CN109356557B - Preparation method of three-dimensional oil reservoir water-drive simulation model and dynamic monitoring visualization device - Google Patents
Preparation method of three-dimensional oil reservoir water-drive simulation model and dynamic monitoring visualization device Download PDFInfo
- Publication number
- CN109356557B CN109356557B CN201811516159.3A CN201811516159A CN109356557B CN 109356557 B CN109356557 B CN 109356557B CN 201811516159 A CN201811516159 A CN 201811516159A CN 109356557 B CN109356557 B CN 109356557B
- Authority
- CN
- China
- Prior art keywords
- dimensional
- model
- oil
- reservoir
- oil reservoir
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004088 simulation Methods 0.000 title claims abstract description 67
- 238000012544 monitoring process Methods 0.000 title claims abstract description 18
- 238000012800 visualization Methods 0.000 title claims abstract description 17
- 238000002360 preparation method Methods 0.000 title claims abstract description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 118
- 238000004519 manufacturing process Methods 0.000 claims abstract description 38
- 238000002347 injection Methods 0.000 claims abstract description 37
- 239000007924 injection Substances 0.000 claims abstract description 37
- 239000011229 interlayer Substances 0.000 claims abstract description 25
- 238000000034 method Methods 0.000 claims abstract description 22
- 239000004576 sand Substances 0.000 claims abstract description 16
- 239000002985 plastic film Substances 0.000 claims abstract description 11
- 229920006255 plastic film Polymers 0.000 claims abstract description 11
- 238000005516 engineering process Methods 0.000 claims abstract description 9
- 238000009826 distribution Methods 0.000 claims abstract description 8
- 239000004033 plastic Substances 0.000 claims abstract description 8
- 238000010146 3D printing Methods 0.000 claims abstract description 5
- 238000011160 research Methods 0.000 claims abstract description 5
- 230000008569 process Effects 0.000 claims abstract description 3
- 239000002184 metal Substances 0.000 claims description 17
- 239000000523 sample Substances 0.000 claims description 17
- 230000035699 permeability Effects 0.000 claims description 9
- 239000000463 material Substances 0.000 claims description 6
- 239000004570 mortar (masonry) Substances 0.000 claims description 6
- 239000012212 insulator Substances 0.000 claims description 5
- 239000004417 polycarbonate Substances 0.000 claims description 4
- 229920000515 polycarbonate Polymers 0.000 claims description 4
- 239000004568 cement Substances 0.000 claims description 3
- 239000004927 clay Substances 0.000 claims description 3
- 238000007639 printing Methods 0.000 claims description 3
- 238000005406 washing Methods 0.000 claims description 3
- 230000004888 barrier function Effects 0.000 claims description 2
- 238000002474 experimental method Methods 0.000 abstract description 16
- 238000011161 development Methods 0.000 abstract description 11
- 238000006073 displacement reaction Methods 0.000 abstract description 10
- 239000003921 oil Substances 0.000 description 92
- 230000000694 effects Effects 0.000 description 6
- 239000010410 layer Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 239000002245 particle Substances 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 238000009472 formulation Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 239000012267 brine Substances 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000010779 crude oil Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000012528 membrane Substances 0.000 description 1
- 230000000877 morphologic effect Effects 0.000 description 1
- 239000002332 oil field water Substances 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- HPALAKNZSZLMCH-UHFFFAOYSA-M sodium;chloride;hydrate Chemical compound O.[Na+].[Cl-] HPALAKNZSZLMCH-UHFFFAOYSA-M 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/20—Displacing by water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B25/00—Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
- G09B25/06—Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes for surveying; for geography, e.g. relief models
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Geophysics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
技术领域technical field
本发明涉及油田注水开发实验领域,特别是涉及一种三维油藏水驱模拟模型制备方法及动态监测可视化装置。The invention relates to the field of oilfield water injection development experiments, in particular to a method for preparing a three-dimensional oil reservoir water flooding simulation model and a dynamic monitoring visualization device.
背景技术Background technique
注水开发油田由于油层存在着三维空间上的非均质性,注水开发过程中会出现注入水的突进现象。油藏驱替实验是油田开发方案编制、开发规划以及后期剩余油研究十分重要的基础实验,能够为油田井网部署、增产措施的实施和剩余油研究及挖潜提供依据。Due to the three-dimensional heterogeneity of the oil layer in the water flooding development oilfield, the inrush phenomenon of the injected water will occur during the water flooding development process. Reservoir flooding experiment is a very important basic experiment for oilfield development plan formulation, development planning and post-remaining oil research.
目前油藏驱替实验主要有两种形式:一种是利用岩心驱替;第二种是三维油藏驱替模拟。岩心驱替实验是在一端加压注入水(或其他驱替剂),另一端为出口端,计量产出的油和水,分析驱替效果和驱油效率。这实际上是一维驱替,忽略了油藏在三维空间的上的非均质性,不能完全反映油藏水驱的实际情况,同时也不能实时监测岩心内部水驱前缘的动态变化。三维油藏驱替模拟实验是从三维空间上研究水驱效果,但现有的三维油藏水驱实验不能实时监测水驱前缘的动态变化,不能定量监测油藏内部含油饱和度的变化,影响了实验的效果,降低了实验对油田开发的指导作用。At present, there are two main forms of reservoir displacement experiments: one is to use core displacement; the second is to simulate three-dimensional reservoir displacement. The core flooding experiment is to inject water (or other displacement agents) under pressure at one end, and the other end is the outlet end, measure the produced oil and water, and analyze the displacement effect and oil displacement efficiency. This is actually one-dimensional displacement, ignoring the heterogeneity of the reservoir in three-dimensional space, and cannot fully reflect the actual situation of water flooding in the reservoir, and at the same time, it cannot monitor the dynamic changes of the water flooding front in the core in real time. The three-dimensional reservoir displacement simulation experiment is to study the effect of water flooding in three-dimensional space, but the existing three-dimensional reservoir water flooding experiments cannot monitor the dynamic changes of the water flooding front in real time, and cannot quantitatively monitor the changes of oil saturation inside the reservoir. It affects the effect of the experiment and reduces the guiding effect of the experiment on oilfield development.
发明内容SUMMARY OF THE INVENTION
在现有技术背景下,本发明提供了一种三维油藏水驱模拟模型制备方法及实时动态监测可视化装置,可以近似实现三维真实油藏缩微模型驱替实验,观察到不同井网条件下注水实验过程中的油水运动状态,剩余油分布规律,为开发方案编制、剩余油挖潜、增产措施的实施提供依据。Under the background of the prior art, the present invention provides a method for preparing a three-dimensional oil reservoir water flooding simulation model and a real-time dynamic monitoring visualization device, which can approximately realize the three-dimensional real oil reservoir miniature model displacement experiment, and observe that water injection under different well pattern conditions The oil-water movement state and the distribution law of remaining oil during the experiment provide the basis for the formulation of development plans, the potential exploitation of remaining oil, and the implementation of production enhancement measures.
为实现上述目的,本发明提供了如下方案:For achieving the above object, the present invention provides the following scheme:
一种三维油藏水驱模拟模型的制备方法,包括:A preparation method of a three-dimensional reservoir water drive simulation model, comprising:
建立油藏三维虚拟模型,具体为根据油藏数字化研究结果以及实际需求,建立油藏三维虚拟模型;Establishing a 3D virtual model of the reservoir, specifically, establishing a 3D virtual model of the reservoir according to the digital research results and actual needs of the reservoir;
构建初步油藏三维模型,具体为根据所述油藏三维虚拟模型,利用3D打印技术,打印出填砂模型框架、油藏底面和油藏断层框架,并将所述填砂模型框架、所述油藏底面和所述油藏断层框架组装在一起,形成初步油藏三维模型;Constructing a preliminary three-dimensional model of the oil reservoir, specifically, according to the three-dimensional virtual model of the oil reservoir, using 3D printing technology to print out the sand-filling model frame, the bottom surface of the oil reservoir and the reservoir fault frame, and printing the sand-filling model frame, the The reservoir bottom surface and the reservoir fault frame are assembled together to form a preliminary three-dimensional reservoir model;
构建三维油藏模型,具体为根据油藏非均质性在所述初步油藏三维模型中填入不同粒级的砂,根据油层中隔层和夹层的分布利用塑料膜代表隔层和夹层设置在所述初步油藏三维模型中,然后在所述初步油藏三维模型的顶面上覆盖上不渗透的膜,粘结牢固,形成三维油藏模型;Constructing a three-dimensional oil reservoir model, specifically filling the preliminary three-dimensional reservoir model with sands of different particle sizes according to the heterogeneity of the reservoir, and using plastic films to represent the settings of the interlayers and interlayers according to the distribution of the interlayers and interlayers in the oil layer In the preliminary three-dimensional oil reservoir model, the top surface of the preliminary three-dimensional oil reservoir model is then covered with an impermeable film, which is firmly bonded to form a three-dimensional oil reservoir model;
制备初级三维油藏水驱模拟模型,具体为根据油田的井网结构,在所述三维油藏模型埋入不同长短的塑料管来模拟采油井和注水井,制备出初级三维油藏水驱模拟模型;Prepare a primary three-dimensional reservoir water flooding simulation model, specifically, according to the well pattern structure of the oil field, bury plastic pipes of different lengths in the three-dimensional oil reservoir model to simulate oil production wells and water injection wells, and prepare a primary three-dimensional reservoir water flooding simulation model Model;
制备三维油藏水驱模拟模型,具体为将多个电阻率测量仪均匀埋置于所述初级三维油藏水驱模拟模型中,制备出三维油藏水驱模拟模型。A three-dimensional reservoir water flooding simulation model is prepared, specifically, a plurality of resistivity measuring instruments are evenly embedded in the primary three-dimensional oil reservoir water flooding simulation model to prepare a three-dimensional oil reservoir water flooding simulation model.
可选的,在构建三维油藏模型中,通过在不同粒级砂中混入粘土或灰浆来模拟三维油藏模型渗透率的非均质性,通过在不同粒级砂中汇入灰浆来降低三维油藏模型的渗透率。Optionally, in the construction of the 3D reservoir model, the heterogeneity of the permeability of the 3D reservoir model is simulated by mixing clay or mortar into sands of different particle sizes, and the three-dimensional reservoir is reduced by mixing mortars into sands of different particle sizes. Permeability of the reservoir model.
可选的,在构建三维油藏模型中,在所述塑料膜上扎出一些孔来模拟三维油藏模型的渗透性隔层和渗透性夹层。Optionally, in constructing the three-dimensional oil reservoir model, some holes are punched in the plastic film to simulate the permeable barrier layer and the permeable interlayer of the three-dimensional oil reservoir model.
可选的,在构建三维油藏模型中,在所述初步油藏三维模型的顶面上覆盖上不渗透的塑料膜,并用水泥抹平覆盖以保证三维油藏模型密封不漏水。Optionally, in constructing a three-dimensional oil reservoir model, an impermeable plastic film is covered on the top surface of the preliminary three-dimensional oil reservoir model, and the cover is smoothed with cement to ensure that the three-dimensional oil reservoir model is sealed and watertight.
一种应用三维油藏水驱模拟模型的实时动态监测可视化装置,包括三维油藏水驱模拟模型、数据采集卡以及电脑;所述电脑内置一套三维空间插值与图形显示软件;A real-time dynamic monitoring visualization device using a three-dimensional reservoir water drive simulation model, comprising a three-dimensional oil reservoir water drive simulation model, a data acquisition card and a computer; the computer has a built-in set of three-dimensional space interpolation and graphic display software;
所述三维油藏水驱模拟模型包括填砂模型框架、填砂、断层、夹层、注水井、采油井以及电阻率测量仪;多个所述注水井、多个所述采油井以及多个所述电阻率测量仪埋入在所述三维油藏水驱模拟模型的不同位置;The three-dimensional reservoir water drive simulation model includes a sand filling model framework, sand filling, faults, interlayers, water injection wells, oil production wells, and resistivity measuring instruments; a plurality of the water injection wells, a plurality of the oil production wells, and a plurality of the The resistivity measuring instrument is embedded in different positions of the three-dimensional reservoir water flooding simulation model;
所述电阻率测量仪通过所述数据采集卡与所述电脑连接;The resistivity measuring instrument is connected with the computer through the data acquisition card;
所述数据采集卡用于实时记录不同时刻不同位置的电阻率值;The data acquisition card is used for real-time recording of resistivity values at different positions at different times;
所述电脑用于将实时采集到的不同时刻不同位置的电阻率值,通过三维空间插值与图形显示软件中的空间网格化插值算法得到三维空间的电阻率值,然后对三维空间任意方向切片,展示出不同方向上的电阻率值的大小,最后把不同时间的同一方向的切片链接在一起形成动画显示;The computer is used to obtain the resistivity value of the three-dimensional space through the three-dimensional space interpolation and the spatial grid interpolation algorithm in the graphic display software, and then slice the three-dimensional space in any direction. , showing the resistivity values in different directions, and finally linking slices in the same direction at different times together to form an animation display;
所述电脑还用于根据预先建立的关系式把电阻率值的大小转化为含油饱和度的大小,进而显示水驱后油藏不同部位的水洗状况以及剩余油饱和度;所述关系式为根据岩电实验结果建立电阻率值与含油饱和度的关系式。The computer is also used to convert the resistivity value into the oil saturation according to a pre-established relational formula, and then display the water washing conditions and remaining oil saturation of different parts of the oil reservoir after water flooding; the relational formula is based on The relationship between the resistivity value and the oil saturation is established from the results of the rock electrical experiment.
可选的,所述采油井埋入在所述三维油藏水驱模拟模型的中心位置,所述注水井埋入在所述三维油藏水驱模拟模型的周围或者所述采油井埋入在所述三维油藏水驱模拟模型的周围,所述注水井埋入在所述三维油藏水驱模拟模型的中心位置。Optionally, the oil production well is buried in the center of the 3D reservoir water flooding simulation model, the water injection well is buried around the 3D reservoir water flooding simulation model, or the oil production well is buried in the 3D reservoir water flooding simulation model. Around the three-dimensional reservoir water drive simulation model, the water injection well is buried in the center of the three-dimensional oil reservoir water drive simulation model.
可选的,所述注水井与平流泵连接加压注水,所述采油井与抽汲的活塞或注射器连接抽汲采油。Optionally, the water injection well is connected to an advection pump for pressurized water injection, and the oil production well is connected to a swabbing piston or a syringe for swabbing and producing oil.
可选的,所述电阻率测量仪包括正极金属探头,负极金属探头,用于连接正负极金属探头的绝缘体,以及电线;所述正极金属探头、所述负极金属探头均通过所述电线与所述数据采集卡连接。Optionally, the resistivity measuring instrument includes a positive metal probe, a negative metal probe, an insulator for connecting the positive and negative metal probes, and a wire; the positive metal probe and the negative metal probe are connected to each other through the wire. The data acquisition card is connected.
可选的,所述采油井、所述注水井均为塑料管,且所述采油井、所述注水井的个数根据实际需求确定。Optionally, the oil production wells and the water injection wells are both plastic pipes, and the numbers of the oil production wells and the water injection wells are determined according to actual needs.
可选的,所述填砂模型框架、所述断层、所述夹层的材料均为聚碳酸酯材。Optionally, the materials of the sand filling model frame, the fault, and the interlayer are all polycarbonate materials.
根据本发明提供的具体实施例,本发明公开了以下技术效果:According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects:
本发明提供的一种三维油藏水驱模拟模型制备方法及实时动态监测可视化装置,主要涉及三维油藏水驱模拟模型的制作方法、注采系统的实现方法、水驱状况实时监测技术与方法,水驱前缘动态可视化技术与方法。本发明根据油田实际情况制作出近似实际的三维油藏水驱模拟模型,模拟不同的注采井网形式,实时监测水驱前缘的变化动态,监测剩余油分布特征,为开发方案编制、剩余油挖潜、增产措施的实施提供依据。The invention provides a method for preparing a three-dimensional reservoir water flooding simulation model and a real-time dynamic monitoring visualization device, which mainly relate to a method for preparing a three-dimensional reservoir water flooding simulation model, a method for implementing an injection-production system, and a technology and method for real-time monitoring of water flooding conditions. , Dynamic visualization technology and method of water flooding front. According to the actual situation of the oil field, the invention produces an approximate actual three-dimensional oil reservoir water drive simulation model, simulates different injection-production well pattern forms, monitors the changing dynamics of the water drive front in real time, monitors the distribution characteristics of the remaining oil, and prepares the development plan and the remaining oil. Provide a basis for the implementation of oil potential and production increase measures.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the accompanying drawings required in the embodiments will be briefly introduced below. Obviously, the drawings in the following description are only some of the present invention. In the embodiments, for those of ordinary skill in the art, other drawings can also be obtained according to these drawings without creative labor.
图1为本发明实施例三维油藏水驱模拟模型制备方法的流程示意图;1 is a schematic flowchart of a method for preparing a three-dimensional reservoir water flooding simulation model according to an embodiment of the present invention;
图2为本发明实施例采用三维油藏水驱模拟模型水驱模拟实时监测与动态可视化装置示意图;2 is a schematic diagram of a real-time monitoring and dynamic visualization device for water flooding simulation using a three-dimensional reservoir water flooding simulation model according to an embodiment of the present invention;
图3为本发明实施例三维油藏水驱模拟模型顶面剖开展示的内部结构示意图;3 is a schematic diagram of the internal structure of the top surface of the three-dimensional reservoir water flooding simulation model according to the embodiment of the present invention;
图4为本发明实施例三维油藏水驱模拟模型侧面剖开展示的内部结构示意图;FIG. 4 is a schematic diagram of the internal structure of the three-dimensional reservoir water drive simulation model according to the embodiment of the present invention, which is cut away from the side and displayed;
图5为本发明电阻率测量仪的结构示意图;41和42分别为正负极金属探头;43为绝缘体;44为电线。5 is a schematic structural diagram of the resistivity measuring instrument of the present invention; 41 and 42 are metal probes for positive and negative electrodes, respectively; 43 is an insulator; and 44 is a wire.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
本发明的目的是提供一种三维油藏水驱模拟模型制备方法及实时动态监测可视化装置,根据油田实际情况制作出近似实际的三维油藏水驱模拟模型,模拟不同的注采井网形式,实时监测水驱前缘的变化动态,监测剩余油分布特征。The purpose of the present invention is to provide a method for preparing a three-dimensional oil reservoir water drive simulation model and a real-time dynamic monitoring visualization device, which can make an approximate actual three-dimensional oil reservoir water drive simulation model according to the actual situation of the oil field, and simulate different injection-production well pattern forms. Real-time monitoring of the changing dynamics of the water flooding front and monitoring of the distribution characteristics of the remaining oil.
为使本发明的上述目的、特征和优点能够更加明显易懂,下面结合附图和具体实施方式对本发明作进一步详细的说明。In order to make the above objects, features and advantages of the present invention more clearly understood, the present invention will be described in further detail below with reference to the accompanying drawings and specific embodiments.
实施例1Example 1
图1为本发明实施例三维油藏水驱模拟模型制备方法的流程示意图,如图1所示,本发明实施例提供的三维油藏水驱模拟模型制备方法具体包括以下步骤。FIG. 1 is a schematic flowchart of a method for preparing a 3D reservoir water flooding simulation model according to an embodiment of the present invention. As shown in FIG. 1 , the method for preparing a 3D reservoir water flooding simulation model provided by an embodiment of the present invention specifically includes the following steps.
步骤101:建立油藏三维虚拟模型,具体为根据油藏数字化研究结果以及实际需求,建立油藏三维虚拟模型。Step 101 : establishing a three-dimensional virtual model of the oil reservoir, specifically, establishing a three-dimensional virtual model of the oil reservoir according to the digital research results and actual requirements of the oil reservoir.
步骤102:构建初步油藏三维模型,具体为根据所述油藏三维虚拟模型,利用3D打印技术,打印出填砂模型框架、油藏底面和油藏断层框架,并将所述填砂模型框架、所述油藏底面和所述油藏断层框架组装在一起,形成初步油藏三维模型。Step 102 : constructing a preliminary three-dimensional reservoir model, specifically, according to the three-dimensional virtual model of the reservoir, using 3D printing technology to print out the sand-filling model frame, the bottom surface of the reservoir and the reservoir fault frame, and printing the sand-filling model frame , the bottom surface of the reservoir and the fault frame of the reservoir are assembled together to form a preliminary three-dimensional model of the reservoir.
针对实际地层不同的空间展布情况,根据油藏的三维地质模型中的底部曲面模型和断层模型,采用聚碳酸酯(PC)材,利用3D打印技术打印出填砂模型框架、油藏底面构造形态和断层的格架。According to the different spatial distribution of the actual strata, according to the bottom surface model and the fault model in the 3D geological model of the reservoir, polycarbonate (PC) material is used to print the sand filling model frame and the bottom surface structure of the reservoir by 3D printing technology. Morphological and fault lattices.
步骤103:构建三维油藏模型,具体为根据油藏非均质性在所述初步油藏三维模型中填入不同粒级的砂,根据油层中隔层和夹层的分布利用塑料膜代表隔层和夹层设置在所述初步油藏三维模型中,然后在所述初步油藏三维模型的顶面上覆盖上不渗透的膜,粘结牢固,形成三维油藏模型。Step 103 : constructing a three-dimensional oil reservoir model, specifically filling the preliminary three-dimensional reservoir model with sands of different particle sizes according to the heterogeneity of the reservoir, and using a plastic film to represent the interlayer according to the distribution of the interlayers and interlayers in the oil layer and the interlayer is arranged in the preliminary three-dimensional oil reservoir model, and then an impermeable membrane is covered on the top surface of the preliminary three-dimensional oil reservoir model, and the adhesion is firm to form a three-dimensional oil reservoir model.
根据不同层段的渗透率大小,选用不同目数的砂充填压实,通过混入粘土或灰浆,模拟渗透率的非均质性;另外还可以在砂中汇入灰浆,降低渗透率。According to the permeability of different layers, use sand with different mesh numbers for filling and compaction, and simulate the heterogeneity of permeability by mixing in clay or mortar; in addition, mortar can be mixed into the sand to reduce the permeability.
油藏中的不渗透夹层利用不渗透的塑胶膜代替,如果有渗透率的话,可以在塑料膜上扎出一些细小的孔,代表渗透性夹层和隔层。The impermeable interlayer in the oil reservoir is replaced by an impermeable plastic film. If there is permeability, some small holes can be pricked in the plastic film to represent the permeable interlayer and interlayer.
在所述初步油藏三维模型的顶面上覆盖上不渗透的塑料膜,并用水泥抹平覆盖以保证三维油藏模型密封不漏水。The top surface of the preliminary three-dimensional oil reservoir model is covered with an impermeable plastic film, and covered with cement to ensure that the three-dimensional oil reservoir model is sealed and watertight.
下面为注采系统的实现方法The following is the realization method of the injection-production system
步骤104:制备初级三维油藏水驱模拟模型,具体为根据油田的井网结构,在所述三维油藏模型埋入不同长短的塑料管来模拟采油井和注水井,制备出初级三维油藏水驱模拟模型。Step 104: Prepare a primary three-dimensional oil reservoir water flooding simulation model, specifically, according to the well pattern structure of the oil field, bury plastic pipes of different lengths in the three-dimensional oil reservoir model to simulate oil production wells and water injection wells, and prepare a primary three-dimensional oil reservoir Water flooding simulation model.
埋入不同长短的塑料管来模拟采油井和注水井,并在对应开发的油层段上布设小孔,注水井可以连接平流泵加压注水,采油井可以与抽汲的活塞或注射器连接抽汲采油,也可以靠油藏注水的压力自然流出。Embed plastic pipes of different lengths to simulate oil production wells and water injection wells, and arrange small holes in the corresponding developed oil intervals. The water injection well can be connected to an advection pump for pressurized water injection, and the oil production well can be connected to a swabbing piston or a syringe for swabbing Oil production can also flow out naturally by the pressure of reservoir water injection.
步骤105:制备三维油藏水驱模拟模型,具体为将多个电阻率测量仪均匀埋置于所述初级三维油藏水驱模拟模型中,制备出三维油藏水驱模拟模型。Step 105 : preparing a three-dimensional reservoir water flooding simulation model, specifically, burying a plurality of resistivity measuring instruments evenly in the primary three-dimensional reservoir water flooding simulation model to prepare a three-dimensional reservoir water flooding simulation model.
本发明根据油田实际情况制作出近似实际的三维油藏水驱模拟模型,进而通过电阻率的测量监测水驱前缘和剩余油饱和度。According to the actual situation of the oil field, the invention produces an approximate actual three-dimensional oil reservoir water flooding simulation model, and then monitors the water flooding front and the remaining oil saturation through the measurement of the resistivity.
实施例2Example 2
如图2、图3及图4所示,本发明实施例提供一种应用三维油藏水驱模拟模型的实时动态监测可视化装置。As shown in FIG. 2 , FIG. 3 and FIG. 4 , an embodiment of the present invention provides a real-time dynamic monitoring visualization device applying a three-dimensional reservoir water drive simulation model.
该装置包括三维油藏水驱模拟模型、数据采集卡5和电脑6。所述电脑6内置一套三维空间插值与图形显示软件。The device includes a three-dimensional reservoir water drive simulation model, a
所述三维油藏水驱模拟模型包括填砂模型框架1、采油井2、注水井3、电阻率测量仪4、填砂7、断层8、夹层9。The three-dimensional reservoir water drive simulation model includes a sand filling model frame 1 , an
多个所述注水井3、多个所述采油井2以及多个所述电阻率测量仪4埋入在所述三维油藏水驱模拟模型的不同位置。A plurality of the
每个所述电阻率测量仪4通过所述数据采集卡5与所述电脑6连接。Each of the
所述砂模型框架1、断层8、夹层9的材料均为聚碳酸酯(PC)材。The materials of the sand model frame 1 , the
所述采油井2、注水井3均为塑料管;所述采油井2设置在所述三维油藏水驱模拟模型的中心位置,所述注水井3布置在所述三维油藏水驱模拟模型的周围或者所述采油井2设置在所述三维油藏水驱模拟模型的周围,所述注水井3设置在所述三维油藏水驱模拟模型的中心位置。The
在本发明实施例中,所述采油井2设置在所述三维油藏水驱模拟模型的周围,所述注水井3设置在所述三维油藏水驱模拟模型的中心位置,且注水井3的个数为1个,采油井2的个数为4个。In the embodiment of the present invention, the
注水井3可以连接平流泵加压注水,采油井2可以与抽汲的活塞或注射器连接抽汲采油,也可以靠油藏注水的压力自然流出。The water injection well 3 can be connected to an advection pump for pressurized water injection, and the oil production well 2 can be connected to a swabbing piston or a syringe for swabbing and oil production, or it can flow out naturally by the pressure of reservoir water injection.
如图5所示,每个电阻率测量仪4包括正极金属探头41、负极金属探头42、用于连接正负极金属探头的绝缘体43,以及电线44。正极金属探头41、负极金属探头42均通过电线44与所述数据采集卡5连接。绝缘体43的长度为2cm。As shown in FIG. 5 , each
其中,水驱状况实时监测技术与方法就是所述三维油藏水驱模拟模型中的多组电阻率测量仪4通过电线44和所述数据采集卡5与所述电脑6连接。所述数据采集卡5用于实时记录不同时刻不同位置的电阻率值。每一组电阻率测量仪4记录一个位置处的一组电阻率数据。因为原油的电阻率与驱替水的电阻率有比较大的差别(为了更好地区别二者的电阻率,可以用盐水),通过不同位置电阻率值大小的变化,监测水驱前缘的推进速度、距离和水驱程度。Among them, the technology and method for real-time monitoring of water flooding conditions is that the multiple groups of
所述水驱前缘动态可视化技术与方法是电脑6用于将实时采集到的不同时刻不同位置的电阻率值,通过三维空间插值与图形显示软件中的空间网格化插值算法得到三维空间的电阻率值,然后对三维空间任意方向切片,展示出不同方向上的电阻率值的大小,最后把不同时间的同一方向的切片链接在一起形成动画显示,可以实时地监测到水驱前缘推进的位置和速度。The dynamic visualization technology and method of the water flooding front is used by the
所述电脑还可以根据岩电实验结果建立电阻率与含油饱和度的关系,把电阻率值的大小转化为含油饱和度的大小,这样就可以直观的观察到水驱后油藏不同部位的水洗状况、剩余油饱和度。The computer can also establish the relationship between resistivity and oil saturation according to the results of rock electrical experiments, and convert the resistivity value into the size of oil saturation, so that the water washing of different parts of the oil reservoir after water flooding can be observed intuitively. Condition, remaining oil saturation.
与现有技术相比,本发明能够实时监测水驱前缘的动态变化,定量监测油藏内部含油饱和度的变化,提高实验对油田开发的指导作用。Compared with the prior art, the invention can monitor the dynamic change of the water flooding front in real time, quantitatively monitor the change of the oil saturation in the oil reservoir, and improve the guiding effect of the experiment on oilfield development.
本说明书中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参见即可。The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments, and the same and similar parts between the various embodiments can be referred to each other.
本文中应用了具体个例对本发明的原理及实施方式进行了阐述,以上实施例的说明只是用于帮助理解本发明的方法及其核心思想;同时,对于本领域的一般技术人员,依据本发明的思想,在具体实施方式及应用范围上均会有改变之处。综上所述,本说明书内容不应理解为对本发明的限制。In this paper, specific examples are used to illustrate the principles and implementations of the present invention. The descriptions of the above embodiments are only used to help understand the methods and core ideas of the present invention; meanwhile, for those skilled in the art, according to the present invention There will be changes in the specific implementation and application scope. In conclusion, the contents of this specification should not be construed as limiting the present invention.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811516159.3A CN109356557B (en) | 2018-12-12 | 2018-12-12 | Preparation method of three-dimensional oil reservoir water-drive simulation model and dynamic monitoring visualization device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811516159.3A CN109356557B (en) | 2018-12-12 | 2018-12-12 | Preparation method of three-dimensional oil reservoir water-drive simulation model and dynamic monitoring visualization device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109356557A CN109356557A (en) | 2019-02-19 |
CN109356557B true CN109356557B (en) | 2020-01-03 |
Family
ID=65330578
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811516159.3A Active CN109356557B (en) | 2018-12-12 | 2018-12-12 | Preparation method of three-dimensional oil reservoir water-drive simulation model and dynamic monitoring visualization device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109356557B (en) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109751049A (en) * | 2019-03-08 | 2019-05-14 | 北京瑞莱博石油技术有限公司 | A device for measuring oil saturation by resistivity |
CN112177571B (en) * | 2019-06-14 | 2023-04-07 | 中国石油化工股份有限公司 | Reservoir deficit sand control well gravel packing degree simulation experiment device and method |
CN111155990A (en) * | 2020-02-12 | 2020-05-15 | 西南石油大学 | An experimental device for evaluating the effect of interlayers and injection-production points on the recovery of thick reservoirs |
CN111335856A (en) * | 2020-03-05 | 2020-06-26 | 西南石油大学 | A three-dimensional physical electrode water flooding heterogeneous model and its simulation method |
CN113533442B (en) * | 2020-04-21 | 2024-08-27 | 中国石油天然气股份有限公司 | Supercritical carbon dioxide foam channeling performance evaluation three-dimensional system and method |
CN111706316B (en) * | 2020-05-13 | 2022-01-07 | 清华大学 | Multi-medium chip oil reservoir and manufacturing and application methods thereof |
CN114428001B (en) * | 2020-10-29 | 2024-04-16 | 中国石油化工股份有限公司 | Method for simulating different-grade hypertonic strip core of reservoir through 3D printing |
CN112965104B (en) * | 2021-02-24 | 2023-03-28 | 中海石油(中国)有限公司 | Intelligent oil-gas cluster well pattern underground micro-seismic monitoring method |
CN113607778B (en) * | 2021-06-18 | 2024-09-13 | 长江大学 | Experimental device and method for simulating pressure-resistant visualization of gas reservoir |
CN113431563A (en) * | 2021-07-28 | 2021-09-24 | 燕山大学 | Complex fault block oil reservoir gravity differentiation simulation experiment device and method |
CN114758571B (en) * | 2022-02-28 | 2024-04-16 | 陕西延长石油(集团)有限责任公司 | Reservoir physical experiment model construction method based on 3D printing technology |
CN117990886A (en) * | 2024-01-08 | 2024-05-07 | 西南石油大学 | Comprehensive discrimination method and device for water-washed secondary oil reservoir |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6792354B1 (en) * | 2000-11-13 | 2004-09-14 | O'meara, Jr. Daniel J. | Method for determining reservoir fluid volumes, fluid contacts, compartmentalization, and permeability in geological subsurface models |
EP1714230B1 (en) * | 2004-01-30 | 2010-04-14 | ExxonMobil Upstream Research Company | Reservoir model building methods |
CN101762829B (en) * | 2010-01-18 | 2010-12-29 | 中国石油大学(北京) | Analog measurement method and device of oil saturation in strata |
CN102022112B (en) * | 2010-11-04 | 2013-05-08 | 中国石油大学(华东) | Intelligent oil well simulation experiment system and working method |
CN103806905B (en) * | 2013-07-31 | 2016-08-24 | 中国石油大学(华东) | Preparation has the device and method of the carbonate reservoir physical model of double porosity |
CN103529087B (en) * | 2013-10-22 | 2016-03-30 | 东南大学 | A kind of underground water aeration repairs two dimensional model test formation method |
CN107807396B (en) * | 2017-09-15 | 2019-07-09 | 中国石油天然气股份有限公司 | Method and device for determining formation matrix resistivity |
CN107642352A (en) * | 2017-10-27 | 2018-01-30 | 成都常明信息技术有限公司 | A kind of three-dimensional simulation oil development experimental provision |
CN108961409B (en) * | 2018-06-15 | 2020-11-13 | 北京大学 | A method for constructing 3D printing physical model based on three-dimensional geological body of oil reservoir |
-
2018
- 2018-12-12 CN CN201811516159.3A patent/CN109356557B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN109356557A (en) | 2019-02-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109356557B (en) | Preparation method of three-dimensional oil reservoir water-drive simulation model and dynamic monitoring visualization device | |
CN102254349B (en) | Method for constructing three-dimensional physical model of sedimentary stratum system by using drilling data | |
CN106223928B (en) | Sand filling method of multilateral well experimental model | |
CN102518421B (en) | Physical simulation visualization experimental device and forming method thereof | |
CN103104254B (en) | Multifunctional oil reservoir simulation experiment device and experiment method thereof | |
CN109670220A (en) | A kind of horizontal well air water two-phase method for numerical simulation based on unstrctured grid | |
CN106223938B (en) | Digital core flow simulation analysis method and device | |
Zhang et al. | Fractal and volume characteristics of 3D mining-induced fractures under typical mining layouts | |
CN103018789B (en) | Mesh generation resistivity method forward probe three-dimensional simulation device and method | |
CN114016997B (en) | Heterogeneous oil reservoir development and adjustment simulation experiment device and method | |
CN104459069B (en) | Model test device and test method for monitoring effect of tunnel water inrush on groundwater environment | |
CN204827402U (en) | Experimental model for researching deep profile control and flooding oil displacement mechanism of water flooding sandstone reservoir | |
CN109283584A (en) | Distribution type fiber-optic sonic test method and device applied to three-dimensional physical simulation | |
CN109142875A (en) | A method of tight sand rock electrology characteristic is obtained using digital cores | |
CN110021220B (en) | Building block type geothermal tail water recharging analysis system and application method | |
CN112231818B (en) | Mountain city three-dimensional geological modeling method based on BIM | |
CN112098223A (en) | Test system and method for evaluating the degree of damage to natural fractures by drilling fluids | |
CN202417477U (en) | Physical simulation visual experimental device | |
CN111951394A (en) | Method and device for constructing 3D model of fault structural unit based on geological map | |
CN106918486A (en) | Every the lateral boundaries implementation method for blending drag reduction in live rain making side slope experiment | |
CN111335857A (en) | Polymer flooding equilibrium displacement front edge monitoring experiment evaluation device and method | |
CN109100307B (en) | Experimental device and system for monitoring deformation of simulated reservoir rock | |
CN115081294B (en) | Analysis method for water filling process of high-water-head reinforced concrete lining pressure tunnel | |
CN114151041B (en) | Weak-cementing hydrate reservoir simulated wellbore construction device and method | |
CN208907919U (en) | Distributed fiber optic acoustic wave testing device for 3D physical simulation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |