CN109408206A - Task analytic approach - Google Patents

Task analytic approach Download PDF

Info

Publication number
CN109408206A
CN109408206A CN201810946910.7A CN201810946910A CN109408206A CN 109408206 A CN109408206 A CN 109408206A CN 201810946910 A CN201810946910 A CN 201810946910A CN 109408206 A CN109408206 A CN 109408206A
Authority
CN
China
Prior art keywords
task
post
queue
staff
analytic approach
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810946910.7A
Other languages
Chinese (zh)
Inventor
李首峰
张磊
孙立宏
陈放
李莉莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guo Zheng Tong Technology Co Ltd
Original Assignee
Guo Zheng Tong Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guo Zheng Tong Technology Co Ltd filed Critical Guo Zheng Tong Technology Co Ltd
Priority to CN201810946910.7A priority Critical patent/CN109408206A/en
Publication of CN109408206A publication Critical patent/CN109408206A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Program initiating; Program switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching
    • G06F9/4843Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
    • G06F9/4881Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Factory Administration (AREA)

Abstract

A kind of task analytic approach, comprising the following steps: S1, default backstage personnel login mouth, operator logins mouth;S2, backstage personnel carry out big task input after logining;S3, big task carry out tree-like decomposition by big Task-decomposing module;Task after S4, decomposition forms queue based on post;Task is assigned to corresponding post after S5, backstage personnel verification.The method of the present invention is simple, and backstage personnel are logined by its account number cipher, and its account can check all operators personnel's account internal work task;The queue that one big task splits into each dendritic is worked one by one, can guarantee big task working efficiency, and quality is completed in the work that can be improved big task, while can also ensure that the equality between different posies.

