CN109413750A - A kind of frequency point determines method and device - Google Patents

A kind of frequency point determines method and device Download PDF

Info

Publication number
CN109413750A
CN109413750A CN201811494989.0A CN201811494989A CN109413750A CN 109413750 A CN109413750 A CN 109413750A CN 201811494989 A CN201811494989 A CN 201811494989A CN 109413750 A CN109413750 A CN 109413750A
Authority
CN
China
Prior art keywords
frequency point
working efficiency
value
frequency
working
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811494989.0A
Other languages
Chinese (zh)
Inventor
王聪惠
王冰峰
亓庆彬
李顺昌
唐展波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Comba Network Systems Co Ltd
Original Assignee
Comba Telecom Technology Guangzhou Ltd
Comba Telecom Systems China Ltd
Comba Telecom Systems Guangzhou Co Ltd
Tianjin Comba Telecom Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Comba Telecom Technology Guangzhou Ltd, Comba Telecom Systems China Ltd, Comba Telecom Systems Guangzhou Co Ltd, Tianjin Comba Telecom Systems Co Ltd filed Critical Comba Telecom Technology Guangzhou Ltd
Priority to CN201811494989.0A priority Critical patent/CN109413750A/en
Publication of CN109413750A publication Critical patent/CN109413750A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/0453Resources in frequency domain, e.g. a carrier in FDMA
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/54Allocation or scheduling criteria for wireless resources based on quality criteria
    • H04W72/542Allocation or scheduling criteria for wireless resources based on quality criteria using measured or perceived quality

Landscapes

  • Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The application provides a kind of frequency point and determines method and device.This method comprises: being detected to N number of frequency point in the working frequency range of equipment, obtain N group working efficiency value, wherein, one group of working efficiency value includes at least two working efficiency measured values an of frequency point, and N is positive integer, according to N group working efficiency value, determine the working efficiency assessed value of N number of frequency point, working efficiency assessed value is used to assess the working efficiency of frequency point, according to the working efficiency assessed value of N number of frequency point, it determines the first frequency point, and sets the first frequency point for the working frequency points of equipment.In the program, pass through N number of frequency point in the working frequency range of detection device, at least two working efficiency measured values are obtained for the detection of each frequency point, the working efficiency assessed value obtained according to working efficiency measured value can more accurately embody the real work efficiency of frequency point, it sets the working efficiency of equipment to the frequency point determined according to working efficiency assessed value, helps to improve the communication efficiency of equipment.

Description

A kind of frequency point determines method and device
Technical field
This application involves fields of communication technology more particularly to a kind of frequency point to determine method and device.
Background technique
When communication equipment and base station communication, the working frequency points of itself can be set according to the information source frequency point of base station, so that itself It is communicated with base station with higher efficiency.
After the information source frequency point of base station changes, communication equipment is also required to reset the working frequency points of itself, existing In technology, after the information source frequency point of base station changes, communication equipment can successively detect the frequency point within the scope of working frequency range, work as inspection As soon as being the frequency point by the frequency point setting of equipment when measuring a working efficiency and meeting the frequency point of preset value.And do so, exist with Lower problem: the working efficiency of a frequency point may generate certain fluctuation due to network fluctuation etc., and the prior art detects The frequency point for meeting preset value, exist due to network fluctuation and cause in a higher possibility of moment working efficiency, and this frequency The real work efficiency of point may and be unsatisfactory for preset value.Therefore, in the prior art, the information source frequency point in base station changes Afterwards, correct frequency point can not be preferably arranged to be communicated in communication equipment, and the communication efficiency of equipment is caused to reduce.
Summary of the invention
The application provides a kind of frequency point and determines method and device, accurately to determine the frequency point with higher working efficiency To improve the communication efficiency of equipment.
In a first aspect, the application, which provides a kind of frequency point, determines method, comprising: to N number of frequency point in the working frequency range of equipment It is detected, obtains N group working efficiency value, then according at least two in i-th group of working efficiency value in N group working efficiency value A working efficiency measured value determines the working efficiency assessed value of i-th of frequency point in N number of frequency point, later according to the work of N number of frequency point Make efficiency evaluation value, determine the first frequency point, and set the first frequency point for the working frequency points of equipment, N is positive integer, i take all over 1 to N.Wherein, one group of working efficiency value includes at least two working efficiency measured values an of frequency point, a working efficiency measured value Indicate working efficiency of the frequency point a moment, working efficiency assessed value is used to assess the working efficiency of frequency point, the first frequency Point is a frequency point in N number of frequency point.In the program, by N number of frequency point in the working frequency range of detection device, for each Frequency point, which all detects, obtains at least two working efficiency measured values, the working efficiency assessed value energy obtained according to working efficiency measured value The real work efficiency for more accurately embodying frequency point, the working efficiency of equipment is set as being determined according to working efficiency assessed value Frequency point, help to improve the communication efficiency of equipment.
In one possible implementation, above-mentioned according to i-th group of working efficiency value, determine i-th of frequency in N number of frequency point The working efficiency assessed value of point may include: adding at least two working efficiency measured values in determining i-th group of working efficiency value Weight average value, the weighted average are the working efficiency assessed value of i-th of frequency point in N number of frequency point.In the program, it will be directed to At least two working efficiency measured values that one frequency point measurement obtains are weighted and averaged, and obtained working efficiency assessed value can be more Accurately embody the real work efficiency of the frequency point whithin a period of time.
In one possible implementation, the working efficiency assessed value of i-th of frequency point in the N number of frequency point of above-mentioned determination it It afterwards, can also include: the M frequency point and the corresponding working efficiency assessed value of the M frequency point recorded in N number of frequency point, wherein The working efficiency assessed value of M frequency point both greater than assesses threshold value, and M is the positive integer no more than N.The above-mentioned work according to N number of frequency point Make efficiency evaluation value, determine the first frequency point, can specifically include: being assessed according to the working efficiency of M frequency point in N number of frequency point Value, determines the first frequency point.In the program, for working efficiency assessed value no more than the frequency point for assessing threshold value, equipment can not be made to have There is higher communication efficiency, therefore will not be one in these frequency points by the frequency point setting of equipment, from working efficiency assessed value It goes select one to be used as the first frequency point in frequency point greater than assessment threshold value, due to the radix reduction of selection, can be improved true The speed of fixed first frequency point.
In one possible implementation, the above-mentioned working efficiency assessed value according to M frequency point in N number of frequency point, really Fixed first frequency point, can be accomplished by the following way: the corresponding frequency point of maximum value in M working efficiency assessed value is determined as First frequency point.In the program, the maximum frequency point of working efficiency assessed value, real work efficiency highest whithin a period of time, The frequency point is determined as the first frequency point, the communication efficiency of equipment can be improved.
In another possible implementation, the above-mentioned working efficiency assessed value according to M frequency point in N number of frequency point, It determines the first frequency point, can also be accomplished by the following way: will be in the corresponding M frequency point of the working efficiency assessed value of M frequency point Any one frequency point be determined as the first frequency point.In the program, select any one as the first frequency point from M frequency point, by Threshold value is both greater than assessed in the working efficiency assessed value of the M frequency point, i.e. the M frequency point is all with higher whithin a period of time Real work efficiency, optional one is used as the first frequency point from the M frequency point, can complete the frequency point setting of equipment faster, Improve the speed that equipment determines working frequency points.
In one possible implementation, N number of frequency point in the above-mentioned working frequency range to equipment detects, and obtains Before N group working efficiency value, it can also comprise determining that the information source frequency point of the base station of equipment connection changes.It is right in the program The information source frequency point of base station is detected, if the information source frequency point of base station does not change, the working frequency points of current device without Variation, there is no need to be scanned to the frequency point in equipment working frequency range, reduces the resource overhead of equipment.
Second aspect, the application provide a kind of frequency point determining device, which includes first detection unit, the first determining list Member, the second determination unit.Wherein, first detection unit is used for, and is detected, is obtained to N number of frequency point in the working frequency range of equipment To N group working efficiency value, one group of working efficiency value includes at least two working efficiency measured values an of frequency point, a work effect Rate measured value indicates working efficiency of the frequency point a moment, and N is positive integer.First determination unit is used for, according to N group work Make at least two working efficiency measured values in i-th group of working efficiency value in efficiency value, determines i-th of frequency in N number of frequency point The working efficiency assessed value of point, i take all over 1 to N, and working efficiency assessed value is used to assess the working efficiency of i-th of frequency point.Second really Order member is used for, and according to the working efficiency assessed value of N number of frequency point, determines the first frequency point, and set the working frequency points of equipment to First frequency point, wherein the first frequency point is a frequency point in N number of frequency point.In the program, by the working frequency range of detection device N number of frequency point, for each frequency point detection obtain at least two working efficiency measured values, obtained according to working efficiency measured value To working efficiency assessed value can more accurately embody the real work efficiency of frequency point, set basis for the working efficiency of equipment Working efficiency assessed value helps to improve the communication efficiency of equipment come the frequency point determined.
In one possible implementation, above-mentioned first determination unit, specifically can be used for: determine i-th group of work effect The weighted average of at least two working efficiency measured values in rate value, the weighted average are i-th of frequency point in N number of frequency point Working efficiency assessed value.In the program, at least two working efficiency measured values obtained for a frequency point measurement are added Weight average, obtained working efficiency assessed value can more accurately embody the real work efficiency of the frequency point whithin a period of time.
In one possible implementation, above-mentioned apparatus can also include storage unit, for recording in N number of frequency point M frequency point and the corresponding working efficiency assessed value of M frequency point, wherein the working efficiency assessed value of the M frequency point, which is greater than, to be commented Estimate threshold value, M is the positive integer no more than N.Above-mentioned second determination unit specifically can be used for according to M frequency point in N number of frequency point Working efficiency assessed value, determine the first frequency point.Frequency in the program, for working efficiency assessed value no more than assessment threshold value Point can not make equipment communication efficiency with higher, therefore will not be one in these frequency points by the frequency point setting of equipment, from Working efficiency assessed value, which is greater than in the frequency point of assessment threshold value, goes select one as the first frequency point, due to the radix reduction of selection, Therefore the speed for determining the first frequency point can be improved.
In one possible implementation, above-mentioned second determination unit, specifically can be used for according to the M in N number of frequency point The working efficiency assessed value of a frequency point, determines the first frequency point, can be accomplished by the following way: the second determination unit is by M work Make the corresponding frequency point of the maximum value in efficiency evaluation value and is determined as the first frequency point.In the program, working efficiency assessed value is maximum Frequency point, real work efficiency highest whithin a period of time, is determined as the first frequency point for the frequency point, and the logical of equipment can be improved Believe efficiency.
In another possible implementation, above-mentioned second determination unit specifically can be used for according in N number of frequency point The working efficiency assessed value of M frequency point, determines the first frequency point, can also be accomplished by the following way: the second determination unit is by M Any one frequency point in the corresponding M frequency point of the working efficiency assessed value of frequency point is determined as the first frequency point.In the program, from M Select any one as the first frequency point in a frequency point, since the working efficiency assessed value of the M frequency point both greater than assesses threshold value, That is M frequency point real work efficiency all with higher whithin a period of time, optional one is used as first from the M frequency point Frequency point can complete the frequency point setting of equipment faster, improve the speed that equipment determines working frequency points.
In one possible implementation, above-mentioned apparatus can also include second detection unit, connect for detection device Whether the information source frequency point of the base station connect changes.It is single by above-mentioned first detection if the information source frequency point of base station changes Member, the first determination unit, the second determination unit reset the working frequency points of equipment, so that equipment is with higher logical Believe efficiency.If the information source frequency point of base station does not change, the working frequency points of current device are without variation, and there is no need to setting Frequency point in standby working frequency range is scanned, and reduces the resource overhead of equipment.
The third aspect, the application provide a kind of network equipment, comprising:
Memory, for storing program instruction;
Processor executes aforementioned first according to the program of acquisition for calling the program instruction stored in the memory Method described in any embodiment in aspect or first aspect.
Fourth aspect, the application provide a kind of computer readable storage medium, the computer-readable recording medium storage There are computer executable instructions, the computer executable instructions are for making computer execute aforementioned first aspect or first aspect Method described in middle any embodiment.
Detailed description of the invention
Fig. 1 is a kind of possible network architecture schematic diagram provided by the present application;
Fig. 2 is the flow diagram that a kind of frequency point provided by the present application determines method;
Fig. 3 is a kind of frequency point determining device schematic diagram provided by the present application;
Fig. 4 is a kind of structural schematic diagram of the network equipment provided by the present application.
Specific embodiment
In order to keep the purposes, technical schemes and advantages of the application clearer, below in conjunction with attached drawing to the application make into One step it is described in detail.
Fig. 1 is a kind of possible network architecture schematic diagram provided by the present application, as shown in Figure 1, the network architecture includes logical Believe and the base station 102 equipment 101 (in Fig. 1 by taking communication equipment is mobile phone as an example), communication equipment 101 and base station 102 pass through wirelessly into Row communication, wherein communication equipment 101 can be mobile phone, tablet computer, navigator etc..The working frequency points of communication equipment 101 are roots It is determined according to the information source frequency point of base station 102, sets the information source frequency point with base station 102 for the working frequency points of communication equipment 101 The frequency point matched, helping to ensure that has higher communication efficiency between communication equipment 101 and base station 102.When the information source frequency of base station 102 When point changes, communication equipment 101 needs to redefine working frequency points, to maintain between communication equipment 101 and base station 102 Communication efficiency.
Based on system architecture shown in FIG. 1, Fig. 2 illustratively shows a kind of frequency point provided by the present application and determines method Flow diagram.The method that the frequency point determines can be executed by the communication equipment 101 in Fig. 1.Method includes the following steps:
Step 201, N number of frequency point in the working frequency range of equipment is detected, obtains N group working efficiency value, N is positive whole Number.
Wherein, one group of working efficiency value includes at least two working efficiency measured values an of frequency point, a working efficiency Measured value indicates a frequency point in the working efficiency at a moment.
Step 202, it is measured according at least two working efficiencies in i-th group of working efficiency value in N group working efficiency value Value, determines the working efficiency assessed value of i-th of frequency point in N number of frequency point, and i takes all over 1 to N.
Wherein, working efficiency assessed value is used to assess the working efficiency of frequency point.Above-mentioned working efficiency measured value can indicate Working efficiency of one frequency point at a time point, the working efficiency when time point may be because of certain cause specifics (such as network fluctuation) and cause the real work efficiency relative to the frequency point bigger than normal or less than normal, dimension cannot reflect the frequency point one Real work efficiency in a period.And working efficiency assessed value is by least two working efficiency measured values of a frequency point Determining, therefore can preferably reflect the real work efficiency of a frequency point whithin a period of time.
Step 203, according to the working efficiency assessed value of N number of frequency point, the first frequency point is determined.
Step 204, the first frequency point is set by the working frequency points of equipment.
In one possible implementation, before above-mentioned steps 201, it is also necessary to the letter of the base station of detection device connection Whether source frequency point changes, and when the information source frequency point when base station changes, then executes above-mentioned steps 201 to step 204, no Then, if the information source frequency point of base station does not change, the current working frequency points of equipment may be implemented to have between equipment and base station compared with High communication efficiency is detected there is no need to each frequency point to equipment and resets a frequency with higher working efficiency Point, so as to reduce the resource overhead of equipment.
In one possible implementation, above-mentioned steps 201 can be accomplished by the following way:
Step 1: the working frequency range of equipment is divided into N number of frequency point.For example, if the entire working frequency range of equipment is 2130MHz To 2170MHz, which can be divided into 400 frequency points, be a kind of possible frequency provided by the present application as shown in table 1 Point divides table.
1 frequency point of table divides table
Frequency point serial number 1 2 3 4 5 ... 398 399 400
Working frequency points 2130 2130.1 2130.2 2130.3 2130.4 ... 2169.8 2169.9 2170
As shown in table 1, by the entire working frequency range of equipment (2130MHz to 2170MHz) divides for 400 frequency points, than Such as, the working frequency points of frequency point 1 are 2130MHz, and the working frequency points of frequency point 3 are 2130MHz.
Step 2: calculating separately N number of frequency point for field programmable gate array (Field-Programmable Gate Array, FPGA) identifiable 32bit frequency control word (NCO), and it is sent to FPGA.
There is different working frequency points different NCO, NCO can be stored in register with 16 systems, and FPGA reading is posted NCO in storage can determine and need to calculate the working efficiency of which frequency point, and the calculation of NCO can be by reality It needs to be arranged.For example, the NCO of frequency point 1 is 0x624DD2F1, FPGA reads 0x624DD2F1, then to the working efficiency of frequency point 1 It is once calculated, the value being calculated is a working efficiency measured value of frequency point 1.
Certainly, the application which kind of processor specifically used to the calculating of working efficiency is not specifically limited, and FPGA is only A kind of possible processor provided by the present application.
Step 3: at least two working efficiency measured values are calculated to any of N number of frequency point in FPGA, it is final to obtain To N group working efficiency value.
It is not particularly limited for which kind of is sequentially calculated N group working efficiency the application by.Such as it can be by FPGA pairs After the working efficiency of frequency point 1 in table 1 calculates at least twice, then successively the working efficiency of frequency point 2 is calculated at least twice. 1 task efficiency successively can also be calculated separately to 400 frequency points in table 1 by FPGA and then to the work of 400 frequency points Make efficiency calculation at least 1 time.
Through the above scheme, N group working efficiency can be obtained.For example, being exemplified by Table 1, available 400 groups of work effect Rate, wherein first group of working efficiency indicates at least two working efficiency measured values of frequency point 1, a working efficiency measured value table Show frequency point 1 in the working efficiency at a moment.
In one possible implementation, it can be accomplished by the following way in above-mentioned steps 202: determine i-th group of work Make the weighted average of at least two working efficiency measured values in efficiency value, which is i-th in N number of frequency point The working efficiency assessed value of a frequency point.For example, for three working efficiency measured values in third group working efficiency value, it is assumed that this Three working efficiency measured values are followed successively by 98,88,92, and are 1 for the weighting coefficient of these three working efficiency measured values, The working efficiency assessed value for then obtaining third frequency point isCertainly, it in practical application, can also only select The first two working efficiency measured value in one group of working efficiency value is taken to be calculated, and weight coefficient for example can be 1 He 0.5, then the working efficiency assessed value of above-mentioned third frequency point beSpecifically choose several work effects Rate measured value, and weight coefficient how is distributed, the application with no restrictions, can determine according to actual needs.In the program, it will be directed to At least two working efficiency measured values that one frequency point measurement obtains are weighted and averaged, and obtained working efficiency assessed value can be more Accurately embody the real work efficiency of the frequency point whithin a period of time.
It in one possible implementation, can also include: the M frequency recorded in N number of frequency point before above-mentioned steps 203 Point and the corresponding working efficiency assessed value of the M frequency point, wherein the working efficiency assessed value of M frequency point is both greater than assessed Threshold value, M are the positive integer no more than N.For example, assessment threshold value is 95,8 working frequency points of equipment are scanned and are calculated each The working efficiency assessed value of frequency point, the working efficiency assessed value for obtaining this 8 frequency points are respectively as follows: frequency point A:92.7, frequency point B: 93.6, frequency point C:94.3, frequency point D:95.1, frequency point E:95.6, frequency point F:94.8, frequency point G:93.1, frequency point H:92.2.Therefore, The frequency point D and frequency point E in 8 frequency points are recorded, and records the working efficiency assessed value 95.1 of frequency point D and the work of frequency point E Efficiency evaluation value 95.6.
Above-mentioned steps 203 can specifically include: according to the working efficiency assessed value of M frequency point in N number of frequency point, determine One frequency point.The first frequency point is determined such as from above-mentioned 8 frequency points, according to the frequency point D of record and frequency point E and corresponding working efficiency Assessed value determines the first frequency point.Specifically, the first frequency point can be determined by following two mode:
The corresponding frequency point of maximum value in M working efficiency assessed value is determined as the first frequency point by mode one.On for example, The working efficiency assessed value for stating the frequency point D of record is 95.1, and the working efficiency assessed value of frequency point E is 95.6, it is thus determined that frequency point E For the first frequency point.In the program, the maximum frequency point of working efficiency assessed value, real work efficiency whithin a period of time is most The frequency point is determined as the first frequency point, the communication efficiency of equipment can be improved by height.
Any one frequency point in the corresponding M frequency point of the working efficiency assessed value of M frequency point is determined as by mode two One frequency point.For example, the first frequency point of an optional conduct in above-mentioned frequency point D and frequency point E from above-mentioned record, it can selection frequency point D also can choose frequency point E as the first frequency point as the first frequency point.In the program, any one work is selected from M frequency point For the first frequency point, since the working efficiency assessed value of the M frequency point both greater than assesses threshold value, i.e., the M frequency point is in a period of time Inside real work efficiency all with higher, optional one is used as the first frequency point from the M frequency point, can complete to set faster Standby frequency point setting improves the speed that equipment determines working frequency points.
Later, in step 204, above-mentioned first frequency point is set by the working frequency points of equipment.Since the first frequency point is opposite In other frequency points of the equipment, the first frequency point is arranged in the working frequency points of equipment by working efficiency assessed value with higher, can So that communication efficiency with higher between equipment and base station.
Based on the same inventive concept, Fig. 3 illustratively shows a kind of frequency point determining device provided by the present application, the device The process that frequency point determines method can be executed.As shown in figure 3, the device includes:
First detection unit 301 is detected for N number of frequency point in the working frequency range to equipment, obtains N group work effect Rate value.Wherein, one group of working efficiency value includes at least two working efficiency measured values an of frequency point, a working efficiency measurement Value indicates working efficiency of the frequency point a moment, and N is positive integer.
First determination unit 302, for according at least two in i-th group of working efficiency value in N group working efficiency value Working efficiency measured value, determines the working efficiency assessed value of i-th of frequency point in N number of frequency point, and i takes all over 1 to N, wherein work effect Rate assessed value is used to assess the working efficiency of i-th of frequency point.
Second determination unit 303 determines the first frequency point for the working efficiency assessed value according to N number of frequency point, and by equipment Working frequency points be set as the first frequency point, wherein the first frequency point be N number of frequency point in a frequency point.
Above scheme by N number of frequency point in the working frequency range of detection device, for the detection of each frequency point obtain to Few two working efficiency measured values, the working efficiency assessed value obtained according to working efficiency measured value can more accurately embody frequency point Real work efficiency, set the working efficiency of equipment to the frequency point determined according to working efficiency assessed value, help to mention The communication efficiency of high equipment.
In one possible implementation, above-mentioned first determination unit 302, specifically can be used for: determine i-th group of work The weighted average of at least two working efficiency measured values in efficiency value, the weighted average are i-th of frequency in N number of frequency point The working efficiency assessed value of point.
In one possible implementation, above-mentioned apparatus can also include storage unit 304, and storage unit 304 is used for Record the M frequency point and the corresponding working efficiency assessed value of M frequency point in N number of frequency point, wherein the work of the M frequency point Efficiency evaluation value is greater than assessment threshold value, and M is the positive integer no more than N.Above-mentioned second determination unit 303, specifically can be used for root According to the working efficiency assessed value of M frequency point in N number of frequency point, the first frequency point is determined.
In one possible implementation, above-mentioned second determination unit 303, specifically can be used for according in N number of frequency point M frequency point working efficiency assessed value, determine the first frequency point, can be accomplished by the following way: the second determination unit is by M The corresponding frequency point of maximum value in working efficiency assessed value is determined as the first frequency point.
In another possible implementation, above-mentioned second determination unit specifically can be used for according in N number of frequency point The working efficiency assessed value of M frequency point, determines the first frequency point, can also be accomplished by the following way: the second determination unit is by M Any one frequency point in the corresponding M frequency point of the working efficiency assessed value of frequency point is determined as the first frequency point.
In one possible implementation, above-mentioned apparatus can also include second detection unit 305, second detection unit Whether the information source frequency point of 305 base stations connected for detection device changes.If the information source frequency point of base station changes, lead to Above-mentioned first detection unit 301, the first determination unit 302, the second determination unit 303 is crossed to carry out again the working frequency points of equipment Setting, so that equipment communication efficiency with higher.If the information source frequency point of base station does not change, the work frequency of current device Point is without variation.
Concept relevant to technical solution provided by the present application involved in above-mentioned apparatus is explained and is described in detail and is other Step refers to aforementioned frequency point and determines the description as described in these contents in method or other embodiments, is not repeated herein.
Based on design same as the previously described embodiments, the application also provides a kind of network equipment.
Fig. 4 is a kind of structural schematic diagram of the network equipment provided by the present application.As shown in figure 4, the network equipment 400 wraps It includes:
Memory 401, for storing program instruction;
Processor 402 executes aforementioned according to the program of acquisition for calling the program instruction stored in the memory One frequency point as described in the examples determines method.
Based on design same as the previously described embodiments, the application also provides a kind of computer storage medium, the computer Readable storage medium storing program for executing is stored with computer executable instructions, and the computer executable instructions are for making computer execute aforementioned One frequency point as described in the examples determines method.
It should be noted that be schematical, only a kind of logical function partition to the division of unit in the application, it is real There may be another division manner when border is realized.Each functional unit in this application can integrate in one processing unit, It is also possible to each unit to physically exist alone, can also be integrated in two or more units in a module.Above-mentioned collection At unit both can take the form of hardware realization, can also realize in the form of software functional units.
In the above-described embodiments, can come wholly or partly by software, hardware, firmware or any combination thereof real It is existing.When implemented in software, it can entirely or partly realize in the form of a computer program product.Computer program product Including one or more computer instructions.When loading on computers and executing computer program instructions, all or part of real estate Raw process or function according to the application.Computer can be general purpose computer, special purpose computer, computer network or its His programmable device.Computer instruction may be stored in a computer readable storage medium, or computer-readable deposit from one Storage media is transmitted to another computer readable storage medium, for example, computer instruction can be from a web-site, calculating Machine, server or data center are (such as red by wired (such as coaxial cable, optical fiber, Digital Subscriber Line (DSL)) or wireless Outside, wirelessly, microwave etc.) mode transmitted to another web-site, computer, server or data center.Computer can Reading storage medium can be any usable medium or include that one or more usable mediums are integrated that computer can access The data storage devices such as server, data center.Usable medium can be magnetic medium, (for example, floppy disk, hard disk, tape), Optical medium (for example, DVD) or semiconductor medium (such as solid state hard disk Solid State Disk (SSD)) etc..
It should be understood by those skilled in the art that, the application can provide as method, system or computer program product.Cause This, the shape of complete hardware embodiment, complete software embodiment or embodiment combining software and hardware aspects can be used in the application Formula.Moreover, the application, which can be used, can use storage in the computer that one or more wherein includes computer usable program code The form for the computer program product implemented on medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.).
The application be referring to according to the present processes, equipment (system) and computer program product flow chart and/or Block diagram describes.It should be understood that each process that can be realized by computer program instructions in flowchart and/or the block diagram and/or The combination of process and/or box in box and flowchart and/or the block diagram.It can provide these computer program instructions to arrive General purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices processor to generate one Machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for realizing flowing The device for the function of being specified in journey figure one process or multiple processes and/or block diagrams one box or multiple boxes.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Obviously, those skilled in the art can carry out various modification and variations without departing from the essence of the application to the application Mind and range.In this way, if these modifications and variations of the application belong to the range of the claim of this application and its equivalent technologies Within, then the application is also intended to include these modifications and variations.

Claims (10)

1. a kind of frequency point determines method characterized by comprising
N number of frequency point in the working frequency range of equipment is detected, obtains N group working efficiency value, wherein one group of working efficiency value At least two working efficiency measured values including a frequency point, one working efficiency measured value indicate a frequency point at one The working efficiency at moment, N are positive integer;
According at least two working efficiency measured values in i-th group of working efficiency value in the N group working efficiency value, institute is determined The working efficiency assessed value of i-th of frequency point in N number of frequency point is stated, i takes all over 1 to N, and the working efficiency assessed value is for assessing institute State the working efficiency of i-th of frequency point;
According to the working efficiency assessed value of N number of frequency point, determine that the first frequency point, first frequency point are in N number of frequency point A frequency point;
First frequency point is set by the working frequency points of the equipment.
2. the method as described in claim 1, which is characterized in that it is described according to i-th group of working efficiency value, determine the N The working efficiency assessed value of i-th of frequency point in a frequency point, comprising:
Determine the weighted average of at least two working efficiency measured values in i-th group of working efficiency value, the weighting is flat Mean value is the working efficiency assessed value of i-th of frequency point in N number of frequency point.
3. method according to claim 2, which is characterized in that imitated according to i-th group of work in the N group working efficiency value Rate value, after the working efficiency assessed value for determining i-th of frequency point in N number of frequency point, further includes:
Record the M frequency point and the corresponding working efficiency assessed value of the M frequency point in N number of frequency point, the M frequency The working efficiency assessed value of point is greater than assessment threshold value, and M is the positive integer no more than N;
The working efficiency assessed value according to N number of frequency point, determines the first frequency point, comprising:
According to the working efficiency assessed value of the M frequency point in N number of frequency point, first frequency point is determined.
4. method as claimed in claim 3, which is characterized in that the work according to the M frequency point in N number of frequency point Make efficiency evaluation value, determine first frequency point, comprising:
The corresponding frequency point of maximum value in the M working efficiency assessed value is determined as first frequency point;Alternatively,
Any one frequency point in the corresponding M frequency point of the working efficiency assessed value of the M frequency point is determined as described first Frequency point.
5. method according to any one of claims 1 to 4, which is characterized in that N number of frequency in the working frequency range to equipment Point is detected, before obtaining N group working efficiency value, further includes:
Determine that the information source frequency point of the base station of the equipment connection changes.
6. a kind of frequency point determining device characterized by comprising
First detection unit is detected for N number of frequency point in the working frequency range to equipment, obtains N group working efficiency value, In, one group of working efficiency value includes at least two working efficiency measured values an of frequency point, one working efficiency measured value Indicate working efficiency of the frequency point a moment, N is positive integer;
First determination unit, for according at least two work in i-th group of working efficiency value in the N group working efficiency value Efficiency measure determines the working efficiency assessed value of i-th of frequency point in N number of frequency point, and i takes all over 1 to N, and the work is imitated Rate assessed value is used to assess the working efficiency of i-th of frequency point;
Second determination unit determines the first frequency point for the working efficiency assessed value according to N number of frequency point, and sets described Standby working frequency points are set as first frequency point, and first frequency point is a frequency point in N number of frequency point.
7. device as claimed in claim 6, which is characterized in that first determination unit is specifically used for:
Determine the weighted average of at least two working efficiency measured values in i-th group of working efficiency value, the weighting is flat Mean value is the working efficiency assessed value of i-th of frequency point in N number of frequency point.
8. device as claimed in claims 6 or 7, which is characterized in that described device further includes second detection unit, for detecting Whether the information source frequency point of the base station of the equipment connection changes.
9. a kind of computer-readable medium, is stored with computer executable instructions, which is characterized in that the computer is executable to be referred to It enables for executing method as claimed in any one of claims 1-5.
10. a kind of computing device characterized by comprising
At least one processor;And the memory being connect at least one described processor communication;Wherein, the memory is deposited The instruction that can be executed by least one described processor is contained, described instruction is executed by least one described processor, so that institute It states at least one processor and is able to carry out method as claimed in any one of claims 1-5.
CN201811494989.0A 2018-12-07 2018-12-07 A kind of frequency point determines method and device Pending CN109413750A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811494989.0A CN109413750A (en) 2018-12-07 2018-12-07 A kind of frequency point determines method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811494989.0A CN109413750A (en) 2018-12-07 2018-12-07 A kind of frequency point determines method and device

Publications (1)

Publication Number Publication Date
CN109413750A true CN109413750A (en) 2019-03-01

Family

ID=65457788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811494989.0A Pending CN109413750A (en) 2018-12-07 2018-12-07 A kind of frequency point determines method and device

Country Status (1)

Country Link
CN (1) CN109413750A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101977419A (en) * 2010-07-23 2011-02-16 展讯通信(上海)有限公司 Mobile telephone network searching method and mobile telephone
CN103517277A (en) * 2012-06-29 2014-01-15 电信科学技术研究院 Frequency point selection method and device of cognitive radio system
JP2014081311A (en) * 2012-10-17 2014-05-08 Panasonic Corp Radar system
WO2015196930A1 (en) * 2014-06-25 2015-12-30 电信科学技术研究院 Method and device for adjusting operating frequency band of cell
CN106358251A (en) * 2016-08-27 2017-01-25 华为技术有限公司 Network switch method and terminal equipment
CN106405254A (en) * 2016-08-25 2017-02-15 北京森馥科技股份有限公司 Low-frequency-band electromagnetic environment analyzing method and device
CN106792730A (en) * 2016-12-20 2017-05-31 京信通信技术(广州)有限公司 A kind of end side interference detecting method, base station and terminal
WO2017133550A1 (en) * 2016-02-06 2017-08-10 中兴通讯股份有限公司 Frequency point selection method and device
CN107295544A (en) * 2016-09-27 2017-10-24 京信通信技术(广州)有限公司 Base station operation frequency self-organization method and device
WO2018049683A1 (en) * 2016-09-19 2018-03-22 海能达通信股份有限公司 Frequency point switching method and apparatus, and wireless base station

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101977419A (en) * 2010-07-23 2011-02-16 展讯通信(上海)有限公司 Mobile telephone network searching method and mobile telephone
CN103517277A (en) * 2012-06-29 2014-01-15 电信科学技术研究院 Frequency point selection method and device of cognitive radio system
JP2014081311A (en) * 2012-10-17 2014-05-08 Panasonic Corp Radar system
WO2015196930A1 (en) * 2014-06-25 2015-12-30 电信科学技术研究院 Method and device for adjusting operating frequency band of cell
WO2017133550A1 (en) * 2016-02-06 2017-08-10 中兴通讯股份有限公司 Frequency point selection method and device
CN106405254A (en) * 2016-08-25 2017-02-15 北京森馥科技股份有限公司 Low-frequency-band electromagnetic environment analyzing method and device
CN106358251A (en) * 2016-08-27 2017-01-25 华为技术有限公司 Network switch method and terminal equipment
WO2018049683A1 (en) * 2016-09-19 2018-03-22 海能达通信股份有限公司 Frequency point switching method and apparatus, and wireless base station
CN107295544A (en) * 2016-09-27 2017-10-24 京信通信技术(广州)有限公司 Base station operation frequency self-organization method and device
CN106792730A (en) * 2016-12-20 2017-05-31 京信通信技术(广州)有限公司 A kind of end side interference detecting method, base station and terminal

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王治国等: "事件驱动的宽带频率源自动测试系统设计", 《电测与仪表》 *

Similar Documents

Publication Publication Date Title
JP5831558B2 (en) Operation management apparatus, operation management method, and program
CN107229518B (en) Distributed cluster training method and device
US10887783B2 (en) Wireless network site survey systems and methods
CN110210067B (en) Method and device for determining threshold straight line based on measurement track
CN109788432B (en) Indoor positioning method, device, equipment and storage medium
JP2013036887A (en) Observed value reliability assessing apparatus, observed value reliability assessing method, and observed value reliability assessing program
JP2022032964A5 (en)
US20170265037A1 (en) Method, system, and storage medium
CN111770528B (en) Visual distance and non-visual distance identification method and device based on channel parameter extraction method
CN109413750A (en) A kind of frequency point determines method and device
CN110909804B (en) Method, device, server and storage medium for detecting abnormal data of base station
CN109560978A (en) Network flow detection method, apparatus and system and computer readable storage medium
CN109308360A (en) Channel parameter finding method, device, storage medium and computer equipment
CN109041093B (en) Blind signal source power position joint estimation method and system
CN104113910B (en) Alignment system in cordless communication network
US11089436B2 (en) Method and determining unit for identifying optimal location(s)
CN116016225A (en) Information processing method, signal positioning method, device, equipment and medium
CN102288937B (en) Positioning correction method based on distance measurement
CN111598390B (en) Method, device, equipment and readable storage medium for evaluating high availability of server
CN107517273A (en) Method, system, computer-readable recording medium and the server of Data Migration
CN104635206A (en) Wireless positioning method and device
CN112181788B (en) Statistical performance acquisition for storage systems
KR102634636B1 (en) Smart advanced metering infrastructure system having water quality sensor and operating server included in the same
WO2018096024A1 (en) Determining coverage efficiency of an access point in a wireless network
KR102634639B1 (en) Smart advanced metering infrastructure system capable of checking leakage type and leakage amount based on clustering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200107

Address after: 510663 Shenzhou Road, Guangzhou Science City, Guangzhou, Guangzhou economic and Technological Development Zone, Guangdong Province, No. 10

Applicant after: COMBA TELECOM SYSTEMS (CHINA) Ltd.

Address before: 510663 Shenzhou Road, Guangzhou Science City, Guangzhou economic and Technological Development Zone, Guangdong, 10

Applicant before: COMBA TELECOM SYSTEMS (CHINA) Ltd.

Applicant before: COMBA TELECOM SYSTEMS (GUANGZHOU) Ltd.

Applicant before: COMBA TELECOM TECHNOLOGY (GUANGZHOU) Ltd.

Applicant before: TIANJIN COMBA TELECOM SYSTEMS Ltd.

TA01 Transfer of patent application right
CB02 Change of applicant information

Address after: 510663 No.10, Shenzhou Road, Guangzhou Science City, Guangzhou Economic and Technological Development Zone, Guangdong Province

Applicant after: Jingxin Network System Co.,Ltd.

Address before: 510663 No.10, Shenzhou Road, Guangzhou Science City, Guangzhou Economic and Technological Development Zone, Guangdong Province

Applicant before: COMBA TELECOM SYSTEMS (CHINA) Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20190301

RJ01 Rejection of invention patent application after publication