CN109347116A - The method that centralized watch is carried out to the whole network reactive voltage state using automatic voltage control system - Google Patents

The method that centralized watch is carried out to the whole network reactive voltage state using automatic voltage control system Download PDF

Info

Publication number
CN109347116A
CN109347116A CN201811290056.XA CN201811290056A CN109347116A CN 109347116 A CN109347116 A CN 109347116A CN 201811290056 A CN201811290056 A CN 201811290056A CN 109347116 A CN109347116 A CN 109347116A
Authority
CN
China
Prior art keywords
avc
power
defect
control system
whole network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811290056.XA
Other languages
Chinese (zh)
Other versions
CN109347116B (en
Inventor
孙歌
沈凌
徐焰
姚璟杰
陈志亮
高凯
赵彬
刘俊
陈辰
孙迪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201811290056.XA priority Critical patent/CN109347116B/en
Publication of CN109347116A publication Critical patent/CN109347116A/en
Application granted granted Critical
Publication of CN109347116B publication Critical patent/CN109347116B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/16Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by adjustment of reactive power
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/18Arrangements for adjusting, eliminating or compensating reactive power in networks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

A method of centralized watch is carried out to the whole network reactive voltage state using automatic voltage control system, belongs to dispatching of power netwoks and manages field.It is included in closed-loop process system to the more limit information found in the alarm block signal of AVC system and operation, concentration, outstanding problem are analyzed, abnormal cause and solution are found out, abnormality processing process is constantly improve, makes process flow complete in detail.Which raises the Operating ettectiveness of AVC system, further improve the controlled level of voltage power-less, ensure power network safety operation, it ensure that the qualification of interdependent node voltage and power factor, farthest reduce the idle transmission of route, reduces power grid active loss because of caused by unnecessary reactive power flow.It can be widely used for dispatching of power netwoks control field.

Description

Centralized watch is carried out to the whole network reactive voltage state using automatic voltage control system Method
Technical field
The invention belongs to dispatchings of power netwoks to manage field, more particularly to a kind of for using automatic voltage control system to the whole network The method of reactive voltage state progress centralized watch.
Background technique
Power grid automatic voltage control system (Automatic Voltage Control, abbreviation AVC) is by electric system In the data such as each node remote measure and communication carry out on-line analysis and calculating, realize the optimal control to voltage and reactive-load compensation equipment, So that the control amounts such as the transmission of rate of qualified voltage, reactive power, power factor meet boundary condition, improve the operation feelings of electric system Condition reduces line loss, improves the stability and economy of electric system.
Power grid automatic voltage control system (AVC) major function is guaranteed under the premise of ensuring power network safety operation Voltage and critical point power factor are qualified, caused by reducing the idle transmission of route as far as possible, reducing power grid because of unnecessary reactive power flow Active loss.
Automatic voltage control system carries out centralized watch and analytical calculation to the whole network reactive voltage state, from global angle Coordination optimization control is carried out to the electric network reactive-load device of wide area dispersion, system voltage stabilization is to maintain, promotes network voltage quality With the important technical of whole system economic operation level, raising Reactive Voltage Management level.
Area power grid AVC system is expansion of the master station automation advanced applied software technology to closed-loop control direction.Pass through Complete high-speed power data communication network can be acquired in control centre and include using the SCADA application function of main station system Real time information including busbar voltage, generator output, Line Flow, switch tool etc., and can be complete in a control centre distant place At the remote control remote regulating operation such as the adjustment of generator reactive power output, the lifting of capacity reactance device switching, load tap changer.
The regulating measure of AVC is to adjust on-load regulator transformer tap and capacitor switch, makes voltage and idle satisfaction Condition.It is measured by node each in monitoring system, advises to system or control.The overall principle is voltage first, when pressure regulation It takes into account idle, makes system voltage in limits, power control is in qualified, idle in-situ balancing of respectively standing.AVC controls plan It slightly include region voltage strategy, busbar voltage strategy, region is idle strategy, single idle strategy of standing, control flow is as shown in Figure 1.
Certain regional power grid belonging to applicant is in the online debugging process of AVC, it was found that following FAQs:
One, AVC is frequently latched: for equipment in protection operation, preventing incorrect control command from causing to damage to controlled device Evil, AVC can be by device latchup and automatic trigger generates AVC alarm signal.
In actual operation, AVC abnormality alarming latch status it is general there are two types of: the movement time of loaded switch/capacitor switch Number is out-of-limit;The tripping twice of loaded switch/capacitor switch, the reason of causing number out-of-limit or tripping twice, are varied, need It is made a concrete analysis of according to different situations.
Two, operation data occur under nominal situation repeatedly out-of-limit: there are mainly two types of the reasons for causing operation data out-of-limit, and one It is the regulating power that operating condition exceeds control system, second is that control strategy is not suitable with carrying out practically condition.
How to solve the above problems, becomes problem anxious to be resolved in real work.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of using automatic voltage control system to the whole network reactive voltage The method of state progress centralized watch.Its more limit information found by the alarm block signal to AVC system and in running is received Enter closed-loop process system, concentration, outstanding problem are analyzed, abnormal cause and solution are found out, to abnormality processing process It is constantly improve, makes process flow complete in detail.
The technical scheme is that provide it is a kind of using automatic voltage control system to the whole network reactive voltage state carry out The method of centralized watch, it is characterized in that the method for the centralized watch includes:
One, reinforce Centralized Monitoring, carry out exception record:
To AVC system, the problem reinforces monitoring and record in operation, it is desirable that each value dispatcher is to AVC system The timely involution of alarm block signal simultaneously records plant stand, time, locking information, processing mode and closed-loop case that alarm locking occurs Carry out corresponding record;
The more limit information found in operation will also be handled in time, and carry out corresponding record, each value dispatcher is handing over Same day AVC operating condition must be included in content of relieving when succeeding, and the progress of processed problem is included at closed loop in time Reason;
Two, process flow, analysis abnormal cause are improved:
Specific process flow is all provided out to the different abnormal conditions being likely to occur, is advised to the problem of cannot handling on the same day The program that constant current turns;Management and running center every month works out AVC and runs monthly magazine, analyzes concentration, outstanding problem, finds out different Normal reason and solution, constantly improve abnormality processing process;
Three, the coordination of development portion border, solving practical problems:
It is related to the problem of non-scheduled profession, holds the coordination committee of each department of power supply company, organizes automation, power transformation, battalion Xiao Deng department joint investigation, finds out the concrete reason of defect generation;And closed loop management is carried out according to defect management process.
Further, the assessment, early warning and decision-making technique make complete in detail all kinds of AVC defects having found Standby process flow.
Specifically, the assessment, early warning and decision-making technique, strict implement defect elimination process flow, the of disfigurement discovery One time judged the property of defect, is recorded;In time send operator and Automation Specialty personnel to scene one, Secondary device is confirmed;The multiple problem occurred to concentration is timely analyzed, and exact cause is found out.
Specifically, the assessment, early warning and decision-making technique carry out tracking processing to temporary indelible defect, and The portion Shi Kaizhan border is coordinated and producer's research cooperation, reinforces monitoring to the plant stand of existing defects, carries out manually adjusting intervention in time, protect Grid operation data is demonstrate,proved not across limit value, improves the safety and economy of operation of power networks.