Description

Task analytic approach
Technical field
The present invention relates to a kind of task analytic approach more particularly to it is a kind of by department or major project automatic classifying at The task in corresponding different posies distributes task to corresponding post after manually verifying.
Background technique
In the epoch of internet development of today, internet is the super presentation man in this epoch at the leading role in epoch. In the large family of internet, task publication is a key point forever.Because everyone be unable to do without task publication with The management of task, because he has given a kind of struggle of management of people, he is a simple website, but important net in being also Stand, he can allow I do not know more accurately oneself What for should not What for, from certain angle, it is also A kind of supermarket of shopping, as soon as because task is distributed to a people, then this people must complete this task in some period, no Then just receive punishment, his namely online sale.These three words of internet mean that it has the rapid of information age and hair The features such as exhibition.Because task be people most but, a kind of most usual people complete mode, people one issued to task A kind of mode for solving internet, has also driven the development of Internet era, and the consumption view of people is also allowed to become more intuitive.
Work breakdown structure (WBS) is a principle with Factorization, is exactly that a project is decomposed, project by certain principle Task is resolved into, task is further decomposed into work in every particular, then work in every particular is assigned in everyone daily routines, until Until decomposition is not gone down.That is: project → task → work → daily routines work breakdown structure (WBS) is guiding pair with deliverable achievement The grouping that project elements carry out, it concludes and defines the entire working range of project, and one layer of every decline is represented to project work More detailed definition.Subject goal is gradually refined to decomposition, the daily routines of the bottom can be dispatched directly to individual and go to complete, point Bascule after solution is clear, very clear from tree root to leaf, avoids as far as possible deep-rooted, logically forms one big Activity.
Such as the Chinese invention patent " a kind of Task-decomposing and method for parallel processing " of Publication No. CN107908463A, Advocate that external system initiates request of data, image parameter is parsed;It distinguishes by unit inquiry data and non-and unit dependency number According to;The further unit of analysis level of power information acquisition system unified interface service platform;Match preconfigured decomposition rule; City-level unit is subjected to unit differentiation;It is multiple institute's grades by unit conversion at county level;According to system current resource situation allocation processing Number of threads executes data pick-up and organization work;For the external demand of decomposition, power information acquisition system unified interface clothes Platform of being engaged in informs the file name that external system generates, but it is primarily with respect to overall task dividing unit, rather than post Change, therefore propose a kind of by big task decomposition, and the method being distributed at each staff is very urgent.
Summary of the invention
The purpose of the invention is to overcome the deficiencies in the prior art, the present invention is achieved through the following technical solutions: being appointed Business decomposition method, it is characterised in that: the following steps are included:
S1, default backstage personnel login mouth, operator logins mouth;
S2, backstage personnel carry out big task input after logining;
S3, big task carry out tree-like decomposition by big Task-decomposing module;
Task after S4, decomposition forms queue based on post;
Task is assigned to corresponding post after S5, backstage personnel verification.
As a kind of above-mentioned preferred embodiment, staff is logined by logining mouth progress staff in the S1, is worked Personnel are logined by account, password.
Through the above technical solutions, backstage personnel are logined by its account number cipher, and its account can check all work Member's personnel's account internal work task.
As a kind of above-mentioned preferred embodiment, the account of staff is its people number, and number is divided into six, preceding two Position represents post number, in two represent Grade numbers, latter two represent personal number.
Through the above technical solutions, if the staff is technology department's electromechanics direction post, and its representative number is 02, etc. Grade is middle rank, and representative number is 02, and person number 31, then its account is 020231, and password is arranged by their own, passes through account Family receives background task.
As a kind of above-mentioned preferred embodiment, tree-like decompose includes that a task is split as multiple independently execute The function of one task operation according to needed for it is as split as multiple subtasks with independent function by subtask.
Through the above technical solutions, the queue that one big task splits into each dendritic is worked one by one, it can Guarantee big task working efficiency, and quality is completed in the work that can be improved big task.
As a kind of above-mentioned preferred embodiment, if the first subtask with an independent function has one with another The result of second subtask of independent function is condition, then there is the relationship that the first subtask depends on the second subtask.
Through the above technical solutions, the first subtask of an independent function has the of independent function with another The result of two subtasks is condition, then there is the first subtask dependent on the relationship of the second subtask then on this same branch Task, therefore be assigned as in the same queue.
As a kind of above-mentioned preferred embodiment, tree-like decompose is that task is divided into mobile jib task and Branch Tasks, point Branch task equally has bifurcated task, therefore is same department described in the same Branch Tasks, these tasks form same queue.
Through the above technical solutions, tree-like decompose is that task is divided into mobile jib task and Branch Tasks, Branch Tasks are same Sample has bifurcated task, therefore is same department described in the same Branch Tasks, these tasks form same queue, are divided into this way Benefit be exactly post difference between result do not influence mutually, if this post do not complete task, will not be to another hilllock Position impacts, and for simultaneously rank queue, can guarantee the equality between different posies, will affect B without the task result in the post A The Task Progress in post, nonpipeline task.
As a kind of above-mentioned preferred embodiment, by distribution task queue to each post after staff's verification, at this time from the background Task queue is numbered, number is six, front two for its be allocated to post the post number, in two for distribution On the date, latter two are task quantity in queue.
Through the above technical solutions, such as queue assignment is to technology department's electromechanics direction post, and distributing the date is No. 10, Task quantity is 21, then its number is 021021, for facilitating statistics.
As a kind of above-mentioned preferred embodiment, task is distributed to post in queue, and staff is logined by staff It mouthful is received, will number and store in last two addition itself of being engaged in of changing to after the completion of each staff.
Through the above technical solutions, each staff after the completion of will change to be engaged in last two additions itself number into After row storage can facilitate task, the executor of task is evaluated.
