CN109346276A - A kind of control method of the converter transformer cooling system of intelligent patrol detection - Google Patents
A kind of control method of the converter transformer cooling system of intelligent patrol detection Download PDFInfo
- Publication number
- CN109346276A CN109346276A CN201811182892.6A CN201811182892A CN109346276A CN 109346276 A CN109346276 A CN 109346276A CN 201811182892 A CN201811182892 A CN 201811182892A CN 109346276 A CN109346276 A CN 109346276A
- Authority
- CN
- China
- Prior art keywords
- cooling system
- control
- converter
- transformer
- patrol detection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01F—MAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
- H01F27/00—Details of transformers or inductances, in general
- H01F27/08—Cooling; Ventilating
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Protection Of Transformers (AREA)
Abstract
The present invention relates to a kind of control method of the converter transformer cooling system of intelligent patrol detection, 1, electricity operation on converter transformer cooling system;2, converter power transformer terminal case operating status is acquired, judges whether converter power transformer puts into operation;3, judge cooling system for MANUAL CONTROL mode or automatic control mode;4, according to converter power transformer whether enter protected mode, whether sample it is abnormal, whether period rotation, whether throw/move back by force by force, whether automatically control, realize the intelligent automatic control of the converter transformer cooling system of intelligent patrol detection.The present invention realizes manual/auto switching when failure;The automatic control to cooling system is realized by the multiple logics such as top-oil temperature and circumstance temperature, winding temperature, transformer load, it is accurate, reliable;Effectively improve the service life and job stability of converter power transformer.
Description
Technical field
The invention belongs to automatic control technology of power system fields, and in particular to a kind of converter power transformer of intelligent patrol detection is cold
But the control method of system.
Background technique
Converter power transformer is one of most important equipment in high voltage direct current transmission project converter station, it is in alternating current and straight
The core position that galvanic electricity mutually converts realizes the mutual conversion between alternating current and direct current together with converter valve.Change of current transformation
Device manufacturing technology is extremely complex, and technology content is very high, represents the newest scientific and technological achievement and developing direction of power transmission and transformation industry.The change of current
Transformer can generate high temperature in the process of running, and high temperature seriously affects converter power transformer service life and normal use, it is therefore necessary to right
Converter power transformer is cooled down.
With the construction of intelligent substation and the gradually popularization of intelligent O&M, it is desirable that converter transformer cooling system can
Have the function of monitoring, control, intelligent patrol detection etc., further promotes the intelligent level of converter power transformer, and traditional change of current becomes
Depressor wind cooling control box has been unable to meet intelligentized needs.
Summary of the invention
In order to solve the above technical problems, the invention proposes a kind of controls of the converter transformer cooling system of intelligent patrol detection
Method can be realized intelligent patrol detection to converter transformer cooling system, automatically control, and effectively improve converter power transformer uses the longevity
Life and job stability.The technical solution adopted in the present invention is as follows:
A kind of control method of the converter transformer cooling system of intelligent patrol detection, comprising the following steps:
Electricity operation in step 1, converter transformer cooling system;
Step 2, acquisition converter power transformer terminal case operating status, judge whether converter power transformer puts into operation, if put into operation, if
Start cooling system, control each group cooler, if not putting into operation, going to step 2 repetition judgements;
Step 3 judges cooling system for MANUAL CONTROL mode or automatic control mode, under MANUAL CONTROL mode, utilizes
Button on control cabinet panel manually controls the start and stop of each group cooler, goes to step 3 repetition judgements;It is then gone to step under automatic mode
4;
Step 4, whether entered according to converter power transformer protected mode, whether sample it is abnormal, whether period rotation, whether strong
It throw/moves back by force, whether automatically control, realize the intelligent automatic control of the converter transformer cooling system of intelligent patrol detection, and turn step
Rapid 3 repeat to judge.
Preferably, the intelligent automatic control of the converter transformer cooling system of intelligent patrol detection is realized described in step 4
Specific step is as follows:
Step 4.1 judges whether cooling system enters protected mode according to the signal that direct current protecting unit issues, if
Be, stop the operation of all coolers, the slot signal then obtained according to scanning and put into operation signal the case where control cooling system
It puts into operation and goes to step 4.2, if not, turn in next step;
Step 4.2 judges whether sampling abnormal, if it is, then report operation irregularity to spare PLC, and start spare PLC,
And 4.3 are gone to step, if not, turn in next step;
Step 4.3, judge when transformer puts into operation whether period rotation, if it is, rotation start one group it is air-cooled and go to step
4.4, if not, turn in next step;
Step 4.4, judge whether to throw by force/move back cooler by force, if it is, open/stop corresponding cooler and go to step 4.4 weights
Multiple judgement if not, turns in next step;
Step 4.5 judges whether to enter and automatically controls, if it is, stop accordingly according to opening/stop logic and open automatically/accordingly
Cooler.
Preferably, described in step 4.1 according to the obtained slot signal of scanning and put into operation signal the case where control cooling system
System puts into operation, and specific step is as follows:
Step 4.1.1, on scan control cabinet involution button slot signal, if it is, manually reset, if not,
Go to step 4.1.1 multiple scanning slot signal;
Step 4.1.2, putting into operation of scanning that substation backstage provides after reset and is judged signal, if receiving the letter that puts into operation
Number, cooler put into operation, if not receiving the signal that puts into operation, going to step 4.1.2 multiple scanning and put into operation signal.
Preferably, stop the specific steps of corresponding cooler according to opening/stopping logic to open automatically/accordingly described in step 4.5
It is as follows:
Step 4.5.1 ,/stop logic and open automatically/is opened according to top-oil temperature and circumstance temperature stops corresponding cooler (transformer top layer oil
Warm oil temperature starts corresponding cooler when being higher than setting value);
Step 4.5.2 ,/stop logic and open automatically/is opened according to winding temperature to stop corresponding cooler (temperature of oil in transformer is higher than setting
Start corresponding cooler when value);
Step 4.5.3 ,/stop logic and open automatically/is opened according to transformer load stops corresponding cooler, (transformer load is higher than
Start corresponding cooler when setting value);
Preferably, the winding temperature, which opens/stop the numberical range of logic, is: 55-75 DEG C, the top-oil temperature and ring
The numberical range of Wen Qi/stop logic is: 45-75 DEG C, the transformer load opens/stops the numberical range of logic according to each transformation
The difference of device and specifically set.
Preferably, on converter transformer cooling system described in step 1 when electricity operation, system uses multiple feed, by 2
Road AC:380V and 2 road DC:220V power supply, and it is able to achieve manual/auto switching when failure.Control mode is automatically controlled in addition to PLC
Outside, control mode can be switched to manual mode by manual/automatic selector switch when PLC system breaks down.
Beneficial effects of the present invention:
1) present invention realizes the intelligent automatic control of the converter transformer cooling system of intelligent patrol detection, and is able to achieve event
Manual/auto switching when barrier;
2) present invention is realized by the multiple logics such as top-oil temperature and circumstance temperature, winding temperature, transformer load to cooling system
The automatic control of system, it is accurate, reliable;
3) present invention can effectively improve the service life and job stability of converter power transformer.
Detailed description of the invention
Fig. 1 is logical procedure diagram of the invention.
Specific embodiment
With reference to the accompanying drawing, embodiments of the present invention are illustrated.
As shown in Figure 1, being logical procedure diagram of the invention.A kind of control of the converter transformer cooling system of intelligent patrol detection
Method processed, comprising the following steps:
Electricity operation in step 1, converter transformer cooling system;To guarantee the safe and reliable operation of system, when upper electricity operation,
System uses multiple feed, is powered by 2 road AC:380V and 2 road DC:220V, and be able to achieve manual/auto switching when failure.
Step 2, acquisition converter power transformer terminal case operating status, judge whether converter power transformer puts into operation, if put into operation, if
Start cooling system, control each group cooler, if not putting into operation, going to step 2 repetition judgements;
Herein, the mode of connection of cooling control system is designed as cross box conjugation.I.e. by converter power transformer sheet
All detection signals, status signal, the control signal of body are directly connected in converter power transformer control cabinet by transfer box, by changing
Acquisition, the processing of signal and the sending of control command of rheology control cabinet completion signal.Although this method signal wire is relatively more, connect
Line amount is big, but signal link is clear, does not intersect, and facilitates later maintenance and maintenance.
Step 3 judges cooling system for MANUAL CONTROL mode or automatic control mode, under MANUAL CONTROL mode, utilizes
Button on control cabinet panel manually controls the start and stop of each group cooler, goes to step 3 repetition judgements;It is then gone to step under automatic mode
4.The control model of system is divided into manually and automatically two kinds of control modes, and the selection of manual/auto working method passes through selection
Switch is to realize.Under manual mode, PLC is not involved in control.The start-up and shut-down control of four groups of cooling systems is realized by hand push button in cabinet.
Under automated manner, system is controlled by PLC.In addition to automatically controlling according to operating condition, the start and stop of cooling system are also straight by backstage
Flow control protects system control.Under MANUAL CONTROL mode, each group cooler is manually controlled using the button on control cabinet panel;From
Step 4 is then carried out under dynamic model formula.
Step 4, whether entered according to converter power transformer protected mode, whether sample it is abnormal, whether period rotation, whether strong
It throw/moves back by force, whether automatically control, realize the intelligent automatic control of the converter transformer cooling system of intelligent patrol detection, and turn step
Rapid 3 repeat to judge.Specific step is as follows:
Step 4.1 judges whether cooling system enters protected mode according to the signal that direct current protecting unit issues, if
Be, stop the operation of all coolers, the slot signal then obtained according to scanning and put into operation signal the case where control cooling system
It puts into operation and goes to step 4.2, if not, turn in next step;
Step 4.1.1, on scan control cabinet involution button slot signal, if it is, manually reset, if not,
Go to step 4.1.1 multiple scanning slot signal;
Step 4.1.2, putting into operation of scanning that substation backstage provides after reset and is judged signal, if receiving the letter that puts into operation
Number, cooler put into operation, if not receiving the signal that puts into operation, going to step 4.1.2 multiple scanning and put into operation signal.
Herein, backstage signal accesses PLC system, realizes the control to cooling system, and control program is as follows: the change of current, which becomes, to be protected
PLC excision is all air-cooled after shield, and PLC enters automatic control after needing hand resetting PLC, change of current change to put into operation after protection involution again
Molding formula;Change of current change, which puts into operation, cuts stoppage in transit state, air-cooled to be stopped one by one by automatic control logic according to top oil, last group of wind
Cold operation is (configurable) after for a period of time to be stopped;It is strong to throw when the change of current becomes stoppage in transit or MANUAL CONTROL mode or change of current change guard mode
Order ceases to be in force automatically;PLC judges whether cooler has redundancy cooling capacity, and the signal is reached control protection center.
Step 4.2 judges whether sampling abnormal, if it is, then report operation irregularity to spare PLC, and start spare PLC,
And 4.3 are gone to step, if not, turn in next step.
Step 4.3, judge when transformer puts into operation whether period rotation, if it is, rotation start one group it is air-cooled and go to step
4.4, if not, turn in next step.
Step 4.4, judge whether to throw by force/move back cooler by force, if it is, open/stop corresponding cooler and go to step 4.4 weights
Multiple judgement if not, turns in next step.
Step 4.5 judges whether to enter and automatically controls, if it is, stop accordingly according to opening/stop logic and open automatically/accordingly
Cooler;
Step 4.5.1 ,/stop logic and open automatically/is opened according to top-oil temperature and circumstance temperature stops corresponding cooler;
Step 4.5.2 ,/stop logic and open automatically/is opened according to winding temperature stops corresponding cooler;
Step 4.5.3 ,/stop logic and open automatically/is opened according to transformer load stops corresponding cooler.
Herein, automatically controlling logic can configure 3 kinds of top oil, winding temperature and transformer load modes, realize
Automatic start-stop control is carried out to cooler by definite value.
Top-oil temperature and circumstance temperature open/stop logic: when top-oil temperature and circumstance temperature are lower than certain value, blower full cut-off, oil pump continues
Operation;When oil temperature and circumstance temperature are higher than certain value, fan oil pump, which continues to run, stops cooler by definite value when transformer is stopped transport, last
Group stops after operation a period of time, and oil pump or fan any starting failure when starting air-cooled, then this group of cooler startup separator is accused
It is alert;Then return system has redundancy cooling capacity to any group of cooler startup separator.Top-oil temperature and circumstance temperature open/stop the number of logic
Value range is: 45-75 DEG C.
Winding temperature opens, and/stop logic and transformer load opens/stops logic and is same as above.Winding temperature opens/stops the numerical value model of logic
Enclosing is: 55-75 DEG C;The numberical range that transformer load opened/stopped logic is specifically set, transformer according to the difference of each transformer
Its different numberical range are different.
Claims (8)
1. a kind of control method of the converter transformer cooling system of intelligent patrol detection, which comprises the following steps:
Electricity operation in step 1, converter transformer cooling system;
Step 2, acquisition converter power transformer terminal case operating status, judge whether converter power transformer puts into operation, if put into operation, if start
Cooling system, control each group cooler, if not putting into operation, going to step 2 repetition judgements;
Step 3 judges that cooling system for MANUAL CONTROL mode or automatic control mode, under MANUAL CONTROL mode, utilizes control
Button on cabinet panel manually controls the start and stop of each group cooler, goes to step 3 repetition judgements;4 are then gone to step under automatic mode;
Step 4, whether entered according to converter power transformer protected mode, whether sample it is abnormal, whether period rotation, whether by force throwing/
It moves back by force, whether automatically control, realize the intelligent automatic control of the converter transformer cooling system of intelligent patrol detection, and go to step 3
It repeats to judge.
2. a kind of control method of the converter transformer cooling system of intelligent patrol detection according to claim 1, feature exist
In specific step is as follows for the intelligent automatic control of the converter transformer cooling system of realization intelligent patrol detection described in step 4:
Step 4.1, according to direct current protecting unit issue signal judge whether cooling system enters protected mode, if it is, stop
Only the operation of all coolers, the slot signal that is then obtained according to scanning and put into operation signal the case where control cooling system put into operation,
And 4.2 are gone to step, if not, turn in next step;
Step 4.2 judges whether sampling abnormal, if it is, then report operation irregularity to spare PLC, and start spare PLC and turn
Step 4.3, if not, turn in next step;
Step 4.3, judge when transformer puts into operation whether period rotation, if it is, rotation start one group it is air-cooled and go to step 4.4,
If not, turn in next step;
Step 4.4, judge whether by force throw/move back cooler by force, if it is, open/stop corresponding cooler and go to step 4.4 repeat sentence
It is disconnected, if not, turn in next step;
Step 4.5 judges whether to enter and automatically controls, if it is, stop corresponding cooling according to opening/stop logic and open automatically/accordingly
Device.
3. a kind of control method of the converter transformer cooling system of intelligent patrol detection according to claim 1 or 2, feature
Be, described in step 4.1 according to the obtained slot signal of scanning and put into operation signal the case where the tool that puts into operation of control cooling system
Steps are as follows for body:
Step 4.1.1, on scan control cabinet involution button slot signal, if it is, manually reset, if not, turn step
Rapid 4.1.1 multiple scanning slot signal;
Step 4.1.2, putting into operation of scanning that substation backstage provides after reset signal and judged, if receive the signal that puts into operation,
Cooler is put into operation, if not receiving the signal that puts into operation, going to step 4.1.2 multiple scanning and put into operation signal.
4. a kind of control method of the converter transformer cooling system of intelligent patrol detection according to claim 1 or 2, feature
It is, stops corresponding cooler described in step 4.5 specific step is as follows according to opening/stopping logic to open automatically/accordingly:
Step 4.5.1 ,/stop logic and open automatically/is opened according to top-oil temperature and circumstance temperature stops corresponding cooler;
Step 4.5.2 ,/stop logic and open automatically/is opened according to winding temperature stops corresponding cooler;
Step 4.5.3 ,/stop logic and open automatically/is opened according to transformer load stops corresponding cooler.
5. a kind of control method of the converter transformer cooling system of intelligent patrol detection according to claim 4, feature exist
In the numberical range that winding temperature described in step 4.5.1 opened/stopped logic is: 55-75 DEG C.
6. a kind of control method of the converter transformer cooling system of intelligent patrol detection according to claim 4, feature exist
It is in the numberical range that, top-oil temperature described in step 4.5.2 and circumstance temperature opened/stopped logic: 45-75 DEG C.
7. a kind of control method of the converter transformer cooling system of intelligent patrol detection according to claim 4, feature exist
In the numberical range that transformer load described in step 4.5.3 opened/stopped logic is specifically set according to the difference of each transformer.
8. according to a kind of described in any item control methods of the converter transformer cooling system of intelligent patrol detection of claim 5-7,
It is characterized in that, system uses multiple feed, by 2 tunnels on converter transformer cooling system described in step 1 when electricity operation
AC:380V and 2 road DC:220V power supply, and it is able to achieve manual/auto switching when failure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811182892.6A CN109346276A (en) | 2018-10-11 | 2018-10-11 | A kind of control method of the converter transformer cooling system of intelligent patrol detection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811182892.6A CN109346276A (en) | 2018-10-11 | 2018-10-11 | A kind of control method of the converter transformer cooling system of intelligent patrol detection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109346276A true CN109346276A (en) | 2019-02-15 |
Family
ID=65309240
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811182892.6A Pending CN109346276A (en) | 2018-10-11 | 2018-10-11 | A kind of control method of the converter transformer cooling system of intelligent patrol detection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109346276A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111313454A (en) * | 2020-02-17 | 2020-06-19 | 云南电网有限责任公司电力科学研究院 | Method and system for synchronously controlling converter transformer tap |
CN115977932A (en) * | 2022-12-15 | 2023-04-18 | 国能太仓发电有限公司 | Feed pump recirculation control method, feed pump recirculation control device, feed pump recirculation control medium and electronic equipment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2924742Y (en) * | 2006-06-14 | 2007-07-18 | 冯宝泉 | Transformer forced-oil-circulation air-cooled intelligent control system |
CN101943921A (en) * | 2010-08-10 | 2011-01-12 | 西安市双合软件技术有限公司 | Intelligent control method and intelligent control device of transformer cooling system |
CN204302686U (en) * | 2014-12-05 | 2015-04-29 | 特变电工沈阳变压器集团有限公司 | Intelligent transformer type electronic controller |
CN105446257A (en) * | 2015-12-10 | 2016-03-30 | 国家电网公司 | Oil temperature monitoring system for oil-immersed transformer |
-
2018
- 2018-10-11 CN CN201811182892.6A patent/CN109346276A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2924742Y (en) * | 2006-06-14 | 2007-07-18 | 冯宝泉 | Transformer forced-oil-circulation air-cooled intelligent control system |
CN101943921A (en) * | 2010-08-10 | 2011-01-12 | 西安市双合软件技术有限公司 | Intelligent control method and intelligent control device of transformer cooling system |
CN204302686U (en) * | 2014-12-05 | 2015-04-29 | 特变电工沈阳变压器集团有限公司 | Intelligent transformer type electronic controller |
CN105446257A (en) * | 2015-12-10 | 2016-03-30 | 国家电网公司 | Oil temperature monitoring system for oil-immersed transformer |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111313454A (en) * | 2020-02-17 | 2020-06-19 | 云南电网有限责任公司电力科学研究院 | Method and system for synchronously controlling converter transformer tap |
CN115977932A (en) * | 2022-12-15 | 2023-04-18 | 国能太仓发电有限公司 | Feed pump recirculation control method, feed pump recirculation control device, feed pump recirculation control medium and electronic equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101980418B (en) | System for detecting secondary wiring of relay protection system in transformer substation on line | |
CN104330275A (en) | Fault analyzing and diagnosing device and method of converter valve cooling system | |
CN109346276A (en) | A kind of control method of the converter transformer cooling system of intelligent patrol detection | |
CN103051282A (en) | Variable-frequency and industrial frequency switching device and switching method of Variable-frequency and industrial frequency switching device | |
CN105807690A (en) | Transformer cooler precise and intelligent control device based on AD sampling | |
CN205507573U (en) | Take malfunction alerting's transformer automatically cooling system | |
CN205620746U (en) | Accurate intelligent control device of transformer cooler based on AD sampling | |
CN201413941Y (en) | Transformer intelligent air-cooling control cabinet | |
CN109962528B (en) | Intelligent management and control system for secondary equipment of transformer substation | |
CN112103040A (en) | Cooling monitoring system and method for transformer | |
CN206410282U (en) | A kind of full-automatic air conditioner unit managing and control system | |
CN211040428U (en) | Lubrication control device | |
CN201117391Y (en) | Transformer intelligent wind cooling control housing | |
CN208156491U (en) | A kind of main transformer forced-oil-air cooling intelligence control system | |
CN208475526U (en) | A kind of water system air-conditioner | |
CN103414247B (en) | The control of returning of multiple-circuit line transmission system coordinates switched system and changing method | |
CN105575616B (en) | Transformer automatic cooling system | |
CN203190575U (en) | Automatic control device of air conditioner | |
CN113495524A (en) | Integrated control system for transformer cooler | |
CN108681312B (en) | DCS/PLC signal interlocking control loop | |
CN202535165U (en) | Remote-control throwing-withdrawing reclosing control apparatus | |
CN205507574U (en) | Transformer automatically cooling system | |
CN112017847A (en) | Temperature control method and device in transformer room | |
CN207530608U (en) | The device that forced oil-circulation air-cooled transformer cooler is thrown by force | |
CN109814633B (en) | Extra-high voltage transformer cooler control circuit and control method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190215 |