CN109348602A - Tunnel lamp on-line monitoring system and method based on image processing techniques - Google Patents

Tunnel lamp on-line monitoring system and method based on image processing techniques Download PDF

Info

Publication number
CN109348602A
CN109348602A CN201811239890.6A CN201811239890A CN109348602A CN 109348602 A CN109348602 A CN 109348602A CN 201811239890 A CN201811239890 A CN 201811239890A CN 109348602 A CN109348602 A CN 109348602A
Authority
CN
China
Prior art keywords
tunnel
image
lamp
line monitoring
capturing system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811239890.6A
Other languages
Chinese (zh)
Inventor
李弘博
曹校勇
李广华
陈海洋
李卓
徐平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Consultants Co Ltd
Original Assignee
CCCC First Highway Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Consultants Co Ltd filed Critical CCCC First Highway Consultants Co Ltd
Priority to CN201811239890.6A priority Critical patent/CN109348602A/en
Publication of CN109348602A publication Critical patent/CN109348602A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05BELECTRIC HEATING; ELECTRIC LIGHT SOURCES NOT OTHERWISE PROVIDED FOR; CIRCUIT ARRANGEMENTS FOR ELECTRIC LIGHT SOURCES, IN GENERAL
    • H05B47/00Circuit arrangements for operating light sources in general, i.e. where the type of light source is not relevant
    • H05B47/20Responsive to malfunctions or to light source life; for protection
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B20/00Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps
    • Y02B20/40Control techniques providing energy savings, e.g. smart controller or presence detection

Landscapes

  • Alarm Systems (AREA)
  • Circuit Arrangement For Electric Light Sources In General (AREA)
  • Selective Calling Equipment (AREA)

Abstract

The present invention relates to tunnel lamp on-line monitoring system and its method based on image processing techniques, image capturing system sends microprocessor by image capturing system communication module for image in collected hole, is then sent to image information processing unit;Image information processing unit determines road surface brightness in current Tunnel by image in analysis hole, whether road surface brightness reaches design standard in the current entire Tunnel of judgement, if not reaching design standard illustrates existing lamps and lanterns damage, the lamp position overhauled needed for being determined according to the position of video camera or camera, it is sent to tunnel management station, service personnel is arranged to remove site examining and repairing.The present invention can road surface brightness in remote real time monitoring Tunnel, judge whether to need to overhaul tunnel illuminating system according to road surface brightness in Tunnel, the maintenance of tunnel illumination lamps and lanterns is become overhauling on demand from periodic inspection strategy, reduces the wasting of resources and security risk caused by periodically artificial live inspection.

