CN109342987A - A kind of combined instrument transformer calibration equipment in included boosting up-flow source - Google Patents

A kind of combined instrument transformer calibration equipment in included boosting up-flow source Download PDF

Info

Publication number
CN109342987A
CN109342987A CN201811476081.7A CN201811476081A CN109342987A CN 109342987 A CN109342987 A CN 109342987A CN 201811476081 A CN201811476081 A CN 201811476081A CN 109342987 A CN109342987 A CN 109342987A
Authority
CN
China
Prior art keywords
phase
transformer
current transformer
cabinet
phase standard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811476081.7A
Other languages
Chinese (zh)
Other versions
CN109342987B (en
Inventor
孙绪明
李国宾
杨宇
颜超
马飞
苏本超
赵强
于强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Taikai Power Electric Co ltd
Shandong Taikai Testing Co ltd
SHANDONG TAIKAI TRANSFORMER CO Ltd
Original Assignee
TAIKAI MUTUAL INDUCTOR CO Ltd SHANDONG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIKAI MUTUAL INDUCTOR CO Ltd SHANDONG filed Critical TAIKAI MUTUAL INDUCTOR CO Ltd SHANDONG
Priority to CN201811476081.7A priority Critical patent/CN109342987B/en
Publication of CN109342987A publication Critical patent/CN109342987A/en
Application granted granted Critical
Publication of CN109342987B publication Critical patent/CN109342987B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/02Testing or calibrating of apparatus covered by the other groups of this subclass of auxiliary devices, e.g. of instrument transformers according to prescribed transformation ratio, phase angle, or wattage rating
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/005Calibrating; Standards or reference devices, e.g. voltage or resistance standards, "golden" references
    • G01R35/007Standards or reference devices, e.g. voltage or resistance standards, "golden references"

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Transformers For Measuring Instruments (AREA)

Abstract

The present invention provides a kind of combined instrument transformer calibration equipments in included boosting up-flow source, including cabinet, single-phase standard current transformer, single-phase rising current transformer, single-phase step-up transformer, single-phase standard potential transformer are set in cabinet, primary connection terminal and switching device are set on cabinet, and cabinet setting is used for the terminal plate of wiring;Single-phase standard current transformer, single-phase rising current transformer, single-phase step-up transformer, single-phase standard potential transformer a line end connect with primary connection terminal;Single-phase standard current transformer, single-phase rising current transformer, single-phase step-up transformer, single-phase standard potential transformer secondary line end connect with terminal plate.The device combines three single-phase standard current transformers, three single-phase standard potential transformers, three step-up transformers, three rising current transformers, reduces occupied space, and connecting terminal and terminal plate is arranged, convenient for operation.

Description

A kind of combined instrument transformer calibration equipment in included boosting up-flow source
Technical field
The present invention relates to power domain, especially a kind of included boosting for detecting to combination transformer flows up source Calibration equipment.
Background technique
In the prior art, well known technology be when testing at present to combination transformer when detecting current error only Access a phase current mutual inductor, only access a phase voltage mutual inductor when detecting voltage error, the condition of the detection method with combine The condition that three-phase current winding and three-phase voltage winding access simultaneously when mutual inductor actual motion is inconsistent, leads to the inspection of single plane method Surveying result not can accurately reflect the actual error situation of combination transformer.If three-phase is detected simultaneously, due to each phase electricity Stream winding and voltage winding access, so that wiring is more, setting up time is long, seriously affects calibrating efficiency, improves and is produced into This.This is existing deficiencies in the technology.
Summary of the invention
The purpose of the present invention is to deficiencies of the prior art, and provide a kind of group in included boosting up-flow source Combined mutual inductor calibration equipment, can be used as three-phase voltage and electric current power frequency ratio standard, and the device is by three single-phase standard electrics Current transformer, three single-phase standard potential transformers, three step-up transformers, three rising current transformers are combined, and are reduced Occupied space, and connecting terminal and terminal plate are set, convenient for operation.
This programme is achieved by the following technical measures: a kind of combined instrument transformer school in included boosting up-flow source Experiment device, including cabinet, be arranged in cabinet single-phase standard current transformer, single-phase rising current transformer, single-phase step-up transformer, Single-phase standard potential transformer, is arranged primary connection terminal and switching device on cabinet, and cabinet setting is used for the wiring of wiring Plate;Single-phase standard current transformer, single-phase rising current transformer, single-phase step-up transformer, single-phase standard potential transformer it is primary Line end is connect with primary connection terminal;It is single-phase standard current transformer, single-phase rising current transformer, single-phase step-up transformer, single-phase The secondary line end of standard potential transformer is connect with terminal plate.Single-phase standard current transformer and single-phase up-flow are set in cabinet Transformer can have single-phase step-up transformer and single-phase normal voltage mutual inductance to the verification in terms of combination transformer progress electric current Device, so that it may the verification in terms of carrying out voltage to combination transformer;Above-mentioned mutual inductor and transformer is arranged in cabinet, drop The cost of low production, installation, and the occupied space of equipment is reduced, connecting terminal and terminal plate are set on cabinet, in this way Wiring is carried out when facilitating verification.The bottom of box is provided with mobile base, whole device easy to remove in this way, carries out verification work Make.
The single-phase standard current transformer is three, and single-phase rising current transformer is three, and single-phase step-up transformer is Three, single-phase standard potential transformer be three, primary connection terminal be 12, the one of each single-phase standard current transformer Secondary line both ends are connect with two primary connection terminals respectively, and single-phase rising current transformer and a single-phase standard current transformer are one by one It is corresponding, and corresponding single-phase rising current transformer and single-phase standard current transformer share primary line, single-phase rising current transformer is single Phase standard current transformer provides up-flow source, the secondary line connecting terminal and single-phase rising current transformer of single-phase standard current transformer Secondary line connecting terminal be arranged on terminal plate;Above-mentioned mutual inductor and transformer is three, in this way can be right simultaneously Three-phase is verified, the error for avoiding single-phase verification from generating.The included boosting up-flow source of such combined type is set in cabinet Three-phase voltage and electric current power frequency ratio standard can carry out voltage to three-phase combination transformer simultaneously simultaneously and current error verify.
The primary line both ends of each single-phase standard potential transformer are connect with two primary connection terminals respectively, single-phase step-up Transformer and single-phase standard potential transformer correspond, and corresponding single-phase step-up transformer and single-phase standard potential transformer Primary line is shared, single-phase step-up transformer provides boosting source for single-phase standard potential transformer, single-phase standard potential transformer The secondary line connecting terminal of secondary line connecting terminal and single-phase step-up transformer is arranged on terminal plate.Using shared primary Line is both convenient for wiring in this way, while being also convenient for being verified.
Three single-phase standard current transformers arrange in a triangle, and three single-phase rising current transformers arrange in a triangle, and three A single-phase step-up transformer arranges in a triangle, and three single-phase standard potential transformers arrange in a triangle, further in compression Portion space, convenient for the influence between internal wiring and reduction electric current and voltage, between voltage and voltage, between electric current and electric current. Plane where all isosceles triangles is arranged parallel to each other, and further avoids interference, while saving space;Three single-phase marks Quasi- current transformer and three single-phase standard potential transformers are separately positioned on cabinet two sides, in single-phase standard current transformer and Single-phase step-up transformer is set between single-phase standard potential transformer, in single-phase step-up transformer and single-phase standard current transformer Between single-phase rising current transformer is set, reduce and interfere with each other, the terminal plate be two, the first terminal plate be arranged in cabinet Close to three single-phase standard current transformers side, the second terminal plate setting it is mutual close to three single-phase normal voltages in cabinet The side of sensor, the secondary line connecting terminal of single-phase standard current transformer and the secondary line connecting terminal of single-phase rising current transformer Be arranged on the first terminal plate, the secondary line connecting terminal of single-phase standard potential transformer and single-phase step-up transformer it is secondary Line connecting terminal is arranged on the second terminal plate, in this way design terminal plate, avoids wiring in the process by line wrong, and When verification, it is also convenient for staff and carries out line.
Switching device includes actuating mechanism and contact base, and actuating mechanism includes the push-rod electric machine with push rod, contact base packet Insulating bar and the contact for powering to connecting terminal are included, contact is matched with connecting terminal, is fixed between contact by insulating bar Connection, push-rod electric machine push contact base by push rod.Push-rod electric machine pushes contact base to realize that contact is connect with connecting terminal, carries out Verification, after verification, contact base retreats under the action of push rod, the separation of contact and connecting terminal is realized, in real work In, also can be set as needed the connection of contact and connecting terminal, also can according to need directly by triple line directly with connect Binding post in line terminals is attached.
Centre tap is arranged in single-phase standard current transformer first winding.User can select not according to mutual inductor ratio difference Same tap measures, and facilitates live use.
Single-phase standard potential transformer and single-phase step-up transformer are fixed on flange by stainless steel plate, and flange is fixed on case It on body, is connected and fixed between the potential winding and iron core of single-phase step-up transformer by insulating cylinder, stainless steel plate can use 0.5mm Thickness is easily installed fixation in this way, and volume reduces, and mitigates overall weight.Cabinet, single-phase standard current transformer, single-phase up-flow Transformer, single-phase normal voltage voltage transformer are filled with dielectric between single-phase step-up transformer, dielectric SF6, Overall weight can be mitigated in this way.
It can be seen that compared with prior art, the present invention implementing with substantive distinguishing features outstanding and significant progress Beneficial effect be also obvious.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the specific embodiment of the invention.
Fig. 2 is the top view of the present apparatus.
Fig. 3 is the side view of the present apparatus.
Fig. 4 is the sectional view of the present apparatus
In figure, 1 is primary connection terminal, and 2 be cabinet, and 3 be single-phase standard current transformer, and 4 be single-phase rising current transformer, and 5 are First terminal plate, 6 be push-rod electric machine, and 61 be contact, and 62 be insulating bar, and 63 be push rod, and 7 be the second terminal plate, and 8 be single-phase step-up Transformer, 9 be single-phase standard potential transformer, and 10 mobile bases, 11 be stainless steel plate, and 12 be flange.
Specific embodiment
In order to clarify the technical characteristics of the invention, below by a specific embodiment, and its attached drawing is combined, it is right This programme is illustrated.
By attached drawing as can be seen that the included boosting of this programme flows up the combined instrument transformer calibration equipment in source, including case Single-phase standard current transformer 3, single-phase rising current transformer 4, single-phase step-up transformer 8, single-phase standard is arranged in body 2 in cabinet 2 Voltage transformer 9, is arranged primary connection terminal 1 and switching device on cabinet 2, and the setting of cabinet 2 is used for the terminal plate of wiring;It is single Phase standard current transformer 3, single-phase rising current transformer 4, single-phase step-up transformer 8, single-phase standard potential transformer 9 primary line End is connect with primary connection terminal 1;Single-phase standard current transformer 3, single-phase rising current transformer 4, single-phase step-up transformer 8, list The secondary line end of phase standard potential transformer 9 is connect with terminal plate.Cabinet 2, single-phase standard current transformer 3, single-phase up-flow become Depressor 4, single-phase normal voltage voltage transformer 9 are filled with dielectric between single-phase step-up transformer 8, and dielectric is SF6.2 bottom of cabinet is provided with mobile base 10, and multiple idler wheels are arranged on the bottom surface of mobile base 10, easy to remove whole in this way A calibration equipment.
Single-phase standard current transformer 3 is three, and single-phase rising current transformer 4 is three, and single-phase step-up transformer 8 is three A, single-phase standard potential transformer 9 is three, combines cost apparatus, the i.e. three-phase electricity in the included boosting up-flow source of composition combined type Pressure and electric current power frequency ratio standard are used for verifying work, and primary connection terminal 1 is 12, each single-phase normalized current mutual inductance The primary line both ends of device 3 are connect with two 1 sons of primary connection end respectively, single-phase rising current transformer 4 and a single-phase normalized current Mutual inductor 3 corresponds, and corresponding single-phase rising current transformer 4 and single-phase standard current transformer 3 share primary line, single-phase mark The secondary line connecting terminal of quasi- current transformer 3 and the secondary line connecting terminal of single-phase rising current transformer 4 are arranged at terminal plate On;The primary line both ends of each single-phase standard potential transformer 9 are connect with two primary connection terminals 1 respectively, single-phase standard electric The 3 primary line both ends at the primary line both ends and single-phase standard current transformer of pressing mutual inductor 9 do not use identical primary connection end Son, single-phase step-up transformer 8 and single-phase standard potential transformer 9 correspond, and corresponding single-phase step-up transformer 8 with it is single-phase Standard potential transformer 9 shares primary line, the secondary line connecting terminal and single-phase step-up transformer of single-phase standard potential transformer 9 8 secondary line connecting terminal is arranged on terminal plate, and centre tap is arranged in single-phase 3 first winding of standard current transformer.
Three single-phase standard current transformers 3 arrange in a triangle, and three single-phase rising current transformers 4 arrange in a triangle, Rising current transformer and single-phase standard current transformer correspond, and three single-phase step-up transformers 8 arrange in a triangle, three lists Phase standard potential transformer 9 arranges in a triangle, and step-up transformer and standard potential transformer correspond, single-phase normalized current Mutual inductor 3 and single-phase standard potential transformer 9 are separately positioned on 2 two sides of cabinet, in single-phase standard current transformer 3 and single-phase mark Single-phase step-up transformer 8 is set between quasi- voltage transformer 9, single-phase step-up transformer 8 and single-phase standard current transformer 3 it Between single-phase rising current transformer 4 is set.The single-phase 3 place plane of standard current transformer of three arranged in a triangle and three it is single-phase 4 place plane of rising current transformer is parallel, three single-phase 8 place planes of standard potential transformer and three single-phase step-up transformers 9 Place plane is parallel, and three single-phase 3 place planes of standard current transformer are flat with three 8 place planes of single-phase step-up transformer Row.
The terminal plate is two, and the close single-phase standard current transformer 3 of cabinet 2 is arranged in the first terminal plate 5 Cabinet 2 is arranged in close to the side of single-phase standard potential transformer 9, single-phase standard current transformer 3 in side, the second terminal plate 7 Secondary line connecting terminal and the secondary line connecting terminal of single-phase rising current transformer 4 be arranged on the first terminal plate 5, single-phase mark The secondary line connecting terminal of quasi- voltage transformer 9 and the secondary line connecting terminal of single-phase step-up transformer 8 are arranged at second and connect On line plate 7.
Switching device includes actuating mechanism and contact base, and actuating mechanism includes the push-rod electric machine 6 with push rod 63, contact base Contact 61 including insulating bar 62 and for powering to primary connection terminal, contact 61 are matched with primary connection terminal 1, contact Quantity can be set according to actual needs, and such as 3,6,9,12;It is solid by insulating bar 62 between contact 61 Fixed connection, push-rod electric machine 6 push contact base by push rod 63.Single-phase standard potential transformer 9 is with single-phase step-up transformer 8 by not Rust steel plate 11 is fixed on flange 12, stainless steel plate 11 realize single-phase rising current transformer 4 and single-phase step-up transformer 8 every From flange 12 is fixed on cabinet 2, is connected and fixed between the potential winding and iron core of single-phase step-up transformer 8 by insulating cylinder.
The present invention is not limited in above-mentioned specific embodiment, and those of ordinary skill in the art are in essential scope of the invention The variations, modifications, additions or substitutions inside made, also should belong to protection scope of the present invention.

Claims (9)

1. a kind of combined instrument transformer calibration equipment in included boosting up-flow source, including cabinet (2), it is characterized in that: in cabinet (2) It is interior that single-phase standard current transformer (3), single-phase rising current transformer (4), single-phase step-up transformer (8), single-phase normal voltage are set Mutual inductor (9), is arranged primary connection terminal (1) and switching device on cabinet (2), and cabinet (2) setting is used for the wiring of wiring Plate;Single-phase standard current transformer (3), single-phase rising current transformer (4), single-phase step-up transformer (8), single-phase normal voltage mutual inductance Line end of device (9) is connect with primary connection terminal (1);Single-phase standard current transformer (3), single-phase rising current transformer (4), Single-phase step-up transformer (8), single-phase standard potential transformer (9) secondary line end connect with terminal plate.
2. the combined instrument transformer calibration equipment in included boosting up-flow source according to claim 1, it is characterized in that: described Single-phase standard current transformer (3) is three, and single-phase rising current transformer (4) is three, and single-phase step-up transformer (8) is three, Single-phase standard potential transformer (9) is three, and primary connection terminal (1) is 12, each single-phase standard current transformer (3) Primary line both ends connect respectively with two primary connection terminals (1), single-phase rising current transformer (4) and a single-phase normalized current Mutual inductor (3) corresponds, and corresponding single-phase rising current transformer (4) and single-phase standard current transformer (3) share primary line, Single-phase rising current transformer provides up-flow source for single-phase standard current transformer, and the secondary line of single-phase standard current transformer (3) connects The secondary line connecting terminal of line terminals and single-phase rising current transformer (4) is arranged on terminal plate;
The primary line both ends of each single-phase standard potential transformer (8) are connect with two primary connection terminals (1) respectively, single-phase liter Pressure transformer (8) and single-phase standard potential transformer (9) correspond, and corresponding single-phase step-up transformer (8) and single-phase mark Quasi- voltage transformer (9) shares primary line, and single-phase step-up transformer provides boosting source, single-phase mark for single-phase standard potential transformer The secondary line connecting terminal of quasi- voltage transformer (9) and the secondary line connecting terminal of single-phase step-up transformer (8) are arranged at and connect On line plate.
3. the combined instrument transformer calibration equipment in included boosting up-flow source according to claim 2, it is characterized in that: three lists Phase standard current transformer (3) arranges in a triangle, and three single-phase rising current transformers (4) arrange in a triangle, three single-phase liters Pressure transformer (8) arranges in a triangle, and three single-phase standard potential transformers (9) arrange in a triangle, and single-phase normalized current is mutual Sensor (3) and single-phase standard potential transformer (9) are separately positioned on cabinet (2) two sides, in single-phase standard current transformer (3) and Single-phase step-up transformer (8) are set between single-phase standard potential transformer (9), in single-phase step-up transformer (8) and single-phase standard Single-phase rising current transformer (4) are set between current transformer (3).
4. the combined instrument transformer calibration equipment in included boosting up-flow source according to claim 3, it is characterized in that: described Terminal plate is two, and the first terminal plate (5) is arranged the side in cabinet (2) close to single-phase standard current transformer (3), second Terminal plate (7) setting in cabinet close to the side of single-phase standard potential transformer (9), the two of single-phase standard current transformer (3) The secondary line connecting terminal of secondary line connecting terminal and single-phase rising current transformer (4) is arranged on the first terminal plate (5), single-phase mark The secondary line connecting terminal of quasi- voltage transformer (9) and the secondary line connecting terminal of single-phase step-up transformer (8) are arranged at On two terminal plates (7).
5. the combined instrument transformer calibration equipment in included boosting up-flow source according to claim 1, it is characterized in that: switching dress It sets including actuating mechanism and contact base, actuating mechanism includes the push-rod electric machine (6) with push rod (63), and contact base includes insulating bar (62) it is matched with the contact (61) for powering to primary connection terminal (1), contact (61) with primary connection terminal (1), contact (61) it is fixedly connected between by insulating bar (62), push-rod electric machine (6) pushes contact base by push rod (63).
6. the combined instrument transformer calibration equipment in included boosting up-flow source according to claim 1, it is characterized in that: single-phase mark Centre tap is arranged in quasi- current transformer (3) first winding.
7. the combined instrument transformer calibration equipment in included boosting up-flow source according to claim 1, it is characterized in that: single-phase mark Quasi- voltage transformer (9) and single-phase step-up transformer (8) are fixed on flange (12) by stainless steel plate (11), and flange (12) is fixed On cabinet (2), it is connected and fixed between the potential winding and iron core of single-phase step-up transformer (8) by insulating cylinder.
8. the combined instrument transformer calibration equipment in included boosting up-flow source according to claim 1, it is characterized in that: cabinet (2), single-phase standard current transformer (3), single-phase rising current transformer (4), single-phase normal voltage voltage transformer (9), single-phase liter Dielectric, dielectric SF6 are filled between pressure transformer (8).
9. the combined instrument transformer calibration equipment in included boosting up-flow source according to claim 1, it is characterized in that: cabinet (2) bottom is provided with mobile base (10).
CN201811476081.7A 2018-12-04 2018-12-04 Combined transformer verification device with boosting and boosting sources Active CN109342987B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811476081.7A CN109342987B (en) 2018-12-04 2018-12-04 Combined transformer verification device with boosting and boosting sources

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811476081.7A CN109342987B (en) 2018-12-04 2018-12-04 Combined transformer verification device with boosting and boosting sources

Publications (2)

Publication Number Publication Date
CN109342987A true CN109342987A (en) 2019-02-15
CN109342987B CN109342987B (en) 2024-03-22

Family

ID=65320361

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811476081.7A Active CN109342987B (en) 2018-12-04 2018-12-04 Combined transformer verification device with boosting and boosting sources

Country Status (1)

Country Link
CN (1) CN109342987B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111693926A (en) * 2020-07-20 2020-09-22 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Voltage transformer calibration system
CN114609573A (en) * 2022-03-25 2022-06-10 山东泰开检测有限公司 Inflatable armoured combined mutual inductor calibrating device

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2754195Y (en) * 2004-09-23 2006-01-25 山东泰开互感器有限公司 Outdoor high-voltage combined mutual inductor
CN101038331A (en) * 2006-03-17 2007-09-19 彭黎迎 Mutual-inductor electric energy meter comprehensive calibrator
CN201035130Y (en) * 2006-03-17 2008-03-12 彭黎迎 Synthetic tester for mutual inductor electric energy meter
CN101498775A (en) * 2009-03-17 2009-08-05 江苏省电力试验研究院有限公司 Calibration apparatus for gate energy meter of digitized transforming plant
CN201311489Y (en) * 2008-11-05 2009-09-16 四川电力试验研究院 Standard detection device for high-voltage three-phase combined transformer
CN101625403A (en) * 2009-07-28 2010-01-13 山西省电力公司电力科学研究院 Testing device for high-voltage three-phase combination transformer
CN102393477A (en) * 2011-11-03 2012-03-28 四川电力科学研究院 Integration wiring apparatus used for high voltage three-phase combination mutual inductor on-site detection
CN203148978U (en) * 2013-03-21 2013-08-21 衡水供电公司 Connection device for puncture test equipment
CN107677980A (en) * 2017-09-30 2018-02-09 国网四川省电力公司电力科学研究院 A kind of power distribution network transformer metering performance integration detection platform and method
CN107942277A (en) * 2017-11-16 2018-04-20 国网四川省电力公司电力科学研究院 A kind of power distribution network transformer error detection connection circuit and switching device
CN108414960A (en) * 2018-04-13 2018-08-17 南京丹迪克电力仪表有限公司 A kind of multichannel directly measures formula mutual-inductor tester and method of calibration
CN108845284A (en) * 2018-09-18 2018-11-20 国网四川省电力公司电力科学研究院 A kind of three phase combined standard mutual inductor
CN209432993U (en) * 2018-12-04 2019-09-24 山东泰开互感器有限公司 A kind of combined instrument transformer calibration equipment in included boosting up-flow source

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2754195Y (en) * 2004-09-23 2006-01-25 山东泰开互感器有限公司 Outdoor high-voltage combined mutual inductor
CN101038331A (en) * 2006-03-17 2007-09-19 彭黎迎 Mutual-inductor electric energy meter comprehensive calibrator
CN201035130Y (en) * 2006-03-17 2008-03-12 彭黎迎 Synthetic tester for mutual inductor electric energy meter
CN201311489Y (en) * 2008-11-05 2009-09-16 四川电力试验研究院 Standard detection device for high-voltage three-phase combined transformer
CN101498775A (en) * 2009-03-17 2009-08-05 江苏省电力试验研究院有限公司 Calibration apparatus for gate energy meter of digitized transforming plant
CN101625403A (en) * 2009-07-28 2010-01-13 山西省电力公司电力科学研究院 Testing device for high-voltage three-phase combination transformer
CN102393477A (en) * 2011-11-03 2012-03-28 四川电力科学研究院 Integration wiring apparatus used for high voltage three-phase combination mutual inductor on-site detection
CN203148978U (en) * 2013-03-21 2013-08-21 衡水供电公司 Connection device for puncture test equipment
CN107677980A (en) * 2017-09-30 2018-02-09 国网四川省电力公司电力科学研究院 A kind of power distribution network transformer metering performance integration detection platform and method
CN107942277A (en) * 2017-11-16 2018-04-20 国网四川省电力公司电力科学研究院 A kind of power distribution network transformer error detection connection circuit and switching device
CN108414960A (en) * 2018-04-13 2018-08-17 南京丹迪克电力仪表有限公司 A kind of multichannel directly measures formula mutual-inductor tester and method of calibration
CN108845284A (en) * 2018-09-18 2018-11-20 国网四川省电力公司电力科学研究院 A kind of three phase combined standard mutual inductor
CN209432993U (en) * 2018-12-04 2019-09-24 山东泰开互感器有限公司 A kind of combined instrument transformer calibration equipment in included boosting up-flow source

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111693926A (en) * 2020-07-20 2020-09-22 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Voltage transformer calibration system
CN114609573A (en) * 2022-03-25 2022-06-10 山东泰开检测有限公司 Inflatable armoured combined mutual inductor calibrating device

Also Published As

Publication number Publication date
CN109342987B (en) 2024-03-22

Similar Documents

Publication Publication Date Title
CN209432993U (en) A kind of combined instrument transformer calibration equipment in included boosting up-flow source
CN105044408B (en) A kind of extra-high voltage detecting current transformer flows up device with high current
CN109342987A (en) A kind of combined instrument transformer calibration equipment in included boosting up-flow source
CN102662153A (en) Three-phase smart electricity meter alternating voltage impulse voltage test tool
CN109188057A (en) A kind of phase sequence zero sequence integration voltage sensor
CN105606951A (en) Method and device for measuring polarity of capacitor voltage transformer by using self-excitation method
CN107912059A (en) The switching device operating method of switching device, test device and transformer measuring device
CN112735795B (en) Standard three-phase combined mutual inductor
CN206074752U (en) A kind of industrial frequency AC Withstand test device
CN102508132B (en) Operation impact test method suitable for dual-core phase-shifting transformer
CN101571553B (en) Minitype high-voltage electric energy meter directly arranged in 10KV power supply circuit
CN201421466Y (en) Small high-voltage kilowatt-hour meter directly arranged on 10KV power supply line
CN204359883U (en) A kind of transformer multifunctional tester
CN104331550B (en) Smoothing reactor broadband electromagnetical transient analysis equivalent circuit based on transmission line structure
CN104155624A (en) Boosting calibration equipment used for power frequency resonance test
CN102945739B (en) Power-frequency single-phase resonant transformer for calibration and boosting of voltage transformer
CN201716379U (en) Tester used for high-voltage electroscopic pen
CN206223961U (en) Simulate the experimental rig of short-circuit fault of power system electric current
CN205943688U (en) Rectifier transformer is pull to many windings dry -type
CN106252024B (en) A kind of system to the unloaded demagnetization simultaneously of more transformers
CN204009042U (en) A kind of calibration equipment that boosts for industrial frequency resonance test
CN210051835U (en) Power frequency transformer power testing device
CN2773700Y (en) Transformer experimental apparatus
CN101145437B (en) Low voltage large current outlet three-phase one tank current mutual inductor mounting and shielding structure
CN208225669U (en) A kind of oil immersed type testing transformer and oil immersed type testing transformer component

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240731

Address after: No. 11526 Longtan South Road, New District, Tai'an City, Shandong Province, 271000

Patentee after: SHANDONG TAIKAI TRANSFORMER Co.,Ltd.

Country or region after: China

Patentee after: Shandong taikai Testing Co.,Ltd.

Patentee after: SHANDONG TAIKAI POWER ELECTRIC Co.,Ltd.

Address before: 271000 No. 11526 Longtan South Road, Taian High-tech Zone, Shandong Province

Patentee before: SHANDONG TAIKAI TRANSFORMER Co.,Ltd.

Country or region before: China