CN109342195B - Method for testing bonding strength of first bonding surface of oil well cement - Google Patents

Method for testing bonding strength of first bonding surface of oil well cement Download PDF

Info

Publication number
CN109342195B
CN109342195B CN201811296632.1A CN201811296632A CN109342195B CN 109342195 B CN109342195 B CN 109342195B CN 201811296632 A CN201811296632 A CN 201811296632A CN 109342195 B CN109342195 B CN 109342195B
Authority
CN
China
Prior art keywords
cement
combined structure
parallel part
structure sample
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811296632.1A
Other languages
Chinese (zh)
Other versions
CN109342195A (en
Inventor
程小伟
秦丹
高显束
于永金
文寨军
张弛
王晶
刘开强
梅开元
刘慧婷
陈祖伟
董庆广
张春梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
CNPC Engineering Technology R&D Co Ltd
China Building Materials Academy CBMA
Original Assignee
Southwest Petroleum University
CNPC Engineering Technology R&D Co Ltd
China Building Materials Academy CBMA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University, CNPC Engineering Technology R&D Co Ltd, China Building Materials Academy CBMA filed Critical Southwest Petroleum University
Priority to CN201811296632.1A priority Critical patent/CN109342195B/en
Publication of CN109342195A publication Critical patent/CN109342195A/en
Application granted granted Critical
Publication of CN109342195B publication Critical patent/CN109342195B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • G01N3/10Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
    • G01N1/36Embedding or analogous mounting of samples
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
    • G01N1/36Embedding or analogous mounting of samples
    • G01N2001/366Moulds; Demoulding
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0014Type of force applied
    • G01N2203/0016Tensile or compressive
    • G01N2203/0017Tensile
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/003Generation of the force
    • G01N2203/0042Pneumatic or hydraulic means
    • G01N2203/0048Hydraulic means
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0058Kind of property studied
    • G01N2203/006Crack, flaws, fracture or rupture
    • G01N2203/0067Fracture or rupture

Abstract

The invention discloses a method for testing the bonding strength of a first bonding surface of oil well cement, which comprises the following steps: (1) manufacturing a simulation casing-cement sheath combined structure sample; (2) vertically placing a simulation sleeve-cement sheath combined structure sample, and clamping two ends of the simulation sleeve-cement sheath combined structure sample on a hydraulic tensile testing machine; starting the tester to load slowly and uniformly to obtain a yield load value F, stopping the loading immediately after the test sample is broken, wherein the load value at the moment is the maximum load value FmaxReading the elongation length L of the yielding phase on a force-elongation graph; and calculating the bonding strength between the parallel parts of the cement stone and the metal stretching rod, namely the bonding strength of the first bonding surface of the cement. The cement paste testing device is reliable in principle and simple and convenient to operate, can be used for simultaneously testing the bonding strength and the tensile strength of the set cement, is beneficial to optimizing the formula of the cement paste, obtains a cement paste system meeting the requirements of site construction, and has wide market application prospect.

Description

Method for testing bonding strength of first bonding surface of oil well cement
Technical Field
The invention relates to a method for testing the bonding strength of a first cementing surface of oil well cement in the well cementation process of an oil-gas well in the field of petroleum and natural gas exploration and development.
Background
As exploration and development move toward deep formations, well cementing projects face increasingly more serious challenges and problems. The requirements on the integrity of the cement sheath are higher and higher under the conditions of high temperature, high pressure, high acidity, complex load and the like. The well cementation engineering is an important link in well drilling operation and is a key for ensuring normal operation of the follow-up operation in the well, and the strength of a cementing surface of well cementation can directly influence the effective development of an oil-gas well.
For oil and gas wells, the most common failure is the failure of the cement interface; for brittle materials, the bond strength at the interface is generally weaker. The cement material is shrunk in the hardening process, the cement stone shrinkage can reduce the cementing capacity between the cement stone and the casing pipe, and a joint surface (the cementing surface between the casing pipe and the cement stone is called as a joint surface) is easy to damage. The cement sheath cementing surface is damaged by strong impact force brought by later yield increasing measures such as perforation and subsequent large-scale operation. The damage of the cemented surface can cause oil gas channeling, the yield is reduced, and even the scrapping of an oil well occurs.
Along with the increasing of complex wells and special wells, the requirement on the integrity of a cement sheath is higher and higher, and the method is particularly important for testing the breaking strength of a cementing surface of a well cementation. Although scholars at home and abroad carry out certain research on the cementing property of the joint, no method which is simple and easy to operate is available for testing the cementing strength of the cementing surface, and the testing of the cementing strength of the cementing surface has no unified standard, so that the method mainly has the following problems:
(1) most of the existing devices for testing the strength of a cementing surface of a well cementation have the problems of complex structure, large volume, difficulty in real-time operation and the like. For example, although the experimental device and the method for testing the cementing strength of the cement ring and the casing (CN 106593414 a) can simulate the formation pressure, the operation process is complicated, the device is complicated, and it is not convenient and feasible for testing the strength of the cementing surface of a large amount of cement materials in a laboratory.
(2) The strength of the cementing surface can not be measured by only testing the strength of the cementing surface. For example, the cementing strength testing device and method for well cementing cement (CN 105092465A) measures the cementing strength of cement stones by using a conventional extrusion method, although the device is improved, the testing method is single.
(3) Conventional set cement tensile strength tests have few other test methods than split tensile. The split-draw method, because it is an indirect test, has a large deviation in measured strength from the true value. Other tensile tests are complex and difficult to operate, such as an oil well cement high-temperature high-pressure tensile stress strain system and a test method thereof (CN 102401770A), and the stress strain system is used for testing the tensile stress of the set cement, so that the general operability in a laboratory is not realized.
Disclosure of Invention
The invention aims to provide a method for testing the bonding strength of the first bonding surface of oil well cement, which has reliable principle and simple and convenient operation, can simultaneously test the bonding strength of cement stone and the tensile strength of materials, is beneficial to optimizing the design of a cement paste formula, so that a cement paste system meeting the field construction requirements is obtained, and has wide market application prospect.
In order to achieve the above technical objects, the present invention provides the following technical solutions.
The simulation sleeve-cement sheath combined structure sample is placed on a hydraulic tensile testing machine for testing, the sample consists of a metal tensile rod and a cement stone and a PVC pipe which are wrapped outside the metal tensile rod, and an interface between the metal tensile rod and the cement stone simulates a first cementing surface of a well cementation.
The method for testing the bonding strength of the first bonding surface of the oil well cement sequentially comprises the following steps of:
(1) manufacturing a simulation sleeve-cement sheath combined structure sample:
the metal stretching rod is manufactured according to GB/T2975-1998, the cross section of the metal stretching rod is circular, the upper end and the lower end of the metal stretching rod are clamping ends, the middle of the metal stretching rod is a parallel part, the diameter of each clamping end is larger than that of the parallel part, the length of each clamping end is smaller than that of the parallel part, and a transition arc is arranged between each clamping end and the parallel part; vertically fixing the metal stretching rod, coating demolding oil on the outer surface of the lower clamping end, sleeving a PVC1 pipe on the lower clamping end, filling cement slurry into an annular space between the PVC1 pipe and the lower clamping end, and curing at normal temperature to an initial setting state; then coating demoulding oil on the surface of the exposed cement stone, sleeving a PVC2 pipe with the same diameter as that of the PVC1 pipe on the parallel part, continuously filling cement paste into the annular space of the PVC2 pipe and the parallel part, and curing at normal temperature to a final set state; and stripping off the cement stone and the PVC1 pipe wrapped outside the lower clamping end, and leaving the cement stone and the PVC2 pipe wrapped outside the parallel part, so that the manufacturing of the simulation sleeve-cement sheath combined structure sample is completed.
(2) Placing a simulated casing-cement sheath combined structure sample on a hydraulic tensile testing machine (the testing machine is tested according to GB/T16825 and is detected in grade 1 or better than grade 1) to perform a tensile test, and obtaining the bonding strength of the first bonding surface of the oil well cement through data processing, wherein the process comprises the following steps:
1) starting the testing machine, pre-loading a small amount of load, unloading to zero, and checking whether the testing machine works normally;
2) vertically placing a simulation sleeve-cement sheath combined structure sample, and clamping two ends of the simulation sleeve-cement sheath combined structure sample on a hydraulic tensile testing machine;
3) starting the tester, slowly and uniformly loading, keeping the strain rate as constant as possible without exceeding 0.0025/s, carefully observing the rotation of the force measuring pointer and the plotting condition of the plotting device, wherein when a first peak point appears in the plot, the value of the force measuring pointer is the yield load value F; continuing loading, wherein the loading speed can be slightly increased after the yield stage, the loading is stopped immediately after the test sample is broken, and the load value at the moment is the maximum load value Fmax(ii) a The plotting device plots a force-extension curve graph on which the extension length L of the yield phase (phase from the start of loading to the occurrence of the yield load value) is read;
4) the diameter of the parallel part and the wrapped cement stone in the simulated casing-cement sheath combined structure sample is P, and the bonding strength between the cement stone and the parallel part of the metal stretching rod, namely the bonding strength M of the first bonding surface of the cement, is calculated by the following formula:
Figure GDA0002666822220000031
the tensile strength of the set cement can be obtained by the method, and the process is as follows: respectively clamping the metal stretching rod and the simulation sleeve-cement sheath combined structure sample in a hydraulic type stretching testing machine for a stretching experiment to obtain the maximum load value F of the metal stretching rod and the simulation sleeve-cement sheath combined structure samplemaxUsing the tensile strength R ═ Fmax(S is the cross-sectional area of the parallel part of the metal stretching rod or the cross-sectional area of the parallel part of the simulated casing-cement sheath combined structure sample and the wrapped cement stone) respectively calculating the original tensile strength of the metal stretching rod and the simulated casing-cement sheathThe tensile strength of the combined structure sample simulates the difference value between the tensile strength of the sleeve-cement sheath combined structure sample and the original tensile strength of the metal stretching rod, and the difference value is the tensile strength of the set cement.
The contact surface of the metal stretching rod and the cement is washed by the drilling fluid, the flushing fluid and the spacer fluid in advance for 3-5 minutes in sequence so as to simulate the actual working condition that the drilling fluid is attached to the first cementing surface.
Compared with the prior art, the invention has the following beneficial effects:
(1) the actual production condition and the experimental measurement condition are comprehensively considered, and the design and processing can be carried out according to the actual specification size proportion, so that the equivalent sample model of the next junction surface under the actual working condition is closer;
(2) in a simulated casing-cement sheath combined structure sample, multiple underground influence factors such as the influence of a filter cake and drilling fluid and the coupling effect of the filter cake and the drilling fluid on a joint surface are fully considered;
(3) different from the conventional evaluation method of the strength of the static cemented surface, the method provided by the invention has the advantages that the cementing strength is tested by using a direct stretching method, and the result is more real and reliable;
(4) the cement slurry tensile strength testing device can be used for testing the cementing strength of the first cementing surface of a well cementation, can also test the tensile strength of set cement through direct stretching, is convenient and simple, is beneficial to optimizing the formula of the cement slurry, and obtains a cement slurry system meeting the requirements of site construction;
(5) the sample preparation is simple and convenient, the test is easy, the experimental error is small, and the repeatability is good.
Description of the drawings:
FIG. 1 is a flow chart of the manufacturing process of a sample simulating the casing-cement sheath composite structure.
Fig. 2 shows a fabricated sample of a simulated casing-cement sheath composite structure.
Detailed Description
The invention is further illustrated by the following figures.
See fig. 1. (a) The method comprises the following steps And (3) coating demolding oil on the periphery from the lower clamping end of the stretching rod to the radian connecting part. (b) The method comprises the following steps And sleeving a PVC1 pipe on the lower clamping end (the diameter of the PVC1 pipe is larger than that of the lower clamping end, and the height of the PVC1 pipe is slightly higher than the transition arc radian joint of the lower clamping end and the parallel part), injecting cement paste into the annular space between the PVC1 pipe and the lower clamping end, and curing at normal temperature until initial setting. (c) The method comprises the following steps And (3) coating demolding oil on the surface of the exposed cement stone, fixing a PVC2 pipe outside the parallel part, injecting cement slurry into the annular space of the PVC2 pipe and the parallel part, and curing to final set. (d) The method comprises the following steps And removing the PVC1 pipe and the wrapped cement paste.
Referring to fig. 2, fig. 2 shows a completed sample of a simulated casing-cement sheath composite structure.
The method for testing the bonding strength of the first bonding surface of the oil well cement sequentially comprises the following steps of:
1. preparing a sample:
(1) coating demoulding oil on the surface of the lower clamping end of the metal stretching rod, sleeving a PVC1 pipe on the surface of the metal stretching rod, pouring cement slurry into the annular cavity of the PVC1 pipe and the lower clamping end, and solidifying at normal temperature;
(2) continuously coating demoulding oil on the upper surface of the set cement, sleeving a PVC2 pipe with the diameter completely consistent with that of a PVC1 pipe on the parallel part in the middle of the metal stretching rod, filling cement slurry in an annular space between the PVC2 pipe and the parallel part, and maintaining to a final setting state;
(3) removing the cement stones wrapped by the first section of PVC1 pipe and the PVC1 pipe, and leaving the cement stones and the PVC2 pipe wrapped by the parallel parts to obtain a simulation casing-cement sheath combined structure sample;
2. and (3) testing:
(1) the hydraulic tester is started, preloaded by a small amount and then unloaded to zero to check whether the tester is working properly and to test the original cross-sectional area S of the parallel portion of the metal stretching rod0
(2) Clamping a metal stretching rod used for comparison on a hydraulic stretching tester;
(3) and opening the hydraulic testing machine to slowly load (load at a loading rate of 6-60 MPa/s before yielding), and observing the rotation of the force measuring pointer and the drawing condition of the drawing device. When the yield stage is reached, capturing the yield load value F0Stopping the test piece immediately after the test piece is broken, and recording the maximum load value
Figure GDA0002666822220000044
Using formulas
Figure GDA0002666822220000043
Calculating the original tensile strength R of the metal stretching rod0
(4) Testing the cross-sectional area S of the parallel part of the simulation casing-cement sheath combined structure sample and the wrapped cement stone1And diameter P1Vertically clamping two ends of the sample on a hydraulic tensile testing machine, loading and recording a yield load value F1Obtaining a force-extension curve diagram, and reading the extension length L of the yield stage on the curve diagram1
(5) Continuously loading, and recording the maximum load value of the sample simulating the casing-cement sheath combined structure
Figure GDA0002666822220000041
Using formulas
Figure GDA0002666822220000045
Calculating the tensile strength R of the sample simulating the casing-cement sheath combined structure1
(6) The collected data is processed and analyzed by data software on a computer through a formula
Figure GDA0002666822220000042
Calculating the bonding strength between the cement stone and the parallel part in the sample simulating the casing-cement sheath combined structure, namely the bonding strength M of the first bonding surface of the cement1
(7) The tensile strength of the set cement is represented by R1-R0And (6) calculating.
The above description is only an embodiment of the present invention, and it should be noted that: modifications may be made by persons skilled in the art without departing from the principles of the invention and these modifications are intended to be within the scope of the invention as defined by the appended claims.

Claims (3)

1. The method for testing the bonding strength of the first bonding surface of the oil well cement sequentially comprises the following steps of:
(1) manufacturing a simulation sleeve-cement sheath combined structure sample:
manufacturing a metal stretching rod, wherein the cross section of the metal stretching rod is circular, the upper end and the lower end of the metal stretching rod are clamping ends, the middle of the metal stretching rod is a parallel part, the diameter of each clamping end is larger than that of the parallel part, the length of each clamping end is smaller than that of the parallel part, and a transition arc is arranged between each clamping end and the parallel part; vertically fixing the metal stretching rod, coating demolding oil on the outer surface of the lower clamping end, sleeving a PVC1 pipe on the lower clamping end, filling cement slurry into an annular space between the PVC1 pipe and the lower clamping end, and curing at normal temperature to an initial setting state; then coating demoulding oil on the surface of the exposed cement stone, sleeving a PVC2 pipe with the same diameter as that of the PVC1 pipe on the parallel part, continuously filling cement paste into the annular space of the PVC2 pipe and the parallel part, and curing at normal temperature to a final set state; stripping off the cement stone and the PVC1 pipe wrapped outside the clamping end, leaving the cement stone and the PVC2 pipe wrapped outside the parallel part, and finishing the manufacturing of the simulation sleeve-cement sheath combined structure sample;
(2) placing a simulation casing pipe-cement sheath combined structure sample on a hydraulic tensile testing machine for tensile test, and obtaining the bonding strength of the first bonding surface of oil well cement through data processing, wherein the process is as follows:
1) starting the testing machine, pre-loading a small amount of load, unloading to zero, and checking whether the testing machine works normally;
2) vertically placing a simulation sleeve-cement sheath combined structure sample, and clamping two ends of the simulation sleeve-cement sheath combined structure sample on a hydraulic tensile testing machine;
3) starting the tester, slowly and uniformly loading, wherein the strain rate is not more than 0.0025/s, observing the rotation of the force measuring pointer and the plotting condition of the plotting device, and when a first peak point appears in the plot, the value of the force measuring pointer is the yield load value F; continuing to load, stopping loading immediately after the sample is broken, wherein the load value at the moment is the maximum load value Fmax(ii) a The drawing device draws a force-extension curve chart, and the extension length L of the yield stage is read on the graph;
4) the diameter of the parallel part and the wrapped cement stone in the simulated casing-cement sheath combined structure sample is P, and the bonding strength between the cement stone and the parallel part of the metal stretching rod, namely the bonding strength M of the first bonding surface of the cement, is calculated by the following formula:
Figure FDA0002666822210000011
2. the method for testing the bonding strength of a first cementing surface of oil-well cement as claimed in claim 1, wherein the contact surface of the metal tensile bar and the cement is previously flushed with a drilling fluid, a flushing fluid and a spacer fluid for 3 to 5 minutes in sequence.
3. The method of claim 1, wherein the tensile strength of the set cement is determined by the following steps: respectively clamping the metal stretching rod and the simulation sleeve-cement sheath combined structure sample in a hydraulic type stretching testing machine for a stretching experiment to obtain the maximum load value F of the metal stretching rod and the simulation sleeve-cement sheath combined structure samplemaxUsing the tensile strength R ═ FmaxAnd S is the cross section area of the parallel part of the metal stretching rod or the cross section area of the parallel part of the simulated sleeve-cement sheath combined structure sample and the wrapped cement stone.
CN201811296632.1A 2018-11-01 2018-11-01 Method for testing bonding strength of first bonding surface of oil well cement Active CN109342195B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811296632.1A CN109342195B (en) 2018-11-01 2018-11-01 Method for testing bonding strength of first bonding surface of oil well cement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811296632.1A CN109342195B (en) 2018-11-01 2018-11-01 Method for testing bonding strength of first bonding surface of oil well cement

Publications (2)

Publication Number Publication Date
CN109342195A CN109342195A (en) 2019-02-15
CN109342195B true CN109342195B (en) 2021-02-19

Family

ID=65313664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811296632.1A Active CN109342195B (en) 2018-11-01 2018-11-01 Method for testing bonding strength of first bonding surface of oil well cement

Country Status (1)

Country Link
CN (1) CN109342195B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111220541A (en) * 2020-03-17 2020-06-02 广东省新材料研究所 Method for testing bonding strength and quality of laser cladding layer
CN112052592B (en) * 2020-09-07 2021-03-09 西南石油大学 Method for establishing chart for mechanical property design of large-scale fracturing oil well set cement
CN112213188A (en) * 2020-09-16 2021-01-12 江苏华久辐条制造有限公司 Method for detecting strength of cold-rolled strip steel
CN112878986B (en) * 2021-01-22 2022-03-25 西南石油大学 Device and method for testing mechanical property and sealing property of cement sheath-formation interface of oil and gas well
CN113063664B (en) * 2021-03-25 2021-12-28 西南石油大学 Device and method for testing tensile bond strength of first interface of well cementation cement sheath of oil-gas well
CN113107467B (en) * 2021-05-11 2022-03-25 西南石油大学 System and method for testing integrity of secondary cementing cement sheath after perforation and fracturing of natural gas well in coal mine overlapping area
CN113984653B (en) * 2021-10-19 2023-02-07 中国石油大学(北京) Casing cement sheath interface normal cementing parameter testing method
CN113984652A (en) * 2021-10-19 2022-01-28 中国石油大学(北京) Tangential cementing parameter testing method for casing cement sheath interface

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101016837A (en) * 2006-09-30 2007-08-15 中国海洋石油总公司 Cement interface shearing in annulus supersonic ultrasonic testing method
CN201935846U (en) * 2011-03-06 2011-08-17 东北石油大学 Cementing strength testing device for well cementation
CN103278446A (en) * 2013-04-25 2013-09-04 西南石油大学 Method for analogue measuring cementing strength and anti-fluid channeling capacity of oil well cement
CN203614095U (en) * 2013-12-24 2014-05-28 中国石油化工集团公司 Cement sheath cementing strength evaluation device
CN105092465A (en) * 2015-08-28 2015-11-25 中国石油天然气股份有限公司 Device and method for testing cementing strength of cementing cement
CN105484729A (en) * 2016-01-07 2016-04-13 中国地质大学(武汉) Two-interface cementing strength testing device of cementing sheath containing hydrates and ice stratum
CN105738277A (en) * 2016-02-17 2016-07-06 中国石油天然气股份有限公司 Experiment device and method used for detecting bonding strength of channeling sealing agent
CN205580879U (en) * 2016-04-29 2016-09-14 长安大学 Detector is drawn to adhesion strength between structural layer of road surface
CN206386111U (en) * 2017-01-10 2017-08-08 中国石油大学(北京) A kind of experimental provision for testing cement sheath and sleeve pipe cementing strength
CN207406332U (en) * 2017-11-20 2018-05-25 中国石油大学(华东) The lower well cementation second interface maintenance of water flooding disturbance and bonding quality evaluating apparatus
CN108361023A (en) * 2018-01-18 2018-08-03 西南石油大学 The evaluation method for one, two cement plane breakdown strengths of cementing the well under dynamic load

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101016837A (en) * 2006-09-30 2007-08-15 中国海洋石油总公司 Cement interface shearing in annulus supersonic ultrasonic testing method
CN201935846U (en) * 2011-03-06 2011-08-17 东北石油大学 Cementing strength testing device for well cementation
CN103278446A (en) * 2013-04-25 2013-09-04 西南石油大学 Method for analogue measuring cementing strength and anti-fluid channeling capacity of oil well cement
CN203614095U (en) * 2013-12-24 2014-05-28 中国石油化工集团公司 Cement sheath cementing strength evaluation device
CN105092465A (en) * 2015-08-28 2015-11-25 中国石油天然气股份有限公司 Device and method for testing cementing strength of cementing cement
CN105484729A (en) * 2016-01-07 2016-04-13 中国地质大学(武汉) Two-interface cementing strength testing device of cementing sheath containing hydrates and ice stratum
CN105738277A (en) * 2016-02-17 2016-07-06 中国石油天然气股份有限公司 Experiment device and method used for detecting bonding strength of channeling sealing agent
CN205580879U (en) * 2016-04-29 2016-09-14 长安大学 Detector is drawn to adhesion strength between structural layer of road surface
CN206386111U (en) * 2017-01-10 2017-08-08 中国石油大学(北京) A kind of experimental provision for testing cement sheath and sleeve pipe cementing strength
CN207406332U (en) * 2017-11-20 2018-05-25 中国石油大学(华东) The lower well cementation second interface maintenance of water flooding disturbance and bonding quality evaluating apparatus
CN108361023A (en) * 2018-01-18 2018-08-03 西南石油大学 The evaluation method for one, two cement plane breakdown strengths of cementing the well under dynamic load

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
A Study of Cement-Pipe Bonding;L.G.Carter et al.;《Journal of Petroleum Technology》;19640228;第16卷(第2期);第157-160页 *
岩石力学性能实验与水泥环胶结强度评价;练章华 等;《钻采工艺》;20110131;第34卷(第1期);第101-103页、第108页 *
高温高压下油井水泥环胶结强度测试新方法;徐璧华 等;《钻井工程》;20161130;第36卷(第11期);第65-69页 *

Also Published As

Publication number Publication date
CN109342195A (en) 2019-02-15

Similar Documents

Publication Publication Date Title
CN109342195B (en) Method for testing bonding strength of first bonding surface of oil well cement
CN108361023B (en) Method for evaluating failure strength of well cementation primary and secondary cementing surfaces under dynamic load
US10989639B1 (en) Experimental test method for subcritical propagation rate of rock fractures based on triaxial stress—strain curve
CN110226081B (en) Method and device for detecting elasticity of well cementation set cement of oil and gas well
CN108729901B (en) Method and device for keeping sealing integrity of cement ring
CN206233918U (en) Oil/gas Well cement sheath sealing integrity test device
CN113281182B (en) Multi-means integrated fracture quantitative evaluation method
Lecampion Hydraulic fracture initiation from an open-hole: wellbore size, pressurization rate and fluid-solid coupling effects
CN108505993A (en) A kind of formation pressure test physical analogy and graduation apparatus and method
Li et al. Deformation and damage of cement sheath in gas storage wells under cyclic loading
CN107991165B (en) Cement sheath air tightness failure judgment method
Xi et al. Research and engineering application of pre-stressed cementing technology for preventing micro-annulus caused by cyclic loading-unloading in deep shale gas horizontal wells
CN112878986B (en) Device and method for testing mechanical property and sealing property of cement sheath-formation interface of oil and gas well
CN114753834A (en) Method for measuring horizontal ground stress of well wall anisotropy
CN208473837U (en) A kind of down-hole casing deformation simulator
CN217845459U (en) Tunnel surrounding rock high ground stress rapid detection system
CN112861393B (en) Method for constructing envelope curve of performance of high-temperature and high-pressure packer
CN113281176B (en) Method for verifying measurement result of hydraulic fracturing method and loading device
CN107059956B (en) Simple test method for measuring long-term shear strength of pile-soil contact surface
Xi et al. Research on the establishment of gas channeling barrier for preventing SCP caused by cyclic loading-unloading in shale gas horizontal wells
CN208252113U (en) A kind of formation pressure test physical analogy and graduation apparatus
CN114458274A (en) Rock capacity expansion method
CN114934769B (en) Integrated simulation device for compact gas reservoir fracturing casing pipe-cement sheath and evaluation method thereof
CN110736698A (en) Cement bond testing device and method
CN215830491U (en) High-pressure airtight simulation device of underground packing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant