CN109387435A - A kind of tunnel distribution of water pressure rule model test apparatus - Google Patents

A kind of tunnel distribution of water pressure rule model test apparatus Download PDF

Info

Publication number
CN109387435A
CN109387435A CN201811220209.3A CN201811220209A CN109387435A CN 109387435 A CN109387435 A CN 109387435A CN 201811220209 A CN201811220209 A CN 201811220209A CN 109387435 A CN109387435 A CN 109387435A
Authority
CN
China
Prior art keywords
water
tunnel
chamber
liner
header tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811220209.3A
Other languages
Chinese (zh)
Inventor
李鹏飞
杨云轩
赵勇
龚彦峰
冯春晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201811220209.3A priority Critical patent/CN109387435A/en
Publication of CN109387435A publication Critical patent/CN109387435A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • G01N3/10Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
    • G01N3/12Pressure testing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/003Generation of the force
    • G01N2203/0042Pneumatic or hydraulic means
    • G01N2203/0048Hydraulic means
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/02Details not specific for a particular testing method
    • G01N2203/022Environment of the test
    • G01N2203/0236Other environments
    • G01N2203/0242With circulation of a fluid

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The invention discloses a kind of tunnel distribution of water pressure rule model test apparatus, and providing one kind can study under different underground water flow regimes, and the bath scaled model experimental device of the pore water pressure regularity of distribution is born in tunnel-liner.The device includes chamber, water system and drainage system.Chamber includes cabinet, tunnel-liner and intake-outlet;Water system includes header tank, variable frequency pump and water segregator.Drainage system includes draining blind pipe and gutter.Intake-outlet setting is equally spaced between tunnel two sides, water inlet, is welded on the outside of water inlet with water valve, controls water inlet flow by water valve.Tunnel-liner is to simulate actual tunnel-liner.Header tank is responsible for recycling the underground water of tunnel drainage system discharge, while providing water source for chamber.Variable frequency pump is placed in header tank, and underground water is pumped at water segregator, then underground water is pumped to chamber intake-outlet respectively by water segregator.

Description

A kind of tunnel distribution of water pressure rule model test apparatus
Technical field
The present apparatus is suitable for verifying tunnel tunnel-liner water pressure experimental rig, belongs to Tunnel Engineering field.
Background technique
Tunnel waterproof and water drainage system is divided into Three models, complete anti-aqueous mode, full discharging mode and controlled drainage mode.Tunnel is anti- The many factors such as the groundwater pressure for needing comprehensive consideration lining cutting that may bear when Water drainage system design and environmental protection.When to lining Design can be overly conservative when block water pressure calculation is excessive, causes the waste of material in building course.When to water pressure calculation deficiency Shi Zehui generates great security risk.However the measurement result of lining cutting behind water pressure is shown in Practical Project, water pressure The regularity of distribution and do not meet its theoretical value.Very big difficulty is caused to the design of tunnel waterproof and water drainage system.
Summary of the invention
The present invention in view of the above-mentioned problems, providing one kind can study under different underground water flow regimes, hold by tunnel-liner By the bath scaled model experimental device of the pore water pressure regularity of distribution.
In order to solve the above technical problems, present invention employs following technical proposals:
A kind of tunnel distribution of water pressure rule model test apparatus, including chamber, water system and drainage system.
Chamber includes cabinet 1, tunnel-liner 2 and intake-outlet 3;Cabinet 1 is welded by stainless-steel sheet, cabinet 1 Bottom center be welded with semi-circular sheet steel, semi-circular sheet steel is to simulate true tunnel-liner 2.The surrounding of cabinet 1 is reserved There is intake-outlet 3, changes the water (flow) direction in cabinet 1 by adjusting the disengaging water state of different intake-outlets, thus mould Intend different Groundwater Flow states.Drain hole 4 is reserved in tunnel-liner 2, drainage system is arranged underground water by drain hole 4 Tunnel out.
Water system includes header tank 5, variable frequency pump 6 and water segregator 7, and header tank 5 is welded by stainless-steel sheet, collection Underground water of the water tank 5 to recycle drainage system discharge.Underground water is pumped into water segregator 7 by variable frequency pump 6, and is underground water Certain head is provided.Water segregator 7 is connect with the interface for being responsible for water inlet in intake-outlet 3, provides water source for chamber.
Drainage system includes draining blind pipe 8 and gutter 9.Draining blind pipe 8 is connect with drain hole 4, drains blind pipe 8 for ground It is lauched and drains into gutter 9.Gutter 9 is to import header tank 5 for underground water.
Detailed description of the invention
Fig. 1 is this experimental rig entirety installation diagram;
Fig. 2 is the positive schematic diagram of chamber;
Fig. 3 is header tank schematic diagram;
In figure: 1- test box body, 2- tunnel-liner, 3- intake-outlet, 4- drain hole, 5- header tank, 6- variable frequency pump, 7- water segregator, 8- drain blind pipe, 9- gutter.
Specific embodiment
The installation steps of this experimental rig are described further with reference to the accompanying drawing.
Test box body 1 is welded by eight blocks of steel plates, and front and rear sides steel plate determines tunnel upper half circular arc, and serves as a contrast with tunnel 2 are built to be welded.Chamber bottom is arranged steelframe and supports, and chamber height is made to be higher than header tank 5.
The setting of intake-outlet 3 is equally spaced between tunnel two sides, water inlet, is welded on the outside of water inlet with water valve, is led to Cross water valve control water inlet flow.
Drain hole is arranged on five sections of tunnel-liner 2 respectively to simulate actual tunnel-liner in tunnel-liner 2 4.Drain hole 4 is arranged 30 °, 60 °, 90 °, 120 ° and 150 ° positions in each section.Ball valve, control draining are connected outside drain hole 4 Node.
Header tank 5 is responsible for the underground water of recycling tunnel drainage system discharge, while providing water source for chamber.Variable frequency pump 6 are placed in header tank 5, and underground water is pumped at water segregator 7, then underground water is pumped to chamber respectively by water segregator 7 Intake-outlet 3.
Drainage system is made of draining blind pipe 8 and gutter 9.Draining blind pipe is responsible for the cabinet by underground water from chamber It is discharged in 1, gutter 9 is responsible for importing underground water in header tank 5, ultimately forms recycling for underground water.
Experimental rig operating procedure is as follows:
Step 1, pipeline connection, water inlet are connect with water segregator, water outlet pipeline is connect with header tank 5.It is fixed simultaneously Tunnel drainage system;
Step 2, the filling of country rock material, soil body layering are filled into chamber, every layer height 10cm, and according to place height Spend embedded sensor.The soil body passes through hammer ram hand compaction after tamping, and every layer is rammed three times;
Step 3, the saturation soil body, keep water inlet valve unimpeded, close scupper valve, open water pump and adjust water pump and raise Journey closes drainage system water valve up to the soil body is saturated after underground water after drainage system outflow;
Step 4 opens discharge outlet water valve, opens drainage system valve, the correlations such as measurement sensor after waiting seepage stability Data;
Step 5 adjusts water inlet and water outlet respectively, changes the flow direction of underground water, and repeats step 3 operation;
Step 6 adjusts variable frequency pump lift, and repeats step 3- step;.

Claims (7)

