CN109409777A - A kind of Groundwater Contamination Risk management-control method based on construction freezing method - Google Patents

A kind of Groundwater Contamination Risk management-control method based on construction freezing method Download PDF

Info

Publication number
CN109409777A
CN109409777A CN201811367755.XA CN201811367755A CN109409777A CN 109409777 A CN109409777 A CN 109409777A CN 201811367755 A CN201811367755 A CN 201811367755A CN 109409777 A CN109409777 A CN 109409777A
Authority
CN
China
Prior art keywords
freezing
underground water
construction
risk management
control method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811367755.XA
Other languages
Chinese (zh)
Inventor
李广兵
徐敏
夏太保
李宝铸
李辰
孟平
陈卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Guozhen Environmental Remediation Ltd By Share Ltd
Original Assignee
Anhui Guozhen Environmental Remediation Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Guozhen Environmental Remediation Ltd By Share Ltd filed Critical Anhui Guozhen Environmental Remediation Ltd By Share Ltd
Priority to CN201811367755.XA priority Critical patent/CN109409777A/en
Publication of CN109409777A publication Critical patent/CN109409777A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/22Treatment of water, waste water, or sewage by freezing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/06Contaminated groundwater or leachate

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Physics & Mathematics (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of Groundwater Contamination Risk management-control method based on construction freezing method includes the following steps: to detect pollution level: for determining underground water pollution boundary;It determines construction location: punch position is positioned;Mounting hole pipeline: aperture is mounted on using special pipeline;Freezing plant: the installation and construction of freezing plant is installed;Maintenance monitoring frost zone: maintenance monitoring is carried out to frost zone.The present invention uses the method for frost to form frost zone on entire underground water pollution boundary to achieve the purpose that polluted underground water is prevented to flow, and contamination can be effectively controlled before groundwater remediation;It avoids underground water from continuing flowing to pollute, after underground water is completed to repair, thaw to frost zone, stratum restores not generate compared with havoc or secondary pollution original underground water.

Description

A kind of Groundwater Contamination Risk management-control method based on construction freezing method
Technical field
The present invention relates to the risk management and control fields of polluted underground water, specifically control polluted underground water based on construction freezing method The risk management and control method of flowing.
Background technique
It is more and more at present underground water pollution emergency event occur, often through curtain-grouting or construction diaphram wall Equal measures carry out isolated risk control to underground water, but there are certain areas underground water pollution depth relatively depth or stratum infiltration systems Situations such as number is smaller, working measure is difficult to achieve the desired results, and is isolated there are notch, there are still outside external diffusions for polluted underground water Possibility.
Engineering measure of mainstream itself at present also generates destruction to underground water, be filled in stratum a large amount of cement slurry etc. its He generates the material of pollution to quality of groundwater, secondary pollution is formed, for this purpose, it is proposed that a kind of ground based on construction freezing method It is lauched pollution risk management-control method.
Summary of the invention
The main purpose of the present invention is to provide a kind of Groundwater Contamination Risk management-control method based on construction freezing method, is adopted Frost zone is formed to achieve the purpose that polluted underground water is prevented to flow, on ground on entire underground water pollution boundary with the method for frost Contamination can be effectively controlled before being lauched reparation.
To achieve the above object, the technical scheme adopted by the invention is as follows:
The invention discloses a kind of Groundwater Contamination Risk management-control method based on construction freezing method, includes the following steps:
1) pollution level is detected: for determining underground water pollution boundary;
2) it determines construction location: punch position is positioned;
3) mounting hole pipeline: aperture is mounted on using special pipeline;
4) freezing plant: the installation and construction of freezing plant is installed;
5) maintenance monitoring maintenance monitoring frost zone: is carried out to frost zone.
Preferably, extracting the underground water of different distance in the step 1) using extraction element, it is separated by between sample point 10-15m detects sample with sewage detection instrument, so that it is determined that underground water pollution boundary, determines frost zone position.
Preferably, punch position is apart from underground water pollution boundary after determining underground water pollution boundary in the step 2) 10-20m, carries out punching work above untainted underground water, orifice diameter control in 14-18cm, while punching 5-8m bores several drainings drilling around aperture, and hole is provided with the drainpipe with filter device, with immersible pump or compression pump Water yield is reduced with lowering of watertable to extracardiac pumping.
Preferably, carrying out leak test work to special pipeline first in the step 3), it is ensured that special pipeline normally makes With by special pipeline by aperture across water table arrival underground water bottom, special pipeline is that diameter is freezing for 10-14cm Pipe.
Preferably, the frost radius outside the freezing pipe is 0.5-1m, the distance between freezing pipe is 0.5-1m.
Preferably, installing artificial cooling equipment in the step 4) at aperture, refrigeration equipment and cryovial are interconnected, Equipment is detected after installing, it is ensured that then the normal operation of equipment carries out actively frost work, cryovial freezes underground water Freezing curtain is formed, freezing curtain composition freezing wall hanging curtain freezes wall to form freezing wall hanging curtain on underground water pollution boundary Curtain thickness 1-2m.
Preferably, the artificial cooling equipment includes refrigerator and two cooling towers, refrigerator and two cooling towers are Main body forms refrigeration system, can carry out actively freezing work after the completion of system debug.
Preferably, to be judged to freeze whether curtain hands over circle and reach design according to observed temperature data in the step 5) Thickness, manual control refrigeration system keep frozen coating thickness, achieve the purpose that safeguard frost zone.
Compared with prior art, the invention has the following beneficial effects:
Use the method for frost to form frost zone on entire underground water pollution boundary prevents polluted underground water from flowing to reach Purpose, contamination can be effectively controlled before groundwater remediation;It avoids underground water from continuing flowing to pollute, in underground water It completes after repairing, thaws to frost zone, stratum restores not generate compared with havoc or secondary pollution original underground water.
Detailed description of the invention
Fig. 1 is a kind of structure chart of the Groundwater Contamination Risk management-control method based on construction freezing method of the present invention.
Fig. 2 is a kind of surface map of the Groundwater Contamination Risk management-control method based on construction freezing method of the present invention.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to Specific embodiment, the present invention is further explained.
Embodiment 1
The invention discloses a kind of Groundwater Contamination Risk management-control method based on construction freezing method, includes the following steps:
1) pollution level is detected: for determining underground water pollution boundary;The underground of different distance is extracted using extraction element Water is separated by 10m between sample point, is detected with sewage detection instrument to sample, so that it is determined that underground water pollution boundary, determines Frost zone position;
2) it determines construction location: punch position is positioned;Punch position is apart from underground water pollution boundary 10m, not Punching work is carried out above the underground water of pollution, orifice diameter control is in 14cm, in the 5m around aperture while punching Several drainings drilling is bored, hole is provided with the drainpipe with filter device, with immersible pump or compression pump to extracardiac pumping, to reduce ground Lower water level reduces water yield, enhances formation stability;
3) mounting hole pipeline: aperture is mounted on using special pipeline;Leak test work is carried out to special pipeline first, it is ensured that Special pipeline is passed through water table by aperture and arrives at underground water bottom by the normal use of special pipeline, and special pipeline is straight Diameter is the freezing pipe of 10cm;Frost radius outside the freezing pipe is 0.5m, and the distance between freezing pipe is 0.5m;
4) freezing plant: the installation and construction of freezing plant is installed;At aperture install artificial cooling equipment, refrigeration equipment with Cryovial is interconnected, and equipment is detected after installing, it is ensured that and then the normal operation of equipment carries out actively frost work, Cryovial freezes Groundwater formation and freezes curtain, freezing curtain composition freezing wall hanging curtain, to be formed on underground water pollution boundary Wall hanging curtain is freezed, wall hanging curtain thickness 1m is freezed;The artificial cooling equipment includes refrigerator and two cooling towers, refrigerator and two Refrigeration system is formed based on platform cooling tower, can carry out actively freezing work after the completion of system debug;
5) maintenance monitoring maintenance monitoring frost zone: is carried out to frost zone;Freezing curtain is judged according to observed temperature data Whether friendship circle and design thickness is reached, manual control refrigeration system keeps frozen coating thickness, achievees the purpose that safeguard frost zone.
Embodiment 2
The invention discloses a kind of Groundwater Contamination Risk management-control method based on construction freezing method, includes the following steps:
1) pollution level is detected: for determining underground water pollution boundary;The underground of different distance is extracted using extraction element Water is separated by 13m between sample point, is detected with sewage detection instrument to sample, so that it is determined that underground water pollution boundary, determines Frost zone position;
2) it determines construction location: punch position is positioned;Punch position is positioned;Punch position is apart from underground Water pollution boundary 15m, carries out punching work above untainted underground water, and orifice diameter is controlled in 16cm, in the same of punching When around aperture 6m bore several drainings with drilling, hole is provided with the drainpipe with filter device, with immersible pump or calms the anger It pumps to extracardiac pumping, with lowering of watertable, reduces water yield, enhance formation stability;
3) mounting hole pipeline: aperture is mounted on using special pipeline;Leak test work is carried out to special pipeline first, it is ensured that Special pipeline is passed through water table by aperture and arrives at underground water bottom by the normal use of special pipeline, and special pipeline is straight Diameter is the freezing pipe of 12cm;Frost radius outside the freezing pipe is 0.8m, and the distance between freezing pipe is 0.8m;
4) freezing plant: the installation and construction of freezing plant is installed;At aperture install artificial cooling equipment, refrigeration equipment with Cryovial is interconnected, and equipment is detected after installing, it is ensured that and then the normal operation of equipment carries out actively frost work, Cryovial freezes Groundwater formation and freezes curtain, freezing curtain composition freezing wall hanging curtain, to be formed on underground water pollution boundary Wall hanging curtain is freezed, wall hanging curtain thickness 1.5m is freezed;The artificial cooling equipment includes refrigerator and two cooling towers, refrigerator and Refrigeration system is formed based on two cooling towers, can carry out actively freezing work after the completion of system debug;
5) maintenance monitoring maintenance monitoring frost zone: is carried out to frost zone;Freezing curtain is judged according to observed temperature data Whether friendship circle and design thickness is reached, manual control refrigeration system keeps frozen coating thickness, achievees the purpose that safeguard frost zone.
Embodiment 3
The invention discloses a kind of Groundwater Contamination Risk management-control method based on construction freezing method, includes the following steps:
1) pollution level is detected: for determining underground water pollution boundary;The underground of different distance is extracted using extraction element Water is separated by 15m between sample point, is detected with sewage detection instrument to sample, so that it is determined that underground water pollution boundary, determines Frost zone position;
2) it determines construction location: punch position is positioned;Punch position is positioned;Punch position is apart from underground Water pollution boundary 20m, carries out punching work above untainted underground water, and orifice diameter is controlled in 18cm, in the same of punching When around aperture 8m bore several drainings with drilling, hole is provided with the drainpipe with filter device, with immersible pump or calms the anger It pumps to extracardiac pumping, with lowering of watertable, reduces water yield, enhance formation stability;
3) mounting hole pipeline: aperture is mounted on using special pipeline;Leak test work is carried out to special pipeline first, it is ensured that Special pipeline is passed through water table by aperture and arrives at underground water bottom by the normal use of special pipeline, and special pipeline is straight Diameter is the freezing pipe of 14cm;Frost radius outside the freezing pipe is 1m, and the distance between freezing pipe is 1m;
4) freezing plant: the installation and construction of freezing plant is installed;At aperture install artificial cooling equipment, refrigeration equipment with Cryovial is interconnected, and equipment is detected after installing, it is ensured that and then the normal operation of equipment carries out actively frost work, Cryovial freezes Groundwater formation and freezes curtain, freezing curtain composition freezing wall hanging curtain, to be formed on underground water pollution boundary Wall hanging curtain is freezed, wall hanging curtain thickness 2m is freezed;The artificial cooling equipment includes refrigerator and two cooling towers, refrigerator and two Refrigeration system is formed based on platform cooling tower, can carry out actively freezing work after the completion of system debug;
5) maintenance monitoring maintenance monitoring frost zone: is carried out to frost zone;Freezing curtain is judged according to observed temperature data Whether friendship circle and design thickness is reached, manual control refrigeration system keeps frozen coating thickness, achievees the purpose that safeguard frost zone.
Table 1 is that a kind of Groundwater Contamination Risk management-control method based on construction freezing method obtained to embodiment 1-3 carries out Performance test is extracted uncontaminated underground water and is detected, test result is as follows table:
Table 1
By 1 experimental data of table it is found that a kind of Groundwater Contamination Risk based on construction freezing method that the application is prepared Management-control method uses the method for frost to form frost zone on entire underground water pollution boundary to reach and prevent polluted underground water flowing Purpose, contamination can be effectively controlled before groundwater remediation;It avoids underground water from continuing flowing to pollute, in underground water It completes after repairing, thaws to frost zone, stratum restores not generate compared with havoc or secondary pollution original underground water, Multiple inspection data is drawn a conclusion, and separately embodiment 3 is optimal selection as shown in Table 1.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (8)

1. a kind of Groundwater Contamination Risk management-control method based on construction freezing method, characterized by the following steps:
1) pollution level is detected: for determining underground water pollution boundary;
2) it determines construction location: punch position is positioned;
3) mounting hole pipeline: aperture is mounted on using special pipeline;
4) freezing plant: the installation and construction of freezing plant is installed;
5) maintenance monitoring maintenance monitoring frost zone: is carried out to frost zone.
2. a kind of Groundwater Contamination Risk management-control method based on construction freezing method according to claim 1, feature exist In: the underground water of different distance is extracted in the step 1) using extraction element, is separated by 10-15m between sample point, is examined with sewage It surveys instrument to detect sample, so that it is determined that underground water pollution boundary, determines frost zone position.
3. a kind of Groundwater Contamination Risk management-control method based on construction freezing method according to claim 1, feature exist In: after determining underground water pollution boundary in the step 2), punch position is apart from underground water pollution boundary 10-20m, uncontaminated Underground water above carry out punching work, orifice diameter control is in 14-18cm, in the 5-8m around aperture while punching Several drainings drilling is bored, hole is provided with the drainpipe with filter device, with immersible pump or compression pump to extracardiac pumping, to reduce ground Lower water level reduces water yield.
4. a kind of Groundwater Contamination Risk management-control method based on construction freezing method according to claim 1, feature exist In: leak test work is carried out to special pipeline first in the step 3), it is ensured that the normal use of special pipeline leads to special pipeline It crosses aperture and arrives at underground water bottom across water table, special pipeline is the freezing pipe that diameter is 10-14cm.
5. a kind of Groundwater Contamination Risk management-control method based on construction freezing method according to claim 4, feature exist In: the frost radius outside the freezing pipe is 0.5-1m, and the distance between freezing pipe is 0.5-1m.
6. a kind of Groundwater Contamination Risk management-control method based on construction freezing method according to claim 1, feature exist In: artificial cooling equipment is installed, refrigeration equipment and cryovial are interconnected, and equipment installs laggard in the step 4) at aperture Row detection, it is ensured that then the normal operation of equipment carries out actively frost work, cryovial freezes Groundwater formation and freezes curtain, It freezes curtain composition freezing wall hanging curtain and freezes wall hanging curtain thickness 1-2m to form freezing wall hanging curtain on underground water pollution boundary.
7. a kind of Groundwater Contamination Risk management-control method based on construction freezing method according to claim 6, feature exist In: the artificial cooling equipment includes refrigerator and two cooling towers, composition refrigeration system based on refrigerator and two cooling towers System can carry out actively freezing work after the completion of system debug.
8. a kind of Groundwater Contamination Risk management-control method based on construction freezing method according to claim 1, feature exist In: to judge whether freezing curtain is handed in the step 5) according to observed temperature data and enclose and reach design thickness, manual control Refrigeration system keeps frozen coating thickness, achievees the purpose that safeguard frost zone.
CN201811367755.XA 2018-11-16 2018-11-16 A kind of Groundwater Contamination Risk management-control method based on construction freezing method Pending CN109409777A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811367755.XA CN109409777A (en) 2018-11-16 2018-11-16 A kind of Groundwater Contamination Risk management-control method based on construction freezing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811367755.XA CN109409777A (en) 2018-11-16 2018-11-16 A kind of Groundwater Contamination Risk management-control method based on construction freezing method

Publications (1)

Publication Number Publication Date
CN109409777A true CN109409777A (en) 2019-03-01

Family

ID=65473718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811367755.XA Pending CN109409777A (en) 2018-11-16 2018-11-16 A kind of Groundwater Contamination Risk management-control method based on construction freezing method

Country Status (1)

Country Link
CN (1) CN109409777A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110127945A (en) * 2019-05-27 2019-08-16 安徽建筑大学 The method and system of organic contamination place in-situ synchronization rehabilitating soil and underground water

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104806253A (en) * 2015-05-15 2015-07-29 中铁二局股份有限公司 Construction method for opening hole between rectangular pipe jacking channels

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104806253A (en) * 2015-05-15 2015-07-29 中铁二局股份有限公司 Construction method for opening hole between rectangular pipe jacking channels

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
姬文轩: ""富水卵砾石地层地铁联络通道人工冻结法施工模型试验研究"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
王廷亮: ""隧道工程地下水处理的环境地质效应"", 《工程勘察》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110127945A (en) * 2019-05-27 2019-08-16 安徽建筑大学 The method and system of organic contamination place in-situ synchronization rehabilitating soil and underground water
CN110127945B (en) * 2019-05-27 2021-12-14 安徽建筑大学 Method and system for synchronously restoring soil and underground water in organic pollution site in situ

Similar Documents

Publication Publication Date Title
CN108956937B (en) Experimental device and experimental method for artificial stratum freezing with multi-parameter dynamic acquisition
CN107843713B (en) Artificial rainfall simulation method for debris flow starting test
CN103510958B (en) A kind of gentle dip super-high seam rock cross-cut coal uncovering
CN114239194A (en) Leakage analysis and leakage point positioning method for large-water-volume water delivery pipe network
CN107843714B (en) Artificial rainfall simulation device for debris flow test
Damvergis Sewer systems: Failures and rehabilitation
CN109060440A (en) The micro- well-flushing sampling monitoring well in refuse landfill underground water multilayer position
CN109409777A (en) A kind of Groundwater Contamination Risk management-control method based on construction freezing method
CN205296385U (en) A dash device that becomes silted up for sewer line among utility tunnel
CN109540959A (en) Rich water thin silt construction freezing method effect simulation system and method
Kang et al. IoT (Internet of Things)-based underground risk assessment system surrounding water pipes in Korea
CN202280143U (en) Municipal drainage pipeline flowmeter installation apparatus
CN116455946A (en) Cloud-based high-frequency wellhead pressure production data analysis method
CN109505610B (en) Simulation system and method for influence of subway station bottom freezing construction on station structure
CN203893781U (en) Device for measuring thickness of sludge layer
CN205776125U (en) Spillway gate recess ice breaker in winter
CN108679453A (en) A kind of determining method of water pipe damage with monitoring system
CN205670033U (en) Based on missile silo remote measurement ultrasonic water level gauge
CN204462881U (en) A kind of liquid level automatic control device
CN210049225U (en) Foundation pit bottom freezing and reinforcing structure
CN207486327U (en) A kind of device of quick reparation underground piping leakage
CN203375177U (en) Oil pipeline warning system
CN107807225B (en) Artificial rainfall simulation method for debris flow test
CN207851056U (en) A kind of monitoring system for being drained outside thermal power plant
CN103924632A (en) Composite water intake technology and device with large-caliber radial well and siphon well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190301