CN109325687A - Peak regulation resource shares system and method between a kind of province - Google Patents
Peak regulation resource shares system and method between a kind of province Download PDFInfo
- Publication number
- CN109325687A CN109325687A CN201811117006.1A CN201811117006A CN109325687A CN 109325687 A CN109325687 A CN 109325687A CN 201811117006 A CN201811117006 A CN 201811117006A CN 109325687 A CN109325687 A CN 109325687A
- Authority
- CN
- China
- Prior art keywords
- electricity
- power
- province
- unit
- peak regulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 40
- 230000005611 electricity Effects 0.000 claims abstract description 342
- 230000012447 hatching Effects 0.000 claims description 12
- 238000010248 power generation Methods 0.000 claims description 11
- 210000004209 hair Anatomy 0.000 claims description 5
- 230000005284 excitation Effects 0.000 abstract description 3
- 230000008859 change Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
The present invention provides peak regulation resources between a kind of province to share system and method, the average capacity factor that methodology of the invention passes through introducing unit generation utilization rate and all electricity power enterprises, the ratio of the sum of the multiple electricity of unit that the multiple electricity of unit to calculate electricity power enterprise indirectly accounts for all electricity power enterprises, in this, as amortization ratio, so that calculating each trading session electricity power enterprise shares electricity.Methodology of the invention is contributed using the peak regulation that capacity factor calculates generating set as index, excitation electricity power enterprise actively provides peak regulation service, promote the release of peak regulation resource, it is difficult that peak regulation is solved by marketized tools, it ensures power network safety operation, promotes power grid and dissolve transregional renewable and clean energy resource ability more than needed.
Description
Technical field
The present invention relates to technical field of electric power, in particular to peak regulation resource shares system and method between a kind of province.
Background technique
In recent years, peak load regulation network contradiction becomes increasingly conspicuous in East China, mainly has power supply adjustment capability deficiency, power grid low
Paddy load increasess slowly, electricity consumption peak-valley difference increases year by year, load is influenced to fluctuate new energy in big, area by temperature/festivals or holidays and developed
The factors such as swift and violent." two detailed rules and regulations " peak regulation compensation relevant provision can not effectively transfer peak load regulation enthusiasm inside the province at present, simultaneously
Peak regulation between province, which mutually helps, lacks marketized tools guidance.
Therefore, there is an urgent need to the flowings transprovincially that market mechanism pushes peak regulation resource, to ensure that electricity net safety stable is transported
Row, promoting new energy consumption is principle, plays effect of the market in peak regulation resource distribution, sufficiently excavates peak load regulation network resource,
It is promoted and dissolves transregional renewable and clean energy resource ability more than needed.
Summary of the invention
The purpose of the present invention is to provide peak regulation resources between a kind of province to share system and method, to solve current power grid
Peak regulation resource there are the problem of.
In order to solve the above technical problems, the present invention peak regulation resource between a kind of province is provided share system, peak regulation between the province
The system of sharing of resource includes:
Module is obtained, for obtaining between province the trading session of peak regulation assisted hatching and province or city in each trading session
In go out clear electricity;
Computing module, for calculating the unit generation utilization rate of each trading session and the average power generation of all electricity power enterprises
Utilization rate, and according to the average capacity factor of the unit generation utilization rate of each trading session and all electricity power enterprises, meter
Calculate the sum of the multiple electricity of unit of each trading session and the multiple electricity of unit of all electricity power enterprises;
Share electricity quantity module, the multiple electricity for the multiple electricity of unit, all electricity power enterprises according to each trading session
The sum of and clear electricity out, calculate the electricity of sharing of each electricity power enterprise of each trading session, and carry out peak regulation between province according to electricity is shared
Clear electricity is shared out.
Optionally, peak regulation resource is shared in system between the province, further includes:
Correction module, the multiple electricity of unit of each trading session for calculating the computing module and all power generations
The sum of multiple electricity of the unit of enterprise carries out value revision, and revised data are assigned to the computing module.
Optionally, peak regulation resource is shared in system between the province, and the course of work of institute's correction module includes:
Calculating cause electricity power enterprise can not subtract power output and multiple electricity;
The multiple electricity is greater than to the average gas-to electricity of all electricity power enterprises from the capacity factor of electricity power enterprise
It is deducted in the electricity of rate part, using the multiple electricity as revised electricity power enterprise.
Optionally, peak regulation resource is shared in system between the province, and the electricity quantity module of sharing calculates any transaction
The formula for sharing electricity use of period each electricity power enterprise is as follows:
Wherein, i is the code name of electricity power enterprise, and the multiple electricity of the unit of i electricity power enterprise is the unit generation of i electricity power enterprise
Utilization rate is greater than the electricity of the average capacity factor part of all electricity power enterprises.
Optionally, peak regulation resource is shared in system between the province, the unit generation utilization rate of each trading session
Are as follows: the ratio between unit actual power power output and the maximum adjustable power output of unit in the trading session of place.
Optionally, peak regulation resource is shared in system between the province, all electricity power enterprises of each trading session
Average capacity factor are as follows: the sum of actual power power output of all electricity power enterprises of the place city trading session Zhong Shenghuo consumption
With province or city consumption all electricity power enterprises maximum it is adjustable power output the sum of the ratio between.
Optionally, peak regulation resource is shared in system between the province, in a certain electricity power enterprise that province or city dissolve
The maximum of maximum adjustable power output and the electricity power enterprise outside the adjustable power output of maximum of electricity power enterprise described in province or city and province or city
Adjustable power output is related;Wherein, the adjustable power output of the maximum of electricity power enterprise described in the province or city is the maximum of the electricity power enterprise
Generating capacity;The adjustable power output of the maximum of the electricity power enterprise is the landing maximum power of the day of trade outside the province or city.
Optionally, peak regulation resource is shared in system between the province, between province when the transaction of peak regulation assisted hatching
Section are as follows: daily 24 hours, be divided into for 96 periods;Object of Transaction is the peak capacity of unit;Purchaser is peak regulation inadequate resource
Provincial power network enterprise, seller are the generating set that the plentiful province of peak regulation resource or city have peak modulation capacity.
Correspondingly, peak regulation resource shares between the province the present invention also provides a kind of methodology of peak regulation resource between province
Method includes the following steps:
S1: the trading session of peak regulation assisted hatching and province or city go out clear electricity in each trading session between acquisition province
Amount;
S2: the unit generation utilization rate of each trading session and the average capacity factor of all electricity power enterprises are calculated;
S3: according to the average capacity factor of the unit generation utilization rate of each trading session and all electricity power enterprises,
Calculate the sum of the multiple electricity of unit of each trading session and the multiple electricity of unit of all electricity power enterprises;
S4: according to the multiple electricity of the unit of each trading session, all electricity power enterprises the sum of multiple electricity and go out clear electricity
Amount, calculate each electricity power enterprise of each trading session shares electricity;
S5: point that peak regulation between province goes out clear electricity is carried out according to the electricity of sharing of each electricity power enterprise of each trading session of calculating
Booth.
Optionally, between the province in the methodology of peak regulation resource, in S3, the unit of any trading session is more
Generated energy is the electricity for the average capacity factor part that unit generation utilization rate is greater than all electricity power enterprises.
Optionally, it between the province in the methodology of peak regulation resource, in S4, calculates any trading session and respectively sends out
The formula for sharing electricity use of electric enterprise is as follows:
Wherein, i is the code name of electricity power enterprise, and the multiple electricity of the unit of i electricity power enterprise is the unit generation of i electricity power enterprise
Utilization rate is greater than the electricity of the average capacity factor part of all electricity power enterprises.
Optionally, between the province in the methodology of peak regulation resource, the unit generation utilization rate of each trading session
Are as follows: the ratio between unit actual power power output and the maximum adjustable power output of unit in the trading session of place.
Optionally, between the province in the methodology of peak regulation resource, all electricity power enterprises of each trading session
Average capacity factor are as follows: the sum of actual power power output of all electricity power enterprises of the place city trading session Zhong Shenghuo consumption
With province or city consumption all electricity power enterprises maximum it is adjustable power output the sum of the ratio between.
Optionally, between the province in the methodology of peak regulation resource, in a certain electricity power enterprise that province or city dissolve
The maximum of maximum adjustable power output and the electricity power enterprise outside the adjustable power output of maximum of electricity power enterprise described in province or city and province or city
Adjustable power output is related;Wherein, the adjustable power output of the maximum of electricity power enterprise described in the province or city is the maximum of the electricity power enterprise
Generating capacity;The adjustable power output of the maximum of the electricity power enterprise is the landing maximum power of the day of trade outside the province or city.
Optionally, between the province in the methodology of peak regulation resource, in S3, further includes:
The sum of multiple electricity of unit to the multiple electricity of the unit of each trading session and all electricity power enterprises carries out numerical value and repairs
Just, it and updates.
Optionally, described to the multiple electricity of the unit of each trading session between the province in the methodology of peak regulation resource
The sum of multiple electricity of unit of amount and all electricity power enterprises carries out value revision and includes the following steps:
Calculating cause electricity power enterprise can not subtract power output and multiple electricity;
The multiple electricity is greater than to the average gas-to electricity of all electricity power enterprises from the capacity factor of electricity power enterprise
It is deducted in the electricity of rate part, using the multiple electricity as revised electricity power enterprise.
Optionally, between the province in the methodology of peak regulation resource, cause electricity power enterprise that can not subtract the factor of power output
It include: power system security constraints and/or AGC hopping pattern.
Peak regulation resource is shared in system and method between province provided by the present invention, point of peak regulation resource between the province
Booth method includes: the electricity clear out of the trading session of peak regulation assisted hatching and province or city in each trading session between obtaining province
Amount;Calculate the unit generation utilization rate of each trading session and the average capacity factor of all electricity power enterprises;When calculating each transaction
The sum of the multiple electricity of unit and the multiple electricity of unit of all electricity power enterprises of section;According to the multiple electricity of the unit of each trading session
Amount, the sum of the multiple electricity of all electricity power enterprises and clear electricity out, calculate each electricity power enterprise of each trading session shares electricity;
According to each electricity power enterprise of each trading session of calculating share electricity carry out province between peak regulation go out sharing for clear electricity.Of the invention
Methodology is set out by the average capacity factor of introducing unit generation utilization rate and all electricity power enterprises with indirect calculating
The multiple electricity of the unit of electric enterprise accounts for the ratio of the sum of multiple electricity of unit of all electricity power enterprises, in this, as amortization ratio,
Share electricity to calculate each trading session electricity power enterprise.Methodology of the invention is calculated by index of capacity factor
The peak regulation of generating set is contributed, and excitation electricity power enterprise actively provides peak regulation service, is promoted the release of peak regulation resource, is passed through market
Change means solve peak regulation difficulty, ensure power network safety operation, promote power grid and dissolve transregional renewable and clean energy resource energy more than needed
Power.
In addition, the factors such as power system security constraints, AGC Input Mode are also contemplated during calculating unit multiple electricity,
To carry out value revision to the multiple electricity of the unit of calculating, to effectively improve the accuracy of the amortization ratio of calculating.
Detailed description of the invention
Fig. 1 is the flow chart of the methodology of peak regulation resource between saving in one embodiment of the invention;
Fig. 2 is the structural schematic diagram for sharing system of peak regulation resource between saving in one embodiment of the invention.
Specific embodiment
The system and method for sharing of peak regulation resource province proposed by the present invention is made below in conjunction with the drawings and specific embodiments
It is further described.According to following explanation and claims, advantages and features of the invention will be become apparent from.It should be noted
It is that attached drawing is all made of very simplified form and using non-accurate ratio, only conveniently, lucidly to aid in illustrating originally
The purpose of inventive embodiments.
To be clearer and more comprehensible the purpose of the present invention, feature, a specific embodiment of the invention is made with reference to the accompanying drawing
Further instruction, however, the present invention can be realized with different forms, it is not considered that being only confined to the embodiment described.
Referring to FIG. 1, the flow chart of the methodology of its peak regulation resource between province of the invention.As shown in Figure 1, described
The methodology of peak regulation resource includes the following steps: between province
Firstly, executing step S1, the trading session of peak regulation assisted hatching and province or city are in each transaction between acquisition province
Go out clear electricity in section.
The trading session of peak regulation assisted hatching between the province are as follows: daily 24 hours, be divided into for 96 periods;Trading standard
It is the peak capacity of unit;Purchaser is the provincial power network enterprise of peak regulation inadequate resource, and seller is the plentiful province of peak regulation resource
Or city has the generating set of peak modulation capacity.
Then, step S2 is executed, the unit generation utilization rate of each trading session and the average hair of all electricity power enterprises are calculated
Electric utilization rate;Wherein, the unit generation utilization rate of each trading session are as follows: unit actual power is contributed in the trading session of place
The ratio between with the maximum adjustable power output of unit;The average capacity factor of all electricity power enterprises of each trading session are as follows: place transaction
The sum of actual power power output of all electricity power enterprises of period Zhong Shenghuo city consumption is looked forward to all power generations in province or city's consumption
The ratio between the sum of power output that the maximum of industry is adjustable.In the adjustable power output of the maximum for a certain electricity power enterprise that province or city dissolve and province or city
The adjustable power output of maximum of the electricity power enterprise is related outside power output that the maximum of the electricity power enterprise is adjustable and province or city;Wherein, described
Power output that the maximum of electricity power enterprise described in province or city is adjustable is the maximum generation ability of the electricity power enterprise;Outside the province or city
Power output that the maximum of the electricity power enterprise is adjustable is the landing maximum power of the day of trade.
Then, step S3 is executed, according to the flat of the unit generation utilization rate of each trading session and all electricity power enterprises
Equal capacity factor calculates the sum of the multiple electricity of unit of each trading session and the multiple electricity of unit of all electricity power enterprises;Its
In, the multiple electricity of the unit of any trading session is the average gas-to electricity that unit generation utilization rate is greater than all electricity power enterprises
The electricity of rate part.
Further, in S3, further includes: to the multiple electricity of the unit of each trading session, (i.e. electricity power enterprise is according to itself
Peak regulation is insufficient and multiple electricity) and all electricity power enterprises the sum of the multiple electricity of unit (i.e. in the province or all hairs of city's consumption
Electric enterprise's peak regulation is insufficient and the sum of multiple electricity) value revision is carried out, and update.
The sum of the multiple electricity of unit to the multiple electricity of the unit of each trading session and all electricity power enterprises counts
Value amendment includes the following steps:
Calculating cause electricity power enterprise can not subtract power output and multiple electricity;Wherein, cause electricity power enterprise that can not subtract power output
Factor includes but is not limited to power system security constraints and/or AGC hopping pattern, further includes that other cause electricity power enterprise that can not subtract out
The factor of power.
The multiple electricity is greater than to the average gas-to electricity of all electricity power enterprises from the capacity factor of electricity power enterprise
It is deducted in the electricity of rate part, using the multiple electricity as revised electricity power enterprise.
Then, step S4 is executed, according to the multiple electricity of the unit of each trading session, the multiple electricity of all electricity power enterprises
The sum of and clear electricity out, calculate each electricity power enterprise of each trading session shares electricity.
Specifically, the formula for sharing electricity use for calculating each electricity power enterprise of any trading session is as follows:
Wherein, i is the code name of electricity power enterprise, and the multiple electricity of the unit of i electricity power enterprise is the unit generation of i electricity power enterprise
Utilization rate is greater than the electricity of the average capacity factor part of all electricity power enterprises;
For the amortization ratio of each electricity power enterprise of trading session.
Then, step S5 is executed, peak regulation between province is carried out according to the electricity of sharing of each electricity power enterprise of each trading session of calculating
Clear electricity is shared out.
In another embodiment, referring to FIG. 2, it is the structural schematic diagram for sharing system of peak regulation resource between saving.Such as figure
Shown in 2, the system of sharing of peak regulation resource includes: to obtain module, computing module and share electricity quantity module between the province, described to obtain
Modulus block is used to obtain the trading session of peak regulation assisted hatching and province or city between province and goes out clear electricity in each trading session
Amount;The computing module is used to calculate the unit generation utilization rate of each trading session and the average power generation benefit of all electricity power enterprises
With rate, and according to the average capacity factor of the unit generation utilization rate of each trading session and all electricity power enterprises, calculate
The sum of the multiple electricity of the unit of each trading session and the multiple electricity of unit of all electricity power enterprises;It is described to share electricity quantity module use
In the sum of multiple electricity of the multiple electricity of unit, all electricity power enterprises according to each trading session and clear electricity out, each friendship is calculated
Easy period each electricity power enterprise shares electricity, and according to share electricity carry out province between peak regulation go out sharing for clear electricity.
Further, it in order to improve the precision for sharing system obtained data of peak regulation resource between province, is further provided with
Correction module, the machine of the unit multiple electricity and all electricity power enterprises of each trading session for calculating the computing module
The sum of multiple electricity of group carries out value revision, and revised data are assigned to the computing module.
Specifically, the course of work of institute's correction module include: calculating cause electricity power enterprise can not subtract power output and more electricity
Amount;The multiple electricity is commanded troops from the average gas-to electricity that the capacity factor of electricity power enterprise is greater than all electricity power enterprises
It is deducted in the electricity divided, using the multiple electricity as revised electricity power enterprise.
Between province of the invention between the province for sharing system of peak regulation resource peak regulation assisted hatching trading session are as follows: it is every
At 24 hours day, it was divided into for 96 periods;Object of Transaction is the peak capacity of unit;Purchaser is the provincial electricity of peak regulation inadequate resource
Enterprise is netted, seller is the generating set that the plentiful province of peak regulation resource or city have peak modulation capacity.
In the present embodiment, it is described share electricity quantity module calculate each electricity power enterprise of any trading session share electricity use
Formula it is as follows:
Wherein, i is the code name of electricity power enterprise, and the multiple electricity of the unit of i electricity power enterprise is the unit generation of i electricity power enterprise
Utilization rate is greater than the electricity of the average capacity factor part of all electricity power enterprises.
Specifically, the unit generation utilization rate of each trading session are as follows: unit actual power is contributed in the trading session of place
The ratio between with the maximum adjustable power output of unit;The average capacity factor of all electricity power enterprises of each trading session are as follows: place transaction
The sum of actual power power output of all electricity power enterprises of period Zhong Shenghuo city consumption is looked forward to all power generations in province or city's consumption
The ratio between the sum of power output that the maximum of industry is adjustable.In the adjustable power output of the maximum for a certain electricity power enterprise that province or city dissolve and province or city
The adjustable power output of maximum of the electricity power enterprise is related outside power output that the maximum of the electricity power enterprise is adjustable and province or city;Wherein, described
Power output that the maximum of electricity power enterprise described in province or city is adjustable is the maximum generation ability of the electricity power enterprise;Outside the province or city
Power output that the maximum of the electricity power enterprise is adjustable is the landing maximum power of the day of trade.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with its
The difference of his embodiment, the same or similar parts in each embodiment may refer to each other.For side disclosed in embodiment
For method, as corresponding with structure disclosed in embodiment, so being described relatively simple, related place is referring to structure division
Explanation.
To sum up, peak regulation resource is shared in system and method between province provided by the present invention, peak regulation resource between the province
Methodology include: the trading session of peak regulation assisted hatching and province or city going out in each trading session between obtaining province
Clear electricity;Calculate the unit generation utilization rate of each trading session and the average capacity factor of all electricity power enterprises;Calculate each friendship
The sum of the multiple electricity of unit and the multiple electricity of unit of all electricity power enterprises of easy period;Unit according to each trading session is more
Generated energy, the sum of the multiple electricity of all electricity power enterprises and clear electricity out, calculate each electricity power enterprise of each trading session shares electricity
Amount;Sharing for peak regulation resource between province is carried out according to the electricity of sharing of each electricity power enterprise of each trading session of calculating.Point of the invention
Booth method passes through the average capacity factor for introducing unit generation utilization rate and all electricity power enterprises, to calculate power generation indirectly
The multiple electricity of the unit of enterprise accounts for the ratio of the sum of multiple electricity of unit of all electricity power enterprises, in this, as amortization ratio,
Share electricity to calculate each trading session electricity power enterprise.Methodology of the invention is calculated by index of capacity factor
The peak regulation of generating set is contributed, and excitation electricity power enterprise actively provides peak regulation service, is promoted the release of peak regulation resource, is passed through market
Change means solve peak regulation difficulty, ensure power network safety operation, promote power grid and dissolve transregional renewable and clean energy resource energy more than needed
Power.
In addition, the factors such as power system security constraints, AGC Input Mode are also contemplated during calculating unit multiple electricity,
To carry out value revision to the multiple electricity of the unit of calculating, to effectively improve the accuracy of the amortization ratio of calculating.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair
Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims
Range.
Claims (17)
1. peak regulation resource shares system between a kind of province characterized by comprising
Module is obtained, for obtaining the trading session of peak regulation assisted hatching and province or city going out in each trading session between province
Clear electricity;
Computing module, for calculating the unit generation utilization rate of each trading session and the average gas-to electricity of all electricity power enterprises
Rate, and according to the average capacity factor of the unit generation utilization rate of each trading session and all electricity power enterprises, it calculates each
The sum of the multiple electricity of the unit of trading session and the multiple electricity of unit of all electricity power enterprises;
Share electricity quantity module, for the multiple electricity of unit, the sum of the multiple electricity of all electricity power enterprises according to each trading session
And clear electricity out, calculate the electricity of sharing of each electricity power enterprise of each trading session, and according to share electricity carry out province between peak regulation it is clear out
Electricity is shared.
2. peak regulation resource shares system between province as described in claim 1, which is characterized in that further include:
Correction module, the multiple electricity of unit of each trading session for calculating the computing module and all electricity power enterprises
The sum of multiple electricity of unit carries out value revision, and revised data are assigned to the computing module.
3. peak regulation resource shares system between province as claimed in claim 2, which is characterized in that the course of work of institute's correction module
Include:
Calculating cause electricity power enterprise can not subtract power output and multiple electricity;
The multiple electricity is commanded troops from the average gas-to electricity that the capacity factor of electricity power enterprise is greater than all electricity power enterprises
It is deducted in the electricity divided, using the multiple electricity as revised electricity power enterprise.
4. peak regulation resource shares system between province as described in claim 1, which is characterized in that described to share electricity quantity module calculating
The formula for sharing electricity use of any each electricity power enterprise of trading session is as follows:
Wherein, i is the code name of electricity power enterprise, and the multiple electricity of the unit of i electricity power enterprise is the unit generation utilization rate of i electricity power enterprise
Greater than the electricity of the average capacity factor part of all electricity power enterprises.
5. peak regulation resource shares system between province as described in claim 1, which is characterized in that the unit of each trading session is sent out
Electric utilization rate are as follows: the ratio between unit actual power power output and the maximum adjustable power output of unit in the trading session of place.
6. peak regulation resource shares system between province as described in claim 1, which is characterized in that all hairs of each trading session
The average capacity factor of electric enterprise are as follows: the actual power of all electricity power enterprises of the place city trading session Zhong Shenghuo consumption goes out
The sum of power with province or city consumption all electricity power enterprises maximum it is adjustable power output the sum of the ratio between.
7. peak regulation resource shares system between province as claimed in claim 6, which is characterized in that in a certain hair that province or city dissolve
Power output that the maximum of electric enterprise is adjustable is looked forward to the power generation outside the adjustable power output of maximum of electricity power enterprise described in province or city and province or city
The maximum of industry is adjustable, and power output is related;Wherein, the adjustable power output of the maximum of electricity power enterprise described in the province or city is power generation enterprise
The maximum generation ability of industry;The adjustable power output of the maximum of the electricity power enterprise is the maximum electricity of landing of the day of trade outside the province or city
Power.
8. peak regulation resource shares system between such as province according to any one of claims 1 to 7, which is characterized in that peak regulation between province
The trading session of assisted hatching are as follows: daily 24 hours, be divided into for 96 periods;Object of Transaction is the peak capacity of unit;Purchase
Buyer is the provincial power network enterprise of peak regulation inadequate resource, and seller is the power generation that the plentiful province of peak regulation resource or city have peak modulation capacity
Unit.
9. the methodology of peak regulation resource between a kind of province, which comprises the steps of:
S1: the trading session of peak regulation assisted hatching and province or city go out clear electricity in each trading session between acquisition province;
S2: the unit generation utilization rate of each trading session and the average capacity factor of all electricity power enterprises are calculated;
S3: it according to the average capacity factor of the unit generation utilization rate of each trading session and all electricity power enterprises, calculates
The sum of the multiple electricity of the unit of each trading session and the multiple electricity of unit of all electricity power enterprises;
S4: it according to the multiple electricity of the unit of each trading session, the sum of the multiple electricity of all electricity power enterprises and clear electricity out, calculates
Each each electricity power enterprise of trading session shares electricity;
S5: according to each electricity power enterprise of each trading session of calculating share electricity carry out province between peak regulation go out sharing for clear electricity.
10. the methodology of peak regulation resource between province as claimed in claim 9, which is characterized in that in S3, any trading session
The multiple electricity of unit be unit generation utilization rate be greater than all electricity power enterprises average capacity factor part electricity.
11. the methodology of peak regulation resource between province as claimed in claim 9, which is characterized in that in S4, calculate any transaction
The formula for sharing electricity use of period each electricity power enterprise is as follows:
Wherein, i is the code name of electricity power enterprise, and the multiple electricity of the unit of i electricity power enterprise is the unit generation utilization rate of i electricity power enterprise
Greater than the electricity of the average capacity factor part of all electricity power enterprises.
12. the methodology of peak regulation resource between province as claimed in claim 9, which is characterized in that the unit of each trading session
Capacity factor are as follows: the ratio between unit actual power power output and the maximum adjustable power output of unit in the trading session of place.
13. the methodology of peak regulation resource between province as claimed in claim 9, which is characterized in that each trading session owns
The average capacity factor of electricity power enterprise are as follows: the actual power of all electricity power enterprises of the place city trading session Zhong Shenghuo consumption
Power output the sum of with province or city consumption all electricity power enterprises maximum it is adjustable power output the sum of the ratio between.
14. the methodology of peak regulation resource between province as claimed in claim 13, which is characterized in that dissolved in province or city a certain
Power output that the maximum of electricity power enterprise is adjustable and the power generation outside the adjustable power output of maximum of electricity power enterprise described in province or city and province or city
The maximum of enterprise is adjustable, and power output is related;Wherein, the adjustable power output of the maximum of electricity power enterprise described in the province or city is the power generation
The maximum generation ability of enterprise;The adjustable power output of the maximum of the electricity power enterprise is the maximum electricity of landing of the day of trade outside the province or city
Power.
15. the methodology of peak regulation resource between province as claimed in claim 9, which is characterized in that in S3, further includes:
The sum of multiple electricity of unit to the multiple electricity of the unit of each trading session and all electricity power enterprises carries out value revision, and
It updates.
16. it is as claimed in claim 15 save between peak regulation resource methodology, which is characterized in that it is described to each trading session
The sum of the multiple electricity of unit and the multiple electricity of unit of all electricity power enterprises carry out value revision and include the following steps:
Calculating cause electricity power enterprise can not subtract power output and multiple electricity;
The multiple electricity is commanded troops from the average gas-to electricity that the capacity factor of electricity power enterprise is greater than all electricity power enterprises
It is deducted in the electricity divided, using the multiple electricity as revised electricity power enterprise.
17. the methodology of peak regulation resource between province as claimed in claim 16, which is characterized in that cause electricity power enterprise that can not subtract
The factor of power output includes: power system security constraints and/or AGC hopping pattern.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811117006.1A CN109325687A (en) | 2018-09-25 | 2018-09-25 | Peak regulation resource shares system and method between a kind of province |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811117006.1A CN109325687A (en) | 2018-09-25 | 2018-09-25 | Peak regulation resource shares system and method between a kind of province |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109325687A true CN109325687A (en) | 2019-02-12 |
Family
ID=65265429
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811117006.1A Pending CN109325687A (en) | 2018-09-25 | 2018-09-25 | Peak regulation resource shares system and method between a kind of province |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109325687A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111628532A (en) * | 2020-05-20 | 2020-09-04 | 中国南方电网有限责任公司 | Method and device for determining output clear electricity quantity, computer equipment and storage medium |
CN111882146A (en) * | 2020-06-10 | 2020-11-03 | 国家电网公司华北分部 | Expense allocation method and calculation equipment for thermal power unit transformation |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103280845A (en) * | 2013-05-28 | 2013-09-04 | 大连理工大学 | Water-fire-electricity system trans-provincial peak-regulating load distribution method |
CN103296679A (en) * | 2013-05-20 | 2013-09-11 | 国家电网公司 | Modeling method for medium and long-term wind power output model of power system capable of optimally running for medium and long terms |
US20150261239A1 (en) * | 2014-03-14 | 2015-09-17 | Panasonic Intellectual Property Management Co., Ltd. | Power supply and demand control method, power supply and demand control device |
CN104967126A (en) * | 2015-07-14 | 2015-10-07 | 华中科技大学 | Interbasin hydropower station group multiple power grid combination adjusting peak method facing regional power grid |
CN106844916A (en) * | 2017-01-09 | 2017-06-13 | 北京清能互联科技有限公司 | A kind of generating and electricity consumption method for organizing and device based on peak regulation assisted hatching |
-
2018
- 2018-09-25 CN CN201811117006.1A patent/CN109325687A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103296679A (en) * | 2013-05-20 | 2013-09-11 | 国家电网公司 | Modeling method for medium and long-term wind power output model of power system capable of optimally running for medium and long terms |
CN103280845A (en) * | 2013-05-28 | 2013-09-04 | 大连理工大学 | Water-fire-electricity system trans-provincial peak-regulating load distribution method |
US20150261239A1 (en) * | 2014-03-14 | 2015-09-17 | Panasonic Intellectual Property Management Co., Ltd. | Power supply and demand control method, power supply and demand control device |
CN104967126A (en) * | 2015-07-14 | 2015-10-07 | 华中科技大学 | Interbasin hydropower station group multiple power grid combination adjusting peak method facing regional power grid |
CN106844916A (en) * | 2017-01-09 | 2017-06-13 | 北京清能互联科技有限公司 | A kind of generating and electricity consumption method for organizing and device based on peak regulation assisted hatching |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111628532A (en) * | 2020-05-20 | 2020-09-04 | 中国南方电网有限责任公司 | Method and device for determining output clear electricity quantity, computer equipment and storage medium |
CN111882146A (en) * | 2020-06-10 | 2020-11-03 | 国家电网公司华北分部 | Expense allocation method and calculation equipment for thermal power unit transformation |
CN111882146B (en) * | 2020-06-10 | 2023-12-22 | 国家电网公司华北分部 | Cost allocation method and computing equipment for thermal power unit reconstruction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Chen et al. | Two market models for demand response in power networks | |
Li et al. | Risk-constrained bidding strategy with stochastic unit commitment | |
O’Neill et al. | Recent ISO software enhancements and future software and modeling plans | |
Moradi-Jalal et al. | Optimal design and operation of irrigation pumping stations | |
CN110232585A (en) | A kind of depth peak regulation market cost allocation method and system | |
CN105243609A (en) | Orderly power utilization decision method of user on the basis of fuzzy analytic hierarchy process | |
CN115577234B (en) | Node power supply emission factor calculation method and system based on power flow distribution | |
CN110516855A (en) | A kind of distributed energy storage optimization of control right dispatching method towards Load aggregation quotient | |
CN109325687A (en) | Peak regulation resource shares system and method between a kind of province | |
CN110994646B (en) | Method, system and storage medium for evaluating running effect of AGC (automatic gain control) adjustment of power grid | |
CN103325009A (en) | Control and charge calculation method for power grid power load peak shift in short supply situation | |
CN109726894A (en) | Ensure the new energy active command calculation method of spot exchange and medium-term and long-term electricity | |
CN1256465A (en) | Control of power output from one generator set to power network and corresponding settlement method in power market | |
TW202119335A (en) | Distributed power management method for electric vehicle charging station which can optimize the charging and discharging schedule of each electric vehicle | |
Eklin et al. | Model for cost estimation in a finite-capacity stochastic environment based on shop floor optimization combined with simulation | |
Huang et al. | Pricing of generators reactive power delivery and voltage control in the unbundled environment | |
Evans | The electricity spot market: Is it future-proof? | |
CN110390443A (en) | A kind of production plan method of adjustment and system considering demand response | |
CN112037082B (en) | Calculation method and system for interruptible load electricity price in power grid peak shaving | |
CN109934454A (en) | The interruptible load compensation method shared based on Nash income | |
CN110288274A (en) | Generation schedule preparation method, device, equipment and the storage medium of multicomputer | |
CN109871983A (en) | A kind of power energy management system | |
CN107017627A (en) | Electric power cooperates with management and running method of dissolving with province interior power outside a kind of area | |
JP2005135266A (en) | Electric power transaction support system | |
Dalle Ave et al. | Industrial demand side management formulation for simultaneous electricity load commitment and future load prediction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190212 |