Description

Tunnel lamp on-line monitoring system and method based on image processing techniques
Technical field
The invention belongs to traffic engineering technical fields, and in particular to a kind of tunnel lamp based on image processing techniques is online Monitor system and method.
Background technique
Tunnel illuminating system is the part of most critical in entire tunnel system, its quality is directly related to the row in tunnel Vehicle safety.Existing tunnel illuminating system maintenance is basic or based on regularly artificial live inspection, although this can largely subtract The generation of few equipment fault, but there is also it is time-consuming and laborious, blindly overhaul the shortcomings that, and if arrange repair time interval compared with It is long, if occurring large number of lamp failure in the meantime, tunnel traffic safety will be impacted.
Summary of the invention
The object of the present invention is to provide a kind of tunnel lamp on-line monitoring system and method based on image processing techniques, will Periodic inspection strategy becomes overhauling on demand, to solve the wasting of resources caused by the periodically artificial live inspection of existing tunnel lighting system With security risk.
The technical scheme adopted by the invention is as follows:
Tunnel lamp on-line monitoring system based on image processing techniques, it is characterised in that:
The system comprises image capturing system, image capturing system communication module, microprocessor, image information processing unit, Data storage cell, fiber optic telecommunications module and GPRS communication module;
Image capturing system is also believed with image respectively by image capturing system communication module and microprocessor communication, microprocessor Cease processing unit, data storage cell, fiber optic telecommunications module and GPRS communication module connection communication.
Power module is also connected on microprocessor.
Image capturing system is the video camera or camera uniformly installed in tunnel.
Tunnel lamp on-line monitoring method based on image processing techniques, it is characterised in that:
It is realized by following steps:
Image in collected hole is passed through image capturing system communication module by video camera or camera in image capturing system It is sent to microprocessor, is then sent to image information processing unit;
Image information processing unit determines road surface brightness in current Tunnel by image in analysis hole, judges entire tunnel at present Whether road surface brightness reaches design standard in road hole, if not reaching design standard illustrates existing lamps and lanterns damage and to tunnel row Vehicle has an impact safely, the lamp position overhauled needed for being determined according to the position of video camera or camera;
Microprocessor sends tunnel management station, tunnel management by fiber optic telecommunications module for the lamp position information of required maintenance Station arrangement service personnel removes site examining and repairing.
The method that image determines road surface brightness in current tunnel hole in image information processing unit analysis hole is that 256 colors turn ash Du Tufa, walsh converter technique or binaryzation converter technique.
GPRS communication module sends tunneltron for the lamp position information of required maintenance using the network of mobile operator Reason station.
The analysis information of the acquisition information of image capturing system and image information processing unit is passed through data by microprocessor Storage unit is stored.
The invention has the following advantages that
Technical solution of the present invention can road surface brightness in remote real time monitoring Tunnel, be according to brightness judgement in road surface in Tunnel It is no to need to overhaul tunnel illuminating system, the maintenance of tunnel illumination lamps and lanterns is become overhauling on demand from periodic inspection strategy, Reduce the wasting of resources and security risk caused by periodically artificial live inspection.
Detailed description of the invention
Fig. 1 is repair process schematic diagram of the present invention;
Fig. 2 is the structural schematic diagram of on-line monitoring system of the present invention;
In figure, 1. microprocessors, 2. power modules, 3. image information processing units, 4. data storage cells, 5. Image Acquisition System communication module, 6. fiber optic telecommunications modules, 7.GPRS communication module.
Specific embodiment
The present invention will be described in detail With reference to embodiment.
A kind of tunnel lamp on-line monitoring system based on image processing techniques of the present invention, including Image Acquisition system System, image capturing system communication module, microprocessor, image information processing unit, data storage cell, fiber optic telecommunications module and GPRS communication module.Image capturing system is also divided by image capturing system communication module and microprocessor communication, microprocessor Not with image information processing unit, data storage cell, fiber optic telecommunications module and GPRS communication module connection communication.Microprocessor On be also connected with power module.
Image capturing system is the video camera or camera uniformly installed in tunnel, can be existing in tunnel for traffic surveillance and control system The image capturing systems such as the video camera of field installation, or can also be video camera, the camera etc. individually installed additional in tunnel.
The tunnel lamp on-line monitoring method based on image processing techniques for relying on above equipment system structure, by following Step is realized:
Image in collected hole is passed through image capturing system communication module by video camera or camera in image capturing system It is sent to microprocessor, is then sent to image information processing unit;
Image information processing unit determines road surface brightness in current Tunnel by image in analysis hole, judges entire tunnel at present Whether road surface brightness reaches design standard in road hole, if not reaching design standard illustrates existing lamps and lanterns damage and to tunnel row Vehicle has an impact safely, the lamp position overhauled needed for being determined according to the position of video camera or camera;
Microprocessor sends tunnel management station, tunnel management by fiber optic telecommunications module for the lamp position information of required maintenance Station arrangement service personnel removes site examining and repairing.
The method that image determines road surface brightness in current tunnel hole in image information processing unit analysis hole is that 256 colors turn ash Du Tufa, walsh converter technique or binaryzation converter technique.
The effect of GPRS communication module be for can not fiber plant communication remote mountain areas tunnel, mobile operation can be used The lamp position information of required maintenance is sent tunnel management station by the network of quotient.
The analysis information of the acquisition information of image capturing system and image information processing unit is passed through data by microprocessor Storage unit is stored.
The present invention can road surface brightness in remote real time monitoring Tunnel, judge whether to need according to road surface brightness in Tunnel Tunnel illuminating system is overhauled, the maintenance of tunnel illumination lamps and lanterns is become overhauling on demand from periodic inspection strategy, is reduced The wasting of resources and security risk caused by periodically artificial live inspection.
The contents of the present invention are not limited to cited by embodiment, and those of ordinary skill in the art are by reading description of the invention And to any equivalent transformation that technical solution of the present invention is taken, all are covered by the claims of the invention.

Claims (7)

1. the tunnel lamp on-line monitoring system based on image processing techniques, it is characterised in that:
The system comprises image capturing system, image capturing system communication module, microprocessor, image information processing unit, Data storage cell, fiber optic telecommunications module and GPRS communication module;
Image capturing system is also believed with image respectively by image capturing system communication module and microprocessor communication, microprocessor Cease processing unit, data storage cell, fiber optic telecommunications module and GPRS communication module connection communication.
2. the tunnel lamp on-line monitoring system according to claim 1 based on image processing techniques, it is characterised in that:
Power module is also connected on microprocessor.
3. the tunnel lamp on-line monitoring system according to claim 1 based on image processing techniques, it is characterised in that:
Image capturing system is the video camera or camera uniformly installed in tunnel.
4. the tunnel lamp on-line monitoring method based on image processing techniques, it is characterised in that:
It is realized by following steps:
Image in collected hole is passed through image capturing system communication module by video camera or camera in image capturing system It is sent to microprocessor, is then sent to image information processing unit;
Image information processing unit determines road surface brightness in current Tunnel by image in analysis hole, judges entire tunnel at present Whether road surface brightness reaches design standard in road hole, if not reaching design standard illustrates existing lamps and lanterns damage and to tunnel row Vehicle has an impact safely, the lamp position overhauled needed for being determined according to the position of video camera or camera;
Microprocessor sends tunnel management station, tunnel management by fiber optic telecommunications module for the lamp position information of required maintenance Station arrangement service personnel removes site examining and repairing.
5. the tunnel lamp on-line monitoring method according to claim 4 based on image processing techniques, it is characterised in that:
The method that image determines road surface brightness in current tunnel hole in image information processing unit analysis hole is that 256 colors turn grayscale image Method, walsh converter technique or binaryzation converter technique.
6. the tunnel lamp on-line monitoring method according to claim 4 based on image processing techniques, it is characterised in that:
GPRS communication module sends tunnel management station for the lamp position information of required maintenance using the network of mobile operator.
7. the tunnel lamp on-line monitoring method according to claim 4 based on image processing techniques, it is characterised in that:
Microprocessor stores the analysis information of the acquisition information of image capturing system and image information processing unit by data Unit is stored.
CN201811239890.6A 2018-10-24 2018-10-24 Tunnel lamp on-line monitoring system and method based on image processing techniques Pending CN109348602A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811239890.6A CN109348602A (en) 2018-10-24 2018-10-24 Tunnel lamp on-line monitoring system and method based on image processing techniques

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811239890.6A CN109348602A (en) 2018-10-24 2018-10-24 Tunnel lamp on-line monitoring system and method based on image processing techniques

Publications (1)

Publication Number Publication Date
CN109348602A true CN109348602A (en) 2019-02-15

Family

ID=65311633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811239890.6A Pending CN109348602A (en) 2018-10-24 2018-10-24 Tunnel lamp on-line monitoring system and method based on image processing techniques

Country Status (1)

Country Link
CN (1) CN109348602A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110446319A (en) * 2019-08-05 2019-11-12 陕西华腾云物联网有限责任公司 A kind of illumination effect of tunnel intelligent regulating system
CN110749601A (en) * 2019-10-24 2020-02-04 中国民用航空总局第二研究所 Airport runway lamp detection system and method based on images
CN113139222A (en) * 2021-03-24 2021-07-20 中交第一公路勘察设计研究院有限公司 ObjectARX-based urban open cut tunnel cross section drawing method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104244542A (en) * 2013-06-17 2014-12-24 合肥源辉光电子有限公司 Fault detection response circuit for highway tunnel LED illumination dimming control device
CN204513294U (en) * 2015-03-06 2015-07-29 江苏迪生建设集团有限公司 A kind of street lamp with road surface failure detector
CN105223520A (en) * 2015-10-20 2016-01-06 广州市光机电技术研究院 A kind of road illuminating lamp on-site test system and method
CN105270179A (en) * 2014-05-30 2016-01-27 Lg电子株式会社 Driver assistance apparatus and vehicle

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104244542A (en) * 2013-06-17 2014-12-24 合肥源辉光电子有限公司 Fault detection response circuit for highway tunnel LED illumination dimming control device
CN105270179A (en) * 2014-05-30 2016-01-27 Lg电子株式会社 Driver assistance apparatus and vehicle
CN204513294U (en) * 2015-03-06 2015-07-29 江苏迪生建设集团有限公司 A kind of street lamp with road surface failure detector
CN105223520A (en) * 2015-10-20 2016-01-06 广州市光机电技术研究院 A kind of road illuminating lamp on-site test system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110446319A (en) * 2019-08-05 2019-11-12 陕西华腾云物联网有限责任公司 A kind of illumination effect of tunnel intelligent regulating system
CN110749601A (en) * 2019-10-24 2020-02-04 中国民用航空总局第二研究所 Airport runway lamp detection system and method based on images
CN113139222A (en) * 2021-03-24 2021-07-20 中交第一公路勘察设计研究院有限公司 ObjectARX-based urban open cut tunnel cross section drawing method

Similar Documents

Publication Publication Date Title
CN109348602A (en) Tunnel lamp on-line monitoring system and method based on image processing techniques
CN109459664A (en) A kind of detection of distribution network failure and positioning analysis system
CN111810241B (en) Tunnel risk and disaster real-time monitoring system and method based on multi-source perception
CN116091901A (en) Operation and maintenance management platform based on fault diagnosis and analysis of monitoring equipment
KR20210115432A (en) Operation and management system of photovoltaic power plant and method thereof
CN112564952A (en) Intelligent inspection system for distribution network line
CN101917061A (en) Automatic inspection method and device for substation
CN115441832A (en) Intelligent photovoltaic operation and maintenance management and control system
CN109765457A (en) The intelligent apparatus that a kind of tunnel cable failure inspection and insulation fault are automatically repaired
CN112183369A (en) Pointer instrument reading identification method for transformer substation unmanned inspection
CN105867267A (en) Method for automatically reporting instrument readings of distribution station room through image identification technology
CN115184269A (en) Track inspection system and method
CN115131505A (en) Multi-system fusion's of transformer substation panorama perception system
CN115184726A (en) Intelligent power grid fault real-time monitoring and positioning system and method
CN105228324A (en) The determination methods of street lamp faiture alarm in a kind of intelligent lighting
CN203455712U (en) Transformer station equipment centralized control and inspection tour online-monitoring system
CN114021754A (en) Dispatching distribution network emergency repair system
KR20190094500A (en) Remote administration system of solar photovoltaic power station
CN113898537A (en) Remote intelligent inspection system for wind power plant
CN111371180B (en) Substation patrol supervision and data analysis system
CN201846134U (en) Automatic inspecting system for transformer substation
CN2807665Y (en) Power equipment environment and image centralization monitoring apparatus
CN206282132U (en) The data acquisition of power equipment running environment and the cooler interlock device of remote control
CN115086391A (en) Fault expert system based on wearable distribution network inspection equipment and use method thereof
CN117476389A (en) Four-station isolating switch

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190215