1. a kind of tunnel distribution of water pressure rule model test apparatus, it is characterised in that: including chamber, water system and draining System;Chamber includes cabinet (1), tunnel-liner (2) and intake-outlet (3);By adjusting the disengaging of different intake-outlets Water state changes the water (flow) direction in cabinet (1), to simulate different Groundwater Flow states;
Water system includes header tank (5), variable frequency pump (6) and water segregator (7);
Drainage system includes draining blind pipe (8) and gutter (9);Draining blind pipe (8) is connect with drain hole (4), drains blind pipe (8) underground water is drained into gutter (9);Gutter (9) is to import header tank (5) for underground water.
2. a kind of tunnel distribution of water pressure rule model test apparatus according to claim 1, it is characterised in that: chamber Cabinet (1) is welded by eight blocks of steel plates, and front and rear sides steel plate determines tunnel upper half circular arc, and is welded with tunnel-liner (2) It connects;Chamber bottom is arranged steelframe and supports, and chamber height is made to be higher than header tank (5).
3. a kind of tunnel distribution of water pressure rule model test apparatus according to claim 1, it is characterised in that: Inlet and outlet water Mouthful (3) setting is equally spaced between tunnel two sides, water inlet, is welded on the outside of water inlet with water valve, by water valve control into Mouth of a river flow.
4. a kind of tunnel distribution of water pressure rule model test apparatus according to claim 1, it is characterised in that: tunnel lining (2) are built to simulate actual tunnel-liner, drain hole (4) are set on five sections of tunnel-liner (2) respectively;It is each to cut Drain hole (4) are arranged 30 °, 60 °, 90 °, 120 ° and 150 ° positions in face;Drain hole (4) connects ball valve, control draining node outside.
5. a kind of tunnel distribution of water pressure rule model test apparatus according to claim 1, it is characterised in that: header tank (5) it is responsible for the underground water of recycling tunnel drainage system discharge, while provides water source for chamber;Variable frequency pump (6) is placed on collection In water tank (5), underground water is pumped at water segregator (7), then underground water is pumped to respectively by chamber disengaging by water segregator (7) The mouth of a river (3).
6. a kind of tunnel distribution of water pressure rule model test apparatus according to claim 1, it is characterised in that: draining system System is made of draining blind pipe (8) and gutter (9);Draining blind pipe is responsible for the discharge from the cabinet (1) of chamber by underground water, Gutter (9) is responsible for importing underground water in header tank (5), ultimately forms recycling for underground water.
7. a kind of tunnel distribution of water pressure rule model test apparatus according to claim 1, it is characterised in that: test dress It is as follows to set operating procedure:
Step 1, pipeline connection, water inlet are connect with water segregator, water outlet pipeline is connect with header tank (5);Fixed tunnel simultaneously Road drainage system;
Step 2, the filling of country rock material, soil body layering are filled into chamber, every layer height 10cm, and are buried according to place height If sensor;The soil body passes through hammer ram hand compaction after tamping, and every layer is rammed three times;
Step 3, the saturation soil body, keep water inlet valve unimpeded, close scupper valve, open water pump and adjust pump head, Drainage system water valve is closed after drainage system outflow up to the soil body is saturated after underground water;
Step 4 opens discharge outlet water valve, opens drainage system valve, the related datas such as measurement sensor after waiting seepage stability;
Step 5 adjusts water inlet and water outlet respectively, changes the flow direction of underground water, and repeats step 3 operation;
Step 6 adjusts variable frequency pump lift, and repeats step 3- step 5.
CN201811220209.3A 2018-10-19 2018-10-19 A kind of tunnel distribution of water pressure rule model test apparatus Pending CN109387435A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811220209.3A CN109387435A (en) 2018-10-19 2018-10-19 A kind of tunnel distribution of water pressure rule model test apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811220209.3A CN109387435A (en) 2018-10-19 2018-10-19 A kind of tunnel distribution of water pressure rule model test apparatus

Publications (1)

Publication Number Publication Date
CN109387435A true CN109387435A (en) 2019-02-26

Family

ID=65427559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811220209.3A Pending CN109387435A (en) 2018-10-19 2018-10-19 A kind of tunnel distribution of water pressure rule model test apparatus

Country Status (1)

Country Link
CN (1) CN109387435A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109975047A (en) * 2019-03-18 2019-07-05 中铁第四勘察设计院集团有限公司 Tunnel drainage blind pipe blocking mechanism model test apparatus and its test method
CN111103225A (en) * 2020-01-23 2020-05-05 中铁第四勘察设计院集团有限公司 Tunnel geotextile physical clogging measuring device and method
CN111257191A (en) * 2020-01-23 2020-06-09 中铁第四勘察设计院集团有限公司 Chemical clogging measurement method for geotextile

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201225934Y (en) * 2008-07-22 2009-04-22 西南交通大学 Hydraulic prototype experiment apparatus for underwater shield tunnel construction model
CN101832140B (en) * 2010-04-20 2012-07-18 北京交通大学 Testing method of water pressure distribution law of subsea tunnel lining
KR101426465B1 (en) * 2014-04-24 2014-08-05 이정테크(주) Waterproof seat for tunnel and waterproof tunnel protecting process using the same
CN106989999A (en) * 2017-05-15 2017-07-28 中铁隧道集团有限公司 A kind of tunnel water pressure intelligent control test device
CN107036955A (en) * 2017-06-09 2017-08-11 北京工业大学 The model test apparatus of simulation tunnel single shell lining entirety waterproof and water drainage system performance
CN107894384A (en) * 2017-11-10 2018-04-10 石家庄铁道大学 Hydrous fluids crack rock tunnel-liner distribution of water pressure Experimental mimic system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201225934Y (en) * 2008-07-22 2009-04-22 西南交通大学 Hydraulic prototype experiment apparatus for underwater shield tunnel construction model
CN101832140B (en) * 2010-04-20 2012-07-18 北京交通大学 Testing method of water pressure distribution law of subsea tunnel lining
KR101426465B1 (en) * 2014-04-24 2014-08-05 이정테크(주) Waterproof seat for tunnel and waterproof tunnel protecting process using the same
CN106989999A (en) * 2017-05-15 2017-07-28 中铁隧道集团有限公司 A kind of tunnel water pressure intelligent control test device
CN107036955A (en) * 2017-06-09 2017-08-11 北京工业大学 The model test apparatus of simulation tunnel single shell lining entirety waterproof and water drainage system performance
CN107894384A (en) * 2017-11-10 2018-04-10 石家庄铁道大学 Hydrous fluids crack rock tunnel-liner distribution of water pressure Experimental mimic system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
于丽等: "基于围岩渗透影响范围的隧道外水压力计算方法模型试验研究", 《岩土力学与工程学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109975047A (en) * 2019-03-18 2019-07-05 中铁第四勘察设计院集团有限公司 Tunnel drainage blind pipe blocking mechanism model test apparatus and its test method
CN111103225A (en) * 2020-01-23 2020-05-05 中铁第四勘察设计院集团有限公司 Tunnel geotextile physical clogging measuring device and method
CN111257191A (en) * 2020-01-23 2020-06-09 中铁第四勘察设计院集团有限公司 Chemical clogging measurement method for geotextile

Similar Documents

Publication Publication Date Title
CN109724865B (en) Tunnel lining water pressure monitoring system test device and test method
CN109387435A (en) A kind of tunnel distribution of water pressure rule model test apparatus
CN107237650B (en) Drilling siphon negative pressure drainage system and method for treating water seepage of tunnel wall
CN108952807B (en) Water-stopping disposal method for water inrush of broken and broken tunnel zone
CN101831924B (en) Simulator for blocking groundwater seepage by underground structure
CN104929143B (en) A kind of bottom of foundation ditch dewatering well shut-in well method
LU501539B1 (en) Pumping and drainage method for foundation pit bottom plate construction of deep foundation pit and pumping and drainage structure
GB2540331A (en) Flood prevention system and method
CN108037267A (en) A kind of pipe leakage water eroding and flooding of simulating induces the experimental rig that road caves in
CN105092798A (en) Indoor recirculation system for simulating varying-head water-permeable soil layer phreatic water stratum and experimental method
CN107152038B (en) Geotechnical centrifugal model test equipment and excavation simulation method
CN106847048B (en) Simulate the emulation Boundary Test system of artesian groundwater recharge
CN104880334A (en) Testing system and method for seepage field model of tunnel in construction and operation periods
CN112177058B (en) Automatic gate valve pressure release anti system that floats of basement
CN115839822B (en) System and method for testing process of submerged and pumping drainage of mountain tunnel induced by heavy rainfall
CN204925080U (en) Simulation becomes indoor system of recharging in flood peak permeable ground dive stratum
CN111239370A (en) Experimental method for simulating karst collapse caused by underground water
CN202870056U (en) Test device of grouting reinforcement model for weak dam
CN104865372B (en) The test method of model assay systems is recharged in the indoor on simulation artesian water stratum
CN108951649A (en) A kind of foundation pit supporting construction
CN116516898B (en) High-groundwater excavation channel side slope drainage system and construction method
CN113338295A (en) Construction method of subway station deep foundation pit under water-rich geological condition
CN107798987A (en) Seasonal variations runoff and underground water influence monitoring model to High aititude opencut
CN210090196U (en) Precipitation funnel soil cavity collapse test analogue means down
CN104895047B (en) A kind of batch (-type) ventilation vacuum prepressing ground foundation treatment method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190226