- CN109375262B CN109375262B CN201811474211.3A CN201811474211A CN109375262B CN 109375262 B CN109375262 B CN 109375262B CN 201811474211 A CN201811474211 A CN 201811474211A CN 109375262 B CN109375262 B CN 109375262B
- Authority
- CN
- China
- Prior art keywords
- detector
- tunnel
- drilling
- drill
- fixed block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 44
- 238000000034 method Methods 0.000 title claims abstract description 29
- 238000005422 blasting Methods 0.000 title claims abstract description 15
- 230000007246 mechanism Effects 0.000 claims abstract description 52
- 238000001514 detection method Methods 0.000 claims abstract description 50
- 238000003384 imaging method Methods 0.000 claims abstract description 5
- 230000005540 biological transmission Effects 0.000 claims description 37
- 238000006073 displacement reaction Methods 0.000 claims description 28
- 239000011435 rock Substances 0.000 claims description 10
- 238000012545 processing Methods 0.000 claims description 8
- 230000002194 synthesizing effect Effects 0.000 claims description 6
- 230000000149 penetrating effect Effects 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 8
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000000694 effects Effects 0.000 abstract description 2
- 230000008569 process Effects 0.000 description 5
- 238000004458 analytical method Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 230000002238 attenuated effect Effects 0.000 description 2
- 238000013016 damping Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 239000002360 explosive Substances 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 230000002829 reductive effect Effects 0.000 description 2
- 239000003638 chemical reducing agent Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 230000005284 excitation Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000010030 laminating Methods 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 230000036961 partial effect Effects 0.000 description 1
- 238000012805 post-processing Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000011897 real-time detection Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 230000008054 signal transmission Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/16—Receiving elements for seismic signals; Arrangements or adaptations of receiving elements
- G01V1/20—Arrangements of receiving elements, e.g. geophone pattern
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/01—Measuring or predicting earthquakes
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/16—Receiving elements for seismic signals; Arrangements or adaptations of receiving elements
- G01V1/18—Receiving elements, e.g. seismometer, geophone or torque detectors, for localised single point measurements
- G01V1/181—Geophones
-
- G—PHYSICS
- G08—SIGNALLING
- G08C—TRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
- G08C17/00—Arrangements for transmitting signals characterised by the use of a wireless electrical link
- G08C17/02—Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link
Landscapes
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Remote Sensing (AREA)
- General Physics & Mathematics (AREA)
- Acoustics & Sound (AREA)
- Environmental & Geological Engineering (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geophysics (AREA)
- Computer Networks & Wireless Communication (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811474211.3A CN109375262B (zh) | 2018-12-04 | 2018-12-04 | 基于检波器布设装置、钻爆法隧道超前预报系统及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811474211.3A CN109375262B (zh) | 2018-12-04 | 2018-12-04 | 基于检波器布设装置、钻爆法隧道超前预报系统及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109375262A CN109375262A (zh) | 2019-02-22 |
CN109375262B true CN109375262B (zh) | 2020-04-21 |
Family
ID=65375868
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811474211.3A Active CN109375262B (zh) | 2018-12-04 | 2018-12-04 | 基于检波器布设装置、钻爆法隧道超前预报系统及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109375262B (zh) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110044403B (zh) * | 2019-05-29 | 2023-12-08 | 四川吉赛特科技有限公司 | 拾波器测试台 |
CN110673203B (zh) * | 2019-10-18 | 2021-10-12 | 钱荣毅 | 一种tbm隧道超前预报采集装置 |
CN111123352B (zh) * | 2019-12-16 | 2024-01-12 | 山东滨莱高速公路有限公司 | 适用于隧道超前地质预报的检波器快速固定装置 |
CN110988984B (zh) * | 2019-12-23 | 2021-08-17 | 山东大学 | 可快速固定的无线检波器装置 |
CN111963142B (zh) * | 2020-08-18 | 2023-07-14 | 中国石油化工股份有限公司华北油气分公司 | 一种天然气开采用地震波信号检测采集装置 |
CN112710203B (zh) * | 2020-12-11 | 2022-09-13 | 武汉理工大学 | 地下岩石工程自动化全断面钻爆法开挖超欠挖的控制方法 |
CN113721290A (zh) * | 2021-09-09 | 2021-11-30 | 山东大学 | 一种施工同步的凿岩台车地震波超前探测观测系统及方法 |
CN114152974B (zh) * | 2021-11-24 | 2023-06-23 | 中铁西南科学研究院有限公司 | 一种用于多臂凿岩台车施工隧道中的地质预报方法 |
CN116953776B (zh) * | 2023-09-18 | 2023-12-12 | 中国建筑一局(集团)有限公司 | 隧道超前地质预报装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103713335A (zh) * | 2014-01-07 | 2014-04-09 | 山东大学 | 隧道掘进机搭载的综合超前地质探测系统 |
CN203658592U (zh) * | 2014-01-07 | 2014-06-18 | 山东大学 | 一种tbm上三种超前地质预报仪器的搭载装置 |
CN104747184A (zh) * | 2015-03-11 | 2015-07-01 | 山东大学 | 隧道掌子面前方岩体三维波速成像的随钻测量方法与装置 |
CN106772565A (zh) * | 2016-12-23 | 2017-05-31 | 山东大学 | 一种tbm地震波超前预报仪器的搭载装置及方法 |
CN108761522A (zh) * | 2018-05-21 | 2018-11-06 | 山东大学 | 搭载于隧道掘进机上的地震波超前探测系统及方法 |
CN108802808A (zh) * | 2018-06-19 | 2018-11-13 | 山东大学 | 用于双护盾岩石掘进机的地震波超前预报搭载装置与方法 |
-
2018
- 2018-12-04 CN CN201811474211.3A patent/CN109375262B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103713335A (zh) * | 2014-01-07 | 2014-04-09 | 山东大学 | 隧道掘进机搭载的综合超前地质探测系统 |
CN203658592U (zh) * | 2014-01-07 | 2014-06-18 | 山东大学 | 一种tbm上三种超前地质预报仪器的搭载装置 |
CN104747184A (zh) * | 2015-03-11 | 2015-07-01 | 山东大学 | 隧道掌子面前方岩体三维波速成像的随钻测量方法与装置 |
CN106772565A (zh) * | 2016-12-23 | 2017-05-31 | 山东大学 | 一种tbm地震波超前预报仪器的搭载装置及方法 |
CN108761522A (zh) * | 2018-05-21 | 2018-11-06 | 山东大学 | 搭载于隧道掘进机上的地震波超前探测系统及方法 |
CN108802808A (zh) * | 2018-06-19 | 2018-11-13 | 山东大学 | 用于双护盾岩石掘进机的地震波超前预报搭载装置与方法 |
Also Published As
Publication number | Publication date |
---|---|
CN109375262A (zh) | 2019-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109375262B (zh) | 基于检波器布设装置、钻爆法隧道超前预报系统及方法 | |
US9500077B2 (en) | Comprehensive advanced geological detection system carried on tunnel boring machine | |
CN108798690B (zh) | 实现地质探测的组合式tbm及地质探测掘进方法 | |
CN103076635B (zh) | Tbm施工隧道前向三维激发极化法超前探测装置系统及方法 | |
US11137507B2 (en) | Near-sea-bottom hydrate detection system | |
CN203037864U (zh) | Tbm施工隧道前向三维激发极化法超前探测装置系统 | |
CN105804721B (zh) | 一种溶洞探测系统及其使用方法 | |
CN103713335B (zh) | 隧道掘进机搭载的综合超前地质探测系统 | |
CN104678427B (zh) | 隧道掘进机破岩震源三维地震超前探测装置及方法 | |
CN203658603U (zh) | 隧道掘进机搭载的综合超前地质探测系统 | |
CN104181581B (zh) | 基于任意排布的地震波地下工程空间观测的系统及方法 | |
CN115127716B (zh) | 小型局部壁面应力解除法岩体参数原位测试系统及方法 | |
WO2021227236A1 (zh) | 基于盾构机施工噪声的多波场地震探测方法与系统 | |
CN106645421A (zh) | 一种海底沉积物声学原位测量与同步取样装置及方法 | |
CN105301645B (zh) | 一种盾构法施工超前地质预报方法以及系统 | |
JPS62242100A (ja) | 地下道から穿たれる水平ボ−リングによる地層の特性を測定する方法および装置 | |
CN103728670B (zh) | Tbm施工隧道前向跨孔雷达透射成像超前预报系统和方法 | |
CN111123352B (zh) | 适用于隧道超前地质预报的检波器快速固定装置 | |
CN113551637B (zh) | 基于tbm施工隧洞全过程围岩变形的监测装置及方法 | |
CN203658599U (zh) | Tbm施工隧道前向跨孔雷达透射成像超前预报系统 | |
CN109738964B (zh) | 地震波和电磁波联合反演的隧道预报装置、掘进机及方法 | |
CN111722288B (zh) | 基于海洋噪声的海-隧联合地震探测方法与系统 | |
CN116927757A (zh) | 用于煤矿井下防冲钻孔的多参数随钻测量智能钻杆及方法 | |
CN209728188U (zh) | 一种瓦斯突出掘进工作面瓦斯包随掘超前探测装置 | |
CN113534289B (zh) | 基于物联网的随掘超前智能综合探测实时预警装置及方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220310 Address after: 250101 Room 601, 6 / F, building a7-5, Hanyu Golden Valley, No. 7000, Jingshi Road, Jinan area, China (Shandong) pilot Free Trade Zone, Jinan City, Shandong Province Patentee after: Shandong bai20 Huitong Engineering Technology Co.,Ltd. Address before: 250061, No. ten, No. 17923, Lixia District, Ji'nan City, Shandong Province Patentee before: SHANDONG University |
|
TR01 | Transfer of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Tunnel advance prediction system and method based on detector deployment device and drilling and blasting method Effective date of registration: 20230830 Granted publication date: 20200421 Pledgee: Qilu Bank Co.,Ltd. Jinan Kaiyuan Branch Pledgor: Shandong bai20 Huitong Engineering Technology Co.,Ltd. Registration number: Y2023980054639 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |