CN109403626A - Build the application method of removable concrete column template - Google Patents

Build the application method of removable concrete column template Download PDF

Info

Publication number
CN109403626A
CN109403626A CN201811171124.0A CN201811171124A CN109403626A CN 109403626 A CN109403626 A CN 109403626A CN 201811171124 A CN201811171124 A CN 201811171124A CN 109403626 A CN109403626 A CN 109403626A
Authority
CN
China
Prior art keywords
template
magnetic
horizontal
magnet base
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811171124.0A
Other languages
Chinese (zh)
Other versions
CN109403626B (en
Inventor
郑景文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Kaiyuan Construction Management Co.,Ltd.
Original Assignee
Dongguan Haoqi Enterprise Management Services Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Haoqi Enterprise Management Services Ltd filed Critical Dongguan Haoqi Enterprise Management Services Ltd
Priority to CN201811171124.0A priority Critical patent/CN109403626B/en
Publication of CN109403626A publication Critical patent/CN109403626A/en
Application granted granted Critical
Publication of CN109403626B publication Critical patent/CN109403626B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor

Abstract

Build the application method of removable concrete column template, removable concrete column template is built to be made of muti-piece Magnetic template, Magnetic template includes template, horizontal magnet base, horizontal connecting plate, vertical magnet base and vertical connecting plate, horizontal magnet base includes horizontal magnetic support, horizontal magnetic core and horizontal magnetic core hand handle, vertical magnet base includes vertical magnetic support, vertical magnetic core and vertical magnetic core hand handle, and template is equipped with left boss, right recess, convex platform and lower recess;In use, the left boss of adjacent forms and right recess grafting by the convex platform of adjacent forms and lower recess grafting, are implemented the connection in length and breadth of template;Adjacent template is linked together to the magnetic attraction of vertical connecting plate to the magnetic attraction of horizontal connecting plate and vertical magnet base using horizontal magnet base, the pouring type chamber of concrete column is constituted using template, eliminates the mode connected with iron nail;After the solidification of concrete column is hardened, template is dismantled, the not damaged connection and dismounting of template is implemented, improves service efficiency and the service life of template.

Description

Build the application method of removable concrete column template
Technical field
The present invention relates to a kind of application method of building template, in particular to a kind of use for building removable concrete column template Method.
Background technique
Currently, needing with planking nail when people build concrete column into a concrete column type chamber, then cement sandstone slurry is filled into Plank is levered up after the solidification of concrete column, plank is caused to damage, construction efficiency is lower by the type chamber of plank;A kind of removable concrete column of building The application method of template, it has also become reduce labor intensity and improve the needs of template service efficiency and service life.
Summary of the invention
The purpose of the present invention is overcome the deficiencies of the prior art and provide a kind of user for building removable concrete column template Method, for improving service efficiency and the service life of template.
It is made of the technical scheme adopted by the invention is: building removable concrete column template Magnetic template, Magnetic template Equipped with muti-piece;Every piece of Magnetic template includes template, horizontal magnet base, horizontal connecting plate, vertical magnet base and vertical connecting plate, template with Horizontal magnet base, horizontal connecting plate, vertical magnet base and vertical connecting plate are fixedly connected;Horizontal magnet base include horizontal magnetic support, horizontal magnetic core with And horizontal magnetic core hand handle, the cross that horizontal magnetic core is actively tied in horizontal magnetic support is rotary-type intracavitary, and horizontal magnetic core hand handle is fixedly connected with horizontal magnetic core, horizontal Magnetic support is fixedly connected with template;Vertical magnet base includes that vertical magnetic support, vertical magnetic core and vertical magnetic core hand handle, vertical magnetic core are actively tied in vertical Indulging for magnetic support is rotary-type intracavitary, and vertical magnetic core hand handle is fixedly connected with vertical magnetic core, and vertical magnetic support is fixedly connected with template;Template is equipped with a left side Boss and right recess, the center line of left boss are identical as the center line of right recess;Horizontal magnet base is set to the left boss one of template Side, horizontal connecting plate are set to the right recess of template on one side;Template be equipped with convex platform and lower recess, the center line of convex platform with it is recessed The center line of mouth is identical;Vertical magnet base is set to the convex platform of template 2, indulges the lower recess that connecting plate is set to template;Horizontal magnet base The axis of horizontal magnetic core is vertical with the axis of vertical magnetic core of vertical magnet base, the center line of left boss and the central axis of convex platform; It is connected with each other using muti-piece Magnetic template, constitutes the pouring type chamber of concrete column, the form for concrete column cement sandstone slurry.
The original state of horizontal magnet base 3 is: the pole N of the horizontal magnetic core of horizontal magnet base and the magnetic line of force of the pole S pass through in horizontal magnetic support Portion's forming circuit, horizontal magnet base do not have magnetic attraction;The original state of vertical magnet base is: the pole N of the vertical magnetic core of vertical magnet base and S The magnetic line of force of pole does not have magnetic attraction by forming circuit inside vertical magnetic support, vertical magnet base;The horizontal magnetic core of horizontal magnet base is rotated by 90 ° When angle, the pole N of horizontal magnetic core and the magnetic line of force of the pole S are formed into a loop by the external of horizontal magnetic support, and horizontal magnet base is to positioned at horizontal magnetic support The ferromagnetic material of horizontal suction surface position has magnetic attraction;When the vertical magnetic core of vertical magnet base is rotated by 90 ° angle, the pole N and the pole S of magnetic core are indulged The magnetic line of force be formed into a loop by indulging the external of magnetic support, vertical magnet base has magnetic to the ferromagnetic material of the vertical suction surface position of vertical magnetic support Attraction;Horizontal connecting plate and vertical connecting plate are made of ferromagnetic material.
The application method for building removable concrete column template is: in use, according to the magnetic of the size selection dimension of concrete column Power template;In the scene of building concrete column, the pouring type chamber of concrete column is set according to the requirement of architectural drawing;First by four pieces of Magnetic templates The left boss of every piece of Magnetic template is inserted into the right recess of adjacent Magnetic template by mutually transverse connection, and four pieces of Magnetic templates are connected It is connected together, implements the located lateral connection of the adjacent forms of Magnetic template;Then the horizontal magnetic of every piece of Magnetic template is held respectively The horizontal magnetic core hand handle of power seat twists 90 ° of angles of horizontal magnetic core handle rotation, and each horizontal magnet base is made to generate magnetic to the horizontal connecting plate on its opposite Attraction sucks the horizontal connecting plate on each horizontal its opposite of magnet base, using the magnetic attraction of horizontal magnet base by four pieces of magnetic force moulds Plate mutually locking links together, and implements the mutually transverse magnetic force locking connection of the adjacent forms of Magnetic template, utilizes four blocks of magnetic Power template constitutes first pouring forms frame;After constituting first pouring forms frame composition using preceding four pieces of Magnetic templates, then will In addition four pieces of Magnetic templates interconnect after, and four pieces of Magnetic templates constitute second pouring forms frame after utilization;Second After a pouring forms frame is constituted, it is aligned second pouring forms frame with first pouring forms frame, by second pouring forms On the convex platform for the template that the lower recess of the template 2 of frame is inserted into first pouring forms frame, make the mould of first pouring forms frame The convex platform of plate is inserted into the lower recess of the template of second pouring forms frame, makes the vertical magnetic force on first pouring forms frame Seat implements the phase of second pouring forms frame and first pouring forms frame against the vertical connecting plate on second pouring forms frame Adjacent template is located by connecting;After being located by connecting of second pouring forms frame and first pouring forms frame, vertical magnetic force is then twisted 90 ° of angles of vertical magnetic core handle rotation of seat make the vertical magnet base generate magnetic attachment to the vertical connecting plate on second pouring forms frame Second pouring forms frame is sucked with first pouring forms frame using the magnetic attraction of vertical magnet base and is linked together by power, Implement the longitudinally connected of first pouring forms frame and the adjacent forms of second pouring forms frame;Magnetic force is from bottom to top utilized again Template constitutes the pouring type chamber of concrete column, so continuous circulation, implements the lateral connection of adjacent forms and longitudinally connected, until filling Until the height of note type chamber reaches design requirement;After solidification is completed in the perfusion of concrete column, Magnetic template is disassembled on concrete column;It tears open When unloading, first opposite direction twists 90 ° of angles of vertical magnetic core handle rotation of vertical magnet base, releases the vertical magnet base in each piece of template to other moulds The magnetic attraction of vertical connecting plate on plate releases longitudinally connected between adjacent forms;Longitudinally connected solution between adjacent forms After removing, 90 ° of angles of horizontal magnetic core handle rotation of horizontal magnet base in template are twisted, lose the horizontal magnet base in each piece of template to adjacent mould The magnetic attraction of horizontal connecting plate on plate releases the lateral magnetic connects between adjacent forms;Again by each piece of template be correspondingly connected with Template separation, implement the lateral separation of Magnetic template, finally from top to bottom by each piece of template and the template that is correspondingly connected with point From whole templates to be separated to the concrete column that completion has been perfused.
It is made of the beneficial effects of the present invention are: building removable concrete column template Magnetic template, Magnetic template is equipped with muti-piece; Every piece of Magnetic template includes that template, horizontal magnet base, horizontal connecting plate, vertical magnet base and vertical connecting plate, horizontal magnet base include Horizontal magnetic support, horizontal magnetic core and horizontal magnetic core hand handle, vertical magnet base include that vertical magnetic support, vertical magnetic core and vertical magnetic core hand handle, template are set There are left boss, right recess, convex platform and lower recess;In use, by the left boss of adjacent forms and right recess grafting, it will be adjacent The convex platform of template and lower recess grafting, implement the connection in length and breadth of template;Using horizontal magnet base to the magnetic attraction of horizontal connecting plate And adjacent template is linked together to the magnetic attraction of vertical connecting plate by vertical magnet base, and the perfusion of concrete column is constituted using template Type chamber eliminates the mode connected with iron nail;After the solidification of concrete column is hardened, the magnetic connection in length and breadth of removing template is solved, template is dismantled, The not damaged connection and dismounting for implementing template solve the defect that common templates use iron nail to connect, improve template Service efficiency and service life.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for building removable concrete column template;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the schematic diagram of horizontal magnet base connection;
Fig. 4 is the schematic diagram of vertical magnet base connection;
Fig. 5 is the schematic diagram of the removable concrete column template connection of building;
Fig. 6 is the top view of Fig. 5.
Specific embodiment
The present invention is further detailed with specific embodiment with reference to the accompanying drawing:
Horizontal magnetic shown in the top view of Fig. 1 shown in the structural schematic diagram of the removable concrete column template of building as shown in Figure 1, Fig. 2, Fig. 3 The schematic diagram of power seat connection, the schematic diagram that magnet base connection is indulged shown in Fig. 4, the removable concrete column template connection of building shown in Fig. 5 The top view of Fig. 5 shown in schematic diagram and Fig. 6;It builds removable concrete column template to be made of Magnetic template 1, Magnetic template 1 is equipped with Muti-piece;Every piece of Magnetic template 1 includes template 2, horizontal magnet base 3, horizontal connecting plate 4, vertical magnet base 5 and vertical connecting plate 6, template 2 are fixedly connected with horizontal magnet base 3, horizontal connecting plate 4, vertical magnet base 5 and vertical connecting plate 6;Horizontal magnet base 3 include horizontal magnetic support 7, Horizontal magnetic core 8 and horizontal magnetic core hand handle 9, horizontal magnetic core 8 are actively tied in the rotary-type chamber 10 of cross of horizontal magnetic support 7, horizontal magnetic core hand handle 9 and cross Magnetic core 8 is fixedly connected, and horizontal magnetic support 7 is fixedly connected with template 2;Vertical magnet base 5 includes vertical magnetic support 11, vertical magnetic core 12 and vertical magnetic Core hand handle 13, vertical magnetic core 12 are actively tied in the indulging in rotary-type chamber 14 of vertical magnetic support 11, it is fixed with vertical magnetic core 12 to indulge magnetic core hand handle 13 Connection, vertical magnetic support 11 are fixedly connected with template 2;Template 2 be equipped with left boss 15 and right recess 16, the center line of left boss 15 with The center line of right recess 16 is identical;Horizontal magnet base 3 is set to the left boss 15 of template 2 on one side, and horizontal connecting plate 4 is set to the right side of template 2 Recess 16 is on one side;Template 2 is equipped with convex platform 17 and lower recess 18, the center line phase of the center line of convex platform 17 and lower recess 18 Together;Vertical magnet base 5 is set to the convex platform 17 of template 2, indulges the lower recess 18 that connecting plate 6 is set to template 2;The horizontal magnetic of horizontal magnet base 3 The axis of core 8 is vertical with the axis of vertical magnetic core 12 of vertical magnet base 5, and the center line of left boss 15 and the center line of convex platform 17 hang down Directly;It is connected with each other using muti-piece Magnetic template 1, constitutes the pouring type chamber of concrete column, the form for concrete column cement sandstone slurry.
The original state of horizontal magnet base 3 is: the pole N of the horizontal magnetic core 8 of horizontal magnet base 3 and the magnetic line of force of the pole S pass through horizontal magnetic support 7 Inside forming circuit, horizontal magnet base 3 do not have magnetic attraction;The original state of vertical magnet base 5 is: the vertical magnetic core 12 of vertical magnet base 5 The pole N and the pole S the magnetic line of force by being formed into a loop inside vertical magnetic support 11, indulging magnet base 5 does not have magnetic attraction;Horizontal magnet base 3 When horizontal magnetic core 8 is rotated by 90 ° angle, the pole N of horizontal magnetic core 8 and the magnetic line of force of the pole S are formed into a loop by the external of horizontal magnetic support 7, horizontal magnetic force The ferromagnetic material of 3 pairs of 19 positions of horizontal suction surface for being located at horizontal magnetic support 7 of seat has magnetic attraction;The vertical magnetic core 12 of vertical magnet base 5 rotates When 90 ° of angles, the magnetic line of force of the pole N and the pole S of indulging magnetic core 12 is formed into a loop by indulging the external of magnetic support 16, indulges magnet base 5 to vertical magnetic The ferromagnetic material of 20 position of vertical suction surface of seat 11 has magnetic attraction;Horizontal connecting plate 4 and vertical connecting plate 6 are by ferromagnetic material structure At.
One piece of template 2 connect and dismantles with the located lateral of another piece of template 2 for convenience, the left boss 15 of template 2 Width it is smaller than 16 width of right recess of template 2, the width of the left boss 15 of template 2 it is smaller than 16 width of right recess of template 21 milli Rice is to 3 millimeters;The center line of the right recess 16 of the center line and template 2 of the left boss 15 of template 2 in the same plane, left boss 15 are located at the left side of right recess 16.
It connect to implement one piece of template 2 above with the locking of following one piece of template 2, the width of the convex platform 17 of template 2 It is smaller than the width of the lower recess 18 of template 2 than template 2, lower recess of the width of the convex platform 17 of template 2 than template 2 than template 2 18 width is 1 millimeter to 3 millimeters small;Template 2 convex platform 17 center line and the lower recess 18 of template 2 center line same In one plane, convex platform 17 is located at the top of lower recess 18.
In order to implement to build the perfusion of concrete column, using the pouring type chamber for building removable concrete column template and constituting concrete column, every piece Magnetic template 1 be equipped with one piece of template 2, every piece of template 2 is equipped with a left boss 15 and a right recess 16, every piece of magnetic force mould Plate 1 is equipped with a horizontal magnet base 3 and a horizontal connecting plate 4, for the lateral connection between template 2 and template;Every piece of magnetic force Template 1 is equipped with a vertical magnet base 5 and a vertical connecting plate 6, is vertically connected with for the longitudinal direction between template 2 and template 2.
In order to be suitble to build the concrete column of different size, Magnetic template 1 is equipped with different specifications, the Magnetic template of same specification 1 dimension and shape is identical, the template 2 of the Magnetic template 1 of same specification, horizontal magnet base 3, horizontal connecting plate 4, vertical magnet base 5 And vertical connecting plate 6 position and size it is identical, to be suitble to be constituted the concrete column of different size;Template 2 is equipped with the anti-snearing of cement Layer, avoids concrete column cement from clinging template 2.
The application method for building removable concrete column template is: in use, according to the magnetic of the size selection dimension of concrete column Power template 1;In the scene of building concrete column, the pouring type chamber of concrete column is set according to the requirement of architectural drawing;First by four pieces of magnetic force moulds The left boss 15 of every piece of Magnetic template 1, is inserted into the right recess 16 of adjacent Magnetic template 1 by the mutually transverse connection of plate 1, by four blocks of magnetic Power template 1 links together, and implements the located lateral connection of the adjacent forms 2 of Magnetic template 1;Then every piece of magnetic force is held respectively The horizontal magnetic core hand handle 9 of the horizontal magnet base 3 of template 1 twists horizontal magnetic core hand handle 9 and rotates 90 ° of angles, makes each horizontal magnet base 3 to its opposite Horizontal connecting plate 4 generate magnetic attraction, the horizontal connecting plate 4 on each horizontal 3 its opposite of magnet base is sucked, horizontal magnet base 3 is utilized Magnetic attraction links together four pieces of 1 mutually lockings of Magnetic template, implements the mutually transverse of the adjacent forms 2 of Magnetic template 1 Magnetic force locking connection, constitutes first pouring forms frame 21 using four pieces of Magnetic templates 1;It is constituted using preceding four pieces of Magnetic templates 1 After first pouring forms frame 21 is constituted, then other four pieces of Magnetic templates 1 afterwards are interconnected, four pieces of magnetic force after utilization Template 1 constitutes second pouring forms frame 21;After second pouring forms frame 21 is constituted, make second pouring forms frame 21 and the One pouring forms frame 21 is aligned, and the lower recess 18 of the template 2 of second pouring forms frame 21 is inserted into first pouring forms On the convex platform 17 of the template 2 of frame 21, the convex platform 17 of the template 2 of first pouring forms frame 21 is made to be inserted into second perfusion In the lower recess 18 of the template 2 of pattern plate bolster 21, make vertical magnet base 5 on first pouring forms frame 21 against second perfusion mould Vertical connecting plate 6 on sheet frame 21 implements determining for second pouring forms frame 21 and the adjacent forms 2 of first pouring forms frame 21 Position connection;After being located by connecting of second pouring forms frame 21 and first pouring forms frame 21, the vertical of vertical magnet base 5 is then twisted Magnetic core hand handle 13 rotates 90 ° of angles, and the vertical magnet base 5 is made to generate magnetic attachment to the vertical connecting plate 6 on second pouring forms frame 21 Second pouring forms frame 21 is sucked with first pouring forms frame 21 using the magnetic attraction of vertical magnet base 5 and is connected to by power Together, implement the longitudinally connected of first pouring forms frame 21 and the adjacent forms 2 of second pouring forms frame 21;Again by lower and On the pouring type chamber of concrete column is constituted using Magnetic template 1, such continuous circulation implements the lateral connection of adjacent forms 2 and vertical To connection, until the height of pouring type chamber reaches design requirement;After solidification is completed in the perfusion of concrete column, by Magnetic template 1 in concrete It is disassembled on column;When disassembly, the vertical magnetic core hand handle 13 that first opposite direction twists vertical magnet base 5 rotates 90 ° of angles, releases each piece of template 2 On vertical magnet base 5 to the magnetic attraction of the vertical connecting plate 6 in other templates 2, release longitudinally connected between adjacent forms 2; After longitudinally connected releasing between adjacent forms 2, the horizontal magnetic core hand handle 9 for twisting horizontal magnet base 3 in template 2 rotates 90 ° of angles, makes each piece Horizontal magnet base 3 in template 2 loses the magnetic attraction to the horizontal connecting plate 4 in adjacent forms 2, releases between adjacent forms 2 Lateral magnetic connects;Each piece of template 2 is separated with the template 2 being correspondingly connected with again, implement Magnetic template 1 lateral separation, finally by Whole templates 2 is separated the concrete column that completion has been perfused by separating each piece of template 2 with the template 2 being correspondingly connected under above.
Being located by connecting and dismantling in order to facilitate adjacent forms 2, when 2 located lateral of adjacent forms connects, adjacent forms 2 Left boss 15 and right recess 16 is dynamic is cooperatively connected;When adjacent forms 2 are longitudinally connected, the convex platform 17 of adjacent forms 2 with it is recessed Mouth 18 is dynamic to be cooperatively connected;Horizontal magnet base 3 is to the magnetic attraction direction of adjacent horizontal connecting plate 4 and vertical magnet base 5 to adjacent vertical connection The magnetic attraction direction of plate 6 is vertical.
In order to be connected to become the pouring type chamber of concrete column, magnetic force mould using Magnetic template 1 for the lateral connection of Magnetic template 1 When plate 1 connects, first first piece of Magnetic template 1 is connect with second piece of Magnetic template 1;Then by second piece of Magnetic template 1 connect with third block Magnetic template 1, then the Magnetic template 1 of third block is connect with the 4th piece of Magnetic template 1, finally by Four pieces of Magnetic template 1 is connect with first piece of Magnetic template 1;When the lateral connection of the adjacent forms 2 of Magnetic template 1, first will The template 2 of first piece of Magnetic template 1 is connect with the template 2 of second piece of Magnetic template 1, then by the mould of second piece of Magnetic template 1 Plate 2 is connect with the template 2 of third block Magnetic template 1, then by the template 2 of third block Magnetic template 1 and the 4th piece of Magnetic template 1 Template 2 connects, and finally connect the template 2 of the 4th piece of Magnetic template 1 with the template 2 of first piece of Magnetic template 1.
In order to implement the located lateral connection of Magnetic template 1, when 2 located lateral of the template connection of Magnetic template 1, first by the 16 grafting of right recess of the template 2 of the left boss 15 and second piece of Magnetic template 1 of the template 2 of one piece of Magnetic template 1, then by 16 grafting of right recess of the template 2 of the left boss 15 and third block Magnetic template 1 of the template 2 of two pieces of Magnetic templates 1, then by third 16 grafting of right recess of the template 2 of the left boss 15 of the template 2 of block Magnetic template 1 and the 4th piece of Magnetic template 1, finally by the 4th 16 grafting of right recess of the template 2 of the left boss 15 of the template 2 of block Magnetic template 1 and first piece of Magnetic template 1.
In order to lock together the template 2 of four pieces of Magnetic templates 1, first by the horizontal magnet base 3 of first piece of Magnetic template 1 Horizontal suction surface 19 contacted with the horizontal connecting plate 4 of second piece of Magnetic template 1, twist first piece of Magnetic template 1 on horizontal magnet base 3 cross Magnetic core hand handle 15 rotates 90 ° of angles, produces horizontal magnet base 3 in first piece of template 2 to the horizontal connecting plate 4 in second piece of Magnetic template 1 Magnetisation attraction sucks first piece of Magnetic template 1 and second piece of Magnetic template 1 together;Then by second piece of Magnetic template 1 The horizontal suction surface 19 of horizontal magnet base 3 contacted with the horizontal connecting plate 4 of third block Magnetic template 1, twist horizontal in second piece of Magnetic template 1 The horizontal magnetic core hand handle 15 of magnet base 3 rotates 90 ° of angles, makes in second piece of template 2 horizontal magnet base 3 in third block Magnetic template 1 Horizontal connecting plate 4 generates magnetic attraction, and second piece of Magnetic template 1 and third block Magnetic template 1 are sucked together;Again by third block The horizontal suction surface 19 of the horizontal magnet base 3 of Magnetic template 1 is contacted with the horizontal connecting plate 4 of the 4th piece of Magnetic template 1, twists third block magnetic force The horizontal magnetic core hand handle 15 of horizontal magnet base 3 rotates 90 ° of angles in template 1, makes in third block template 2 horizontal magnet base 3 to the 4th piece of magnetic force Horizontal connecting plate 4 in template 1 generates magnetic attraction, and third block Magnetic template 1 and the 4th piece of Magnetic template 1 are sucked together; Finally the horizontal suction surface 19 of the horizontal magnet base 3 of the 4th piece of Magnetic template 1 is contacted with the horizontal connecting plate 4 of first piece of Magnetic template 1, The horizontal magnetic core hand handle 15 for twisting horizontal magnet base 3 in the 4th piece of Magnetic template 1 rotates 90 ° of angles, makes horizontal magnet base 3 in the 4th piece of template 2 Magnetic attraction is generated to the horizontal connecting plate 4 in first piece of Magnetic template 1, by the 4th piece of Magnetic template 1 and first piece of Magnetic template 1 It sucks together.
In order to implement the longitudinal register connection of Magnetic template 1, when 2 longitudinal register of template of Magnetic template 1 connects, first It, will be under four pieces of templates 2 of second pouring forms frame 21 after pouring forms frame 21 and second pouring forms frame 21 are constituted Recess 18 is aligned with the convex platform 17 of first pouring forms frame, 21 4 pieces of templates 2, by the template 2 of second pouring forms frame 21 Four lower recesses 18 template 2 for being inserted into first pouring forms frame 21 four convex platforms 17 on, make first pouring forms Four convex platforms 17 of the template 2 of frame 21 are inserted into four lower recesses 18 of the template 2 of second pouring forms frame 21;So Four of next pouring forms frame 21 lower recesses 18, are inserted in four convex platforms of a upper pouring forms frame 21 by constantly circulation On 17, until the height of pouring type chamber reaches design requirement.
In order to implement the longitudinally connected of a upper pouring forms frame 21 and next pouring forms frame 21, Magnetic template 1 is vertical To when connection, first pouring forms frame 21 is first placed in the basal plane of concrete column, under the upper placement of first horizontal pouring forms frame 21 One pouring forms frame 21 makes first pouring forms after being aligned first pouring forms frame 21 with next pouring forms frame 21 The vertical suction surface 20 of vertical magnet base 5 on frame 21 vertical connecting plate 6 corresponding with next pouring forms frame 21 contacts;Then distinguish The vertical magnetic core hand handle 13 for twisting four vertical magnet bases 5 on first pouring forms frame 21 rotates 90 ° of angles, makes this four vertical magnet bases 5 Vertical magnetic core 12 rotate 90 ° of angles, so that four vertical magnet bases 5 is generated magnetic attraction, using magnetic attraction by first perfusion mould Sheet frame 21 is locked together with next pouring forms frame 31;So constantly recycle, it will be upper using the magnetic attraction of vertical magnet base 5 One pouring forms frame 21 is locked together with next pouring forms frame 31.
In order to disassemble Magnetic template 1 on concrete column, when Magnetic template 1 is dismantled, from top to bottom opposite direction twists vertical magnetic The vertical magnetic core hand handle 13 of power seat 5 rotates 90 ° of angles, and 12 opposite direction of vertical magnetic core of vertical magnet base 5 is made to rotate 90 ° of angles, makes vertical magnet base 5 Magnetic attraction is lost, the longitudinal magnetism connection of adjacent forms 2 is released;Then from top to bottom opposite direction twists the horizontal magnetic of horizontal magnet base 3 Core hand handle 15 rotates 90 ° of angles, so that 8 opposite direction of horizontal magnetic core of horizontal magnet base 3 is rotated 90 ° of angles, horizontal magnet base 3 is made to lose magnetic attachment Power releases the connection of 2 lateral magnetic force of adjacent forms;After the magnetic attraction of vertical magnet base 5 and horizontal magnet base 3 is eliminated, rubber hammer is used The template 2 on concrete column is beaten, loosening is struck into the adhesion of concrete column cement and template 2;Loosening is struck in the adhesion of concrete column cement and template 2 Afterwards, Magnetic template 1 is removed from top to bottom, the purpose to reach easy to disassemble, without damaging template;Magnetic template 1 is dismantled When, after the template 2 of Magnetic template 1 strikes pine, hand grabs the horizontal magnet base 3 of template 2, takes off the template 2 connecting with horizontal magnet base 3, makes this The left boss 15 of template 2 is detached from the right recess 16 of adjacent forms 2, and the lower recess 18 of the template 2 is made to be detached from the convex of adjacent forms 2 Platform 17 makes the right recess 16 of template 2 be detached from the left boss 15 of adjacent forms 2;It so constantly recycles, by whole Magnetic templates 1 Separate the concrete column of form.

Claims (10)

1. the removable concrete column template of building described in the application method of removable concrete column template is built to be made of Magnetic template (1), Magnetic template (1) is equipped with muti-piece;Every piece of Magnetic template (1) includes template (2), horizontal magnet base (3), horizontal connecting plate (4), vertical magnetic Power seat (5) and vertical connecting plate (6), horizontal magnet base (3) include horizontal magnetic support (7), horizontal magnetic core (8) and horizontal magnetic core hand handle (9), Vertical magnet base (5) include vertical magnetic support (11), vertical magnetic core (12) and vertical magnetic core hand handle (13), and template (2) is equipped with left boss (15) and right recess (16), template (2) are equipped with convex platform (17) and lower recess (18);The original state of horizontal magnet base (3) Be: the pole N of the horizontal magnetic core (8) of horizontal magnet base (3) and the magnetic line of force of the pole S inside horizontal magnetic support (7) by being formed into a loop, horizontal magnet base (3) there is no magnetic attraction;The original state of vertical magnet base (5) is: the pole N of the vertical magnetic core (12) of vertical magnet base (5) and the magnetic of the pole S For the line of force by forming circuit inside vertical magnetic support (11), indulging magnet base (5) does not have magnetic attraction;It is characterized by: the building The application method of removable concrete column template is: in use, according to the Magnetic template (1) of the size selection dimension of concrete column;In The pouring type chamber of concrete column is arranged according to the requirement of architectural drawing for the scene for building concrete column;It is first that four pieces of Magnetic templates (1) are mutually horizontal To connection, the left boss (15) of every piece of Magnetic template (1) is inserted into the right recess (16) of adjacent Magnetic template (1), by four blocks of magnetic Power template (1) links together, and implements the located lateral connection of the adjacent forms (2) of Magnetic template (1);Then it holds respectively every The horizontal magnetic core hand handle (9) of the horizontal magnet base (3) of block Magnetic template (1) twists horizontal magnetic core hand handle (9) and rotates 90 ° of angles, makes each horizontal magnetic Power seat (3) generates magnetic attraction to the horizontal connecting plate (4) on its opposite, by the horizontal connecting plate (4) on each horizontal its opposite of magnet base (3) It sucks, four pieces of Magnetic template (1) mutually lockings is linked together using the magnetic attraction of horizontal magnet base (3), implement magnetic force mould The mutually transverse magnetic force of the adjacent forms (2) of plate (1) locks connection, constitutes first perfusion mould using four pieces of Magnetic templates (1) Sheet frame (21);Constituted after first pouring forms frame (21) constitute using preceding four pieces of Magnetic templates (1), then will in addition after four blocks of magnetic Power template (1) interconnects, and four pieces of Magnetic templates (1) constitute second pouring forms frame (21) after utilization;Second After pouring forms frame (21) is constituted, it is aligned second pouring forms frame (21) with first pouring forms frame (21), by second The lower recess (18) of the template (2) of a pouring forms frame (21) is inserted into the convex of the template (2) of first pouring forms frame (21) On platform (17), the convex platform (17) of the template (2) of first pouring forms frame (21) is made to be inserted into second pouring forms frame (21) in the lower recess (18) of template (2), fill the vertical magnet base (5) on first pouring forms frame (21) against second Vertical connecting plate (6) on injection molding sheet frame (21) implements second pouring forms frame (21) and first pouring forms frame (21) Adjacent forms (2) are located by connecting;After being located by connecting of second pouring forms frame (21) and first pouring forms frame (21), Then the vertical magnetic core hand handle (13) for twisting vertical magnet base (5) rotates 90 ° of angles, makes vertical magnet base (5) to second pouring forms frame (21) vertical connecting plate (6) on generates magnetic attraction, using the magnetic attraction of vertical magnet base (5) by second pouring forms frame (21) it sucks and links together with first pouring forms frame (21), implement first pouring forms frame (21) and second perfusion The adjacent forms (2) of pattern plate bolster (21) it is longitudinally connected;The pouring type of concrete column is from bottom to top constituted using Magnetic template (1) again Chamber, so continuous circulation implement the lateral connection of adjacent forms (2) and longitudinally connected, until the height of pouring type chamber reaches Until design requirement;After solidification is completed in the perfusion of concrete column, Magnetic template (1) is disassembled on concrete column;When disassembly, first opposite direction The vertical magnetic core hand handle (13) for twisting vertical magnet base (5) rotates 90 ° of angles, releases the vertical magnet base (5) on each piece of template (2) to other moulds The magnetic attraction of vertical connecting plate (6) on plate (2) releases longitudinally connected between adjacent forms (2);Between adjacent forms (2) Longitudinally connected releasing after, twist template (2) on horizontal magnet base (3) horizontal magnetic core hand handle (9) rotate 90 ° of angles, make each piece of template (2) On horizontal magnet base (3) lose the magnetic attraction to the horizontal connecting plate (4) on adjacent forms (2), release between adjacent forms (2) Lateral magnetic connects;Each piece of template (2) is separated with the template (2) being correspondingly connected with again, implements the transverse direction point of Magnetic template (1) From finally separating each piece of template (2) with the template (2) being correspondingly connected with from top to bottom, whole templates (2) is separated and has been filled Infuse the concrete column completed.
2. according to the application method of the removable concrete column template of building described in claim 1, it is characterised in that: the adjacent forms (2) when located lateral connects, the left boss (15) of adjacent forms (2) and right recess (16) dynamic mating connection;Adjacent forms (2) are vertical To when connection, the convex platform (17) of adjacent forms (2) and lower recess (18) are moved and are cooperatively connected;Horizontal magnet base (3) is to adjacent horizontal company The magnetic attraction direction of fishplate bar (4) is vertical with magnetic attraction direction of the vertical magnet base (5) to adjacent vertical connecting plate (6).
3. the application method of the removable concrete column template of building according to claim 2, it is characterised in that: the magnetic force mould When plate (1) connects, first first piece of Magnetic template (1) is connect with second piece of Magnetic template (1);Then by second piece of magnetic Power template (1) is connect with third block Magnetic template (1), then by the Magnetic template (1) of third block and the 4th piece of Magnetic template (1) 4th piece of Magnetic template (1), finally connect by connection with first piece of Magnetic template (1).
4. the application method of the removable concrete column template of building according to claim 3, it is characterised in that: the magnetic force mould When the lateral connection of the adjacent forms (2) of plate (1), first by the template (2) of first piece of Magnetic template (1) and second piece of Magnetic template (1) template (2) connection, then by the template (2) of the template (2) of second piece of Magnetic template (1) and third block Magnetic template (1) Connection, then the template (2) of third block Magnetic template (1) is connect with the template (2) of the 4th piece of Magnetic template (1), finally by the The template (2) of four pieces of Magnetic templates (1) is connect with the template (2) of first piece of Magnetic template (1).
5. the application method of the removable concrete column template of building according to claim 4, it is characterised in that: the magnetic force mould When template (2) the located lateral connection of plate (1), first by the left boss (15) and second of the template (2) of first piece of Magnetic template (1) Right recess (16) grafting of the template (2) of block Magnetic template (1), it is then that a left side for the template (2) of second piece of Magnetic template (1) is convex Right recess (16) grafting of the template (2) of platform (15) and third block Magnetic template (1), then by the mould of third block Magnetic template (1) Right recess (16) grafting of the template (2) of the left boss (15) of plate (2) and the 4th piece of Magnetic template (1), finally by the 4th block of magnetic Right recess (16) grafting of the left boss (15) of the template (2) of power template (1) and the template (2) of first piece of Magnetic template (1).
6. the application method of the removable concrete column template of building according to claim 5, it is characterised in that: described first will The horizontal connecting plate (4) of the horizontal suction surface (19) of the horizontal magnet base (3) of first piece of Magnetic template (1) and second piece of Magnetic template (1) Contact, the horizontal magnetic core hand handle (15) for twisting horizontal magnet base (3) on first piece of Magnetic template (1) rotate 90 ° of angles, make first piece of template (2) horizontal magnet base (3) generates magnetic attraction to the horizontal connecting plate (4) on second piece of Magnetic template (1) on, by first piece of magnetic force mould Plate (1) and second piece of Magnetic template (1) suck together;Then by the horizontal suction of the horizontal magnet base (3) of second piece of Magnetic template (1) Draw face (19) to contact with the horizontal connecting plate (4) of third block Magnetic template (1), twists horizontal magnet base (3) on second piece of Magnetic template (1) Horizontal magnetic core hand handle (15) rotate 90 ° of angles, make on second piece of template (2) horizontal magnet base (3) in third block Magnetic template (1) Horizontal connecting plate (4) generates magnetic attraction, and second piece of Magnetic template (1) and third block Magnetic template (1) are sucked together;Again will The horizontal connecting plate (4) of the horizontal suction surface (19) of the horizontal magnet base (3) of third block Magnetic template (1) and the 4th piece of Magnetic template (1) Contact, the horizontal magnetic core hand handle (15) for twisting horizontal magnet base (3) in third block Magnetic template (1) rotate 90 ° of angles, make third block template (2) horizontal magnet base (3) generates magnetic attraction to the horizontal connecting plate (4) on the 4th piece of Magnetic template (1) on, by third block magnetic force mould Plate (1) and the 4th piece of Magnetic template (1) suck together;Finally by the horizontal suction of the horizontal magnet base (3) of the 4th piece of Magnetic template (1) Draw face (19) to contact with the horizontal connecting plate (4) of first piece of Magnetic template (1), twists horizontal magnet base (3) on the 4th piece of Magnetic template (1) Horizontal magnetic core hand handle (15) rotate 90 ° of angles, make on the 4th piece of template (2) horizontal magnet base (3) on first piece of Magnetic template (1) Horizontal connecting plate (4) generates magnetic attraction, and the 4th piece of Magnetic template (1) and first piece of Magnetic template (1) are sucked together.
7. the application method of the removable concrete column template of building according to claim 5, it is characterised in that: the magnetic force mould When template (2) the longitudinal register connection of plate (1), first pouring forms frame (21) and second pouring forms frame (21) are constituted Afterwards, by the lower recess (18) of four pieces of templates (2) of second pouring forms frame (21) and first (21) four pieces of pouring forms frame The convex platform (17) of template (2) is aligned, and four of the template (2) of second pouring forms frame (21) lower recesses (18) are inserted into the On four convex platforms (17) of the template (2) of one pouring forms frame (21), make the template (2) of first pouring forms frame (21) Four convex platforms (17) template (2) for being inserted into second pouring forms frame (21) four lower recesses (18) in;So not Disconnected circulation, four of next pouring forms frame (21) lower recesses (18) are inserted on four of a upper pouring forms frame (21) On boss (17), until the height of pouring type chamber reaches design requirement.
8. the application method of the removable concrete column template of building according to claim 7, it is characterised in that: the magnetic force mould When plate (1) is longitudinally connected, first pouring forms frame (21) is first placed in the basal plane of concrete column, in first horizontal pouring forms frame (21) The next pouring forms frame (21) of upper placement, be aligned first pouring forms frame (21) with next pouring forms frame (21) Afterwards, make the vertical suction surface (20) of the vertical magnet base (5) on first pouring forms frame (21) and next pouring forms frame (21) right Vertical connecting plate (6) contact answered;Then the vertical magnetic core hand of four vertical magnet bases (5) on first pouring forms frame (21) is twisted respectively (13) are rotated 90 ° of angles, so that the vertical magnetic core (12) of this four vertical magnet bases (5) is rotated 90 ° of angles, makes four vertical magnet bases (5) magnetic attraction is generated, is locked in first pouring forms frame (21) and next pouring forms frame (31) using magnetic attraction Together;So continuous circulation, using the magnetic attraction of vertical magnet base (5) by a upper pouring forms frame (21) and next perfusion Pattern plate bolster (31) locks together.
9. the application method of the removable concrete column template of building according to claim 8, it is characterised in that: the magnetic force mould When plate (1) is dismantled, the vertical magnetic core hand handle (13) that from top to bottom opposite direction twists vertical magnet base (5) rotates 90 ° of angles, makes vertical magnet base (5) vertical magnetic core (12) opposite direction rotates 90 ° of angles, and vertical magnet base (5) is made to lose magnetic attraction, releases the vertical of adjacent forms (2) To magnetic connection;Then the horizontal magnetic core hand handle (15) that from top to bottom opposite direction twists horizontal magnet base (3) rotates 90 ° of angles, makes horizontal magnetic force Horizontal magnetic core (8) opposite direction of seat (3) rotates 90 ° of angles, and horizontal magnet base (3) is made to lose magnetic attraction, releases adjacent forms (2) laterally Magnetic connection;After the magnetic attraction of vertical magnet base (5) and horizontal magnet base (3) is eliminated, the template on concrete column is beaten with rubber hammer (2), loosening is struck into the adhesion of concrete column cement and template (2);After loosening is struck in the adhesion of concrete column cement and template (2), from top to bottom Ground removes Magnetic template (1), the purpose to reach easy to disassemble, without damaging template.
10. the application method of the removable concrete column template of building according to claim 9, it is characterised in that: the magnetic force When template (1) is dismantled, after the template (2) of Magnetic template (1) strikes pine, hand grabs the horizontal magnet base (3) of template (2), takes off and horizontal magnetic force The template (2) of seat (3) connection makes the left boss (15) of the template (2) be detached from the right recess (16) of adjacent forms (2), makes the mould The lower recess (18) of plate (2) is detached from the convex platform (17) of adjacent forms (2), and the right recess (16) of template (2) is made to be detached from adjacent mould The left boss (15) of plate (2);It so constantly recycles, whole Magnetic templates (1) is separated to the concrete column of form.
CN201811171124.0A 2018-10-09 2018-10-09 Use method of detachable concrete column template for building Active CN109403626B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811171124.0A CN109403626B (en) 2018-10-09 2018-10-09 Use method of detachable concrete column template for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811171124.0A CN109403626B (en) 2018-10-09 2018-10-09 Use method of detachable concrete column template for building

Publications (2)

Publication Number Publication Date
CN109403626A true CN109403626A (en) 2019-03-01
CN109403626B CN109403626B (en) 2021-06-22

Family

ID=65466787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811171124.0A Active CN109403626B (en) 2018-10-09 2018-10-09 Use method of detachable concrete column template for building

Country Status (1)

Country Link
CN (1) CN109403626B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040140603A1 (en) * 2003-01-09 2004-07-22 Sack James A. Pulling iron pocket, lid and shield
CN201826533U (en) * 2010-09-01 2011-05-11 缪巍 Construction pouring square columnar moldboard combined by plastic sections
CN105926936A (en) * 2016-06-14 2016-09-07 中国建筑第五工程局有限公司 Fabricated section-adjustable formwork system for square stiff pillars and construction method of fabricated section-adjustable formwork system
CN205604712U (en) * 2016-05-18 2016-09-28 江苏建筑职业技术学院 Aluminum alloy template is connected to magnetism for building
CN106760507A (en) * 2017-01-19 2017-05-31 河南工业大学 Cast-in-place column and its construction method in a kind of civil construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040140603A1 (en) * 2003-01-09 2004-07-22 Sack James A. Pulling iron pocket, lid and shield
CN201826533U (en) * 2010-09-01 2011-05-11 缪巍 Construction pouring square columnar moldboard combined by plastic sections
CN205604712U (en) * 2016-05-18 2016-09-28 江苏建筑职业技术学院 Aluminum alloy template is connected to magnetism for building
CN105926936A (en) * 2016-06-14 2016-09-07 中国建筑第五工程局有限公司 Fabricated section-adjustable formwork system for square stiff pillars and construction method of fabricated section-adjustable formwork system
CN106760507A (en) * 2017-01-19 2017-05-31 河南工业大学 Cast-in-place column and its construction method in a kind of civil construction

Also Published As

Publication number Publication date
CN109403626B (en) 2021-06-22

Similar Documents

Publication Publication Date Title
CN103770203B (en) A kind of mould processing U-shaped tank
CN105035941A (en) Sand core hoisting device
CN206653501U (en) A kind of mould of batch casting concrete test block
CN209339605U (en) A kind of building concrete column template
CN209323967U (en) A kind of removable concrete column template of building
CN104191502B (en) A kind of conveniently stripped concrete square pile die
CN109403626A (en) Build the application method of removable concrete column template
CN109235880A (en) Build removable concrete column template
CN109356383A (en) Build the application method of concrete column Magnetic template
CN207825149U (en) A kind of easily demoulding detachable concrete experimental block mould
CN209277540U (en) A kind of building concrete column Magnetic template
CN109208905A (en) Build concrete column combination template
CN206899453U (en) A kind of cylinder type refractory material is stripped grinding tool
CN209277541U (en) A kind of building concrete column combination template
CN109083403A (en) Build concrete column Magnetic template
CN209277536U (en) A kind of removable template of building
CN109208904A (en) Build concrete column template
CN204711134U (en) A kind of novel sandbox
CN209293412U (en) A kind of building combined template
CN207392470U (en) A kind of improved T plate bottom plate piece construction
CN209482713U (en) A kind of removable floor template of building
CN206256658U (en) A kind of raised flooring
CN109208903A (en) Build the application method of concrete column template
CN109403625A (en) Build the application method of concrete column combination template
CN109208896A (en) Build the application method of removable template

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210429

Address after: 311200 No.73, Jianshe 1st Road, Xiaoshan Economic and Technological Development Zone, Hangzhou City, Zhejiang Province

Applicant after: Hangzhou Kaiyuan Construction Management Co.,Ltd.

Address before: 523907 Guangdong province Dongguan city Humen town Jinzhou community shatai Road No. 199 Tianyuan computer city four floor shop V-10

Applicant before: DONGGUAN HAOQI ENTERPRISE MANAGEMENT SERVICE Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant