CN109325730A - A method of it supports that BOM is directly imported production system - Google Patents

A method of it supports that BOM is directly imported production system Download PDF

Info

Publication number
CN109325730A
CN109325730A CN201810989469.0A CN201810989469A CN109325730A CN 109325730 A CN109325730 A CN 109325730A CN 201810989469 A CN201810989469 A CN 201810989469A CN 109325730 A CN109325730 A CN 109325730A
Authority
CN
China
Prior art keywords
bom
production system
initial
information
final
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810989469.0A
Other languages
Chinese (zh)
Inventor
徐健
袁和秀
尹强
马秀碧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Jiuzhou Electronic Technology Co Ltd
Original Assignee
Sichuan Jiuzhou Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Jiuzhou Electronic Technology Co Ltd filed Critical Sichuan Jiuzhou Electronic Technology Co Ltd
Priority to CN201810989469.0A priority Critical patent/CN109325730A/en
Publication of CN109325730A publication Critical patent/CN109325730A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

The invention discloses a kind of methods for supporting that BOM is directly imported production system, comprising: step S100: being configured PCB design software, and typing material key message exports initial BOM into schematic diagram;Step S200: the material information in initial BOM is carried out automatically to merge statistics, classification and sequence, generates final BOM, the material information includes type of device, material code, encapsulation and value;Step S300: final BOM is introduced directly into production system.The present invention realizes automatic classification, merging and sequence using shell script, can effectively improve the efficiency for exporting final BOM;It reduces the information many and diverse to material to be compared, only by useful data input, the probability of human error can be reduced;Operation to PCB schematic diagram is, it can be achieved that the recycling of circuit modular or blocking, reduces human cost.

Description

A method of it supports that BOM is directly imported production system
Technical field
The present invention relates to PCB materials and production system technical field, specifically, be it is a kind of support directly BOM is imported The method of production system.
Background technique
Bill of materials (BOM, bill of material) refers to parts list and its structure needed for product, is to constitute The inventory of all subassemblies of father's assembly parts, part and raw material, and zero every kind required for one assembly parts of manufacture The inventory of the quantity of part.Production system refers to the information system of the running of support unit's routine work under normal circumstances.It includes Creation data, creation data processing system and production network.In general, electronic product can all use printed circuit board (PCB), engineering Teacher will use PCB design software and directly export initial BOM (Excel or extended formatting) after the completion of PCB schematic diagram.It is general every A company has the row needed inside specific requirement, such as BOM comprising which key message, BOM to the format or content of BOM Version etc..And the directly derived initial BOM of software, the requirement for meeting final BOM is tended not to, engineer needs to compile BOM Volume, arrange, then the BOM is entered into subsequent production system and assembled, weld.This link is critically important, and engineer can be non- Often with caution, it goes through, check information (including device type, material code, encapsulation, value, the precision of the every kind of material in the inside BOM It is required that, temperature coefficient, brand etc.), default material information is added, and typesetting is carried out to BOM, makes the format character of BOM Close production system.When facing hundreds and thousands of kinds of materials, inspection artificial in this way, arrangement are not only wasted time, but also in personnel Error is very easy in the case where tired out.If BOM malfunctions, subsequent production system can be caused to stagnate, not only influence the friendship of product Phase, or even will affect the quality of product.In currently available technology, by BOM typing production system, be all by the way of artificial, Every kind of material Manual arranging typing.It since data are very huge, requires a great deal of time and energy, and is very easy to lose Leakage and error, considerably increase the quality risk of product.Therefore need a kind of BOM that can quickly, accurately import production system whole Reason scheme.
Summary of the invention
It is existing for solving the purpose of the present invention is to provide a kind of method for supporting that BOM is directly imported production system Initial BOM can not be introduced directly into production system in technology, need to carry out human-edited to initial BOM, process is cumbersome time-consuming to ask Topic.
The present invention is solved the above problems by following technical proposals:
A method of it supports that BOM is directly imported production system, comprising:
Step S100: being configured PCB design software, and for typing material key message into schematic diagram, export is initial BOM;
Step S200: the material information in initial BOM is carried out automatically to merge statistics, classification and sequence, is generated final BOM, the material information include type of device, material code, encapsulation and value;
Step S300: final BOM is introduced directly into production system.
Batch operation is carried out using PCB design software such as Cadence, PADS, Altium Designer, Protel etc., is deleted Except useless material information, key message is entered into schematic diagram, initial BOM derived from schematic diagram.Again to using VB language Shell script realization classified automatically to initial BOM, merged, being sorted, production system can be introduced directly by being organized into, service In the normative BOM of research and development, production.Using script, the efficiency of output BOM can be effectively improved;Reduce the information many and diverse to material It is compared, only by useful data input, the probability of human error can be reduced;Operation to PCB schematic diagram is, it can be achieved that circuit The recycling of modularization or blocking reduces human cost.The present invention is classifying to initial BOM, is merging and collated Cheng Zhong beats debugging breakpoints and uses the mode of variable storage data instead by addition, modification logical code in shell script, and Data are handled in the buffer, efficiency can be made to be increased dramatically.
Further, the step S200 is specifically included:
Step S210: opening initial BOM, reads the material information in initial BOM, and is put into the storage of script execution equipment In device;
Step S220: position of the spare material in final BOM in initial BOM is set;
Step S230: the identical item of material information is merged, and statistical magnitude and position number;
Step S240: classifying according to the initial of material code, and material code is carried out according to the rule of setting Sequence;
Step S250: the sequence sequenced is write into Excel table.
PCB design software is specifically arranged, edits the attribute of single material, deletes useless material description in batches Information.The material informations such as batch input " device type ", " material code ", " encapsulation ", " value ".Export contains the material information Initial BOM (Excel format).The shell script for running VB language, classified to the material information in initial BOM, merged, Sequence etc., is organized into the BOM format for meeting production system.The operation includes: the initial of the opening PCB design Software Create BOM;The material information in the BOM is read, memory is put into;Selected " row of the value with NC device, and place it in EXCEL table Lattice end;" device type ", " material code ", " encapsulation ", the identical material of " value " information are merged, and count position Number and quantity;Classified according to file leader's alphabetical sequence of " material code ";According to the row of selected " material code " according to setting Sequence arrangement;The size carry out sequence arrangement of the value of row basis " encapsulation " in selected " material code ";The sequence that will be sequenced EXCEL table is write into, final BOM is formed.
Further, further include step S260: adding title, sequence number and Table Header information that final BOM needs.
Further, the step S100 is specifically included:
Step S110: in PCB design software, editing the attribute of single material, deletes useless material description letter in batches Breath;
Step S120: batch input material information;
Step S130: original BOM is exported, includes the material information in the step S120 in the original BOM.
The deletion garbage and addition critical component information of batch, reduce data volume, and it is equal not need every kind of material Manual arranging input, improves work efficiency, reduces the probability of error and omission.
Further, the step S300 includes:
Step S310: operation production system imports the final BOM put in order;
Step S320: if occurring not being inconsistent information normally in operational process, there is the prompt that reports an error in human window.
It can return to modify initial BOM or to initial BOM classification, merging and sequence according to the error message of prompt Rule, until final BOM can correctly import production system.
Compared with prior art, the present invention have the following advantages that and the utility model has the advantages that
(1) present invention uses shell script to realize automatic classification, merge and sort, and can effectively improve the final BOM's of output Efficiency;It reduces the information many and diverse to material to be compared, only by useful data input, the probability of human error can be reduced;It is right The operation of PCB schematic diagram is, it can be achieved that the recycling of circuit modular or blocking, reduces human cost.
(2) present invention classified to initial BOM, merge and sequencer procedure in, by adding, modifying logical code, Debugging breakpoints are beaten, and use the mode of variable storage data instead, and handle data in the buffer, it is then another and document is written, it writes After the completion of entering, finally unifies to save document data, efficiency can be made to be increased dramatically.
Specific embodiment
The present invention is described in further detail below with reference to embodiment, embodiments of the present invention are not limited thereto.
Embodiment 1:
A method of it supports that BOM is directly imported production system, comprising:
Step S100: being configured PCB design software, and for typing material key message into schematic diagram, export is initial BOM:
Step S110: in PCB design software, editing the attribute of single material, deletes useless material description letter in batches Breath;
Step S120: batch input material information;
Step S130: original BOM is exported, includes the material information in the step S120 in the original BOM.
Step S200: the material information in initial BOM is carried out automatically to merge statistics, classification and sequence, is generated final BOM, the material information include type of device, material code, encapsulation and value:
Step S210: opening initial BOM, reads the material information in initial BOM, and is put into the storage of script execution equipment In device;
Step S220: position of the spare material in final BOM in initial BOM is set;
Step S230: the identical item of material information is merged, and statistical magnitude and position number;
Step S240: classifying according to the initial of material code, and material code is carried out according to the rule of setting Sequence;
Step S250: the sequence sequenced is write into Excel table;
Step S260: title, sequence number and Table Header information that final BOM needs are added.
Step S300: final BOM is introduced directly into production system:
Step S310: operation production system imports the final BOM put in order;
Step S320: if occurring not being inconsistent information normally in operational process, there is the prompt that reports an error in human window.
Batch operation is carried out using PCB design software such as Cadence, PADS, Altium Designer, Protel etc., is deleted Except useless material information, key message is entered into schematic diagram, initial BOM derived from schematic diagram.The deletion of batch is useless Information and addition critical component information, reduce data volume, and do not need the equal Manual arranging input of every kind of material, improve work Efficiency reduces the probability of error and omission.PCB design software is specifically arranged, the attribute of single material is edited, batch Amount deletes useless material description information.The material informations such as batch input " device type ", " material code ", " encapsulation ", " value ". Export contains the initial BOM (Excel format) of the material information.The shell script for running VB language, to the object in initial BOM Material information is classified, is merged, is sorted, and the BOM format for meeting production system is organized into.The operation includes: described in opening The initial BOM of PCB design Software Create;The material information in the BOM is read, memory is put into;It is selected that " value is with NC device Row, and place it in Microsoft Excel end;" device type ", " material code ", " encapsulation ", " value " information is identical Material merges, and counts position number and quantity;Classified according to file leader's alphabetical sequence of " material code ";According to selected The row of " material code " is arranged according to the sequence of setting;The size progress sequence of row basis " encapsulation " in selected " material code " Arrangement;The sequence sequenced is write into EXCEL table, forms final BOM.Production system is opened, final BOM is imported into production system System can return to modify initial BOM or the rule to initial BOM classification, merging and sequence according to the error message of prompt, Until final BOM can correctly import production system.
Using script, the efficiency of output BOM can be effectively improved;It reduces the information many and diverse to material to be compared, will only have Data input can reduce the probability of human error;Operation to PCB schematic diagram is, it can be achieved that circuit modular or blocking Recycling, reduce human cost.The present invention classify to initial BOM, merge and sequencer procedure in, by script It added in program, modify logical code, beaten debugging breakpoints and use the mode of variable storage data instead, and handle number in the buffer According to efficiency being made to be increased dramatically.
Although reference be made herein to invention has been described for explanatory embodiment of the invention, and above-described embodiment is only this hair Bright preferable embodiment, embodiment of the present invention are not limited by the above embodiments, it should be appreciated that those skilled in the art Member can be designed that a lot of other modification and implementations, these modifications and implementations will fall in principle disclosed in the present application Within scope and spirit.

Claims (5)

1. a kind of method for supporting that BOM is directly imported production system characterized by comprising
Step S100: being configured PCB design software, and typing material key message exports initial BOM into schematic diagram;
Step S200: carrying out the material information in initial BOM automatically to merge statistics, classification and sequence, generate final BOM, The material information includes type of device, material code, encapsulation and value;
Step S300: final BOM is introduced directly into production system.
2. a kind of method for supporting that BOM is directly imported production system according to claim 1, which is characterized in that described Step S200 is specifically included:
Step S210: opening initial BOM, reads the material information in initial BOM, and is put into the memory of script execution equipment In;
Step S220: position of the spare material in final BOM in initial BOM is set;
Step S230: the identical item of material information is merged, and statistical magnitude and position number;
Step S240: classifying according to the initial of material code, and material code is ranked up according to the rule of setting;
Step S250: the sequence sequenced is write into Excel table.
3. a kind of method for supporting that BOM is directly imported production system according to claim 2, which is characterized in that also wrap It includes step S260: adding title, sequence number and Table Header information that final BOM needs.
4. a kind of method for supporting that BOM is directly imported production system according to claim 3, which is characterized in that described Step S100 is specifically included:
Step S110: in PCB design software, the attribute of single material is edited, deletes useless material description information in batches;
Step S120: batch input material information;
Step S130: original BOM is exported, includes the material information in the step S120 in the original BOM.
5. a kind of method for supporting that BOM is directly imported production system according to claim 1, which is characterized in that described Step S300 includes:
Step S310: operation production system imports the final BOM put in order;
Step S320: if occurring not being inconsistent information normally in operational process, there is the prompt that reports an error in human window.
CN201810989469.0A 2018-08-28 2018-08-28 A method of it supports that BOM is directly imported production system Pending CN109325730A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810989469.0A CN109325730A (en) 2018-08-28 2018-08-28 A method of it supports that BOM is directly imported production system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810989469.0A CN109325730A (en) 2018-08-28 2018-08-28 A method of it supports that BOM is directly imported production system

Publications (1)

Publication Number Publication Date
CN109325730A true CN109325730A (en) 2019-02-12

Family

ID=65264027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810989469.0A Pending CN109325730A (en) 2018-08-28 2018-08-28 A method of it supports that BOM is directly imported production system

Country Status (1)

Country Link
CN (1) CN109325730A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110377620A (en) * 2019-07-16 2019-10-25 四川康佳智能终端科技有限公司 A kind of material searching method, computer and storage medium based on BOM tool
CN110471653A (en) * 2019-08-16 2019-11-19 四川长虹电器股份有限公司 BOM automatic arranging method based on C#
CN110515951A (en) * 2019-08-27 2019-11-29 云汉芯城(上海)互联网科技股份有限公司 A kind of BOM standardized method, system and electronic equipment and storage medium
CN111967217A (en) * 2020-08-14 2020-11-20 上海弘快科技有限公司 Design system capable of realizing electrical interconnection of schematic diagrams
CN112465418A (en) * 2020-10-29 2021-03-09 苏州浪潮智能科技有限公司 Material loading method and device based on product life cycle management
CN112559443A (en) * 2019-09-10 2021-03-26 南通深南电路有限公司 Storage method of lamination data, lamination method of circuit board and related device
CN112801621A (en) * 2021-01-30 2021-05-14 深圳捷创电子科技有限公司 BOM bill of material sorting and approving method, system and computer readable storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1960624A (en) * 2006-08-23 2007-05-09 上海广联电子有限公司 Programmable control method for pasting chips for machine of pasting chips
CN103678648A (en) * 2013-12-23 2014-03-26 泰富重工制造有限公司 Classifying and gathering system and method of BOM tables
US20150128102A1 (en) * 2013-11-06 2015-05-07 Texas Instruments Incorporated Circuit design synthesis tool with export to a computer-aided design format
CN104778540A (en) * 2015-03-27 2015-07-15 中材装备集团有限公司 BOM (bill of material) management method and management system for building material equipment manufacturing
CN105761045A (en) * 2016-02-29 2016-07-13 万高(杭州)科技有限公司 Printed circuit board BOM sorting method and system
CN107633353A (en) * 2017-09-08 2018-01-26 南京国电南自电网自动化有限公司 Material BOM tables based on EXCEL Table V BA close rule inspection method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1960624A (en) * 2006-08-23 2007-05-09 上海广联电子有限公司 Programmable control method for pasting chips for machine of pasting chips
US20150128102A1 (en) * 2013-11-06 2015-05-07 Texas Instruments Incorporated Circuit design synthesis tool with export to a computer-aided design format
CN103678648A (en) * 2013-12-23 2014-03-26 泰富重工制造有限公司 Classifying and gathering system and method of BOM tables
CN104778540A (en) * 2015-03-27 2015-07-15 中材装备集团有限公司 BOM (bill of material) management method and management system for building material equipment manufacturing
CN105761045A (en) * 2016-02-29 2016-07-13 万高(杭州)科技有限公司 Printed circuit board BOM sorting method and system
CN107633353A (en) * 2017-09-08 2018-01-26 南京国电南自电网自动化有限公司 Material BOM tables based on EXCEL Table V BA close rule inspection method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110377620A (en) * 2019-07-16 2019-10-25 四川康佳智能终端科技有限公司 A kind of material searching method, computer and storage medium based on BOM tool
CN110471653A (en) * 2019-08-16 2019-11-19 四川长虹电器股份有限公司 BOM automatic arranging method based on C#
CN110515951A (en) * 2019-08-27 2019-11-29 云汉芯城(上海)互联网科技股份有限公司 A kind of BOM standardized method, system and electronic equipment and storage medium
CN110515951B (en) * 2019-08-27 2020-05-08 云汉芯城(上海)互联网科技股份有限公司 BOM standardization method and system, electronic device and storage medium
CN112559443A (en) * 2019-09-10 2021-03-26 南通深南电路有限公司 Storage method of lamination data, lamination method of circuit board and related device
CN112559443B (en) * 2019-09-10 2021-12-14 南通深南电路有限公司 Storage method of lamination data, lamination method of circuit board and related device
CN111967217A (en) * 2020-08-14 2020-11-20 上海弘快科技有限公司 Design system capable of realizing electrical interconnection of schematic diagrams
CN112465418A (en) * 2020-10-29 2021-03-09 苏州浪潮智能科技有限公司 Material loading method and device based on product life cycle management
CN112465418B (en) * 2020-10-29 2022-06-03 苏州浪潮智能科技有限公司 Material loading method and device based on product life cycle management
CN112801621A (en) * 2021-01-30 2021-05-14 深圳捷创电子科技有限公司 BOM bill of material sorting and approving method, system and computer readable storage medium

Similar Documents

Publication Publication Date Title
CN109325730A (en) A method of it supports that BOM is directly imported production system
Sorenson et al. The Metaview system for many specification environments
US8671084B2 (en) Updating a data warehouse schema based on changes in an observation model
CN106055618B (en) Data processing method based on web crawler and structured storage
CN105373469A (en) Interface based software automation test method
CN107844424A (en) Model-based testing system and method
CN105354239A (en) Configuration data processing model based processing center data stream processing method
CN103077192B (en) A kind of data processing method and system thereof
CN109086985B (en) Professional test information management system for spacecraft assembly
CN110489297A (en) A kind of FPGA debugging signal setting method based on graphical interfaces
CN111881579B (en) Complex dynamic data model management method
US20110078218A1 (en) Event history storage device, event history tracking device, event history storage method, event history storage program, and data structure
CN111401028A (en) Automatic comparison method and device for RPS software version of nuclear power station
JP5690472B2 (en) Data extraction system
Gephart et al. Qualitative Data Analysis: Three Microcomputer-Supported Approaches.
CN109614143A (en) The development approach of failure flow chart is automatically generated in IETM browser
CN108846198A (en) A method of it being automatically deleted invalid via hole in Cadence software
CN109032580A (en) A kind of production method that general data is reported to a higher authorities for approval and analyzes software
CN112508520A (en) Method, system, device and storage medium for rapidly checking bill of material
CN108628606B (en) Method and system for generating WEB network management application program of embedded equipment
CN102541855A (en) Information data processing system and method
US8839097B2 (en) System and method for information encapsulation for providing multiple deliverable formats from one information source
KR100656559B1 (en) Program Automatic Generating Tools
Ra et al. Framework of a conceptual simulation model design tool
CN116627390B (en) ICD file substitution method and device in aviation software development

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190212

RJ01 Rejection of invention patent application after publication