Compared with prior art, the beneficial effects of the present invention are: the method for the present invention is simple, backstage personnel pass through its account Password is logined, and its account can check all operators personnel's account internal work task;If the staff is technology department Electromechanical direction post, and its representative number is 02, grade is middle rank, and representative number is 02, and person number 31, then its account is 020231, password is arranged by their own, receives background task by account;One big task is split into each dendritic Queue worked one by one, can guarantee big task working efficiency, and can be improved big task work complete quality;One First subtask of independent function has the result of the second subtask of an independent function as condition using another, then has the Relationship then task this same branch on of one subtask dependent on the second subtask, therefore be assigned as in the same queue; Tree-like decompose is that task is divided into mobile jib task and Branch Tasks, and Branch Tasks equally have bifurcated task, therefore same It is same department described in Branch Tasks, these tasks form same queue, and the benefit being divided into this way is exactly between the difference of post As a result it does not influence mutually, if this post does not complete task, another post will not be impacted, for simultaneously rank queue, energy Enough guarantee the equality between different posies, will affect the Task Progress in the post B, nonpipeline without the task result in the post A Task;Such as the queue assignment is to technology department's electromechanics direction post, and distributing the date is No. 10, task quantity is 21, then its Number is 021021, for facilitating statistics;It will be in last two additions itself number of being engaged in of changing to after the completion of each staff Carry out storage can facilitate task after, the executor of task is evaluated.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present application, constitutes part of this application, this Shen Illustrative embodiments and their description please are not constituted an undue limitation on the present application for explaining the application.In the accompanying drawings:
Fig. 1 is the task analytic approach flow chart according to the embodiment of the present application.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, the present invention is carried out below further It is described in detail.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to limit this hair It is bright.
In conjunction with shown in attached drawing, the present invention provides a kind of task analytic approach, it is characterised in that: the following steps are included:
S1, default backstage personnel login mouth, operator logins mouth;
S2, backstage personnel carry out big task input after logining;
S3, big task carry out tree-like decomposition by big Task-decomposing module;
Task after S4, decomposition forms queue based on post;
Task is assigned to corresponding post after S5, backstage personnel verification.
As a kind of above-mentioned preferred embodiment, staff is logined by logining mouth progress staff in the S1, is worked Personnel are logined by account, password.
Through the above technical solutions, backstage personnel are logined by its account number cipher, and its account can check all work Member's personnel's account internal work task.
As a kind of above-mentioned preferred embodiment, the account of staff is its people number, and number is divided into six, preceding two Position represents post number, in two represent Grade numbers, latter two represent personal number.
Through the above technical solutions, if the staff is technology department's electromechanics direction post, and its representative number is 02, etc. Grade is middle rank, and representative number is 02, and person number 31, then its account is 020231, and password is arranged by their own, passes through account Family receives background task.
As a kind of above-mentioned preferred embodiment, tree-like decompose includes that a task is split as multiple independently execute The function of one task operation according to needed for it is as split as multiple subtasks with independent function by subtask.
Through the above technical solutions, the queue that one big task splits into each dendritic is worked one by one, it can Guarantee big task working efficiency, and quality is completed in the work that can be improved big task.
As a kind of above-mentioned preferred embodiment, if the first subtask with an independent function has one with another The result of second subtask of independent function is condition, then there is the relationship that the first subtask depends on the second subtask.
Through the above technical solutions, the first subtask of an independent function has the of independent function with another The result of two subtasks is condition, then there is the first subtask dependent on the relationship of the second subtask then on this same branch Task, therefore be assigned as in the same queue.
As a kind of above-mentioned preferred embodiment, tree-like decompose is that task is divided into mobile jib task and Branch Tasks, point Branch task equally has bifurcated task, therefore is same department described in the same Branch Tasks, these tasks form same queue.
Through the above technical solutions, tree-like decompose is that task is divided into mobile jib task and Branch Tasks, Branch Tasks are same Sample has bifurcated task, therefore is same department described in the same Branch Tasks, these tasks form same queue, are divided into this way Benefit be exactly post difference between result do not influence mutually, if this post do not complete task, will not be to another hilllock Position impacts, and for simultaneously rank queue, can guarantee the equality between different posies, will affect B without the task result in the post A The Task Progress in post, nonpipeline task.
As a kind of above-mentioned preferred embodiment, by distribution task queue to each post after staff's verification, at this time from the background Task queue is numbered, number is six, front two for its be allocated to post the post number, in two for distribution On the date, latter two are task quantity in queue.
Through the above technical solutions, such as queue assignment is to technology department's electromechanics direction post, and distributing the date is No. 10, Task quantity is 21, then its number is 021021, for facilitating statistics.
As a kind of above-mentioned preferred embodiment, task is distributed to post in queue, and staff is logined by staff It mouthful is received, will number and store in last two addition itself of being engaged in of changing to after the completion of each staff.
Through the above technical solutions, each staff after the completion of will change to be engaged in last two additions itself number into After row storage can facilitate task, the executor of task is evaluated.
Compared with prior art, the beneficial effects of the present invention are: the method for the present invention is simple, backstage personnel pass through its account Password is logined, and its account can check all operators personnel's account internal work task;If the staff is technology department Electromechanical direction post, and its representative number is 02, grade is middle rank, and representative number is 02, and person number 31, then its account is 020231, password is arranged by their own, receives background task by account;
The queue that one big task splits into each dendritic is worked one by one, can guarantee big task work effect Rate, and quality is completed in the work that can be improved big task;First subtask of one independent function has a list with another The result of second subtask of only function is condition, then there is the first subtask, then this position is same dependent on the relationship of the second subtask Task on one branch, therefore be assigned as in the same queue;
Tree-like decompose is that task is divided into mobile jib task and Branch Tasks, and Branch Tasks equally have bifurcated task, because Be same department described in this same Branch Tasks, these tasks form same queue, the benefit being divided into this way be exactly post not Result between does not influence mutually, if this post does not complete task, will not impact to another post, be arranged side by side Queue can guarantee the equality between different posies, will affect the Task Progress in the post B without the task result in the post A, non- Line task;Such as the queue assignment is to technology department's electromechanics direction post, and distributing the date is No. 10, task quantity is 21 A, then its number is 021021, for facilitating statistics;
Will store and can facilitate times in last two addition itself number of being engaged in of changing to after the completion of each staff After business, the executor of task is evaluated.
The present invention is that backstage personnel login, and inputs considerable task, big task carries out tree-like point by big Task-decomposing module Solution, is split as multiple subtasks independently executed for a task, as by the function of task operation according to needed for it Multiple subtasks with independent function are split as, the first subtask with an independent function has a list with another The result of second subtask of only function is condition, then there is the relationship that the first subtask depends on the second subtask;Operator It logins, account receives task queue;After the completion of task, the number of two addition completion task personnel is deposited after mission number Storage.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (8)

1. a kind of task analytic approach, it is characterised in that: the following steps are included:
S1, default backstage personnel login mouth, operator logins mouth;
S2, backstage personnel carry out big task input after logining;
S3, big task carry out tree-like decomposition by big Task-decomposing module;
Task after S4, decomposition forms queue based on post;
Task is assigned to corresponding post after S5, backstage personnel verification.
2. task analytic approach according to claim 1, it is characterised in that: in the S1 staff by login mouth into Row staff logins, and staff is logined by account, password.
3. task analytic approach according to claim 2, it is characterised in that: the account of staff is its people volume Number, number is divided into six, and front two represents post number, in two represent Grade numbers, latter two represent personal number.
4. task analytic approach according to claim 1, it is characterised in that: tree-like decompose includes tearing a task open It is divided into multiple subtasks independently executed, is as split as the function of task operation according to needed for it multiple with single The subtask of only function.
5. task analytic approach according to claim 4, it is characterised in that: if the first son with an independent function Task has the result of the second subtask of an independent function as condition using another, then there is the first subtask dependent on the The relationship of two subtasks.
6. task analytic approach according to claim 4, it is characterised in that: tree-like decompose is that task is divided into master Bar task and Branch Tasks, Branch Tasks equally have bifurcated task, therefore are same department described in the same Branch Tasks, this A little tasks form same queue.
7. task analytic approach according to claim 1, it is characterised in that: staff will distribute task queue after verifying To each post, task queue is numbered on backstage at this time, and number is six, and front two is allocated to the hilllock in post for it Bit number, in two be the distribution date, latter two are task quantity in queue.
8. task analytic approach according to claim 7, it is characterised in that: task is distributed to post in queue, work Personnel login mouth by staff and receive, will be in last two additions itself of being engaged in of changing to after the completion of each staff Number is stored.
CN201810946910.7A 2018-08-20 2018-08-20 Task analytic approach Pending CN109408206A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810946910.7A CN109408206A (en) 2018-08-20 2018-08-20 Task analytic approach

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810946910.7A CN109408206A (en) 2018-08-20 2018-08-20 Task analytic approach

Publications (1)

Publication Number Publication Date
CN109408206A true CN109408206A (en) 2019-03-01

Family

ID=65464368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810946910.7A Pending CN109408206A (en) 2018-08-20 2018-08-20 Task analytic approach

Country Status (1)

Country Link
CN (1) CN109408206A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111639867A (en) * 2020-06-01 2020-09-08 嘉兴久昌人力资源有限公司 Human resource task allocation management system
CN112308413A (en) * 2020-10-30 2021-02-02 中京恒瑞国际软件有限公司 Man-of-law architecture and business architecture separation design, seamless coupling EB (electronic Beam) technology platform and operation method implemented based on two-way fusion

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103136246A (en) * 2011-11-30 2013-06-05 成都飞机工业(集团)有限责任公司 Work breakdown structure (WBS) automatic generation method based on flow diagram
US20150215173A1 (en) * 2014-01-30 2015-07-30 Xerox Corporation Methods and systems for scheduling a task
US20160224376A1 (en) * 2015-01-30 2016-08-04 Yiqun Ge Dividing, scheduling, and parallel processing compiled sub-tasks on an asynchronous multi-core processor
CN106599214A (en) * 2016-12-16 2017-04-26 四川长虹电器股份有限公司 Method for performing task allocation based on enterprise organizational structure
CN107609721A (en) * 2016-07-11 2018-01-19 上海新昇半导体科技有限公司 Project task distribution method, device, computer equipment and project management system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103136246A (en) * 2011-11-30 2013-06-05 成都飞机工业(集团)有限责任公司 Work breakdown structure (WBS) automatic generation method based on flow diagram
US20150215173A1 (en) * 2014-01-30 2015-07-30 Xerox Corporation Methods and systems for scheduling a task
US20160224376A1 (en) * 2015-01-30 2016-08-04 Yiqun Ge Dividing, scheduling, and parallel processing compiled sub-tasks on an asynchronous multi-core processor
CN107609721A (en) * 2016-07-11 2018-01-19 上海新昇半导体科技有限公司 Project task distribution method, device, computer equipment and project management system
CN106599214A (en) * 2016-12-16 2017-04-26 四川长虹电器股份有限公司 Method for performing task allocation based on enterprise organizational structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111639867A (en) * 2020-06-01 2020-09-08 嘉兴久昌人力资源有限公司 Human resource task allocation management system
CN112308413A (en) * 2020-10-30 2021-02-02 中京恒瑞国际软件有限公司 Man-of-law architecture and business architecture separation design, seamless coupling EB (electronic Beam) technology platform and operation method implemented based on two-way fusion
CN112308413B (en) * 2020-10-30 2024-08-02 中京恒瑞国际软件有限公司 Legal architecture and business architecture separation design based on two-in-one implementation, seamless coupling EB (electronic component) technology platform and operation method

Similar Documents

Publication Publication Date Title
Camisón-Haba et al. How technology-based firms become also highly innovative firms? The role of knowledge, technological and managerial capabilities, and entrepreneurs’ background
Moreno et al. Complementarity as a driver of value in business intelligence and analytics adoption processes
Hassard Commodification, construction and compression: a review of time metaphors in organizational analysis
CN109408206A (en) Task analytic approach
Dewangan et al. Resource scheduling in cloud: A comparative study
CN101667268A (en) Calculating method supporting one person with multi-post salaries and expense allocation
CN111798196A (en) Agile development management system based on SpringBoot framework
CN109685300A (en) Enterprise's big data application power index system and its construction method
Falasca et al. An optimization model for humanitarian relief volunteer management
Fatima et al. Business model canvas to create and capture AI-enabled public value
CN107403308A (en) Data managing method, system, computer-readable recording medium and computer equipment
CN105184497A (en) Bearing capacity analysis method and system based on overall business and production capacity
CN109858789A (en) Human resources visible processing method, device, equipment and readable storage medium storing program for executing
Ngamsirijit Using queuing theory for evaluating flexibility performance in banking services
Liu A coordinated scheduling system for customer orders scheduling problem in job shop environments
CN108509259A (en) Obtain the method and air control system in multiparty data source
Lee et al. R&D performance monitoring, evaluation, and management system: a model and methods
Liu The optimization of worker's quantity based on cross-utilization in two departments
Yusupova et al. Controlling the functioning of the hotel business
Cyplik et al. CRITICAL CHAIN PROJECT MANAGEMENT AND DRUM-BUFFER-ROPE TOOLS INTEGRATION IN CONSTRUCTION INDUSTRY-CASE STUDY.
Abdelzaher et al. New Simulation Model for Workload Analysis Addressing Occupational Stress in a Production Company
Ganapathy Factors that deter small and medium enterprises from adopting ERP
Iorga et al. Matrix-type model to control the business processes
Dixit HRM to e-HRM: Concept, application & applicability
Mano-Negrin Spanning the boundaries: A stakeholder approach to effectiveness gaps and empowerment in public and independent human service organizations

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190301

RJ01 Rejection of invention patent application after publication