CN109398409A - A kind of administrative region of a city rolling stock three-level repairs technique - Google Patents
A kind of administrative region of a city rolling stock three-level repairs technique Download PDFInfo
- Publication number
- CN109398409A CN109398409A CN201811203642.6A CN201811203642A CN109398409A CN 109398409 A CN109398409 A CN 109398409A CN 201811203642 A CN201811203642 A CN 201811203642A CN 109398409 A CN109398409 A CN 109398409A
- Authority
- CN
- China
- Prior art keywords
- maintenance
- bogie
- cleaning
- inspection
- hitch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61K—AUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
- B61K11/00—Serving peculiar to locomotives, e.g. filling with, or emptying of, water, sand, or the like at the depots
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60S—SERVICING, CLEANING, REPAIRING, SUPPORTING, LIFTING, OR MANOEUVRING OF VEHICLES, NOT OTHERWISE PROVIDED FOR
- B60S3/00—Vehicle cleaning apparatus not integral with vehicles
- B60S3/006—Vehicle cleaning apparatus not integral with vehicles specially adapted for railway vehicles
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B21/00—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M13/00—Testing of machine parts
- G01M13/04—Bearings
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M17/00—Testing of vehicles
- G01M17/08—Railway vehicles
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M3/00—Investigating fluid-tightness of structures
- G01M3/02—Investigating fluid-tightness of structures by using fluid or vacuum
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N27/00—Investigating or analysing materials by the use of electric, electrochemical, or magnetic means
- G01N27/72—Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating magnetic variables
- G01N27/82—Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating magnetic variables for investigating the presence of flaws
- G01N27/83—Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating magnetic variables for investigating the presence of flaws by investigating stray magnetic fields
- G01N27/84—Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating magnetic variables for investigating the presence of flaws by investigating stray magnetic fields by applying magnetic powder or magnetic ink
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N29/00—Investigating or analysing materials by the use of ultrasonic, sonic or infrasonic waves; Visualisation of the interior of objects by transmitting ultrasonic or sonic waves through the object
- G01N29/04—Analysing solids
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/005—Testing of electric installations on transport means
- G01R31/008—Testing of electric installations on transport means on air- or spacecraft, railway rolling stock or sea-going vessels
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2291/00—Indexing codes associated with group G01N29/00
- G01N2291/02—Indexing codes associated with the analysed material
- G01N2291/023—Solids
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2291/00—Indexing codes associated with group G01N29/00
- G01N2291/02—Indexing codes associated with the analysed material
- G01N2291/028—Material parameters
- G01N2291/0289—Internal structure, e.g. defects, grain size, texture
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Chemical & Material Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Acoustics & Sound (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Manufacture Of Motors, Generators (AREA)
Abstract
Technique is repaired the invention discloses a kind of administrative region of a city rolling stock three-level, and step is that train returns the vehicle to the garage and knock off and detects to wheel to pantograph after admission;Vehicle is cleaned comprehensively;Train is reorganized and outfit button and is repaired;Solution volume is carried out to car body, the car body of solution editorial afterword is decomposed, it is decomposed into car body, traction and electric braking, air damping and air supply system, hitch and bogie, bogie is continued to decompose, and the component after car body, traction and electric braking and air supply system, hitch and bogie decomposition is overhauled;Car body, traction and electric braking, air damping and air supply system and hitch are subjected to general assembly;It will be assembled by the truck components overhauled, the bogie after forming maintenance;Vehicle by maintenance is carried out to fall Che Zuoye, forms bicycle;Single car test is carried out to bicycle;It carries out organizing into groups quiet tune;Carry out dynamic debugging;Static state hands over vehicle, bicycle parking can online operation after class.Maintenance craft of the invention is suitable for the characteristics of administrative region of a city rolling stock, and technique comprehensive and reasonable.
Description
Technical field
The invention belongs to administrative region of a city railway arts, repair technique more particularly, to a kind of administrative region of a city rolling stock three-level.
Background technique
The purpose of car inspection and repair is to maintain and improves the basic performance of vehicle, ensures the safe and reliable of operation, reduces vehicle
Failure occurs.Administrative region of a city vehicle preferably carries out the maintenance system that " plan and control+status maintenance+equilibrium is repaired " combines in terms of maintenance.Plan
Repair and belong to preventative maintenance with status maintenance, be with plan and control it is leading, repaired according to time and traveling mileage;Status maintenance is root
Maintenance opportunity is determined according to equipment actual techniques situation.It is in the train non-service time that equilibrium, which is repaired, and the off-peak hours are transported using vehicle
Row stoppage in transit window overhauls train, and maintenance content is dispersed in different time sections and different occasions.
Administrative region of a city railway has the design feature of itself compared to subway and high-speed rail, firstly, its speed and range of operation between
Between subway and high-speed rail;Secondly, its operation has flexibility, both it fastly can rise and stop fastly or long transmission line is run;In addition, its passenger capacity
It is bigger compared to high-speed rail.Since the speed volume range of administrative region of a city railway operation is different from subway and high-speed rail, the mill of components
The speed of damage is different, and the time cycle of corresponding components maintenance and replacement is not also identical.
It is referred to the maintenance craft and specification of high-speed rail, EMU and subway etc. in current technology data, but does not relate to
And the specific maintenance detailed process at different levels of administrative region of a city vehicle or details, such as the specific operation process overhauled of the third level or process it is thin
Section.In addition administrative region of a city vehicle is for state's iron or subway, and vehicle major parameter and performance are different, and maintenance craft also has
Corresponding variation.Therefore the maintenance of administrative region of a city rolling stock cannot indiscriminately imitate the maintenance craft process of state's iron and subway completely, when maintenance
It needs to make corresponding change for the characteristics of administrative region of a city vehicle, therefore herein proposes the maintenance craft process that administrative region of a city vehicle three-level is repaired.
Summary of the invention
Aiming at the above defects or improvement requirements of the prior art, the present invention provides a kind of administrative region of a city rolling stock three-level and repairs work
Skill, in conjunction with the operational mode that administrative region of a city rolling stock rises fastly fastly stops itself, the big feature of passenger capacity, in combination with administrative region of a city rolling stock
With the difference on big iron construction, adaptability maintenance is carried out to position easy to wear, increases the overhaul process of section components, deletes
Some unnecessary maintenance crafts in administrative region of a city rolling stock three-level is repaired increase the technique that solution is compiled newly in three-level is repaired, and solution editorial afterword is just
In hitch snap ring is cleaned and overhauled, seal washer in hitch blast connection is replaced;Solution compiles later section vehicle and individually changes steering
Frame changes part, requires to reduce to maintenance craft platform bit quantity, saves resource.
To achieve the goals above, the present invention provides a kind of administrative region of a city rolling stock three-level and repairs technique, and steps are as follows:
S1 train returns the vehicle to the garage and knock off and detects to wheel to pantograph after admission;
S2 cleans vehicle comprehensively, and the dirt dust removed on vehicle is convenient for subsequent maintenance;
S3 train is reorganized and outfit button and is repaired;
S4 carries out solution volume to car body, decomposes to the car body of solution editorial afterword, is decomposed into car body, traction and electric braking, air
Braking and air supply system, hitch and bogie, bogie are continued to decompose, and to car body, traction and electric braking and wind regime
Component after system, hitch and bogie decompose is overhauled;
Car body, traction and electric braking, air damping and air supply system and hitch are carried out general assembly by S5;
S6 assembles the truck components overhauled after decomposing, the bogie after forming maintenance;
S7 carries out the vehicle by maintenance to fall Che Zuoye, forms bicycle;
S8 carries out single car test to bicycle;
S9 carries out organizing into groups quiet tune;
S10 carries out dynamic debugging;
S11 static state hands over vehicle, bicycle parking can online operation after class.
Further, step S4 includes the following steps:
S41 in car body equipment compartment, run-through channel, vehicle window, built-in facility, driving position and Electric Appliance Cabinet, car door and auxiliary be
System is overhauled respectively;
S42 overhauls traction and electric braking, including the cleaning of pantograph, high voltage isolation switch insulator, high_voltage isolation
Switch block lubrication, the cleaning of high-tension cable component inspection, vehicle roof supports insulator and inspection, high-voltage equipment box inspection and cleaning,
The cleaning of tractive transformer strainer, status checkout, traction convertor status checkout and cleaning, cooling unit, secondary filtering reactor
Strainer and ontology cleaning;
S43 air damping and the maintenance of air supply system, including cylinder draining, cutout cock inspection, brake piping inspection and
Air-tight test, the inspection of air engine oil level, the empty machine lubricating oil sample detection of main pressure and replacement, the cleaning of main air compressor machine, filter filter
Core cleaning, desiccant inspection, bagpipe test, the bad replacement of windshield wiper brushing piece;
The maintenance of S44 hitch includes automatic car coupler maintenance and semi-permanent car coupler maintenance;
S45 decomposes bogie, be decomposed into wheel to components such as axle box, traction electric machine, gear-box and components, and to point
Each component part of component after solution is overhauled.
Further, in step S44, automatic car coupler maintenance includes checking, cleaning, lubricating automatic vehicle gib head, automatic car coupler
Air valve maintenance, cleaning automatic car coupler, electric hook head palpus dry cleansing;Visually inspect entire hitch components it is not damaged and corrosion, tightly
Firmware is firmly installed without lacking, preventing elastic label cleaning dislocation-free, verifies the centering function of the mechanism of destructing manually, inspection adjustment hitch
Energy.
Further, in step S44, semi-permanent car coupler maintenance include check, lubrication traction device, cylinder set snap ring and partly forever
Long property hitch;Clean semi-permanent car coupler and air circuit connection;Hitch snap ring and snap ring coupling collar position and oil removing are cleaned, hitch is detected
The coupling collar position of upper snap ring, smears lubricating grease again;Replace the seal washer in hitch blast connection;Replace the fixed spiral shell of snap ring
Bolt, nut and gasket.
Further, in step S45, before maintenance, by all air pipe line connectors of bogie, institute's live wire, cable are connect
Head, at journal box rear cover labyrinth seal, at gear-box front and rear covers labyrinth seal, the components such as traction electric machine cleaned before it is anti-
Shield, then carries out Integral cleaning for bogie.
Further, in step S45,
S451 decomposes wheel to axle box;
S452 studies traction electric machine and overhauls, and the process of maintenance is followed successively by traction electric machine disassembly, apparent condition inspection, small tooth
Wheel main shaft visual examination, Insulation Test, is delivered for a check filter gauze cleaning;
S453 is cleaned and is checked to gear-box, and the process of maintenance is followed successively by visual examination, oil extraction, the cleaning of magnetic bolt, gas
The cleaning of pipe plug, the decomposition of gear box cover, pre-add lubricating oil, hands over inspection at gear-box cleaning;
Situations such as S454 checks bogie, determined if damage is replaced in time.
Further, step S451 includes:
S45101 visual examination;
S45102 component mark;
The disassembly of S45103 velocity sensor;
The disassembly of S45104 rear cover;
S45105 axle box, which moves back, to be unloaded;
S45106 front cover, which moves back, to be unloaded;
The cleaning of S45107 bearing surface;
S45108 positioning node is decomposed;
S45109 components visual examination.
Further, in step S6, the bogie being completed need to carry out stress state on dedicated bracket loading test platform
Under dimensional gaughing and brake pad action test, brake-line leak test etc.;After bogie test passed examination, appearance is needed
Make up a deficiency paint.After bogie hands over inspection qualified, completion operation can be carried out with car body.
Further, in step S6, bogie completion is pressed bogie completion package technique condition and is executed, including adjustment troubleshooting
Mounting height of the device away from rail level.
Further, under light condition, pilot rubber baffle bottom surface height to the top of rail is 25mm~30mm, pilot gold
Category baffle bottom surface height to the top of rail is 60mm~65mm.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, can obtain down and show
Beneficial effect:
(1) administrative region of a city rolling stock three-level of the invention repairs technique, the operation for itself rising fastly fastly stopping in conjunction with administrative region of a city rolling stock
Mode, the big feature of passenger capacity carry out position easy to wear in combination with the difference on administrative region of a city rolling stock and big iron construction
Adaptability maintenance, increases the overhaul process of section components, deletes some unnecessary inspections in administrative region of a city rolling stock three-level is repaired
Technique is repaired, increases the technique that solution is compiled newly in three-level is repaired, solution editorial afterword replaces hitch wind convenient for hitch snap ring is cleaned and overhauled
Seal washer in pipe fitting;Solution compiles later section vehicle and individually changes bogie, changes part, requires to reduce to maintenance craft platform bit quantity,
Save resource.
(2) administrative region of a city rolling stock three-level of the invention repairs technique, and comprehensive maintenance, including wheel are carried out to bogie to axis
Wheel after the decomposition of case, decomposition to, earthing or grounding means, wheel rim, wheel axis spring and the other comprehensive maintenance of velocity sensor equal part, inspection
It repairs process rationally and matches with administrative region of a city rolling stock design feature and operation characteristic.
(3) domain rolling stock three-level of the invention repairs technique, before maintenance, by all air pipe line connectors of bogie, institute
Live wire, cable connector, at journal box rear cover labyrinth seal, at gear-box front and rear covers labyrinth seal, the components such as traction electric machine into
Protection before row cleaning, then carries out Integral cleaning for bogie, guarantees in maintenance process to the safety of respective lines and complete
Whole property;The characteristics of according to administrative region of a city rolling stock, eliminate damper on bogie, air spring, drawing pull bar, shaft coupling, row
The maintenance of fault device, air interchanger.
(4) domain rolling stock three-level of the invention repairs technique, only needs to check hitch compared to big iron in the maintenance of hitch
Without blocking, snap ring fills lubricating grease, the screw and nut on snap ring in hole on blast connection No leakage and the lower snap ring of visual inspection
Locking label is clear, and the maintenance craft in the present invention for administrative region of a city railway is more careful, adapts to administrative region of a city rolling stock, can both rise fastly
Stop fastly can also long transmission line operational flexibility and its passenger capacity compared to the higher feature of high-speed rail.
(5) domain rolling stock three-level of the invention repairs technique, and it is logical to eliminate emergency using window emergency ventilation living for administrative region of a city vehicle
Wind inverter and emergency ventilation control, simplify system configuration, reduce maintenance cost, eliminate in the present invention to emergency ventilation inversion
The maintenance of device, it is only necessary to which window living is overhauled.
(6) domain rolling stock three-level of the invention repair administrative region of a city running velocity unlike technique and city rail vehicle compared with
Fastly, containing equipment compartment, dismounting inspection need to be carried out to skirtboard, equipment ceiling board, skirtboard hook, bulkhead plate.Administrative region of a city rolling stock takes
Disappeared plumbing and health department, reduces maintenance link.
Detailed description of the invention
Fig. 1 is a kind of flow chart of administrative region of a city rolling stock three-level maintenance craft of the embodiment of the present invention;
Fig. 2 is that wheel forms decomposition technique flow chart to axle box in the embodiment of the present invention;
Fig. 3 is to be taken turns in the embodiment of the present invention to composition maintenance craft flow chart.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right
The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not
For limiting the present invention.As long as in addition, technical characteristic involved in the various embodiments of the present invention described below that
Not constituting conflict between this can be combined with each other.
The three-level of administrative region of a city railway of the invention repairs that interval time is 3 years or Interval mileage is 45~600,000 kilometers.Such as Fig. 1
Shown, specific maintenance step is as follows:
S1 train returns the vehicle to the garage and knock off and detects to wheel to pantograph after admission;
S2 cleans vehicle comprehensively, and the dirt dust removed on vehicle is convenient for subsequent maintenance;
S3 train is reorganized and outfit button and is repaired;
S4 carries out solution volume to car body, does not all include solution in the three-level maintenance of state's iron and subway and compiles, administrative region of a city railway of the invention
Vehicle three-level repairs the solution volume that car body is arranged in technique, and solution editorial afterword is convenient for changing convenient for hitch snap ring etc. is cleaned and overhauled
Seal washer in hitch blast connection, the progress of easy access;The car body of solution editorial afterword is decomposed, car body, traction are decomposed into
With electric braking, air damping and air supply system, hitch and bogie, bogie is continued to decompose, and to car body, traction and
Component after electric braking and air supply system, hitch and bogie decompose is overhauled, solution compile later section bicycle individually change bogie,
Part is changed, the requirement to maintenance craft platform bit quantity is reduced, resource needed for saving maintenance;
S41 in car body equipment compartment, run-through channel, vehicle window, built-in facility, driving position and Electric Appliance Cabinet, car door and auxiliary be
System is overhauled respectively;
The present invention is opposite to increase the maintenance to equipment compartment, including skirtboard, equipment ceiling board, skirt with traditional three-level maintenance
Plate hook, bulkhead plate carry out dismounting inspection, adapt to the fast feature of the damage of the too fast feature equipment compartment of railway in October speed;
Wherein, run-through channel inspection is mainly that run-through channel locking checks that run-through channel is threadedly coupled inspection with car body, and run-through channel crosses
Plate is hinged, abrasion bar abrasion inspection, top plate abrasion bar, the inspection of cab apron abrasion bar and replacement;The inspection of vehicle window include guest room vehicle window,
The status checkout of cab front window, side window and active window;Equipment compartment decompose and is repaired;Preferably, administrative region of a city vehicle is answered using window living
Anxious ventilation eliminates emergency ventilated inverter and emergency ventilation control, therefore eliminates the maintenance to emergency inverter.
The maintenance of car door and auxiliary system includes the maintenance of guest room door, the maintenance of drivers' cab side, the maintenance of cab back-end door, department
End door maintenance, emergency evacuation door maintenance and the maintenance of auxiliary system behind machine room.Wherein, door maintenance in guest room includes guest room door system function
Energy inspection, brake piping inspection and air-tight test, the inspection of air engine oil level, main air compressor lubricating oil sample detection and replacement,
It is replaced when main air compressor machine cleaning, filter element cleaning, desiccant inspection, bagpipe test and bad windshield wiper brushing piece;Drivers' cab
Side maintenance includes cab lateral door fastener status checkout, door lock maintenance;Cab back-end door maintenance include internal lock, folding door and
Door-plate inspection;Emergency evacuation door maintenance includes emergency evacuation theft sealing rubber strip cleaning maintenance and functional check;Auxiliary system maintenance
Including battery inspection, surge protective device inspection, grounding resistor inspection and cleaning, contactless box inspection, cleaning.
S42 overhauls traction and electric braking, including the cleaning of pantograph, high voltage isolation switch insulator, high_voltage isolation
Switch block lubrication, the cleaning of high-tension cable component inspection, vehicle roof supports insulator and inspection, high-voltage equipment box inspection and cleaning,
The cleaning of tractive transformer strainer, status checkout, traction convertor status checkout and cleaning, cooling unit, secondary filtering reactor
Strainer and ontology cleaning;
Wherein overhaul the standard of completion are as follows: cooling unit surface cleaning without drift along, dirt, visual examination cooling unit installation
In good condition, mechanical part is damaged without significant mechanical, fastener non-loosening, and surface paint is good, and electrical wiring is connected firmly, respectively
Connection cables are without aging, excessively thermo-color and mechanical damage, and the cable protective with protection is in good condition, fixation, cable marker,
Device identification is complete clear.
S43 air damping and the maintenance of air supply system, including cylinder draining, cutout cock inspection, brake piping inspection and
Air-tight test, the inspection of air engine oil level, the empty machine lubricating oil sample detection of main pressure and replacement, the cleaning of main air compressor machine, filter filter
Core cleaning, desiccant inspection, bagpipe test, the bad replacement of windshield wiper brushing piece.
The maintenance of S44 hitch includes automatic car coupler maintenance and semi-permanent car coupler maintenance, and the intermediate vehicle in administrative region of a city vehicle uses
Semi-permanent car coupler, vehicle uses automatic car coupler end to end;
Wherein, automatic car coupler maintenance includes inspection, cleaning, lubricates automatic vehicle gib head, the maintenance of automatic car coupler air valve, cleaning certainly
Motor-car hook, electric hook head must dry cleansings;Visually inspect entire hitch components it is not damaged and corrosion, fastener firmly installs intact
It loses, prevent elastic label cleaning dislocation-free, the alignment function for verifying the mechanism of destructing manually, checking adjustment hitch.
Semi-permanent car coupler maintenance includes checking, lubricating traction device, cylinder set snap ring and semipermanent hitch;It cleans semipermanent
Hitch and air circuit connection.Hitch snap ring and snap ring coupling collar position and oil removing are cleaned, the coupling collar position of hitch upper snap ring is detected,
Again lubricating grease is smeared.Replace the seal washer in hitch blast connection;Replace snap ring fixing bolt, nut and gasket.
When the marshalling maintenance of state's iron, it is only necessary to which the hole under checking hitch blast connection No leakage and visually inspecting on snap ring is without stifled
Plug, snap ring fill lubricating grease, and the locking label of the screw and nut on snap ring is clear, dislocation-free.When dislocation, bolt, gasket are carried out
It is updated with nut.Maintenance craft in the present invention for administrative region of a city railway is more careful, adapts to administrative region of a city rolling stock, can both rise fastly fast
Stop can also long transmission line operational flexibility and its passenger capacity it is higher compared to high-speed rail, the characteristic of caused parts wear.
S45 decomposes bogie, be decomposed into wheel to components such as axle box, traction electric machine, gear-box and components, and to point
Each component part of component after solution is overhauled;Wherein, by wheel to axle box composition, traction electric machine composition, gear-box, sensing
Device, earthing or grounding means, etc. components maintenance is removed from framework.Remaining part carries out repair based on condition of component.It is all in maintenance process to remove
Fastener update, after fastening apply beat locking label.
Preferably, before maintenance, by all air pipe line connectors of bogie, institute's live wire, cable connector, journal box rear cover fan
At the sealing of palace, at gear-box front and rear covers labyrinth seal, the components such as traction electric machine cleaned before protection, then by bogie
Carry out Integral cleaning.
Further, damper, air spring, drawing pull bar, shaft coupling, obstacle deflector, air interchanger be not on bogie
Overhaul, be different from traditional big iron three-level repair in need to overhaul these components.
S451 decomposes wheel to axle box, as shown in Fig. 2, specific decomposition technique process is as follows:
S45101 visual examination;
S45102 component mark;
The disassembly of S45103 velocity sensor;
The disassembly of S45104 rear cover;
S45105 axle box, which moves back, to be unloaded;
S45106 front cover, which moves back, to be unloaded;
The cleaning of S45107 bearing surface;
S45108 positioning node is decomposed;
S45109 components visual examination;
Wheel to resolve into wheel to, earthing or grounding means, wheel rim, wheel axis spring and velocity sensor;
Wherein, to the wheel after decomposition to overhauling, as shown in figure 3, specific maintenance step is as follows:
S451101 visual examination;
S451102 dismounting maintenance rim lubricating device;
The maintenance of S451103 integral bearing;
S451104 axle surface depainting, derusting;
S451105 magnetic powder inspection;
S451106 ultrasonic examination;
S451107 wheel repairs rotation;
S451108 wheelset profile inspection;
S451109 spray paint;
The maintenance of S451110 brake disc;
S451111 hands over inspection to deliver for a check.
Wherein, it is rigid that the step of vehicle earthing or grounding means overhauls is followed successively by earthing or grounding means decomposition, cleaning, visual examination, detection spring
It spends, make up a deficiency paint;The step of journal box spring composition maintenance, is followed successively by journal box spring decomposition, visual examination, delivers for a check, is pressed, to group;
The step of velocity sensor overhauls measures for apparent condition maintenance and Insulation Test and coil resistance value;
S452 studies traction electric machine and overhauls, and the process of maintenance is followed successively by traction electric machine disassembly, apparent condition inspection, small tooth
Wheel main shaft visual examination, Insulation Test, is delivered for a check filter gauze cleaning;
S453 is cleaned and is checked to gear-box, and the process of maintenance is followed successively by visual examination, oil extraction, the cleaning of magnetic bolt, gas
The cleaning of pipe plug, the decomposition of gear box cover, pre-add lubricating oil, hands over inspection at gear-box cleaning;
Situations such as S454 checks bogie, determined if damage is replaced in time;
Car body, traction and electric braking, air damping and air supply system and hitch are carried out general assembly by S5;
S6 assembles the truck components overhauled after decomposing, the bogie after forming maintenance;Wherein, it turns to
Frame completion is pressed bogie completion package technique condition and is executed.Including adjusting mounting height of the pilot away from rail level: preferably, unloaded
Under state, pilot rubber baffle bottom surface height to the top of rail is 25-30mm;Pilot metal baffle bottom surface height to the top of rail is
60-65mm。
Further, the bogie being completed need to carry out the inspection of the size under stress state on dedicated bracket loading test platform
Look into brake pad action test, brake-line leak test etc..After bogie test passed examination, appearance need to make up a deficiency paint.
After bogie hands over inspection qualified, completion operation can be carried out with car body.
S7 carries out the vehicle by maintenance to fall Che Zuoye, forms bicycle;
S8 carries out single car test to bicycle;
S9 carries out organizing into groups quiet tune;
S10 carries out dynamic debugging;
S11 static state hands over vehicle, bicycle parking can online operation after class.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, it is not used to
The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should all include
Within protection scope of the present invention.
Claims (10)
1. a kind of administrative region of a city rolling stock three-level repairs technique, which is characterized in that steps are as follows:
S1 train returns the vehicle to the garage and knock off and detects to wheel to pantograph after admission;
S2 cleans vehicle comprehensively, and the dirt dust removed on vehicle is convenient for subsequent maintenance;
S3 train is reorganized and outfit button and is repaired;
S4 carries out solution volume to car body, decomposes to the car body of solution editorial afterword, is decomposed into car body, traction and electric braking, air damping
And air supply system, hitch and bogie, bogie is continued to decompose, and to car body, traction and electric braking and air supply system,
Component after hitch and bogie decompose is overhauled;
Car body, traction and electric braking, air damping and air supply system and hitch are carried out general assembly by S5;
S6 assembles the truck components overhauled after decomposing, the bogie after forming maintenance;
S7 carries out the vehicle by maintenance to fall Che Zuoye, forms bicycle;
S8 carries out single car test to bicycle;
S9 carries out organizing into groups quiet tune;
S10 carries out dynamic debugging;
S11 static state hands over vehicle, bicycle parking can online operation after class.
2. a kind of administrative region of a city rolling stock three-level according to claim 1 repairs technique, which is characterized in that step S4 includes as follows
Step:
S41 is to the equipment compartment in car body, run-through channel, vehicle window, built-in facility, driving position and Electric Appliance Cabinet, car door and auxiliary system point
It is not overhauled;
S42 overhauls traction and electric braking, including the cleaning of pantograph, high voltage isolation switch insulator, high voltage isolator
Component lubrication, high-tension cable component inspection, the cleaning of vehicle roof supports insulator and inspection, high-voltage equipment box inspection and cleaning, traction
The cleaning of transformer strainer, status checkout, traction convertor status checkout and cleaning, cooling unit, secondary filtering reactor strainer
It is cleaned with ontology;
S43 air damping and the maintenance of air supply system, including cylinder draining, cutout cock inspection, brake piping inspection and airtight
Property test, the inspection of air engine oil level, the empty machine lubricating oil sample detection of main pressure and replacement, the cleaning of main air compressor machine, filter element it is clear
Clean, desiccant inspection, bagpipe test, the bad replacement of windshield wiper brushing piece;
The maintenance of S44 hitch includes automatic car coupler maintenance and semi-permanent car coupler maintenance;
S45 decomposes bogie, be decomposed into wheel to components such as axle box, traction electric machine, gear-box and components, and to decomposition after
Each component part of component overhauled.
3. a kind of administrative region of a city rolling stock three-level according to claim 2 repairs technique, which is characterized in that in step S44, automatically
Inspection and repair of couplers includes inspection, cleaning, lubrication automatic vehicle gib head, automatic car coupler air valve overhauls, cleaning automatic car coupler, electric hook head must be done
Dry cleaning;Visually inspect that entire hitch components are not damaged and corrosion, fastener is firmly installed without lacking, prevent that elastic label cleans
Dislocation-free, the alignment function for verifying the mechanism of destructing manually, checking adjustment hitch.
4. a kind of administrative region of a city rolling stock three-level according to claim 2 or 3 repairs technique, which is characterized in that in step S44,
Semi-permanent car coupler maintenance includes checking, lubricating traction device, cylinder set snap ring and semipermanent hitch;It is gentle to clean semi-permanent car coupler
Road connection;Hitch snap ring and snap ring coupling collar position and oil removing are cleaned, the coupling collar position of hitch upper snap ring is detected, smears again
Lubricating grease;Replace the seal washer in hitch blast connection;Replace snap ring fixing bolt, nut and gasket.
5. a kind of administrative region of a city rolling stock three-level according to claim 2 repairs technique, which is characterized in that in step S45, examining
Before repairing, by all air pipe line connectors of bogie, institute's live wire, cable connector, at journal box rear cover labyrinth seal, before and after gear-box
At lid labyrinth seal, the components such as traction electric machine cleaned before protection, bogie is then subjected to Integral cleaning.
6. a kind of administrative region of a city rolling stock three-level according to claim 2 or 5 repairs technique, which is characterized in that in step S45,
S451 decomposes wheel to axle box;
S452 studies traction electric machine and overhauls, and the process of maintenance is followed successively by traction electric machine disassembly, apparent condition inspection, pinion gear master
Axis visual examination, Insulation Test, is delivered for a check filter gauze cleaning;
S453 is cleaned and is checked to gear-box, the process of maintenance be followed successively by visual examination, oil extraction, magnetic bolt cleaning, tracheae insert
Head cleaning, the decomposition of gear box cover, pre-add lubricating oil, hands over inspection at gear-box cleaning;
Situations such as S454 checks bogie, determined if damage is replaced in time.
7. a kind of administrative region of a city rolling stock three-level according to claim 6 repairs technique, which is characterized in that step S451 includes:
S45101 visual examination;
S45102 component mark;
The disassembly of S45103 velocity sensor;
The disassembly of S45104 rear cover;
S45105 axle box, which moves back, to be unloaded;
S45106 front cover, which moves back, to be unloaded;
The cleaning of S45107 bearing surface;
S45108 positioning node is decomposed;
S45109 components visual examination.
8. a kind of administrative region of a city rolling stock three-level according to claim 1 repairs technique, which is characterized in that in step S6, assembling
The bogie of completion need to be carried out on dedicated bracket loading test platform dimensional gaughing under stress state and brake pad action test,
Brake-line leak test etc.;After bogie test passed examination, appearance need to make up a deficiency paint;It, can after bogie hands over inspection qualified
Completion operation is carried out with car body.
9. a kind of administrative region of a city rolling stock three-level according to claim 1 or 8 repairs technique, which is characterized in that in step S6, turn
It presses bogie completion package technique condition to frame completion to execute, including adjusting mounting height of the pilot away from rail level.
10. a kind of administrative region of a city rolling stock three-level according to claim 9 repairs technique, which is characterized in that under light condition, row
Barrier device rubber baffle bottom surface height to the top of rail be 25mm~30mm, pilot metal baffle bottom surface height to the top of rail be 60mm~
65mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811203642.6A CN109398409A (en) | 2018-10-16 | 2018-10-16 | A kind of administrative region of a city rolling stock three-level repairs technique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811203642.6A CN109398409A (en) | 2018-10-16 | 2018-10-16 | A kind of administrative region of a city rolling stock three-level repairs technique |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109398409A true CN109398409A (en) | 2019-03-01 |
Family
ID=65468152
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811203642.6A Pending CN109398409A (en) | 2018-10-16 | 2018-10-16 | A kind of administrative region of a city rolling stock three-level repairs technique |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109398409A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110470248A (en) * | 2019-08-27 | 2019-11-19 | 上海航天控制技术研究所 | A kind of hitch centering method for automatic measurement |
CN111661106A (en) * | 2020-06-23 | 2020-09-15 | 广州电力机车有限公司 | Wheel drive maintenance flexible production process |
CN112985707A (en) * | 2019-12-16 | 2021-06-18 | 中车唐山机车车辆有限公司 | Automatic car coupler and buffer device air tightness test method |
CN113607441A (en) * | 2021-08-24 | 2021-11-05 | 湖南工业大学 | Universal intelligent operation and maintenance system and method for flexible variable maintenance process of high-speed train |
CN114228667A (en) * | 2022-01-19 | 2022-03-25 | 中铁第四勘察设计院集团有限公司 | Annual inspection process method suitable for intelligent rail train |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2001025968A1 (en) * | 1999-10-01 | 2001-04-12 | General Electric Railcar Services_Corporation | Method and database arrangement for inspection and requalification of vehicles used for transporting commodities and/or hazardous materials |
CN102950414A (en) * | 2011-08-26 | 2013-03-06 | 北京新联铁科技股份有限公司 | Motor train unit framework flow line maintenance system and maintenance method thereof |
CN104281900A (en) * | 2013-07-03 | 2015-01-14 | 上海杰之能信息科技有限公司 | Method for optimizing bogie procedure in advanced repair of motor train unit and planning and scheduling method and system |
CN107655388A (en) * | 2017-08-10 | 2018-02-02 | 中车青岛四方机车车辆股份有限公司 | Axle box detection means |
CN108399851A (en) * | 2018-03-16 | 2018-08-14 | 长春师范大学 | A kind of typotron wheel maintenance virtual simulated training system |
-
2018
- 2018-10-16 CN CN201811203642.6A patent/CN109398409A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2001025968A1 (en) * | 1999-10-01 | 2001-04-12 | General Electric Railcar Services_Corporation | Method and database arrangement for inspection and requalification of vehicles used for transporting commodities and/or hazardous materials |
CN102950414A (en) * | 2011-08-26 | 2013-03-06 | 北京新联铁科技股份有限公司 | Motor train unit framework flow line maintenance system and maintenance method thereof |
CN104281900A (en) * | 2013-07-03 | 2015-01-14 | 上海杰之能信息科技有限公司 | Method for optimizing bogie procedure in advanced repair of motor train unit and planning and scheduling method and system |
CN107655388A (en) * | 2017-08-10 | 2018-02-02 | 中车青岛四方机车车辆股份有限公司 | Axle box detection means |
CN108399851A (en) * | 2018-03-16 | 2018-08-14 | 长春师范大学 | A kind of typotron wheel maintenance virtual simulated training system |
Non-Patent Citations (1)
Title |
---|
王忠凯: "动车组运用检修计划优化方法的研究", 《中国博士学位论文全文数据库 工程科技Ⅱ辑》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110470248A (en) * | 2019-08-27 | 2019-11-19 | 上海航天控制技术研究所 | A kind of hitch centering method for automatic measurement |
CN112985707A (en) * | 2019-12-16 | 2021-06-18 | 中车唐山机车车辆有限公司 | Automatic car coupler and buffer device air tightness test method |
CN112985707B (en) * | 2019-12-16 | 2023-03-21 | 中车唐山机车车辆有限公司 | Automatic car coupler and buffer device air tightness test method |
CN111661106A (en) * | 2020-06-23 | 2020-09-15 | 广州电力机车有限公司 | Wheel drive maintenance flexible production process |
CN111661106B (en) * | 2020-06-23 | 2021-10-15 | 广州电力机车有限公司 | Wheel drive maintenance flexible production process |
CN113607441A (en) * | 2021-08-24 | 2021-11-05 | 湖南工业大学 | Universal intelligent operation and maintenance system and method for flexible variable maintenance process of high-speed train |
CN114228667A (en) * | 2022-01-19 | 2022-03-25 | 中铁第四勘察设计院集团有限公司 | Annual inspection process method suitable for intelligent rail train |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109398409A (en) | A kind of administrative region of a city rolling stock three-level repairs technique | |
CN109436022A (en) | A kind of administrative region of a city rolling stock second level repairs technique | |
CN109398411B (en) | Five-level repair process for urban railway vehicle | |
CN109436023A (en) | A kind of administrative region of a city rolling stock level-one repairs technique | |
CN104260736A (en) | Multifunctional flaw detection vehicle for highland railway steel rail | |
CN109398410A (en) | A kind of administrative region of a city rolling stock level Four repairs technique | |
CN113465953B (en) | Fault prediction and health management device for motor train unit transmission system and using method thereof | |
CN109131435B (en) | Method for overhauling urban vehicle body | |
RU197233U1 (en) | FREIGHT WAGON BRAKE EQUIPMENT | |
CN102785670A (en) | Internal combustion locomotive with low axle weight and narrow track | |
CN207813135U (en) | A kind of motor-car uses institute | |
CN201193028Y (en) | CRH3 high speed motor train set | |
Yu et al. | A study on reliability centered rolling stock maintenance methods | |
CN108035573A (en) | A kind of motor-car uses institute | |
CN112373515A (en) | Comprehensive maintenance process flow method for suspension type monorail train | |
CN112368197B (en) | Monitoring and diagnostic system for intelligent freight cars | |
CN106274927A (en) | Integrated driving position with diagnostic system | |
CN207712052U (en) | Rail-defect detector car suitable for high-speed railway | |
Bepperling et al. | Estimation of safety requirements for wayside hot box detection systems | |
CN109242117A (en) | A kind of stage division of administrative region of a city rolling stock Pyatyi maintenance | |
CN206293837U (en) | A kind of comprehensive pipeline arrangement apparatus for overhead rail vehicular traffic | |
CN201128410Y (en) | Air braking system for lorry | |
CN103978195B (en) | A kind of rail mounted aluminium liquid transporting equipment | |
CN217240468U (en) | Waterproof device for vehicle-mounted equipment junction box | |
CN203843159U (en) | Track-type molten aluminum transportation device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190301 |
|
RJ01 | Rejection of invention patent application after publication |