CN109395407A - New energy Amusement arrangement with hopping motions of the substructure and application method - Google Patents
New energy Amusement arrangement with hopping motions of the substructure and application method Download PDFInfo
- Publication number
- CN109395407A CN109395407A CN201811396413.0A CN201811396413A CN109395407A CN 109395407 A CN109395407 A CN 109395407A CN 201811396413 A CN201811396413 A CN 201811396413A CN 109395407 A CN109395407 A CN 109395407A
- Authority
- CN
- China
- Prior art keywords
- bungee jumping
- main shaft
- fixedly installed
- platform
- case
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63G—MERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
- A63G31/00—Amusement arrangements
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63G—MERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
- A63G31/00—Amusement arrangements
- A63G2031/002—Free-fall
Landscapes
- Toys (AREA)
Abstract
A kind of new energy Amusement arrangement with hopping motions of the substructure, including platform, the platform is apart from 80 meters of ground, the mesa base is fixedly connected with the ground, motor supporting table is equipped in the middle part of the table top, battery is equipped with inside the supporting table, rotating electric machine is fixedly installed at the top of the motor supporting table, the rotating electric machine front end is fixedly installed with main shaft one, head pulley is fixedly installed on the outside of the main shaft one, belt is installed at the top of the head pulley, the invention has the advantages that: the configuration of the present invention is simple, it is easy to operate, bungee jumping person Zi is used by the gravitional force that Luo Ti Sou is generated, electric energy, which is converted into, by generator is stored into the power resources rotated in battery as main shaft, main shaft rotation drives belt to run elevator upward or downward, since elevator is equipped with clump weight, main shaft can greatly reduce power consumption, frictional force need to only be overcome Or tourist can be sent on platform by the gravity of clump weight half.
Description
Technical field
The present invention relates to technical field of new energy utilization more particularly to a kind of new energy Amusement arrangement with hopping motions of the substructure and application methods.
Background technique
Currently, bungee jumping has been a widely known extreme sport, need people station one on the bungee jumping platform of seventy or eighty meters
The feeling of jump and experience stimulation, the bungee jumping platform that when tourist's bungee jumping needs to be served seventy or eighty meters are then needed using elevator, and
Electric energy needed for elevator is run one day is a no small spending, and people's freely falling body 40 that one individual weight is 60 kilograms when bungee jumping
Rice is about 300 kilojoules or more by the energy that acceleration of gravity generates, and the elastic potential energy for counting bungee jumping rope in, which offsets a part, also to be had
More than 200 kilojoules, one liter of water is heated to 100 DEG C from 0 DEG C enough, tourist's quantity of a reception in bungee jumping platform one day is reachable
100 people, these people are a huge numbers by the energy that bungee jumping generates, and are subject to conversion supply elevator and use, or
It is otherwise utilized to bring huge benefit, it is a kind of new energy.
Summary of the invention
The invention solves the above-mentioned problems of the prior art, a kind of new energy Amusement arrangement with hopping motions of the substructure and application method are provided,
Bungee jumping rope is connected to generator and spooler, when people jumps lower diving tower, bungee jumping rope band moves generator rotation and issues huge electric energy,
Electric energy is used by the operation that conversion storage supplies elevator in the battery, and most of bungee jumping platform is all built up in the dangerously steep place of topography, even
It connects alternating current to be inconvenient, and expense is higher, gravitional force when this equipment is by bungee jumping is converted into electric energy, gets rid of the beam of alternating current
It ties up.
The technical scheme adopted by the invention to solve the technical problem: this new energy Amusement arrangement with hopping motions of the substructure, including platform, described flat
Apart from 80 meters of ground, the mesa base is fixedly connected with the ground platform, and motor supporting table, institute are equipped in the middle part of the table top
It states and is equipped with battery inside supporting table, rotating electric machine is fixedly installed at the top of the motor supporting table, the rotating electric machine front end is solid
Dingan County is equipped with main shaft one, and head pulley is fixedly installed on the outside of the main shaft one, is equipped with belt, the branch at the top of the head pulley
Left support arm is fixedly installed on the left of support platform, and left support arm left end bearing is connected with left rotary shaft, outside the left rotary shaft front end
Side is fixedly installed with left chain wheel, and the belt left end is flexibly connected with left chain wheel, and belt left end bottom is fixedly connected with electricity
Terraced case, the elevator case right end are equipped with sliding door, and right support arm is fixedly installed on the right side of the supporting table, and the right support arm is right
End bearing is connected with right spindle, and the right spindle front end outer side is fixedly installed with right pulley, and the belt right end and right pulley are living
Dynamic connection, belt right end bottom are fixedly connected with clump weight, and the gravity of the clump weight is twice of elevator case, described flat
It is fixedly installed with diving tower case in front of platform, step is fixedly installed on rear side of the jump, middle part is equipped with generator inside the diving tower case,
The power generation motor spindle is fixedly connected with diving tower chamber interior wall bottom, and the generator left end is fixedly installed with main shaft two, the master
It is fixedly installed with spooler on the outside of axis two, bungee jumping rope one is equipped with above the diving tower case, one bottom of bungee jumping rope passes through diving tower
It is connect at the top of chamber interior wall with spooler, one bottom of bungee jumping rope connects by spooler bottom and diving tower chamber interior wall bottom are fixed
It connects, fixed ring one is equipped at the top of the bungee jumping rope one, the generator upper left side is equipped with shaft two, and two right of shaft is equipped with
With the fixed block being fixedly mounted inside diving tower box top, the fixed block is located above generator, two left end of shaft and jump
The connection of platform case inner left wall bearing, two right end of shaft are connect with bearing on the left of fixed block, fixed peace on the outside of the shaft two
Equipped with spooler two, be equipped with bungee jumping rope two above the diving tower case, two bottom of bungee jumping rope pass through at the top of diving tower chamber interior wall with
Spooler two connects, and two bottom of bungee jumping rope is fixedly connected by two bottom of spooler with diving tower chamber interior wall bottom, the spring
Rope two top in pole is equipped with fixed ring two, in conclusion bungee jumping rope one is able to drive generator when bungee jumping person jumps off from diving tower case
Rotary electrification is carried out, gravitional force is proportionally converted to electric energy storage in the battery, battery can supply one conduct of main shaft
Energy source, the rotation of main shaft one drive belt that elevator case is able to carry out and pump.
A kind of new energy Amusement arrangement with hopping motions of the substructure and application method, its step are as follows:
One, it appears on the stage: needing one group of ten people of tourist of bungee jumping to enter in elevator case by sliding door and press rising button, elevator case adds
The gravity of tourist is equal to the weight of clump weight, and main shaft one drives belt movement, and one need of main shaft overcome frictional force that can incite somebody to action at this time
Tourist serves platform, electric energy needed for battery supplies motion of main shaft;
Two, bungee jumping: tourist is tied up to bungee jumping rope one and bungee jumping rope two on both legs by fixed ring one and fixed ring two in bungee jumping,
When tourist jumps off platform, bungee jumping rope one drives main shaft two to rotate, and generator issues a large amount of electric energy and is transported to electricity by circuit at this time
Inside pond, when tourist's bungee jumping finishes, tourist is connect down and unlocks fixed ring one and fixed ring two, take-up by the staff on ground
Bungee jumping rope one and bungee jumping rope two are withdrawn platform by device and spooler two;
Three, the declines button of elevator case is pressed when one group of ten people of tourist's bungee jumping finishes, main shaft one drives belt movement, due to
The empty-weight of elevator case is the half of clump weight, therefore one need of main shaft overcome the gravity of clump weight half can be by elevator case
Drop to ground.
The invention has the advantages that: the configuration of the present invention is simple, easy to operate, the weight that bungee jumping person Zi is generated by Luo Ti Sou
Power potential energy is used, and is converted into electric energy by generator and is stored into the power resources rotated in battery as main shaft, main
Axis rotation drives belt to run elevator upward or downward, and since elevator is equipped with clump weight, main shaft can greatly reduce power consumption,
Only it need to overcome the gravity of frictional force or clump weight half that tourist can be sent on platform.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is A of the invention to cross-sectional view;
Fig. 3 is the partial enlarged view of diving tower case in Fig. 1;
Fig. 4 is the partial enlarged view of left chain wheel and right pulley.
Description of symbols: elevator case 1, left rotary shaft 2, belt 3, left support arm 4, right support arm 5, right spindle 6, sliding door
7, platform 8, spooler 29, shaft 2 10, fixed ring 2 11, supporting table 12, rotating electric machine 13, head pulley 14, main shaft 1,
Bungee jumping rope 2 16, generator 17, bungee jumping rope 1, spooler 19, diving tower case 20, fixed ring 1, fixed block 22, main shaft two
23, step 24, battery 25, left chain wheel 26, right pulley 27, clump weight 28.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings:
Referring to attached drawing 1,2 and 3,4: new energy Amusement arrangement with hopping motions of the substructure in the present embodiment, including platform 8, the platform 8 is apart from ground 80
Rice, 8 bottom of platform is fixedly connected with the ground, and 8 middle top of platform is equipped with motor supporting table 12, in the supporting table
Portion is equipped with battery 25, is fixedly installed with rotating electric machine 13 at the top of the motor supporting table 12,13 front end of rotating electric machine is fixed
Main shaft 1 is installed, one 15 outside of main shaft is fixedly installed with head pulley 14, is equipped with belt at the top of the head pulley 16
3, left support arm 4 is fixedly installed on the left of the supporting table 12, and the 4 left end bearing of left support arm is connected with left rotary shaft 2, described
2 front end outer side of left rotary shaft is fixedly installed with left chain wheel 26, and 3 left end of belt is flexibly connected with left chain wheel 26, and the belt 3 is left
End bottom is fixedly connected with elevator case 1, and 1 right end of elevator case is equipped with sliding door 7, is fixedly installed on the right side of the supporting table 12
Right support arm 5, the 5 right end bearing of right support arm are connected with right spindle 6, and 6 front end outer side of right spindle is fixedly installed with the right side
Pulley 27,3 right end of belt are flexibly connected with right pulley 27, and the 3 right end bottom of belt is fixedly connected with clump weight 28, institute
The gravity for stating clump weight 28 is twice of elevator case 1, and diving tower case 20 is fixedly installed in front of the platform 8, and the jump rear side is solid
Dingan County is equipped with step 24, and 20 inside middle part of the diving tower case is equipped with generator 17, in 17 bottom of generator and diving tower case 20
Wall bottom is fixedly connected, and 17 left end of generator is fixedly installed with main shaft 2 23, and 2 23 outside of main shaft is fixedly installed with
Spooler 19, bungee jumping rope 1 is equipped with above the diving tower case 20, and one 18 bottom of bungee jumping rope passes through 20 inner wall top of diving tower case
Portion is connect with spooler 19, and one 18 bottom of bungee jumping rope connects by 19 bottom of spooler and 20 inner wall bottom of diving tower case are fixed
It connects, one 18 top of bungee jumping rope is equipped with fixed ring 1, and 17 upper left side of generator is equipped with shaft 2 10, the shaft two
10 rights are equipped with the fixed block 22 being fixedly mounted with 20 top interior of diving tower case, and the fixed block 22 is located at 17 top of generator,
2 10 left end of shaft is connect with 20 inner left wall bearing of diving tower case, 2 10 right end of shaft and 22 left side bearing of fixed block
Connection, 2 10 outside of shaft is fixedly installed with spooler 29, bungee jumping rope 2 16 is equipped with above the diving tower case 20, described
2 16 bottom of bungee jumping rope, which passes through, to be connect at the top of 20 inner wall of diving tower case with spooler 29, and take-up is passed through in 2 16 bottom of bungee jumping rope
29 bottom of device is fixedly connected with 20 inner wall bottom of diving tower case, and 2 16 top of bungee jumping rope is equipped with fixed ring 2 11.
Referring to attached drawing 1,2 and 3,4: this new energy Amusement arrangement with hopping motions of the substructure and application method, its step are as follows:
One, it appears on the stage: needing one group of ten people of tourist of bungee jumping to enter in elevator case 1 by sliding door 7 and press rising button, elevator case
1 adds the gravity of tourist to be equal to the weight of clump weight 28, and the drive movement of belt 3 of main shaft 1, one 15 need of main shaft, which overcome, at this time rubs
Tourist can be served platform 8, electric energy needed for battery 25 supplies motion of main shaft by wiping power;
Two, bungee jumping: tourist passes through fixed ring 1 and fixed ring 2 11 in bungee jumping for 2 16 system of bungee jumping rope 1 and bungee jumping rope
On both legs, when tourist jumps off platform, bungee jumping rope 1 drives main shaft 2 23 to rotate, and generator 17 issues a large amount of electric energy at this time
It is transported to inside battery 25 by circuit, when tourist's bungee jumping finishes, tourist is connect down and unlocks fixed ring by the staff on ground
1 and fixed ring 2 11, spooler 19 and spooler 29 bungee jumping rope 1 and bungee jumping rope 2 16 withdrawn into platform 8;
Three, the declines button of elevator case 1 is pressed when one group of ten people of tourist's bungee jumping finishes, main shaft 1 drives belt 3 to move,
Due to the half that the empty-weight of elevator case 15 is clump weight 28, therefore one 15 need of main shaft overcome the gravity of clump weight half just
Elevator case 1 can be dropped to ground.
Although the present invention has been illustrated and described with reference to preferred embodiments, this profession ordinary skill
Personnel are it is to be appreciated that within the scope of the claims, can make various variation in form and details.
Claims (2)
1. a kind of new energy Amusement arrangement with hopping motions of the substructure, including platform (8), it is characterized in that: the platform (8) is apart from 80 meters of ground, it is described
Platform (8) bottom is fixedly connected with the ground, and platform (8) middle top is equipped with motor supporting table (12), in the supporting table
Portion is equipped with battery (25), is fixedly installed with rotating electric machine (13) at the top of the motor supporting table (12), the rotating electric machine (13)
Front end is fixedly installed with main shaft one (15), is fixedly installed with head pulley (14), the head pulley on the outside of the main shaft one (15)
(16) top is equipped with belt (3), is fixedly installed with left support arm (4) on the left of the supporting table (12), the left support arm (4)
Left end bearing is connected with left rotary shaft (2), and left rotary shaft (2) front end outer side is fixedly installed with left chain wheel (26), the belt (3)
Left end is flexibly connected with left chain wheel (26), and belt (3) the left end bottom is fixedly connected with elevator case (1), the elevator case (1)
Right end is equipped with sliding door (7), is fixedly installed with right support arm (5) on the right side of the supporting table (12), right support arm (5) right end
Bearing is connected with right spindle (6), and right spindle (6) front end outer side is fixedly installed with right pulley (27), belt (3) right end
It is flexibly connected with right pulley (27), belt (3) the right end bottom is fixedly connected with clump weight (28), the clump weight (28)
Gravity is twice of elevator case (1), is fixedly installed with diving tower case (20) in front of the platform (8), is fixedly mounted on rear side of the jump
Have step (24), the internal middle part of the diving tower case (20) is equipped with generator (17), generator (17) bottom and diving tower case
(20) inner wall bottom is fixedly connected, and generator (17) left end is fixedly installed with main shaft two (23), and the main shaft two (23) is outside
Side is fixedly installed with spooler (19), and bungee jumping rope one (18), bungee jumping rope one (18) bottom are equipped with above the diving tower case (20)
Portion, which passes through, to be connect at the top of diving tower case (20) inner wall with spooler (19), and spooler (19) bottom is passed through in bungee jumping rope one (18) bottom
Portion is fixedly connected with diving tower case (20) inner wall bottom, and fixed ring one (21), the power generation are equipped at the top of the bungee jumping rope one (18)
Machine (17) upper left side is equipped with shaft two (10), and shaft two (10) right is equipped with to be fixedly mounted with diving tower case (20) top interior
Fixed block (22), the fixed block (22) is located above generator (17), shaft two (10) left end and diving tower case (20)
The connection of inner left wall bearing, shaft two (10) right end are connect with bearing on the left of fixed block (22), and the shaft two (10) is outside
Side is fixedly installed with spooler two (9), is equipped with bungee jumping rope two (16), bungee jumping rope two (16) bottom above the diving tower case (20)
Portion, which passes through, to be connect at the top of diving tower case (20) inner wall with spooler two (9), and spooler two (9) is passed through in bungee jumping rope two (16) bottom
Bottom is fixedly connected with diving tower case (20) inner wall bottom, and fixed ring two (11) is equipped at the top of the bungee jumping rope two (16).
2. a kind of new energy Amusement arrangement with hopping motions of the substructure and application method, its step are as follows:
One, it appears on the stage: needing one group of ten people of tourist of bungee jumping to enter in elevator case (1) by sliding door (7) and press rising button, electricity
The gravity of terraced case (1) plus tourist are equal to the weight of clump weight (28), and main shaft one (15) drives belt (3) movement, at this time main shaft one
(15) only it need to overcome frictional force that can serve tourist platform (8), electric energy needed for battery (25) supplies motion of main shaft;
Two, bungee jumping: tourist passes through fixed ring one (21) and fixed ring two (11) in bungee jumping for bungee jumping rope one (18) and bungee jumping rope
Two (16) tie up on both legs, and when tourist jumps off platform, bungee jumping rope one (18) drives main shaft two (23) rotation, at this time generator
(17) a large amount of electric energy are issued, battery (25) inside is transported to by circuit, the staff on ground will swim when tourist's bungee jumping finishes
Visitor connects down and unlocks fixed ring one (21) and fixed ring two (11), and spooler (19) and spooler two (9) are by bungee jumping rope one (18)
Platform (8) are withdrawn with bungee jumping rope two (16);
Three, the declines button of elevator case (1) is pressed when one group of ten people of tourist's bungee jumping finishes, main shaft one (15) drives belt
(3) it moves, due to the half that the empty-weight of elevator case (15) is clump weight (28), therefore main shaft one (15) need to only overcome counterweight
Elevator case (1) can be dropped to ground by the gravity of block half.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811396413.0A CN109395407A (en) | 2018-11-22 | 2018-11-22 | New energy Amusement arrangement with hopping motions of the substructure and application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811396413.0A CN109395407A (en) | 2018-11-22 | 2018-11-22 | New energy Amusement arrangement with hopping motions of the substructure and application method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109395407A true CN109395407A (en) | 2019-03-01 |
Family
ID=65474564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811396413.0A Withdrawn CN109395407A (en) | 2018-11-22 | 2018-11-22 | New energy Amusement arrangement with hopping motions of the substructure and application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109395407A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112642167A (en) * | 2020-12-30 | 2021-04-13 | 北京中冶设备研究设计总院有限公司 | Space jump |
CN112755541A (en) * | 2020-12-30 | 2021-05-07 | 北京中冶设备研究设计总院有限公司 | Controllable speed-reducing device |
CN112807700A (en) * | 2020-12-30 | 2021-05-18 | 北京中冶设备研究设计总院有限公司 | Sky jump recovery device |
-
2018
- 2018-11-22 CN CN201811396413.0A patent/CN109395407A/en not_active Withdrawn
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112642167A (en) * | 2020-12-30 | 2021-04-13 | 北京中冶设备研究设计总院有限公司 | Space jump |
CN112755541A (en) * | 2020-12-30 | 2021-05-07 | 北京中冶设备研究设计总院有限公司 | Controllable speed-reducing device |
CN112807700A (en) * | 2020-12-30 | 2021-05-18 | 北京中冶设备研究设计总院有限公司 | Sky jump recovery device |
CN112807700B (en) * | 2020-12-30 | 2022-10-25 | 北京中冶设备研究设计总院有限公司 | Sky jump recovery device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109395407A (en) | New energy Amusement arrangement with hopping motions of the substructure and application method | |
CN204380080U (en) | A kind of fitness power generation rowing machine | |
CN105749496A (en) | Tension-adjustable body-building power generation device | |
CN206372491U (en) | New-type drawing rowing machine | |
CN204493092U (en) | Kinergety collection march knapsack | |
CN202287090U (en) | Lifting medicine cabinet | |
CN207158553U (en) | A kind of elevator potential energy collection device | |
CN103933721B (en) | Coriolis football device | |
CN104707296B (en) | Low energy consumption high-efficiency treadmill | |
CN211863708U (en) | Outdoor parent-child fitness equipment | |
CN207221187U (en) | Interactive intelligent body-building power generation advertising equipment | |
CN106286106A (en) | A kind of TRT based on ocean energy | |
CN104906791B (en) | Wind power electric swing | |
CN103182157A (en) | Pulling generator | |
CN205360415U (en) | Multi -functional environment -friendly exercise bicycle | |
CN104100475B (en) | Portable walking TRT | |
CN202777687U (en) | Automatic fitness device | |
CN105727505B (en) | A kind of desk-top fitness equipment of stair | |
CN110051965A (en) | A kind of Multifunctional physical training auxiliary device | |
CN204864735U (en) | From cascaded mountain -climbing of electricity generation machine | |
CN107842475A (en) | A kind of hamster cage TRT | |
CN211068917U (en) | Power generation type fitness equipment | |
CN202237063U (en) | Novel fitness slimming device | |
CN206950559U (en) | A kind of secondary Sheng Yang mechanisms of treadmill | |
CN107673166B (en) | Helical orbit elevator and wind power generating set |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190301 |
|
WW01 | Invention patent application withdrawn after publication |