Specifically, the assessment, early warning and decision-making technique, carried out AVC by control centre and run monthly magazine, to every month AVC and system operation data are summarized, and not found problem is searched;Defect is analyzed by long-term operation data; Non- closed loop defect is made a record, tracking is reinforced;Aiming at the problem that existing on last stage, arrange the work weight of next stage properly Point.
Compared with the prior art, the invention has the advantages that
1. using the technical program, concentration prison is carried out to power grid Nei Ge substation's on-load voltage regulating device and reactive-load compensation equipment Control, unified management and on-line checking can greatly improve the voltage controlled level of dispatching of power netwoks or regulation person, mitigate pressure regulation repeatedly Labor intensity improves idle, voltage management efficiency.
2. using the technical program, the Operating ettectiveness of AVC system is improved, the control water of voltage power-less is further improved It is flat, it is ensured that power network safety operation ensure that the qualification of interdependent node voltage and power factor, farthest reduce Transmission that route is idle reduces power grid active loss because of caused by unnecessary reactive power flow.
3. by using the technical program, regulation center AVC application level has a raising of matter, supply voltage qualification rate and Idle controlled level has also reached new height.
Detailed description of the invention
Fig. 1 is existing AVC control flow chart schematic diagram;
Fig. 2 is AVC defect processing flow diagram of the present invention.
Specific embodiment
The present invention will be further described with reference to the accompanying drawing.
Technical solution of the present invention provide it is a kind of using automatic voltage control system to the whole network reactive voltage state carry out The method of centralized watch, invention are:
One, reinforce Centralized Monitoring, carry out exception record
To AVC system, the problem reinforces monitoring and record in operation, it is desirable that each value dispatcher is to AVC system The timely involution of alarm block signal simultaneously records plant stand, time, locking information, processing mode and closed-loop case that alarm locking occurs Carry out corresponding record.The more limit information found in operation will also be handled in time, and carry out corresponding record.Each value scheduling Member AVC operating condition must be included in content of relieving by the day of when relieving, and carry out timely closed loop to processed problem.
Two, process flow, analysis abnormal cause are improved
Specific process flow is all defined to the different abnormal conditions being likely to occur, is advised to the problem of cannot handling on the same day The program of circulation is determined.Center every month works out AVC and runs monthly magazine, analyzes concentration, outstanding problem, finds out abnormal cause And solution, abnormality processing process is constantly improve.
Three, the coordination of development portion border, solving practical problems
It is related to the problem of non-scheduled profession, holds interagency coordination meeting, the departments such as tissue automation, power transformation, marketing connection Investigation is closed, the concrete reason of defect generation is found out;And closed loop management is carried out according to defect management process.
The innovative point of technical solution of the present invention and the breakthrough of acquirement:
Perfect defect management process:
Detailed complete process flow is formulated, has seen institute in Fig. 2 for all kinds of AVC defects having found in certain regulation center Show, since it is general format and expression method in the industry, those skilled in the art understands that its is described interior in which can have no contrary opinion Appearance and working principle, therefore this will not be detailed here.
Strict implement defect elimination process flow judges the property of defect in the first time of disfigurement discovery, is recorded;And When send operator and Automation Specialty personnel to confirm live first and second equipment;Occur to concentration multiple Property problem is timely analyzed, and exact cause is found out.
To temporary indelible defect, tracking processing is carried out, timely development portion border is coordinated and producer's research cooperation, right The plant stands of existing defects reinforces monitoring, carries out manually adjusting interventions in time when necessary, guarantee grid operation data not across limit value, Improve the safety and economy of operation of power networks.
AVC operation monthly magazine is carried out, summarizes to AVC every month and system operation data, searches not found problem;It is logical Long-term operation data is crossed to analyze defect;Non- closed loop defect is made a record, tracking is reinforced;For existing on last stage The problem of, the next stage of arranging properly focus.
Situations such as and abnormal obliteration out-of-limit for the number occurred in AVC operational process, by busbar voltage, main transformer without The operation datas curves such as function, on-load voltage regulation gear are analysed and compared, and determine the real causes of AVC defect.
The reason of causing AVC defect substantially has at following 4 points: 1, primary equipment failure;2, secondary device failure;3, remote signalling Telemetering failure;4, AVC control strategy is not applicable.Wherein, it is according to system correlation operation data optimization of profile AVC control strategy The difficult point of AVC defect elimination processing, table 1 are AVC relevant control mode.
1 AVC control mode of table
Original control strategy is power factor calculating method, is converted into nothing by power factor limit value and current active power Function control limit will cause main transformer tap changer and act prior to capacitor switch in some cases, cause reactive compensation insufficient Or overcompensation;And main transformer tap changer frequent movement causes to be latched.
Selection takes fixed reactive limit value method that can preferentially throw in the case where idle insufficient or excessive in this case Capacitor is jumped, operating parameter is made to restore normal range (NR).
The implementation of technical solution of the present invention improves AVC system so that the operational failure of AVC system is greatly lowered extremely The Operating ettectiveness of system further improves the controlled level of voltage power-less, it is ensured that power network safety operation ensure that correlation The qualification of node voltage and power factor farthest reduces the idle transmission of route, reduces power grid because unnecessary idle Active loss caused by trend.
In addition, carrying out Centralized Monitoring, unified management to power grid Nei Ge substation's on-load voltage regulating device and reactive-load compensation equipment And on-line checking, the labor intensity that can be greatly improved regulation person's voltage controlled level, mitigate pressure regulation repeatedly improve idle, electric Press the efficiency of management.
It invention can be widely used in dispatching of power netwoks control field.

Claims (5)

1. a kind of method for carrying out centralized watch to the whole network reactive voltage state using automatic voltage control system, it is characterized in that institute The method for stating centralized watch includes:
One, reinforce Centralized Monitoring, carry out exception record:
To AVC system, the problem reinforces monitoring and record in operation, it is desirable that alarm of each value dispatcher to AVC system The timely involution of block signal simultaneously records plant stand, time, locking information, processing mode and closed-loop case that alarm locking occurs and carries out Corresponding record;
The more limit information found in operation will also be handled in time, and carry out corresponding record, each value dispatcher is relieving Same day AVC operating condition is included in content of relieving by Shi Bixu, and carries out being included in closed-loop process in time to processed problem;
Two, process flow, analysis abnormal cause are improved:
Specific process flow is all provided out to the different abnormal conditions being likely to occur, regulation the problem of cannot handling on the same day is flowed The program turned;Management and running center every month works out AVC and runs monthly magazine, analyzes concentration, outstanding problem, finds out abnormal former Cause and solution constantly improve abnormality processing process;
Three, the coordination of development portion border, solving practical problems:
It is related to the problem of non-scheduled profession, holds the coordination committee of each department of power supply company, tissue automation, power transformation, marketing etc. Department's joint investigation, finds out the concrete reason of defect generation;And closed loop management is carried out according to defect management process.
2. described in accordance with the claim 1 carry out centralized watch to the whole network reactive voltage state using automatic voltage control system Method, it is characterized in that the assessment, early warning and decision-making technique make complete in detail all kinds of AVC defects having found Process flow.
3. carrying out centralized watch to the whole network reactive voltage state using automatic voltage control system according to claim 2 Method, it is characterized in that the assessment, early warning and decision-making technique, strict implement defect elimination process flow, the first of disfigurement discovery Time judges the property of defect, is recorded;Send operator and Automation Specialty personnel to scene one, two in time Secondary device is confirmed;The multiple problem occurred to concentration is timely analyzed, and exact cause is found out.
4. carrying out centralized watch to the whole network reactive voltage state using automatic voltage control system according to claim 2 Method, it is characterized in that the assessment, early warning and decision-making technique carry out tracking processing, in time to temporary indelible defect Development portion border is coordinated and producer's research cooperation, reinforces monitoring to the plant stand of existing defects, carries out manually adjusting intervention in time, guarantee Grid operation data improves the safety and economy of operation of power networks not across limit value.
5. carrying out centralized watch to the whole network reactive voltage state using automatic voltage control system according to claim 2 Method, it is characterized in that the assessment, early warning and decision-making technique, carried out AVC by control centre and run monthly magazine, to every month AVC and system operation data are summarized, and not found problem is searched;Defect is analyzed by long-term operation data; Non- closed loop defect is made a record, tracking is reinforced;Aiming at the problem that existing on last stage, arrange the work weight of next stage properly Point.
CN201811290056.XA 2018-10-31 2018-10-31 Method for centralized monitoring of reactive voltage state of whole network by adopting automatic voltage control system Active CN109347116B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811290056.XA CN109347116B (en) 2018-10-31 2018-10-31 Method for centralized monitoring of reactive voltage state of whole network by adopting automatic voltage control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811290056.XA CN109347116B (en) 2018-10-31 2018-10-31 Method for centralized monitoring of reactive voltage state of whole network by adopting automatic voltage control system

Publications (2)

Publication Number Publication Date
CN109347116A true CN109347116A (en) 2019-02-15
CN109347116B CN109347116B (en) 2021-04-16

Family

ID=65313435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811290056.XA Active CN109347116B (en) 2018-10-31 2018-10-31 Method for centralized monitoring of reactive voltage state of whole network by adopting automatic voltage control system

Country Status (1)

Country Link
CN (1) CN109347116B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110601214A (en) * 2019-10-30 2019-12-20 国网浙江浦江县供电有限公司 Distribution network reactive voltage governance monitoring system
CN111817308A (en) * 2020-06-08 2020-10-23 广东电网有限责任公司 AVC-based reactive power regulation effectiveness judgment method and system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110601214A (en) * 2019-10-30 2019-12-20 国网浙江浦江县供电有限公司 Distribution network reactive voltage governance monitoring system
CN111817308A (en) * 2020-06-08 2020-10-23 广东电网有限责任公司 AVC-based reactive power regulation effectiveness judgment method and system

Also Published As

Publication number Publication date
CN109347116B (en) 2021-04-16

Similar Documents

Publication Publication Date Title
US10581245B2 (en) Voltage/reactive power operation assisting device and assisting method, and voltage/reactive power operation monitoring control device and monitoring control method
Liang et al. Dispatch of main transformer ULTC and capacitors in a distribution system
JP6604076B2 (en) Supervisory control system
CN103166241B (en) Isolated power grid stability control system
CN100555792C (en) Based on energy-saving and cost-reducing total management system of the power distribution network of multiple agent and management method thereof
CN105119291B (en) A kind of reactive voltage distributed optimization control system and method
CN101431240A (en) Space-saving integrated AVC system control method considering step power station
CN104283222B (en) A kind of area power grid reactive voltage control system
CN110363326B (en) Power grid 110kV line short-term load curve prediction method
JP2017034752A (en) Monitoring control system
CN109347116A (en) The method that centralized watch is carried out to the whole network reactive voltage state using automatic voltage control system
CN101976847A (en) SVC (Static Var Compensator) and AVC (Automatic Voltage Control) joint debugging control system
CN104242297B (en) A kind of method of electric voltage exception location and the analysis of causes
DE102010025959A1 (en) System for e.g. optimizing conformity condition in parameter of service security in power supply network, has actuators designed as network controlling element that is assigned to sub-network, and controller co-operating with actuator
CN103501056A (en) Regional and county integrated automatic voltage control system
CN109191006B (en) Method for automatically scanning and analyzing risk of N-1 of 110kV main transformer of power grid
CN104167740A (en) Automatic control system and method for 35kV capacitor reactance provincial and local collaboration of 500kV transformer substation
CN105184657B (en) Power supply risk assessment method and system for power system
CN106444589A (en) 30-degree phase angle difference distributing line loop closing and opening operation system
Liu et al. An optimization method of maintenance strategy for power equipment
Xue Towards space-time cooperative defence framework against blackouts in China
CN109217322A (en) The method of the stability and economy of electric system is improved using fixed reactive limit value method
CN104319779A (en) Regional power grid reactive voltage control method
Rexhepi The dispatch center’s role in the power grid operation and control.
Xue Progresses of blackout defense systems in China

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant