising
First receiving module, the semi-persistent scheduling for receiving base station transmission configure message, and the semi-persistent scheduling configures message
In include at least two semi-persistent scheduling information, half that semi-persistent scheduling is included at least in each semi-persistent scheduling information is quiet
State dispatches radio network temporary identifier;
Second receiving module, for receiving the scrambled by the semi-persistent scheduling radio network temporary identifier of the base station transmission
Control signaling and target index;
Execution module, in the case where for including the mark of the user equipment itself in target index, according to described
Control signaling executes corresponding operating, the behaviour for the semi-persistent scheduling of the corresponding semi-persistent scheduling radio network temporary identifier
Make to include activation and/or release.
29. user equipment according to claim 28, which is characterized in that
Second receiving module is used to receive on Physical Downlink Control Channel interim by the semi-persistent scheduling wireless network
Identify scrambled activation signaling;And/or it receives on Physical Downlink Control Channel or using radio resource control information by institute
State the scrambled release signaling of semi-persistent scheduling radio network temporary identifier.
30. the user equipment according to claim 28 or 29, which is characterized in that the target index is included in the control
In signaling;
The user equipment further comprises:
Decoder module, for attempting using the semi-persistent scheduling radio network temporary identifier in semi-persistent scheduling configuration message
The control signaling is decoded;
Judgment module, for judge in target index whether include the user equipment itself mark.
31. the user equipment according to claim 28 or 29, which is characterized in that the target index is included in the control
In signaling;
The user equipment further comprises:
Judgment module, for judge in target index whether include the user equipment itself mark;
Decoder module, in the case where for including the mark of the user equipment itself in target index, using described
Semi-persistent scheduling radio network temporary identifier in semi-persistent scheduling configuration message is decoded the control signaling.
32. a kind of base station characterized by comprising processor and the transceiver for being connected to the processor;
The processor, which is used to send semi-persistent scheduling to user equipment by the transceiver, configures message, the semi-static tune
Include at least two semi-persistent scheduling information in degree configuration message, is included at least in each semi-persistent scheduling information semi-static
The semi-persistent scheduling radio network temporary identifier of scheduling;It is sent to the user equipment by described semi-static by the transceiver
The scrambled control signaling of radio network temporary identifier and target index are dispatched, includes that at least one user sets in the target index
Standby mark so that the corresponding user equipment of the mark according to the control signaling for the corresponding semi-persistent scheduling without
The semi-persistent scheduling of line Network Temporary Identifier executes corresponding operating.
33. base station according to claim 32, which is characterized in that
The processor is used to send to the user equipment by described on Physical Downlink Control Channel by the transceiver
The scrambled activation signaling of semi-persistent scheduling radio network temporary identifier;And/or on Physical Downlink Control Channel or use nothing
Line Resource Control Message is sent to the user equipment to be believed by the scrambled release of the semi-persistent scheduling radio network temporary identifier
It enables.
34. base station according to claim 32, which is characterized in that
The processor is used to respond the operation requests for corresponding semi-persistent scheduling that the user equipment is sent and passes through institute
It states transceiver and sends the control signaling corresponding with the operation requests to the user equipment, the operation requests include swashing
Request and/or release request living.
35. base station according to claim 34, which is characterized in that
The processor is used to not receive the continuous of the data that the user equipment is sent using corresponding semi-static scheduling resources
When number is greater than preset threshold, the corresponding control signaling is sent to the user equipment by the transceiver.
36. base station according to claim 32, which is characterized in that
The processor is used to send institute to multiple user equipmenies in a manner of multicast or broadcast the transceiver
State control signaling.
37. base station according to claim 36, which is characterized in that
The processor is further used for receiving the respective operations request that the user equipment is sent by the transceiver, wherein
The quantity of the operation requests in specified duration from the user equipment is greater than specified threshold.
38. the base station according to claim 37, which is characterized in that
It include that the target indexes in the control signaling;The processor is used for through the transceiver several times with multicast
Mode at least sends the control signaling to the user equipment for sending the operation requests, and sends the number of the control signaling
It is minimum with the sum of the maximum quantity of the mark that includes in target index.
39. the base station according to any one of claim 32-37, which is characterized in that
The target index is included in the control signaling.
40. the base station according to any one of claim 32-38, which is characterized in that
The processor is further used for through the transceiver being the user equipment assignment flag.
41. base station according to claim 40, which is characterized in that
The mark includes group mark and user equipment mark.
42. base station according to claim 41, which is characterized in that
The processor be used to respond the operation requests of user equipment the transceiver in a manner of multicast at least to transmission
When the user equipment of the operation requests sends the control signaling, if the group mark of sending object is identical and has sent described
Operation requests, then the mark for including in the target index is the group mark.
43. the base station according to any one of claim 32-38, which is characterized in that
The semi-persistent scheduling information further comprises period and the resource allocation of the semi-persistent scheduling.
44. base station according to claim 43, which is characterized in that
The semi-persistent scheduling information further comprises the release command of the semi-persistent scheduling.
45. a kind of user equipment characterized by comprising processor and the telecommunication circuit for being connected to the processor;
The processor, which is used to receive the semi-persistent scheduling that base station is sent by the telecommunication circuit, configures message, described semi-static
It include at least two semi-persistent scheduling information in scheduling configuration message, it is quiet to include at least half in each semi-persistent scheduling information
The semi-persistent scheduling radio network temporary identifier of state scheduling;By the telecommunication circuit receive that the base station sends by described half
The scrambled control signaling of static scheduling radio network temporary identifier and target index;If including the user in the target index
The mark of equipment itself, then it is quiet for correspond to the semi-persistent scheduling radio network temporary identifier half according to the control signaling
State scheduling executes corresponding operating, and the operation includes activation and/or release.
46. user equipment according to claim 45, which is characterized in that
The processor for received on Physical Downlink Control Channel by the telecommunication circuit by the semi-persistent scheduling without
The scrambled activation signaling of line Network Temporary Identifier;And/or disappear on Physical Downlink Control Channel or using wireless heterogeneous networks
Breath is received by the scrambled release signaling of semi-persistent scheduling radio network temporary identifier.
47. user equipment according to claim 45, which is characterized in that
The processor is further used for sending the behaviour for corresponding semi-persistent scheduling to the base station by the telecommunication circuit
It requests, the operation requests include activation request and/or release request.
48. user equipment according to claim 47, which is characterized in that
The processor is used to send the operation requests for corresponding semi-persistent scheduling to the base station by the telecommunication circuit.
49. user equipment according to claim 47, which is characterized in that
The processor stops using corresponding semi-static scheduling resources to send data to the base station for continuous n times, wherein
The N is greater than preset threshold.
50. the user equipment according to any one of claim 45-49, which is characterized in that
The target index is included in the control signaling;The processor is further used for attempting to use the semi-static tune
Semi-persistent scheduling radio network temporary identifier in degree configuration message is decoded the control signaling;If successfully decoded,
Judge in target index whether to include itself mark.
51. the user equipment according to any one of claim 45-49, which is characterized in that
The target index is not included in the control signaling;The processor is further used for judging in the target index
It whether include itself mark;If the mark of itself, is matched using the semi-persistent scheduling described in including in the target index
The semi-persistent scheduling radio network temporary identifier set in message is decoded the control signaling.
52. the user equipment according to any one of claim 45-49, which is characterized in that
The processor is further used for receiving the mark of base station distribution by the telecommunication circuit.
53. user equipment according to claim 51, which is characterized in that
The mark includes group mark and user equipment mark.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2017/070160 WO2018126359A1 (en) | 2017-01-04 | 2017-01-04 | Method, base station, and user equipment for semi-persistent scheduling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109417791A true CN109417791A (en) | 2019-03-01 |
CN109417791B CN109417791B (en) | 2023-11-10 |
Family
ID=62788923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201780021810.7A Active CN109417791B (en) | 2017-01-04 | 2017-01-04 | Semi-static scheduling method, base station and user equipment |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN109417791B (en) |
WO (1) | WO2018126359A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112153672A (en) * | 2019-06-29 | 2020-12-29 | 华为技术有限公司 | Resource allocation method and device |
WO2023011322A1 (en) * | 2021-08-04 | 2023-02-09 | 中国移动通信有限公司研究院 | Scheduling method and apparatus, related devices, and storage medium |
WO2023165247A1 (en) * | 2022-03-01 | 2023-09-07 | 荣耀终端有限公司 | Semi-persistent scheduling method, user equipment, base station and communication system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2159949A2 (en) * | 2008-08-27 | 2010-03-03 | Innovative Sonic Limited | Method and apparatus for handling HARQ process of semi-persistent scheduling |
CN101800991A (en) * | 2009-02-06 | 2010-08-11 | 大唐移动通信设备有限公司 | Method, system and device for data transmission |
CN102158973A (en) * | 2010-02-11 | 2011-08-17 | 电信科学技术研究院 | Method, system and equipment for semi-duration dispatching, transmitting and processing |
CN102595600A (en) * | 2011-01-17 | 2012-07-18 | 华为技术有限公司 | Semi-static scheduling method, user equipment and network device |
CN103166737A (en) * | 2011-12-16 | 2013-06-19 | 鼎桥通信技术有限公司 | Group service scrambling method, descrambling method, base station and user equipment |
WO2016176965A1 (en) * | 2015-05-05 | 2016-11-10 | 中兴通讯股份有限公司 | Method and device for resource allocation |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104469747B (en) * | 2013-09-23 | 2018-06-26 | 普天信息技术有限公司 | Receive the method and terminal of downlink data |
US10123224B2 (en) * | 2013-10-04 | 2018-11-06 | Qualcomm Incorporated | Defense against false detection of semi-persistent scheduling (SPS) activation or release |
-
2017
- 2017-01-04 WO PCT/CN2017/070160 patent/WO2018126359A1/en active Application Filing
- 2017-01-04 CN CN201780021810.7A patent/CN109417791B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2159949A2 (en) * | 2008-08-27 | 2010-03-03 | Innovative Sonic Limited | Method and apparatus for handling HARQ process of semi-persistent scheduling |
CN101800991A (en) * | 2009-02-06 | 2010-08-11 | 大唐移动通信设备有限公司 | Method, system and device for data transmission |
CN102158973A (en) * | 2010-02-11 | 2011-08-17 | 电信科学技术研究院 | Method, system and equipment for semi-duration dispatching, transmitting and processing |
CN102595600A (en) * | 2011-01-17 | 2012-07-18 | 华为技术有限公司 | Semi-static scheduling method, user equipment and network device |
CN103166737A (en) * | 2011-12-16 | 2013-06-19 | 鼎桥通信技术有限公司 | Group service scrambling method, descrambling method, base station and user equipment |
WO2016176965A1 (en) * | 2015-05-05 | 2016-11-10 | 中兴通讯股份有限公司 | Method and device for resource allocation |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112153672A (en) * | 2019-06-29 | 2020-12-29 | 华为技术有限公司 | Resource allocation method and device |
WO2021000840A1 (en) * | 2019-06-29 | 2021-01-07 | 华为技术有限公司 | Resource configuration method and apparatus |
CN112153672B (en) * | 2019-06-29 | 2022-06-10 | 华为技术有限公司 | Resource allocation method and device |
WO2023011322A1 (en) * | 2021-08-04 | 2023-02-09 | 中国移动通信有限公司研究院 | Scheduling method and apparatus, related devices, and storage medium |
WO2023165247A1 (en) * | 2022-03-01 | 2023-09-07 | 荣耀终端有限公司 | Semi-persistent scheduling method, user equipment, base station and communication system |
Also Published As
Publication number | Publication date |
---|---|
CN109417791B (en) | 2023-11-10 |
WO2018126359A1 (en) | 2018-07-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113785612B (en) | Method and apparatus for measuring and reporting channel state in side link communication | |
US10425915B2 (en) | Resource pool access for device to device communications | |
CN109495974B (en) | Information transferring method and device | |
CN108633050B (en) | Random access method, terminal and base station | |
CN114342307A (en) | Resource selection method and device for side link transmission | |
CN109392175A (en) | The sending method of scheduling request, the processing method of scheduling request and relevant device | |
CN110581754B (en) | Method, equipment and device for sending and receiving request signal | |
WO2017193976A1 (en) | Resource allocation method and device, and base station | |
WO2018141244A1 (en) | Resource scheduling method, device and system | |
WO2021159856A1 (en) | Method for performing communication on basis of ue capability, and ue and network side device | |
CN110225585A (en) | Wireless communications method, wireless telecom equipment and processor readable storage medium | |
WO2015081844A1 (en) | Downlink control channel processing method, apparatus and system | |
KR20170089847A (en) | Prioritized rts-cts resources | |
WO2018028537A1 (en) | Access control method, device and system | |
WO2014032497A1 (en) | Group scheduling method and device | |
JP2023514297A (en) | Information transmission method and information transmission device, related equipment, and storage medium | |
CN109417791A (en) | Semi-static scheduling method, base station and user equipment | |
CN110913485A (en) | Resource allocation method, resource competition method and related device | |
CN113692060B (en) | Method for configuring and updating random access resources in multi-antenna MIMO scene | |
CN107743315A (en) | Method and apparatus for the transmission based on competition | |
WO2016168967A1 (en) | Method and device for component carrier group configuration | |
CN107787013B (en) | Scheduling request transmission method, user equipment and base station | |
CN107113792A (en) | A kind of sending method of control information, detection method, base station and user equipment | |
CN113647163B (en) | Communication method and device | |
WO2020151350A1 (en) | Resource reservation method and related device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |