CN109399872A - A kind of rapid integrated repairing method in heavy metal pollution lake - Google Patents
A kind of rapid integrated repairing method in heavy metal pollution lake Download PDFInfo
- Publication number
- CN109399872A CN109399872A CN201811571590.8A CN201811571590A CN109399872A CN 109399872 A CN109399872 A CN 109399872A CN 201811571590 A CN201811571590 A CN 201811571590A CN 109399872 A CN109399872 A CN 109399872A
- Authority
- CN
- China
- Prior art keywords
- heavy metal
- water
- lake
- artificial floating
- floating island
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F9/00—Multistage treatment of water, waste water or sewage
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01J—CHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
- B01J20/00—Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof
- B01J20/02—Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof comprising inorganic material
- B01J20/06—Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof comprising inorganic material comprising oxides or hydroxides of metals not provided for in group B01J20/04
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01J—CHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
- B01J20/00—Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof
- B01J20/02—Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof comprising inorganic material
- B01J20/20—Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof comprising inorganic material comprising free carbon; comprising carbon obtained by carbonising processes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01J—CHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
- B01J20/00—Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof
- B01J20/28—Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof characterised by their form or physical properties
- B01J20/28014—Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof characterised by their form or physical properties characterised by their form
- B01J20/28016—Particle form
- B01J20/28021—Hollow particles, e.g. hollow spheres, microspheres or cenospheres
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/28—Treatment of water, waste water, or sewage by sorption
- C02F1/283—Treatment of water, waste water, or sewage by sorption using coal, charred products, or inorganic mixtures containing them
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/66—Treatment of water, waste water, or sewage by neutralisation; pH adjustment
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2101/00—Nature of the contaminant
- C02F2101/10—Inorganic compounds
- C02F2101/20—Heavy metals or heavy metal compounds
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2103/00—Nature of the water, waste water, sewage or sludge to be treated
- C02F2103/007—Contaminated open waterways, rivers, lakes or ponds
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F3/00—Biological treatment of water, waste water, or sewage
- C02F3/32—Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
Abstract
The present invention provides a kind of rapid integrated repairing method in heavy metal pollution lake, is related to pollution control field, comprising the following steps: daily 8:00-10:00 sheds a certain amount of pulverized limestone, daily 17:00-18:00 sample detection monitoring water body pH variation in lake;When water body pH to 7-9, mollusk being launched in water and is put into artificial floating island, plantation has water plant on the artificial floating island, is equipped with heavy metal absorbent in the artificial floating island;Timely collecting and water plant is reseeded, water plant harvest is burned or buried after drying, and continues sample detection monitoring heavy metal in water after its qualification, and mollusk is salvaged burning or buried, finally takes out artificial floating island.
Description
Technical field
The present invention relates to pollution control fields, and in particular to a kind of rapid integrated repairing method in heavy metal pollution lake.
Background technique
Lake is the important material base that the mankind depend on for existence and development, is fresh water accumulation library important on the earth, earth's surface
Available freshwater resources 90% are all accumulated in lake.China is the country in lake more than one, is spread all over the place in inland lake,
It is multi-point and wide-ranging, reinforce management and protection to lake water quality, is one of the vital task of water resources management and protection.In portion, China
Region-by-region, there is mineral resources abundant, and the development and utilization of mineral resources also can while bringing huge economic benefit
Generate many troubling environmental problems.It such as digs up mine, smelt industry and can generate the waste water of the heavy metal containing high concentration, these are useless
Water is directly discharged into lake if unprocessed, generates significant damage in lake and periphery animals and plants, or even threaten
The life security and health of the mankind.
Heavy metal pollution of water body is primarily referred to as bio-toxicity significant Hg, Cd, Pb, Cr, and it is virose to additionally include tool
Zn, Cu, Co, Ni, Sn, V etc..They are enriched in soil and organism, contaminated soil and crop, growth, yield to crop
There is larger harm with quality, and food chain can also be entered by crop rich absorbent, there is the damage mankind and animal health
Potential danger.Wherein, heavy metal Cd is pollutant important in environment, usually exists jointly constitute compound dirt in nature
Dye, is mostly non-degradable type noxious material, does not have natural purifying ability, once it is difficult to therefrom remove into water body.In recent years
Come, with urbanization, the development of process of industrialization, heavy metal element is got worse to the pollution of environment and to the destruction of ecology,
Especially sudden heavy metal pollution, seriously threatens the survival and development of the mankind.
It is mainly the following method: 1, phytoremediation currently, administering to repair for lake pollution, phytoremediation technology is
Using the heavy metal in plant removal water environment, the heavy metal pollution in water environment, this technological investment and maintenance cost are reduced
It is low, it is easy to operate, it not will cause secondary pollution, more adapt to the requirement of environmental protection, and there is potential or distinct economic etc.
Advantage, but due to the difference of the factors such as polluted-water, rehabilitation plant self-characteristic, screening suitable rehabilitation plant just becomes a huge sum of money
The phytoremediation technology for belonging to polluted water region is promoted and the core and key point of practical application;2, biological prosthetic, biological prosthetic skill
Art is to grow up recent years, is had using pseudomonas, saccharomycete and mould etc. to higher concentration heavy metal ion
The microorganism of tolerance removes the heavy metal ion intake bacterium in waste water again into the cell;3, physical chemistry reparation, physical chemistry
Recovery technique contains many specific processing methods, as chemical precipitation, solvent extraction, ion exchange, UF membrane, active carbon and
Silica gel absorption etc., at high cost, complicated for operation, higher to equipment and technical requirements, above every kind of recovery technique has advantage, also has
Certain defect.
The patent that notification number is 105254017 A of CN discloses a kind of eutrophication, heavy metal-polluted water ecology synthesis
Processing method.Prior art low efficiency, for this purpose, this eutrophication, heavy metal-polluted water ecology synthesis processing method are being fed
Mouthful, by high speed steel wire rope type root leaf separation cutter by the water hyacinth on the roomy water surface of fore into cutting, cauline leaf, root after cutting
Portion is collapsed by the side wall of horn-type feed port, concentrates, and thick-layer is formed, by root chain-bar type transmission net and cauline leaf chain-bar type transmission net
It collects, it is high-efficient;Using special drying device, sunning dehydration is carried out to floating plant, accurately sloughs the water of 60-70%
Point, improve amount of dry matter and the nutrition of floating plant.The present invention is suitble to for enclosed waters such as lake, the ponds in inland or has deposited
The processing of eutrophication pollution and heavy metal pollution is carried out in open waters such as river, the water channels that water hyacinth, water peanut are invaded, is
The powerful mean administering water pollution, turning waste into wealth.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of rapid integrated repairing methods in heavy metal pollution lake.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs:
A kind of rapid integrated repairing method in heavy metal pollution lake, comprising the following steps:
(1) daily 8:00-10:00 sheds a certain amount of pulverized limestone, daily 17:00-18:00 sample detection monitoring in lake
Water body pH variation;
(2) when water body pH to 7-9, mollusk is launched in water and is put into artificial floating island, is planted on the artificial floating island
Kind has water plant, is equipped with heavy metal absorbent in the artificial floating island;
(3) timely collecting and water plant is reseeded, water plant harvest burns after drying or buried, lasting sampling
Detection monitoring heavy metal in water after its qualification, by mollusk salvage burn or it is buried, finally artificial floating island is taken out.
Preferably, the area of the artificial floating island is the 1/2-2/3 of area of lake.
Preferably, the artificial floating island includes plate body, and kind is implanted with water plant, the left and right of the plate body in the middle part of the plate body
Two sides are equipped with solar panels, and the bottom of the plate body is surrounded by coaming plate, and the bottom of the coaming plate is equipped with the string bag, the string bag with
It is dispersed with heavy metal absorbent between plate body, propeller is connected with by connecting rod on the coaming plate, the propeller is by electric power storage
Pond driving, the circuit between the propeller and battery are equipped with remotely control by controller and open and be closed remote
Process control switch.
Preferably, the bottom of the plate body is equipped with several floating drums.
Preferably, the solar panels are connect with the battery by conducting wire, and the conducting wire is equipped with inverter.
Preferably, the mollusk is clam or Pacific oyster.
Preferably, the water plant be Eichhornia crassipes, big Piao, rhizoma alismatis, duckweed, knotweed, fine duckweed, Chinese scholartree Ye Pingzhong at least one
Kind.
Preferably, the heavy metal absorbent is iron hydroxide/manganese dioxide doped mesocarbon microspheres.
Preferably, the iron hydroxide/oxidation additive Mn carbon microspheres the preparation method comprises the following steps:
(1) ammonium hydroxide is slowly added dropwise into iron nitrate solution, until mixed liquor pH value be 7-8, stir 10-20min after, rise
For temperature to 40-50 DEG C of insulation reaction 40-60min, filtering, solid washing is dry, obtains iron hydroxide;
(2) by potassium permanganate deionized water dissolving, it is slowly added dropwise concentrated hydrochloric acid, it, will be above-mentioned after sonic oscillation 20-40min
Iron hydroxide, which is added, continues sonic oscillation 20-40min, and mixed solution sealing is put into baking oven, 110 DEG C of reaction 2- are warming up to
5h takes out cooled and filtered, and dehydrated alcohol and distilled water respectively clean 3 times, and last 80 DEG C of vacuum drying obtain manganese dioxide cladding
Iron hydroxide;
(3) manganese dioxide cladding iron hydroxide is added in formalin, after stirring 10-20min, it is molten adds formic acid
Liquid continues to stir, until solution becomes cloudy, hydrochloric acid solution is added dropwise at this time, stops stirring, and washing, ethyl alcohol are washed after standing 20-25h,
After activation, iron hydroxide/manganese dioxide doped carbon microspheres can be obtained.
Preferably, activation method is as follows: be put into 20 DEG C/min in Muffle furnace and be heated to 140 DEG C, keep the temperature after 2h again with 5 DEG C/
Min is warming up to 200 DEG C, keeps the temperature 1h, is finally warming up to 450 DEG C with 5 DEG C/min, air-cooled to come out of the stove.
(3) beneficial effect
The present invention provides a kind of rapid integrated repairing methods in heavy metal pollution lake, have the advantages that
Water plant, heavy metal absorbent, mollusk are respectively in the upper, middle and lower position of water body to lake in the present invention
Interior heavy metal carries out adsorption treatment, more comprehensively without dead angle, and by plant, biology, three heavy metal species absorption side of physical chemistry
Formula combines, and heavy metal pollution lake is repaired more quickly, efficiently, high treating effect;And artificial floating island in the present invention
The hight coordinate for having reached ecological benefits, economic benefit and Landscape benefit is unified, and heavy metal absorbent is iron hydroxide/manganese oxide
Adulterate carbon microspheres, carbon microspheres can be such that heavy metal absorbent is suspended in water body, sufficiently contact with water body as carrier, improve and
The adsorption efficiency of heavy metal ion, manganese dioxide coat iron hydroxide, and iron hydroxide can expand the internal gutter of manganese dioxide,
Surface area is increased, the displacement that heavy metal ion cadmium, copper, zinc, lead, arsenic in water etc. generate manganese generates complex compound and plays suction
Attached effect, the bigger adsorption effect of manganese dioxide area is better, and heavy metal absorbent is always positioned in artificial floating island, repairs
After, additional artificial treatment is not needed, easy to use, repairing effect fast to the lake reparation speed of heavy metal pollution
It is good.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of artificial floating island;
Figure label respectively represents:
1, solar panels;2, plate body;3, floating drum;4, propeller;5, coaming plate;6, the string bag;7, heavy metal absorbent.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention,
Technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is the present invention one
Divide embodiment, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making
Every other embodiment obtained, shall fall within the protection scope of the present invention under the premise of creative work.
Embodiment 1:
A kind of rapid integrated repairing method in heavy metal pollution lake, comprising the following steps:
(1) daily 8:00-10:00 sheds a certain amount of pulverized limestone, daily 17:00-18:00 sample detection monitoring in lake
Water body pH variation;
(2) when water body pH to 7-9, clam is launched in water and is put into artificial floating island, the area of artificial floating island is lake
The 1/2 of area, plantation has Eichhornia crassipes, great Piao, rhizoma alismatis on artificial floating island, is equipped with heavy metal absorbent in artificial floating island;
(3) timely collecting and Eichhornia crassipes, great Piao, rhizoma alismatis are reseeded, Eichhornia crassipes, great Piao that is harvested, rhizoma alismatis are burnt after drying
Burn or it is buried, continue sample detection monitoring heavy metal in water after its qualification, by mollusk salvage burn or it is buried, finally will
Artificial floating island takes out.
Artificial floating island includes plate body, and the bottom of plate body is equipped with several floating drums, and kind is implanted with water plant, plate body in the middle part of plate body
The left and right sides be equipped with solar panels, the bottom of plate body is surrounded by coaming plate, and the bottom of coaming plate is equipped with the string bag, the string bag and plate body it
Between be dispersed with heavy metal absorbent, propeller is connected with by connecting rod on coaming plate, propeller is driven by battery, propeller with
Circuit between battery is equipped with can remotely control the remote control switch opened and be closed, solar panels by controller
It is connect with battery by conducting wire, conducting wire is equipped with inverter.
Heavy metal absorbent is iron hydroxide/manganese dioxide doped mesocarbon microspheres, preparation method are as follows: to ferric nitrate
Ammonium hydroxide is slowly added dropwise in solution, until mixed liquor pH value be 7-8, stir 15min after, be warming up to 40 DEG C of insulation reaction 45min,
Filtering, solid washing is dry, obtains iron hydroxide;By potassium permanganate deionized water dissolving, concentrated hydrochloric acid is slowly added dropwise, ultrasound
After vibrating 20min, above-mentioned iron hydroxide is added and continues sonic oscillation 40min, mixed solution sealing is put into baking oven, is heated up
To 110 DEG C of reaction 3h, cooled and filtered is taken out, dehydrated alcohol and distilled water respectively clean 3 times, and last 80 DEG C of vacuum drying obtain
Manganese dioxide coats iron hydroxide;Manganese dioxide cladding iron hydroxide is added in formalin, after stirring 10min, then plus
Enter formic acid solution, continue to stir, until solution becomes cloudy, hydrochloric acid solution is added dropwise at this time, stops stirring, stands washing, second after 22h
Alcohol is washed, and is placed into 20 DEG C/min in Muffle furnace and is heated to 140 DEG C, is warming up to 200 DEG C again after keeping the temperature 2h with 5 DEG C/min, is kept the temperature 1h,
Finally 450 DEG C are warming up to 5 DEG C/min, it is air-cooled to come out of the stove, iron hydroxide/manganese dioxide doped carbon microspheres can be obtained.
Embodiment 2:
A kind of rapid integrated repairing method in heavy metal pollution lake, comprising the following steps:
(1) daily 8:00-10:00 sheds a certain amount of pulverized limestone, daily 17:00-18:00 sample detection monitoring in lake
Water body pH variation;
(2) when water body pH to 7-9, Pacific oyster is launched in water and is put into artificial floating island, the area of artificial floating island
It is the 2/3 of area of lake, plantation has knotweed, fine duckweed on artificial floating island, is equipped with heavy metal absorbent in artificial floating island;
(3) timely collecting and knotweed, fine duckweed are reseeded, burning or buried after knotweed, fine duckweed harvest dries persistently takes
Sample detection monitoring heavy metal in water after its qualification, by Pacific oyster salvage burn or it is buried, finally artificial floating island is taken out.
Artificial floating island includes plate body, and the bottom of plate body is equipped with several floating drums, and kind is implanted with water plant, plate body in the middle part of plate body
The left and right sides be equipped with solar panels, the bottom of plate body is surrounded by coaming plate, and the bottom of coaming plate is equipped with the string bag, the string bag and plate body it
Between be dispersed with heavy metal absorbent, propeller is connected with by connecting rod on coaming plate, propeller is driven by battery, propeller with
Circuit between battery is equipped with can remotely control the remote control switch opened and be closed, solar panels by controller
It is connect with battery by conducting wire, conducting wire is equipped with inverter.
Heavy metal absorbent is iron hydroxide/manganese dioxide doped mesocarbon microspheres, preparation method are as follows: to ferric nitrate
Ammonium hydroxide is slowly added dropwise in solution, until mixed liquor pH value be 7-8, stir 10min after, be warming up to 40 DEG C of insulation reaction 50min,
Filtering, solid washing is dry, obtains iron hydroxide;By potassium permanganate deionized water dissolving, concentrated hydrochloric acid is slowly added dropwise, ultrasound
After vibrating 40min, above-mentioned iron hydroxide is added and continues sonic oscillation 20min, mixed solution sealing is put into baking oven, is heated up
To 110 DEG C of reaction 3.5h, cooled and filtered is taken out, dehydrated alcohol and distilled water respectively clean 3 times, and last 80 DEG C of vacuum drying obtain
Iron hydroxide is coated to manganese dioxide;Manganese dioxide cladding iron hydroxide is added in formalin, after stirring 10min, then
Addition formic acid solution, continues to stir, until solution becomes cloudy, hydrochloric acid solution is added dropwise at this time, stops stirring, washed after standing 25h,
Ethyl alcohol is washed, and is placed into 20 DEG C/min in Muffle furnace and is heated to 140 DEG C, is warming up to 200 DEG C again after keeping the temperature 2h with 5 DEG C/min, heat preservation
1h is finally warming up to 450 DEG C with 5 DEG C/min, air-cooled to come out of the stove, and iron hydroxide/manganese dioxide doped carbon microspheres can be obtained.
Embodiment 3:
A kind of rapid integrated repairing method in heavy metal pollution lake, comprising the following steps:
(1) daily 8:00-10:00 sheds a certain amount of pulverized limestone, daily 17:00-18:00 sample detection monitoring in lake
Water body pH variation;
(2) when water body pH to 7-9, Pacific oyster is launched in water and is put into artificial floating island, the area of artificial floating island
It is the 1/2 of area of lake, plantation has Eichhornia crassipes on artificial floating island, is equipped with heavy metal absorbent in artificial floating island;
(3) timely collecting and Eichhornia crassipes is reseeded, Eichhornia crassipes harvest burns or buried after drying, persistently sample detection
Monitor heavy metal in water after its qualification, by Pacific oyster salvage burn or it is buried, finally artificial floating island is taken out.
Artificial floating island includes plate body, and the bottom of plate body is equipped with several floating drums, and kind is implanted with water plant, plate body in the middle part of plate body
The left and right sides be equipped with solar panels, the bottom of plate body is surrounded by coaming plate, and the bottom of coaming plate is equipped with the string bag, the string bag and plate body it
Between be dispersed with heavy metal absorbent, propeller is connected with by connecting rod on coaming plate, propeller is driven by battery, propeller with
Circuit between battery is equipped with can remotely control the remote control switch opened and be closed, solar panels by controller
It is connect with battery by conducting wire, conducting wire is equipped with inverter.
Heavy metal absorbent is iron hydroxide/manganese dioxide doped mesocarbon microspheres, preparation method are as follows: to ferric nitrate
Ammonium hydroxide is slowly added dropwise in solution, until mixed liquor pH value be 7-8, stir 20min after, be warming up to 50 DEG C of insulation reaction 45min,
Filtering, solid washing is dry, obtains iron hydroxide;By potassium permanganate deionized water dissolving, concentrated hydrochloric acid is slowly added dropwise, ultrasound
After vibrating 40min, above-mentioned iron hydroxide is added and continues sonic oscillation 25min, mixed solution sealing is put into baking oven, is heated up
To 110 DEG C of reaction 2h, cooled and filtered is taken out, dehydrated alcohol and distilled water respectively clean 3 times, and last 80 DEG C of vacuum drying obtain
Manganese dioxide coats iron hydroxide;Manganese dioxide cladding iron hydroxide is added in formalin, after stirring 10min, then plus
Enter formic acid solution, continue to stir, until solution becomes cloudy, hydrochloric acid solution is added dropwise at this time, stops stirring, stands washing, second after 20h
Alcohol is washed, and is placed into 20 DEG C/min in Muffle furnace and is heated to 140 DEG C, is warming up to 200 DEG C again after keeping the temperature 2h with 5 DEG C/min, is kept the temperature 1h,
Finally 450 DEG C are warming up to 5 DEG C/min, it is air-cooled to come out of the stove, iron hydroxide/manganese dioxide doped carbon microspheres can be obtained.
Embodiment 4:
A kind of rapid integrated repairing method in heavy metal pollution lake, comprising the following steps:
(1) daily 8:00-10:00 sheds a certain amount of pulverized limestone, daily 17:00-18:00 sample detection monitoring in lake
Water body pH variation;
(2) when water body pH to 7-9, clam is launched in water and is put into artificial floating island, the area of artificial floating island is lake
The 1/2 of area, plantation has fine duckweed, Chinese scholartree Ye Ping on artificial floating island, is equipped with heavy metal absorbent in artificial floating island;
(3) fine duckweed, Chinese scholartree Ye Ping are reseeded timely collecting and, fine duckweed harvest, Chinese scholartree leaf duckweed burn after drying or depth
Bury, continue sample detection monitoring heavy metal in water after its qualification, by clam salvage burn or it is buried, finally artificial floating island is taken
Out.
Artificial floating island includes plate body, and the bottom of plate body is equipped with several floating drums, and kind is implanted with water plant, plate body in the middle part of plate body
The left and right sides be equipped with solar panels, the bottom of plate body is surrounded by coaming plate, and the bottom of coaming plate is equipped with the string bag, the string bag and plate body it
Between be dispersed with heavy metal absorbent, propeller is connected with by connecting rod on coaming plate, propeller is driven by battery, propeller with
Circuit between battery is equipped with can remotely control the remote control switch opened and be closed, solar panels by controller
It is connect with battery by conducting wire, conducting wire is equipped with inverter.
Heavy metal absorbent is iron hydroxide/manganese dioxide doped mesocarbon microspheres, preparation method are as follows: to ferric nitrate
Ammonium hydroxide is slowly added dropwise in solution, until mixed liquor pH value be 7-8, stir 20min after, be warming up to 48 DEG C of insulation reaction 42min,
Filtering, solid washing is dry, obtains iron hydroxide;By potassium permanganate deionized water dissolving, concentrated hydrochloric acid is slowly added dropwise, ultrasound
After vibrating 20min, above-mentioned iron hydroxide is added and continues sonic oscillation 25min, mixed solution sealing is put into baking oven, is heated up
To 110 DEG C of reaction 2h, cooled and filtered is taken out, dehydrated alcohol and distilled water respectively clean 3 times, and last 80 DEG C of vacuum drying obtain
Manganese dioxide coats iron hydroxide;Manganese dioxide cladding iron hydroxide is added in formalin, after stirring 10min, then plus
Enter formic acid solution, continue to stir, until solution becomes cloudy, hydrochloric acid solution is added dropwise at this time, stops stirring, stands washing, second after 20h
Alcohol is washed, and is placed into 20 DEG C/min in Muffle furnace and is heated to 140 DEG C, is warming up to 200 DEG C again after keeping the temperature 2h with 5 DEG C/min, is kept the temperature 1h,
Finally 450 DEG C are warming up to 5 DEG C/min, it is air-cooled to come out of the stove, iron hydroxide/manganese dioxide doped carbon microspheres can be obtained.
Embodiment 5:
A kind of rapid integrated repairing method in heavy metal pollution lake, comprising the following steps:
(1) daily 8:00-10:00 sheds a certain amount of pulverized limestone, daily 17:00-18:00 sample detection monitoring in lake
Water body pH variation;
(2) when water body pH to 7-9, Pacific oyster is launched in water and is put into artificial floating island, the area of artificial floating island
It is the 2/3 of area of lake, plantation has duckweed, knotweed on artificial floating island, is equipped with heavy metal absorbent in artificial floating island;
(3) timely collecting and duckweed, knotweed are reseeded, the duckweed that harvest, knotweed burn or buried after drying, and lasting sampling is examined
Survey monitoring heavy metal in water after its qualification, by Pacific oyster salvage burn or it is buried, finally artificial floating island is taken out.
Artificial floating island includes plate body, and the bottom of plate body is equipped with several floating drums, and kind is implanted with water plant, plate body in the middle part of plate body
The left and right sides be equipped with solar panels, the bottom of plate body is surrounded by coaming plate, and the bottom of coaming plate is equipped with the string bag, the string bag and plate body it
Between be dispersed with heavy metal absorbent, propeller is connected with by connecting rod on coaming plate, propeller is driven by battery, propeller with
Circuit between battery is equipped with can remotely control the remote control switch opened and be closed, solar panels by controller
It is connect with battery by conducting wire, conducting wire is equipped with inverter.
Heavy metal absorbent is iron hydroxide/manganese dioxide doped mesocarbon microspheres, preparation method are as follows: to ferric nitrate
Ammonium hydroxide is slowly added dropwise in solution, until mixed liquor pH value be 7-8, stir 20min after, be warming up to 50 DEG C of insulation reaction 60min,
Filtering, solid washing is dry, obtains iron hydroxide;By potassium permanganate deionized water dissolving, concentrated hydrochloric acid is slowly added dropwise, ultrasound
After vibrating 40min, above-mentioned iron hydroxide is added and continues sonic oscillation 40min, mixed solution sealing is put into baking oven, is heated up
To 110 DEG C of reaction 5h, cooled and filtered is taken out, dehydrated alcohol and distilled water respectively clean 3 times, and last 80 DEG C of vacuum drying obtain
Manganese dioxide coats iron hydroxide;Manganese dioxide cladding iron hydroxide is added in formalin, after stirring 20min, then plus
Enter formic acid solution, continue to stir, until solution becomes cloudy, hydrochloric acid solution is added dropwise at this time, stops stirring, stands washing, second after 25h
Alcohol is washed, and is placed into 20 DEG C/min in Muffle furnace and is heated to 140 DEG C, is warming up to 200 DEG C again after keeping the temperature 2h with 5 DEG C/min, is kept the temperature 1h,
Finally 450 DEG C are warming up to 5 DEG C/min, it is air-cooled to come out of the stove, iron hydroxide/manganese dioxide doped carbon microspheres can be obtained.
Embodiment 6:
A kind of rapid integrated repairing method in heavy metal pollution lake, comprising the following steps:
(1) daily 8:00-10:00 sheds a certain amount of pulverized limestone, daily 17:00-18:00 sample detection monitoring in lake
Water body pH variation;
(2) when water body pH to 7-9, clam is launched in water and is put into artificial floating island, the area of artificial floating island is lake
The 1/2 of area, plantation has Eichhornia crassipes on artificial floating island, is equipped with heavy metal absorbent in artificial floating island;
(3) timely collecting and Eichhornia crassipes is reseeded, Eichhornia crassipes harvest burns or buried after drying, persistently sample detection
Monitor heavy metal in water after its qualification, by clam salvage burn or it is buried, finally artificial floating island is taken out.
Artificial floating island includes plate body, and the bottom of plate body is equipped with several floating drums, and kind is implanted with water plant, plate body in the middle part of plate body
The left and right sides be equipped with solar panels, the bottom of plate body is surrounded by coaming plate, and the bottom of coaming plate is equipped with the string bag, the string bag and plate body it
Between be dispersed with heavy metal absorbent, propeller is connected with by connecting rod on coaming plate, propeller is driven by battery, propeller with
Circuit between battery is equipped with can remotely control the remote control switch opened and be closed, solar panels by controller
It is connect with battery by conducting wire, conducting wire is equipped with inverter.
Heavy metal absorbent is iron hydroxide/manganese dioxide doped mesocarbon microspheres, preparation method are as follows: to ferric nitrate
Ammonium hydroxide is slowly added dropwise in solution, until mixed liquor pH value be 7-8, stir 10min after, be warming up to 40 DEG C of insulation reaction 40min,
Filtering, solid washing is dry, obtains iron hydroxide;By potassium permanganate deionized water dissolving, concentrated hydrochloric acid is slowly added dropwise, ultrasound
After vibrating 20min, above-mentioned iron hydroxide is added and continues sonic oscillation 20min, mixed solution sealing is put into baking oven, is heated up
To 110 DEG C of reaction 2h, cooled and filtered is taken out, dehydrated alcohol and distilled water respectively clean 3 times, and last 80 DEG C of vacuum drying obtain
Manganese dioxide coats iron hydroxide;Manganese dioxide cladding iron hydroxide is added in formalin, after stirring 10min, then plus
Enter formic acid solution, continue to stir, until solution becomes cloudy, hydrochloric acid solution is added dropwise at this time, stops stirring, stands washing, second after 20h
Alcohol is washed, and is placed into 20 DEG C/min in Muffle furnace and is heated to 140 DEG C, is warming up to 200 DEG C again after keeping the temperature 2h with 5 DEG C/min, is kept the temperature 1h,
Finally 450 DEG C are warming up to 5 DEG C/min, it is air-cooled to come out of the stove, iron hydroxide/manganese dioxide doped carbon microspheres can be obtained.
Embodiment 7:
A kind of rapid integrated repairing method in heavy metal pollution lake, comprising the following steps:
(1) daily 8:00-10:00 sheds a certain amount of pulverized limestone, daily 17:00-18:00 sample detection monitoring in lake
Water body pH variation;
(2) when water body pH to 7-9, Pacific oyster is launched in water and is put into artificial floating island, the area of artificial floating island
It is the 1/2 of area of lake, plantation has rhizoma alismatis, duckweed, knotweed on artificial floating island, is equipped with heavy metal absorbent in artificial floating island;
(3) timely collecting and rhizoma alismatis, duckweed, knotweed are reseeded, burning or buried after the rhizoma alismatis that harvest, duckweed, knotweed dry,
Continue sample detection monitoring heavy metal in water after its qualification, by Pacific oyster salvage burn or it is buried, finally will it is artificial float
It takes out on island.
Artificial floating island includes plate body, and the bottom of plate body is equipped with several floating drums, and kind is implanted with water plant, plate body in the middle part of plate body
The left and right sides be equipped with solar panels, the bottom of plate body is surrounded by coaming plate, and the bottom of coaming plate is equipped with the string bag, the string bag and plate body it
Between be dispersed with heavy metal absorbent, propeller is connected with by connecting rod on coaming plate, propeller is driven by battery, propeller with
Circuit between battery is equipped with can remotely control the remote control switch opened and be closed, solar panels by controller
It is connect with battery by conducting wire, conducting wire is equipped with inverter.
Heavy metal absorbent is iron hydroxide/manganese dioxide doped mesocarbon microspheres, preparation method are as follows: to ferric nitrate
Ammonium hydroxide is slowly added dropwise in solution, until mixed liquor pH value be 7-8, stir 15min after, be warming up to 45 DEG C of insulation reaction 55min,
Filtering, solid washing is dry, obtains iron hydroxide;By potassium permanganate deionized water dissolving, concentrated hydrochloric acid is slowly added dropwise, ultrasound
After vibrating 35min, above-mentioned iron hydroxide is added and continues sonic oscillation 35min, mixed solution sealing is put into baking oven, is heated up
To 110 DEG C of reaction 3.5h, cooled and filtered is taken out, dehydrated alcohol and distilled water respectively clean 3 times, and last 80 DEG C of vacuum drying obtain
Iron hydroxide is coated to manganese dioxide;Manganese dioxide cladding iron hydroxide is added in formalin, after stirring 10min, then
Addition formic acid solution, continues to stir, until solution becomes cloudy, hydrochloric acid solution is added dropwise at this time, stops stirring, washed after standing 20h,
Ethyl alcohol is washed, and is placed into 20 DEG C/min in Muffle furnace and is heated to 140 DEG C, is warming up to 200 DEG C again after keeping the temperature 2h with 5 DEG C/min, heat preservation
1h is finally warming up to 450 DEG C with 5 DEG C/min, air-cooled to come out of the stove, and iron hydroxide/manganese dioxide doped carbon microspheres can be obtained.
According to water environment quality standard (GB3838-2002), every 20d to 1 lake sample detection of embodiment, lake
In various heavy metal ion result of variations it is as shown in table 1 below:
Table 1:
To sum up, the embodiment of the present invention has the following beneficial effects:
It is equal in a short time by heavy metal ion cadmium, copper, zinc, lead, arsenic content in the processed lake of the method for the present invention
There is a sharp decline.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in process, method, article or equipment including the element.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments
Invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each implementation
Technical solution documented by example is modified or equivalent replacement of some of the technical features;And these modification or
Replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.
Claims (10)
1. a kind of rapid integrated repairing method in heavy metal pollution lake, which comprises the following steps:
(1) daily 8:00-10:00 sheds a certain amount of pulverized limestone in lake, and daily 17:00-18:00 sample detection monitors water body
PH variation;
(2) when water body pH to 7-9, mollusk is launched in water and is put into artificial floating island, planting on the artificial floating island has
Water plant, the artificial floating island is interior to be equipped with heavy metal absorbent;
(3) timely collecting and water plant is reseeded, water plant harvest is burned or buried after drying, persistently sample detection
Monitor heavy metal in water after its qualification, by mollusk salvage burn or it is buried, finally artificial floating island is taken out.
2. the rapid integrated repairing method in heavy metal pollution lake as described in claim 1, which is characterized in that described artificial floating
The area on island is the 1/2-2/3 of area of lake.
3. the rapid integrated repairing method in heavy metal pollution lake as described in claim 1, which is characterized in that described artificial floating
Island includes plate body, and kind is implanted with water plant in the middle part of the plate body, and the left and right sides of the plate body is equipped with solar panels, the plate body
Bottom be surrounded by coaming plate, the bottom of the coaming plate is equipped with the string bag, is dispersed with heavy metal adsorption between the string bag and plate body
Agent is connected with propeller by connecting rod on the coaming plate, and the propeller is driven by battery, the propeller and battery
Between circuit be equipped with can remotely control by controller open and be closed remote control switch.
4. the rapid integrated repairing method in heavy metal pollution lake as claimed in claim 3, which is characterized in that the plate body
Bottom is equipped with several floating drums.
5. the rapid integrated repairing method in heavy metal pollution lake as claimed in claim 3, which is characterized in that the solar energy
Plate is connect with the battery by conducting wire, and the conducting wire is equipped with inverter.
6. the rapid integrated repairing method in heavy metal pollution lake as described in claim 1, which is characterized in that the software is dynamic
Object is clam or Pacific oyster.
7. the rapid integrated repairing method in heavy metal pollution lake as described in claim 1, which is characterized in that the aquatic plant
Object is at least one of Eichhornia crassipes, great Piao, rhizoma alismatis, duckweed, knotweed, fine duckweed, Chinese scholartree leaf duckweed.
8. the rapid integrated repairing method in heavy metal pollution lake as described in claim 1, which is characterized in that the heavy metal
Adsorbent is iron hydroxide/manganese dioxide doped mesocarbon microspheres.
9. the rapid integrated repairing method in heavy metal pollution lake as described in claim 1, which is characterized in that the hydroxide
Iron/manganese dioxide doped carbon microspheres the preparation method comprises the following steps:
(1) ammonium hydroxide is slowly added dropwise into iron nitrate solution, until mixed liquor pH value be 7-8, stir 10-20min after, be warming up to
40-50 DEG C of insulation reaction 40-60min, filtering, solid washing is dry, obtains iron hydroxide;
(2) by potassium permanganate deionized water dissolving, concentrated hydrochloric acid is slowly added dropwise, after sonic oscillation 20-40min, by above-mentioned hydrogen-oxygen
Change iron and continuation sonic oscillation 20-40min is added, mixed solution sealing is put into baking oven, 110 DEG C of reaction 2-5h is warming up to, takes
Cooled and filtered out, dehydrated alcohol and distilled water respectively clean 3 times, and last 80 DEG C of vacuum drying obtain manganese dioxide cladding hydrogen-oxygen
Change iron;
(3) manganese dioxide cladding iron hydroxide is added in formalin, after stirring 10-20min, adds formic acid solution,
Continuing to stir, until solution becomes cloudy, hydrochloric acid solution is added dropwise at this time, stops stirring, washing, ethyl alcohol are washed after standing 20-25h, then
After overactivation, iron hydroxide/manganese dioxide doped carbon microspheres can be obtained.
10. the rapid integrated repairing method in heavy metal pollution lake as claimed in claim 9, which is characterized in that activation method
It is as follows: to be put into 20 DEG C/min in Muffle furnace and be heated to 140 DEG C, be warming up to 200 DEG C again after keeping the temperature 2h with 5 DEG C/min, keep the temperature 1h, most
450 DEG C are warming up to afterwards with 5 DEG C/min, it is air-cooled to come out of the stove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811571590.8A CN109399872B (en) | 2018-12-21 | 2018-12-21 | Rapid comprehensive restoration method for heavy metal polluted lake |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811571590.8A CN109399872B (en) | 2018-12-21 | 2018-12-21 | Rapid comprehensive restoration method for heavy metal polluted lake |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109399872A true CN109399872A (en) | 2019-03-01 |
CN109399872B CN109399872B (en) | 2021-09-24 |
Family
ID=65461106
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811571590.8A Active CN109399872B (en) | 2018-12-21 | 2018-12-21 | Rapid comprehensive restoration method for heavy metal polluted lake |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109399872B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111573882A (en) * | 2020-04-16 | 2020-08-25 | 中南大学 | Process for deeply removing heavy metals in water body |
CN111701566A (en) * | 2020-06-30 | 2020-09-25 | 广东工业大学 | Adsorbent and preparation method and application thereof |
Citations (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5863588A (en) * | 1981-10-12 | 1983-04-15 | Takashina Kiyuumei Kigu Kk | Floating bed for fishing |
US4391645A (en) * | 1982-04-12 | 1983-07-05 | Diamond Shamrock Corporation | Additives for cementitious materials |
CN1443600A (en) * | 2002-03-12 | 2003-09-24 | 拜尔公司 | Adsorbent mixture |
DE10333824A1 (en) * | 2002-12-17 | 2004-07-01 | Franz Dietrich Oeste | Activated carbon fibers, useful as adsorbent, e.g. in water or gas purification, gas or liquid treatment or test or technical process, are produced by pyrolysis from raw material fibers with coating of solid oxidant |
CN102145947A (en) * | 2011-02-24 | 2011-08-10 | 哈尔滨工业大学 | Water treatment method for removing Tl<+> and/or Cd2<+> by producing nanometer iron and manganese oxides in situ |
CN102489498A (en) * | 2011-11-22 | 2012-06-13 | 环境保护部华南环境科学研究所 | Application of ruellia brittoniana in repairing soil and/or water body cadmium pollution |
CN103241839A (en) * | 2013-05-27 | 2013-08-14 | 沈阳大学 | Treatment method of treating cadmium contaminated water |
CN103506065A (en) * | 2013-10-23 | 2014-01-15 | 中国科学院烟台海岸带研究所 | Magnetic heavy metal adsorbent with casing-core structure and preparation method thereof |
CN103657613A (en) * | 2013-12-16 | 2014-03-26 | 中国科学院城市环境研究所 | Fe-Mn loaded nanofiber membrane cadmium elimination material and preparation method thereof |
CN104003524A (en) * | 2014-05-19 | 2014-08-27 | 湖南大学 | Ecological adsorption floating bed used for treating eutrophication |
CN203890135U (en) * | 2014-01-17 | 2014-10-22 | 浙江卓锦工程技术有限公司 | Floating bed using waste biomass to adsorb heavy-metal-polluted water body |
CN104150540A (en) * | 2014-07-14 | 2014-11-19 | 河南大学 | Heavy metal ion adsorbent ferrite hollow spheres MFe2O4 |
CN104556393A (en) * | 2015-01-27 | 2015-04-29 | 肖艳辉 | Method for remedying cadmium pollution in eutrophic water body with fennel |
CN104607448A (en) * | 2014-12-10 | 2015-05-13 | 韩山师范学院 | Method for restoring Cd-polluted soil or water body |
CN104817228A (en) * | 2015-04-15 | 2015-08-05 | 北京林业大学 | Solar power nitrogen and phosphorus removal biological box array used for in-situ purification for eutrophic slow flow water body |
CN105330107A (en) * | 2015-11-17 | 2016-02-17 | 广州市戴斌生态环境科技有限公司 | Water quality purification system and method for urban river |
CN205088003U (en) * | 2015-09-10 | 2016-03-16 | 上海湛清环境工程有限公司 | Artificial floating island structure |
CN105688793A (en) * | 2016-01-25 | 2016-06-22 | 华东交通大学 | Preparation method of MnO2-based magnetic nano Fe3O4 heavy metal adsorbing material |
CN106348531A (en) * | 2016-10-09 | 2017-01-25 | 常州亚环环保科技有限公司 | Method for treating cadmium-containing wastewater with combined biological method |
CN205973881U (en) * | 2016-08-19 | 2017-02-22 | 农业部环境保护科研监测所 | Float heavy metal ion's on water absorption and float bed |
CN206538261U (en) * | 2016-09-26 | 2017-10-03 | 格丰环保科技有限公司 | A kind of ecological floating island of black and odorous water repairing and treating |
CN207096236U (en) * | 2017-06-20 | 2018-03-13 | 深圳市景方盈科技有限公司 | A kind of environment-friendly type water environment on-line measuring device |
-
2018
- 2018-12-21 CN CN201811571590.8A patent/CN109399872B/en active Active
Patent Citations (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5863588A (en) * | 1981-10-12 | 1983-04-15 | Takashina Kiyuumei Kigu Kk | Floating bed for fishing |
US4391645A (en) * | 1982-04-12 | 1983-07-05 | Diamond Shamrock Corporation | Additives for cementitious materials |
CN1443600A (en) * | 2002-03-12 | 2003-09-24 | 拜尔公司 | Adsorbent mixture |
DE10333824A1 (en) * | 2002-12-17 | 2004-07-01 | Franz Dietrich Oeste | Activated carbon fibers, useful as adsorbent, e.g. in water or gas purification, gas or liquid treatment or test or technical process, are produced by pyrolysis from raw material fibers with coating of solid oxidant |
CN102145947A (en) * | 2011-02-24 | 2011-08-10 | 哈尔滨工业大学 | Water treatment method for removing Tl<+> and/or Cd2<+> by producing nanometer iron and manganese oxides in situ |
CN102489498A (en) * | 2011-11-22 | 2012-06-13 | 环境保护部华南环境科学研究所 | Application of ruellia brittoniana in repairing soil and/or water body cadmium pollution |
CN103241839A (en) * | 2013-05-27 | 2013-08-14 | 沈阳大学 | Treatment method of treating cadmium contaminated water |
CN103506065A (en) * | 2013-10-23 | 2014-01-15 | 中国科学院烟台海岸带研究所 | Magnetic heavy metal adsorbent with casing-core structure and preparation method thereof |
CN103657613A (en) * | 2013-12-16 | 2014-03-26 | 中国科学院城市环境研究所 | Fe-Mn loaded nanofiber membrane cadmium elimination material and preparation method thereof |
CN203890135U (en) * | 2014-01-17 | 2014-10-22 | 浙江卓锦工程技术有限公司 | Floating bed using waste biomass to adsorb heavy-metal-polluted water body |
CN104003524A (en) * | 2014-05-19 | 2014-08-27 | 湖南大学 | Ecological adsorption floating bed used for treating eutrophication |
CN104150540A (en) * | 2014-07-14 | 2014-11-19 | 河南大学 | Heavy metal ion adsorbent ferrite hollow spheres MFe2O4 |
CN104607448A (en) * | 2014-12-10 | 2015-05-13 | 韩山师范学院 | Method for restoring Cd-polluted soil or water body |
CN104556393A (en) * | 2015-01-27 | 2015-04-29 | 肖艳辉 | Method for remedying cadmium pollution in eutrophic water body with fennel |
CN104817228A (en) * | 2015-04-15 | 2015-08-05 | 北京林业大学 | Solar power nitrogen and phosphorus removal biological box array used for in-situ purification for eutrophic slow flow water body |
CN205088003U (en) * | 2015-09-10 | 2016-03-16 | 上海湛清环境工程有限公司 | Artificial floating island structure |
CN105330107A (en) * | 2015-11-17 | 2016-02-17 | 广州市戴斌生态环境科技有限公司 | Water quality purification system and method for urban river |
CN105688793A (en) * | 2016-01-25 | 2016-06-22 | 华东交通大学 | Preparation method of MnO2-based magnetic nano Fe3O4 heavy metal adsorbing material |
CN205973881U (en) * | 2016-08-19 | 2017-02-22 | 农业部环境保护科研监测所 | Float heavy metal ion's on water absorption and float bed |
CN206538261U (en) * | 2016-09-26 | 2017-10-03 | 格丰环保科技有限公司 | A kind of ecological floating island of black and odorous water repairing and treating |
CN106348531A (en) * | 2016-10-09 | 2017-01-25 | 常州亚环环保科技有限公司 | Method for treating cadmium-containing wastewater with combined biological method |
CN207096236U (en) * | 2017-06-20 | 2018-03-13 | 深圳市景方盈科技有限公司 | A kind of environment-friendly type water environment on-line measuring device |
Non-Patent Citations (2)
Title |
---|
于志红: "生物炭_锰氧化物复合材料吸附砷_的性能研究", 《农业环境科学学报》 * |
付军: "铁锰复合氧化物_壳聚糖珠_一种环境友好型除磷吸附剂", 《环境科学》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111573882A (en) * | 2020-04-16 | 2020-08-25 | 中南大学 | Process for deeply removing heavy metals in water body |
CN111701566A (en) * | 2020-06-30 | 2020-09-25 | 广东工业大学 | Adsorbent and preparation method and application thereof |
Also Published As
Publication number | Publication date |
---|---|
CN109399872B (en) | 2021-09-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106966513B (en) | Remote control formula water normal position prosthetic devices | |
CN110327882A (en) | The preparation method and application of multidigit activation and modified reed-south reed charcoal | |
CN106734092B (en) | A kind of construction method of city Venous Industrial garden system | |
CN101164916B (en) | Method for treating eutrophication water body by hydrophyte | |
CN109399872A (en) | A kind of rapid integrated repairing method in heavy metal pollution lake | |
CN103395891A (en) | Microbial fuel cell type three-dimensional combined ecological floating bed device and application thereof | |
CN110314651A (en) | A kind of compound porous environment-friendly materials of magnetism sulphur iron charcoal and its environment-friendly preparation method thereof and application | |
CN106186249B (en) | A kind of micro-nano iron sulfide/porous carbon composite and its preparation and seaweed biomass application | |
CN101306813B (en) | Method for preparing smooth cord-grass active carbon for treating cadmium-containing waste water | |
CN110256174A (en) | A kind of preparation method and application for the biological charcoal slow-release fertilizer being passivated heavy metal-polluted soil | |
CN106430181A (en) | Biochar material facilitating carbon cycling, preparation method and application | |
CN109336082A (en) | Stalk processing method, charcoal and its preparation method and application | |
CN101444719B (en) | Biosorption agent and application method thereof | |
CN105668805B (en) | Utilize the method for cadmium in biomass-microorganism collaboration removal waste water | |
CN109179928A (en) | The method of content of beary metal in the protein supernatant extracted in a kind of reduction sludge | |
CN101402472A (en) | Aquatic ecology renovation machine | |
CN111676924A (en) | Magnetic catch boat algae water extraction device | |
CN115948166A (en) | Composite soil conditioner and preparation method thereof | |
CN101280273A (en) | Industrialized culture method and device for photosynthetic autotroph | |
CN108163986A (en) | A kind of endogenous nitrogen phosphorus complex repairation control system based on eel grass-SMFC | |
CN111807451A (en) | Device and method for reducing pollution of lake and reservoir dredging to surrounding water body | |
CN106277675B (en) | The efficient minimizing technology of Cadmium Pollutants On The Chinese | |
CN112125356A (en) | Preparation method of light composite algaecide with dephosphorization effect and floating type algae removal method on light composite algaecide | |
CN105731749B (en) | A kind of method of bioleaching removal Heavy Metals in Sludge Cd | |
CN101088642A (en) | Process of repairing heavy metal polluted soil with both oudemansiella radicata and Tricholoma lobynsis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210901 Address after: 410000 floor 12, building 6, Banshan International Center, 268 Laodong Road, Yuhua District, Changsha City, Hunan Province Applicant after: Zhilan Ecological Environment Construction Co.,Ltd. Address before: No.20, Xiongying formation, Shipei Town, Shipei village, Quanjiao County, Chuzhou City, Anhui Province, 239500 Applicant before: Xu Rongxia |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |