CN109403977A - The method of well work mechanization high-efficiency mining oil shale - Google Patents

The method of well work mechanization high-efficiency mining oil shale Download PDF

Info

Publication number
CN109403977A
CN109403977A CN201811079587.4A CN201811079587A CN109403977A CN 109403977 A CN109403977 A CN 109403977A CN 201811079587 A CN201811079587 A CN 201811079587A CN 109403977 A CN109403977 A CN 109403977A
Authority
CN
China
Prior art keywords
coal
bulk
coalcutter
scratch board
machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811079587.4A
Other languages
Chinese (zh)
Inventor
周景奎
任尧喜
刘攀龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longkou Mining Group Co Ltd
Original Assignee
Longkou Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longkou Mining Group Co Ltd filed Critical Longkou Mining Group Co Ltd
Priority to CN201811079587.4A priority Critical patent/CN109403977A/en
Publication of CN109403977A publication Critical patent/CN109403977A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C25/00Cutting machines, i.e. for making slits approximately parallel or perpendicular to the seam
    • E21C25/06Machines slitting solely by one or more cutting rods or cutting drums which rotate, move through the seam, and may or may not reciprocate
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C25/00Cutting machines, i.e. for making slits approximately parallel or perpendicular to the seam
    • E21C25/68Machines for making slits combined with equipment for removing, e.g. by loading, material won by other means
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C27/00Machines which completely free the mineral from the seam
    • E21C27/10Machines which completely free the mineral from the seam by both slitting and breaking-down
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C35/00Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
    • E21C35/04Safety devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention relates to the method for well work mechanization high-efficiency mining oil shale, (1) face timbering quality managements;(2) the one-way coal cutting technique that downlink coal cutting uplink sky machine returns.The present invention improves the Homes Using TV of working face, it is ensured that the safe and efficient production of working face.

Description

The method of well work mechanization high-efficiency mining oil shale
Technical field
The present invention relates to the methods of well work mechanization high-efficiency mining oil shale.
Background technique
Mine of Longkou Mining Area oil shale resources are compared with horn of plenty, and oil content is high, but working face geology condition is complex, by mined out Area, old working, tomography etc. influence coal wall cranny development and enrich, and stability is poor, and coal wall bulk slabbing is more in exploitation process, greatly Block product is larger, causes to slip head unloading difficulty, production efficiency is low.
Oil shale face uses medium-thickness seam full-seam mining, moves towards longwell retrusive whole caving method.Using MGTY400/930-1.1D double-ended shearer coal cutting, front roll cut top coal, and back roll cuts ground coal, mining height 4m, cutting depth For 0.6m.According to the oily 2 working face extraction experiences of coal 1, coalcutter is from scratch board conveyor head to scratch board conveyor tail (coalcutter Uplink) during coal cutting, the bulk formed during broken coal cannot be by crossing coal channel, and coalcutter uplink and scraper plate are transported in addition Defeated machine-made egg-shaped or honey-comb coal briquets stream is contrary, and one side bulk blocked that coal channel coal piling is more and more, and another aspect bulk not card scraper plate causes Scratch board conveyor load causes greatly equipment damage.The drawbacks of coalcutter uplink coal cutting, can not overcome under existence conditions.
Summary of the invention
To overcome the shortcomings of existing technologies, the present invention provides a kind of method of well work mechanization high-efficiency mining oil shale, this The technical solution of invention is:
(1) face timbering quality management: force piece setting load must reach 24MPa or more, and bracket support state reaches Quality standardization requirement guarantees bracket front column and the requirement of top beam setting load, work to the carry out fluid infusion that setting load does not reach requirement Make face and strictly carries out back production by regulation mining height and layer position;
(2) coalcutter downlink coal cutting, after scratch board conveyor head is cut, by the upper and lower position tune of two rollers of coalcutter or so It changes, returns machine to scratch board conveyor tail direction sky machine, coal wall float coal is peace and quiet, and force piece all pulls together, drag conveyor In straight knife state;
(3) drag conveyor is started to release at away from scratch board conveyor tail 35m, makes scratch board conveyor bending section 18m, it is curved Tune is all released to scratch board conveyor tail;
(4) coalcutter makes roller beveling enter coal wall to the traction of scratch board conveyor tail direction, is cut and is scraped by the bending section of 18m Plate transporter tail coal wall from top to bottom all releases drag conveyor so that coalcutter reaches normal cutting depth 0.6m, In straight knife state;
(5) upper and lower position of two rollers of coalcutter or so is exchanged, leads the normal coal cutting of machine to scratch board conveyor heading, chases after Machine moves frame operation, starts next circulation feed;
(6) bulk manually abolishes construction: coal mining crusher machine is used in shale bulk a part that oil shale face production process generates, Some shale bulk needs to be crushed using manual type, increases work face pressure wind connector quantity, makes pneumatic pick Entire working face can be covered with range, aspect bulk is abolished, and according to the generating region of working face bulk, is slipping head, coalcutter Bottom roll and upper roller respectively arrange one group to carry out bulk with machine and abolish construction, while scratch board conveyor head concentration is abolished, Implementation abolishes construction to the comprehensive spreadability bulk for slipping head from slipping tail to coalcutter in advance;
(7) after oil shale have passed through mechanical, hand breaking in process of production, still there is the shale of the larger lumpiness in part, in oily page Coal Sizing Crusher 2PLF120/150 is installed, working face oil shale is broken with classification by coal at scar transportation roadway belt conveyer head It is broken that broken machine carries out last time, it is ensured that safe and efficient production.
Itself longitudinal cranny development in oil shale face simultaneously is influenced to be the visitor for causing bulk by 2 gob collapse of coal and old working See reason.It is analyzed from supporting quality management first, the reduction of force piece supporting quality, which causes to connect, pushes up not firm, coal wall caving model Enclose the generation for expanding and having aggravated bulk.First is that improving force piece supporting quality to the understanding of Roof Control importance, improve Bracket support quality can reduce roof delamination, enhance top plate self-strength, increase the stability of top plate;Bracket is improved to machine road The enabling capabilities of top plate reduce face roof end face degree of fragmentation, mitigate coal wall caving;On compacting top plate and pedestal floats downward cash, Improve support system rigidity;The specified enabling capabilities of bracket are made full use of, roof and floor is reduced with respect to the amount of shifting near, reduces to former before coal wall The destruction again in raw crack, to reduce the generation of bulk.Specific operation requires:
(1) force piece setting load must reach prescribed requirement (reference frame pressure gauge numerical value is 24MPa or more), bracket branch The requirement of shield reaching quality standards of state.
(2) bracket is newly moved in production process to working face and carries out setting load inspection, is mended to what setting load did not reached requirement Liquid guarantees bracket front column and the requirement of top beam setting load.
(3) the maintenance management of force piece is reinforced, and the blowby liquid occurred to bracket will be handled in time from failures such as drops, respectively Safety valve must reach yield load requirement.
(4) working face strictly carries out back production by regulation mining height and layer position, when coalcutter coal cutting, receives wall supporting personnel in front roll Advanced 1~2 frame of preceding standard receives wall supporting, prevents wall caving.When wall caving occurs, to draw advanced frame to stretch out extensible canopy in time, accomplish fluently shield Side board safeguards top plate, prevents that sky top area is excessive, causes to leak useful event.
(5) working face wants strict implement to chase after machine and moves frame system, safeguards top plate in time.After unit front roll is cut, stretch out in time Extensible canopy, back roll accomplish fluently face guard later in time, prevent coal wall caving.
(6) working face lag 2~3 frame of coalcutter starts to chase after machine and moves frame, accomplishes fluently face guard in time after moving frame, it is desirable that end face away from ≤340mm。
(7) bracket will arrange in a line, and deviation must not exceed ± 50mm, and deviation of centre distance is no more than ± 100mm.
(8) bracket wants vertical roof and floor, crooked < ± 5 °;Set cap is parallel with top plate to be installed, and 7 ° of maximum elevation <.
(9) obvious mismatch cannot be had between adjacent stent, and bracket is not squeezed and do not stung, and gap is no more than 200mm between frame.
The invention has the benefit that the one-way coal cutting technique that downlink coal cutting uplink sky machine returns substantially alleviates coal mining The coal piling situation formed when uplink coal cutting, the bulk that do not abolish when uplink sky machine returns, when can be by downlink carry out secondary broken It is broken, improve the Homes Using TV of working face, it is ensured that the safe and efficient production of working face.
Specific embodiment
The invention will now be further described with reference to specific embodiments, the advantages and features of the present invention will be with description and It is apparent.But examples are merely exemplary for these, and it is not intended to limit the scope of the present invention in any way.Those skilled in the art Member it should be understood that without departing from the spirit and scope of the invention can details to technical solution of the present invention and form into Row modifications or substitutions, but these modifications and replacement are fallen within the protection scope of the present invention.
The present invention relates to a kind of methods of well work mechanization high-efficiency mining oil shale:
(1) face timbering quality management: force piece setting load must reach 24MPa or more, and bracket support state reaches Quality standardization requirement guarantees bracket front column and the requirement of top beam setting load, work to the carry out fluid infusion that setting load does not reach requirement Make face and strictly carries out back production by regulation mining height and layer position;
(2) coalcutter downlink coal cutting, after scratch board conveyor head is cut, by the upper and lower position tune of two rollers of coalcutter or so It changes, returns machine to scratch board conveyor tail direction sky machine, coal wall float coal is peace and quiet, and force piece all pulls together, drag conveyor In straight knife state;
(3) drag conveyor is started to release at away from scratch board conveyor tail 35m, makes scratch board conveyor bending section 18m, it is curved Tune is all released to scratch board conveyor tail;
(4) coalcutter makes roller beveling enter coal wall to the traction of scratch board conveyor tail direction, is cut and is scraped by the bending section of 18m Plate transporter tail coal wall from top to bottom all releases drag conveyor so that coalcutter reaches normal cutting depth 0.6m, In straight knife state;
(5) upper and lower position of two rollers of coalcutter or so is exchanged, leads the normal coal cutting of machine to scratch board conveyor heading, chases after Machine moves frame operation, starts next circulation feed;
(6) bulk manually abolishes construction: coal mining crusher machine is used in shale bulk a part that oil shale face production process generates, Some shale bulk needs to be crushed using manual type, increases work face pressure wind connector quantity, makes pneumatic pick Entire working face can be covered with range, aspect bulk is abolished, and according to the generating region of working face bulk, is slipping head, coalcutter Bottom roll and upper roller respectively arrange one group to carry out bulk with machine and abolish construction, while scratch board conveyor head concentration is abolished, Implementation abolishes construction to the comprehensive spreadability bulk for slipping head from slipping tail to coalcutter in advance;
(7) after oil shale have passed through mechanical, hand breaking in process of production, still there is the shale of the larger lumpiness in part, in oily page Coal Sizing Crusher 2PLF120/150 is installed, working face oil shale is broken with classification by coal at scar transportation roadway belt conveyer head It is broken that broken machine carries out last time, it is ensured that safe and efficient production.
Itself longitudinal cranny development in oil shale face simultaneously is influenced to be the visitor for causing bulk by 2 gob collapse of coal and old working See reason.It is analyzed from supporting quality management first, the reduction of force piece supporting quality, which causes to connect, pushes up not firm, coal wall caving model Enclose the generation for expanding and having aggravated bulk.First is that improving force piece supporting quality to the understanding of Roof Control importance, improve Bracket support quality can reduce roof delamination, enhance top plate self-strength, increase the stability of top plate;Bracket is improved to machine road The enabling capabilities of top plate reduce face roof end face degree of fragmentation, mitigate coal wall caving;On compacting top plate and pedestal floats downward cash, Improve support system rigidity;The specified enabling capabilities of bracket are made full use of, roof and floor is reduced with respect to the amount of shifting near, reduces to former before coal wall The destruction again in raw crack, to reduce the generation of bulk.Specific operation requires:
(1) force piece setting load must reach prescribed requirement (reference frame pressure gauge numerical value is 24MPa or more), bracket branch The requirement of shield reaching quality standards of state.
(2) bracket is newly moved in production process to working face and carries out setting load inspection, is mended to what setting load did not reached requirement Liquid guarantees bracket front column and the requirement of top beam setting load.
(3) the maintenance management of force piece is reinforced, and the blowby liquid occurred to bracket will be handled in time from failures such as drops, respectively Safety valve must reach yield load requirement.
(4) working face strictly carries out back production by regulation mining height and layer position, when coalcutter coal cutting, receives wall supporting personnel in front roll Advanced 1~2 frame of preceding standard receives wall supporting, prevents wall caving.When wall caving occurs, to draw advanced frame to stretch out extensible canopy in time, accomplish fluently shield Side board safeguards top plate, prevents that sky top area is excessive, causes to leak useful event.
(5) working face wants strict implement to chase after machine and moves frame system, safeguards top plate in time.After unit front roll is cut, stretch out in time Extensible canopy, back roll accomplish fluently face guard later in time, prevent coal wall caving.
(6) working face lag 2~3 frame of coalcutter starts to chase after machine and moves frame, accomplishes fluently face guard in time after moving frame, it is desirable that end face away from ≤340mm。
(7) bracket will arrange in a line, and deviation must not exceed ± 50mm, and deviation of centre distance is no more than ± 100mm.
(8) bracket wants vertical roof and floor, crooked < ± 5 °;Set cap is parallel with top plate to be installed, and 7 ° of maximum elevation <.
(9) obvious mismatch cannot be had between adjacent stent, and bracket is not squeezed and do not stung, and gap is no more than 200mm between frame.

Claims (1)

1. the method for well work mechanization high-efficiency mining oil shale, it is characterised in that:
(1) face timbering quality management: force piece setting load must reach 24MPa or more, and bracket support state reaches Quality standardization requirement guarantees bracket front column and the requirement of top beam setting load, work to the carry out fluid infusion that setting load does not reach requirement Make face and strictly carries out back production by regulation mining height and layer position;
(2) coalcutter downlink coal cutting, after scratch board conveyor head is cut, by the upper and lower position tune of two rollers of coalcutter or so It changes, returns machine to scratch board conveyor tail direction sky machine, coal wall float coal is peace and quiet, and force piece all pulls together, drag conveyor In straight knife state;
(3) drag conveyor is started to release at away from scratch board conveyor tail 35m, makes scratch board conveyor bending section 18m, it is curved Tune is all released to scratch board conveyor tail;
(4) coalcutter makes roller beveling enter coal wall to the traction of scratch board conveyor tail direction, is cut and is scraped by the bending section of 18m Plate transporter tail coal wall from top to bottom all releases drag conveyor so that coalcutter reaches normal cutting depth 0.6m, In straight knife state;
(5) upper and lower position of two rollers of coalcutter or so is exchanged, leads the normal coal cutting of machine to scratch board conveyor heading, chases after Machine moves frame operation, starts next circulation feed;
(6) bulk manually abolishes construction: coal mining crusher machine is used in shale bulk a part that oil shale face production process generates, Some shale bulk needs to be crushed using manual type, increases work face pressure wind connector quantity, makes pneumatic pick Entire working face can be covered with range, aspect bulk is abolished, and according to the generating region of working face bulk, is slipping head, coalcutter Bottom roll and upper roller respectively arrange one group to carry out bulk with machine and abolish construction, while scratch board conveyor head concentration is abolished, Implementation abolishes construction to the comprehensive spreadability bulk for slipping head from slipping tail to coalcutter in advance;
(7) after oil shale have passed through mechanical, hand breaking in process of production, still there is the shale of the larger lumpiness in part, in oily page Coal Sizing Crusher 2PLF120/150 is installed, working face oil shale is broken with classification by coal at scar transportation roadway belt conveyer head It is broken that broken machine carries out last time, it is ensured that safe and efficient production.
CN201811079587.4A 2018-09-17 2018-09-17 The method of well work mechanization high-efficiency mining oil shale Pending CN109403977A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811079587.4A CN109403977A (en) 2018-09-17 2018-09-17 The method of well work mechanization high-efficiency mining oil shale

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811079587.4A CN109403977A (en) 2018-09-17 2018-09-17 The method of well work mechanization high-efficiency mining oil shale

Publications (1)

Publication Number Publication Date
CN109403977A true CN109403977A (en) 2019-03-01

Family

ID=65464780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811079587.4A Pending CN109403977A (en) 2018-09-17 2018-09-17 The method of well work mechanization high-efficiency mining oil shale

Country Status (1)

Country Link
CN (1) CN109403977A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5938289A (en) * 1996-11-08 1999-08-17 Superior Highwall Miners, Inc. High wall mining conveyor system
RU2138640C1 (en) * 1998-08-20 1999-09-27 Институт угля и углехимии СО РАН Method for development of thick gently dipping coal seam
CN103590842A (en) * 2013-11-21 2014-02-19 山东大学 Full-thread anchor rod pre-tightening force exerting device capable of achieving automatic anchor unloading and operation method
CN106337685A (en) * 2016-10-21 2017-01-18 中国矿业大学(北京) Method for combined exploitation of coal and its associated oil shales

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5938289A (en) * 1996-11-08 1999-08-17 Superior Highwall Miners, Inc. High wall mining conveyor system
RU2138640C1 (en) * 1998-08-20 1999-09-27 Институт угля и углехимии СО РАН Method for development of thick gently dipping coal seam
CN103590842A (en) * 2013-11-21 2014-02-19 山东大学 Full-thread anchor rod pre-tightening force exerting device capable of achieving automatic anchor unloading and operation method
CN106337685A (en) * 2016-10-21 2017-01-18 中国矿业大学(北京) Method for combined exploitation of coal and its associated oil shales

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
宋磊桐等: "油页岩工作面大块联合破除工艺研究", 《山东煤炭科技》 *

Similar Documents

Publication Publication Date Title
CN103742148B (en) The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam
CN105626071B (en) Mining method for gently inclined thin ore body
CN103104260B (en) Under complex geological condition, comprehensive-machine is to hand-pulled noodles coal-mining method
CN102587913A (en) Steeply inclined seam dip oblique strike longwall comprehensive mechanical coal mining method
CN106968671B (en) The filling of underground coal mine coal working face return channel withdraws method
CN107387084A (en) A kind of gob side entry retaining reduces the construction method for cutting top depth
CN101936172B (en) Governance method of floor heave of mine roadway during mining
CN108412494B (en) A kind of long-armed longitudinally oriented strip belt paste body filling process for stoping
CN105804753A (en) Carbon dioxide blasting-based method for weakening top caving coal on hard coal seam
Hebblewhite Status and prospects of underground thick coal seam mining methods
CN101881168A (en) Ultra-thin coal seam bottom climbing type comprehensive mechanical mining method
CN104265291A (en) Comprehensive mechanized coal mining method of steeply inclined and extremely thick coal seam planing conveyor
CN110359914A (en) A kind of safe, inexpensive combined section mining methods of gently inclined medium thick orebody
CN110985083B (en) Stoping roadway stack type support supporting system and method
CN109577981A (en) A kind of high seam pillar recovery method
CN106703808A (en) Method for increasing end top coal recovery rate by means of thick coal seam fully-mechanized caving face mining roadway drilling presplitting
CN104234715B (en) The double fully-mechanized mining working process for stoping of high working face
CN107780936B (en) A kind of high seam something lost coal second mining technique
CN109403977A (en) The method of well work mechanization high-efficiency mining oil shale
CN109268013A (en) A kind of fully-mechanized mining working Length discrepancy big angle rotary production practice
CN110273686A (en) High inclination-angle structure is complicated thick seam large mining high comprehensive mining process for stoping
CN113027502B (en) Synchronous withdrawing and installing process of fully mechanized mining equipment
CN205532650U (en) Roof support structure and well worker colliery withdrawing working face that has this structure
CN104863584B (en) Coal-face non-notch feed coal mining complete equipment and tool feeding method
Howe Two Decades of Mobile Roof Support Applications

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190301