CN109324356A - A kind of mine total space three dimension direct current experimental rig and test method - Google Patents

A kind of mine total space three dimension direct current experimental rig and test method Download PDF

Info

Publication number
CN109324356A
CN109324356A CN201811430966.3A CN201811430966A CN109324356A CN 109324356 A CN109324356 A CN 109324356A CN 201811430966 A CN201811430966 A CN 201811430966A CN 109324356 A CN109324356 A CN 109324356A
Authority
CN
China
Prior art keywords
pvc pipe
copper wire
pvc
total space
vision
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811430966.3A
Other languages
Chinese (zh)
Other versions
CN109324356B (en
Inventor
高卫富
韩进
施龙青
王颖
刘天浩
曲兴玥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201811430966.3A priority Critical patent/CN109324356B/en
Publication of CN109324356A publication Critical patent/CN109324356A/en
Application granted granted Critical
Publication of CN109324356B publication Critical patent/CN109324356B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V13/00Manufacturing, calibrating, cleaning, or repairing instruments or devices covered by groups G01V1/00 – G01V11/00

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Examining Or Testing Airtightness (AREA)

Abstract

The invention belongs to mine geophysical prospecting technical fields, it is related to a kind of mine total space three dimension direct current experimental rig and test method, using the Fluid Dynamics working face shoulder-bed resistivity (SBR) in sink, metallic conductor simulates low-resistance anomalous body, and non-metallic isolator simulates high resistance area;Similar tunnel is designed, similar electrode and cable are laid in tunnel, establishes total space experimental observation device;Observation device is fully recessed into the water in sink, it is connected by copper conductor with cable connector, realize the acquisition of DC electrical method instrument data, establish mine total space three dimension direct current test platform, conducting shaft total space three dimension direct current experimental study, three-dimensional DC electrical law technology is improved, so that effectively detection operations face rock stratum watery, better services are prevented and treated in water bursting in mine;Its experimental rig principle is simple, reproducible convenient for operation, practical, environmental-friendly.

Description

A kind of mine total space three dimension direct current experimental rig and test method
Technical field:
The invention belongs to mine geophysical prospecting technical fields, are related to a kind of mine total space three dimension direct current test Device and test method.
Background technique:
North China type coalfield deep fractures exploitation in China's is constantly subjected to Water Inrush threat, and a large amount of mining Practice proves, adopts Before detect floor undulation not water zone, be possible to be converted into water zone during working face mining, to cause bottom Plate gushing water water damage.Therefore, it is one worth constantly deep that Floor water end of love how is effectively detected during the advance of the face Enter the project probed into.
For rock stratum watery in effectively detection operations face, Three Dimensional Ground DC electrical method technology is applied directly to by people The detection of formation downhole watery, realizes working face three-dimensional DC electrical law technology.However, conventional three-dimensional DC electrical method technical application To underground, since underground space limits, electrode and cable can only be laid around working face (ring working face lay electrode and Cable), electrode and cable cannot be laid inside working face, measurement data points are concentrated mainly on the outside rock stratum of working face, thus Rock stratum on the inside of floor undulation is caused blind area occur, therefore, mine water prevention and treatment person cannot accurately draw a circle to approve out the model of bottom plate exceptions area It encloses, easily causes floor undulation water bursting disaster, influence working face and normally promote.
Currently, for conventional three-dimensional DC electrical method technology can only on the outside of detection operations face the watery of rock stratum problem, lead to It crosses and builds three dimension direct current physical simulation experiment platform in laboratory, face rock stratum watery detection test of carrying out the work is ground Study carefully, analyzes floor undulation post non of low resistance body abnormal response.However, during the test, traditional three dimension direct current physics Simulation test is all half space, is not able to satisfy mine total space physical simulation experiment demand.
Summary of the invention:
It is an object of the invention to overcome disadvantage of the existing technology, design provides a kind of mine total space three-dimensional direct current Electrical method experimental rig and test method, according to the principle of similitude, based in sink water, metallic conductor, non-metallic isolator with adopt There are similitudes for the country rock of coal working face and low resistance abnormity area and high resistance area, and it is flat to establish the test of mine total space three dimension direct current Platform, conducting shaft total space three dimension direct current experimental study improve three-dimensional DC electrical law technology, thus effectively detection operations face Rock stratum watery, better services are in water bursting in mine prevention and treatment person.
To achieve the goals above, the main structure packet of mine total space three dimension direct current experimental rig of the present invention Include mine total space three-dimensional observation device, DC electrical method instrument, 32 core data acquisition cable, cable interface, sink, Natural Water, Metallic conductor and non-metallic isolator;Wherein mine total space three-dimensional observation device include pvc pipe plane of vision, pvc pipe pillar, Small copper wire, copper conductor constitute mine total space three-dimensional observation device;Pvc pipe plane of vision is seen by PVC two-by-two by four pvc pipes Plane three-way plug connection composition rectangular planar structure is surveyed, for simulating headentry road and return aircourse and working face open-off cut Eye etc.;Pvc pipe pillar includes long pvc pipe, pvc pipe pillar three-way plug and short pvc pipe, the identical long pvc pipe point of four height It is not mounted below pvc pipe plane of vision by PVC plane of vision three-way plug, every root long pvc pipe lower end is separately connected one Pvc pipe pillar three-way plug, short pvc pipe are mounted below long pvc pipe by pvc pipe pillar three-way plug, are used to support observation Plane and stablize pvc pipe pillar, pvc pipe plane of vision is made to be located at sustained height;With anti-at each pvc pipe pillar three-way plug The winding of glue cloth, makes pvc pipe pillar three-way plug and pvc pipe plane of vision stable connection;The small copper wire difference of 5cm long is equidistant It is fixed on four pvc pipes of pvc pipe plane of vision, for simulating the electrode in tunnel, the quantity of small copper wire is seen according to pvc pipe The length of pvc pipe and the spacing of small copper wire in plane is surveyed to determine;Small copper wire is acquired by copper conductor and cable interface and core data The length of cable connection, copper conductor is determined according in test demand;Small copper wire and copper conductor junction are wound using mackintosh, It prevents copper conductor from leaking electricity, electrode is caused to be unable to normal power supply;DC electrical method instrument and 32 core data acquire cable connection, and cable connects Cable connector sheet metal on mouth is fastened by copper conductor, and Natural Water is filled in sink, and the height of water level of Natural Water is greater than The height of pvc pipe pillar, less than the height of sink, mine total space three-dimensional observation device is placed in sink, metallic conductor and Non-metallic isolator is placed inside mine total space three-dimensional observation device in the sink.
Mine total space three-dimensional observation device of the present invention the preparation method comprises the following steps:
(1) it according to principle of similitude design experiment working face plane of vision length and width in the prior art, then uses The long two short pvc pipes of the interception respectively two of the pvc pipe of long 2m are made two long two short pvc pipes by PVC plane of vision three-way plug At pvc pipe plane of vision;
(2) according to test demand, the height of pvc pipe pillar is designed, four identical height are then intercepted from the pvc pipe of long 2m The long pvc pipe of degree connects the long pvc pipe intercepted at PVC plane of vision three-way plug, makes in the other end of long pvc pipe With pvc pipe pillar three-way plug, connect short pvc pipe, be fabricated to pvc pipe pillar, then in PVC plane of vision three-way plug and Pvc pipe pillar three-way plug junction is utilized respectively mackintosh winding, makes to be connected firmly between pvc pipe;
(3) it on pvc pipe plane of vision, measures identical distance and makes marks and preset small copper wire position, then in long copper wire The small copper wire multistage of upper interception 5cm, is fixed on the place that marked for small copper wire using mackintosh;
(4) one end of copper conductor is opened, exposes copper wire, the copper wire exposed in the upper end of small copper wire connection copper conductor, Copper wire is wound with small copper wire junction using mackintosh again, small copper wire electric leakage is prevented and treated, finally, by copper conductor along pvc pipe Trend along going out, mostly will be bundled in one piece with copper conductor, be fixed on above pvc pipe, the length of copper conductor can be according to experiment need Seek design.
The present invention realizes the detailed process of mine total space three dimension direct current test are as follows:
(1) connection of experimental rig: designing according to test requirements document and build sink, Natural Water is put into sink, then will Mine total space three-dimensional observation device is put into sink middle position, and small copper wire is fixed on to the pvc pipe of pvc pipe plane of vision On, copper conductor and small copper wire are connected, copper conductor is then pulled out into sink, copper conductor is wrapped in data acquisition cable connector On sheet metal, then with mackintosh winding prevent from leaking electricity, it is good that DC electrical method instrument and 32 core data are then acquired cable connection, Metallic conductor and non-metallic isolator are put to the bottom plate Exception Model established in working face mining active process in the sink, test dress Connection is set to finish;
(2) Test Data Collecting: opening DC electrical method instrument, detect to small copper wire connection, if connection is not It is good, it needs to reconnect, after determining that small copper wire connection is intact, starts to carry out data acquisition to the bottom plate Exception Model of foundation, and The test data of acquisition is saved;
(3) test data extract and processing: the test data of acquisition is pressed in into row data processing, it is too small for electric current or The data for not meeting field distribution are rejected, and the data of requirement extract different device are detected according to working face, to extraction data Inversion procedure is carried out, the total space three-dimensional data of inverting is obtained;
(4) three-dimensional visualization of mine total space inverting data volume: the total space 3D data volume of inverting is imported existing Three-dimensional visualization software establishes the 3D data volume of inverting, and according to the high and low resistance modal position situation of foundation, draws different Dropping cut slice, the terrace cut slice in direction, so that the position in delineation abnormality area, analyzes the validity of test detection achievement.
Compared with prior art, the present invention according to the principle of similitude, based on water, metallic conductor, the non-metallic insulation in sink There are similitudes for the country rock and low resistance abnormity area of body and coal working face and high resistance area, are enclosed using the Fluid Dynamics working face in sink Rock resistivity, metallic conductor simulate low-resistance anomalous body, and non-metallic isolator simulates high resistance area;Similar tunnel is designed, in tunnel Similar electrode and cable are laid, total space experimental observation device is established;Observation device is fully recessed into the water in sink, is passed through Copper conductor is connected with cable connector, realizes the acquisition of DC electrical method instrument data, establishes the examination of mine total space three dimension direct current Platform is tested, conducting shaft total space three dimension direct current experimental study improves three-dimensional DC electrical law technology, to effectively detect work Make face rock stratum watery, better services are in water bursting in mine prevention and treatment person;Its experimental rig principle is simple, reproducible convenient for operation, It is practical, it is environmental-friendly.
Detailed description of the invention:
Fig. 1 is main structure schematic illustration of the invention.
Fig. 2 is the principle schematic diagram of mine total space three-dimensional observation device of the present invention.
Fig. 3 is that data of the present invention acquire cable interface principle schematic diagram.
Fig. 4 is pvc pipe corbeling schematic illustration of the present invention.
Specific embodiment:
The present invention will be further described by way of example and in conjunction with the accompanying drawings.
Embodiment:
The main structure of mine total space three dimension direct current experimental rig described in the present embodiment includes the mine total space three It ties up observation device, DC electrical method instrument 1,32 core data and acquires cable 2, cable interface 3, sink 4, Natural Water 5, metallic conductor 8 With non-metallic isolator 9;Wherein mine total space three-dimensional observation device includes pvc pipe plane of vision 7, pvc pipe pillar 6, small copper Silk 701-732, copper conductor 302 constitute mine total space three-dimensional observation device;Pvc pipe plane of vision 7 is by four 733 liang of pvc pipe Two by the connection composition rectangular planar structure of PVC plane of vision three-way plug 601, for simulating headentry road and return air Tunnel and working face open-off cut eye etc.;Pvc pipe pillar 6 includes long pvc pipe 602, pvc pipe pillar three-way plug 603 and short pvc pipe 604, The identical long pvc pipe 602 of four height is mounted under pvc pipe plane of vision 7 by PVC plane of vision three-way plug 601 respectively Side, every 602 lower end of root long pvc pipe are separately connected a pvc pipe pillar three-way plug 603, and short pvc pipe 604 passes through pvc pipe pillar Three-way plug 603 is mounted on long 602 lower section of pvc pipe, is used to support plane of vision and stablizes pvc pipe pillar, keeps pvc pipe observation flat Face 7 is located at sustained height;It is wound at each pvc pipe pillar three-way plug 603 with mackintosh, inserts pvc pipe pillar threeway First 603 with 7 stable connection of pvc pipe plane of vision;It is flat that the small copper wire 701-732 of 5cm long is equidistantly fixed on pvc pipe observation respectively On four pvc pipes in face 7, for simulating the electrode in tunnel, the quantity of small copper wire is according to pvc pipe in pvc pipe plane of vision 7 733 length and the spacing of small copper wire determine;Small copper wire 701-732 passes through copper conductor 302 and the core data of cable interface 301 and 32 It acquires cable 2 to connect, the length of copper conductor is determined according in test demand;Small copper wire and copper conductor junction use mackintosh Winding, prevents copper conductor from leaking electricity, electrode is caused to be unable to normal power supply;The core data of DC electrical method instrument 1 and 32 acquire cable 2 and connect It connecing, the cable connector sheet metal 301 on cable interface 3 is fastened by copper conductor 302, Natural Water 5 is filled in sink 4, from The height of water level of right water 5 is greater than the height of pvc pipe pillar 6, and less than the height of sink 4, mine total space three-dimensional observation device is put It sets in sink 4, metallic conductor 8 and non-metallic isolator 9 are placed inside mine total space three-dimensional observation device in the sink.
Sink 4 described in the present embodiment uses the commercially available home-use swimming pool of large size, and size is 4m × 2m × 1m;Natural Water 5 For simulating working face roof and floor country rock, volume is 4m × 2m × 0.8m;DC electrical method instrument 1 uses FlashRES64-61 Ultra high density electrical instrument, for acquiring the device of resistivity during testing;The use of metallic conductor 8 0.2m × 0.2m × The column metal bucket that the iron plate of 0.02m and a length of 0.2m diameter are 0.1m;Non-metallic isolator 9 uses a length of 0.3m diameter for 8cm Cylindrical plastic tube and a length of 0.3m, width 0.2m, thickness be 2cm plastic plate.
Mine total space three-dimensional observation device described in the present embodiment the preparation method comprises the following steps:
It (1) is 1.1m × 0.5m's according to the size of principle of similitude design experiment pvc pipe plane of vision 7 in the prior art Then plane intercepts pvc pipe two of 1.1m and 0.5m respectively on the pvc pipe of long 2m, passes through PVC plane of vision three-way plug Two long two short pvc pipes are fabricated to pvc pipe plane of vision 7 by 601;
(2) according to test demand, the height of design pvc pipe pillar 6 is 0.6m, then intercepts four from the pvc pipe of long 2m The long pvc pipe 602 of root 0.6m long connects the long pvc pipe 602 intercepted, in long PVC at PVC plane of vision three-way plug 601 The other end of pipe 602 uses pvc pipe pillar three-way plug 603, and connection length is the short pvc pipe 604 of 0.1m, is fabricated to PVC Then tube support 6 is utilized respectively waterproof in PVC plane of vision three-way plug 601 and 603 junction of pvc pipe pillar three-way plug Adhesive plaster winding, makes to be connected firmly between pvc pipe;
(3) it on pvc pipe plane of vision 7, makes marks every 0.1m and presets small copper wire position, then intercepted on long copper wire Small copper wire is fixed on marked locations using mackintosh, is wound using mackintosh by the small copper wire multistage of 5cm, will Small copper wire is fixed;
(4) one end of copper conductor is opened, exposes copper wire, the copper wire exposed in the upper end of small copper wire connection copper conductor, Copper wire is wound with small copper wire junction using mackintosh again, small copper wire electric leakage is prevented and treated, finally, will be with small copper wire 701-706 For the copper conductor of connection along pvc pipe left side along out, the copper conductor connecting with small copper wire 707-712 is suitable out along pvc pipe right side, will The copper conductor being connect with small copper wire 713-714 along on front side of pvc pipe along going out, the copper conductor being connect with small copper wire 715-717 along Along out, the copper conductor connecting with small copper wire 718-722, along out, connects pvc pipe rear side along pvc pipe right side with small copper wire 723-728 The copper conductor connect along on the left of pvc pipe along going out, copper conductor connect with small copper wire 729-730 along on rear side of pvc pipe along out, and it is small The copper conductor of copper wire 731-732 connection, along out, will be bundled in one piece along the more copper conductors gone out, be fixed on along pvc pipe front side Above pvc pipe, the length of copper conductor can be according to experiment Demand Design.
The present embodiment realizes the detailed process of mine total space three dimension direct current test are as follows:
(1) connection of experimental rig: designing according to test requirements document and builds sink 4, and Natural Water 5 is put into sink 4, then Mine total space three-dimensional observation device is put into 4 middle position of sink, and small copper wire 701-732 is pulled out into sink 4, copper wire is led Line 302 is connected after being wrapped on cable connector sheet metal 301 with mackintosh, then by the core data of DC electrical method instrument 1 and 32 Acquisition cable 2 connects, and metallic conductor 8 and non-metallic isolator 9 are placed in sink 4, established in working face mining active process Bottom plate Exception Model, experimental rig connection finish;
(2) Test Data Collecting: DC electrical method instrument 1 is opened, small copper wire 701-732 connection is detected, such as Fruit connection is bad, needs to reconnect, after determining that small copper wire 701-732 connection is intact, starts the bottom plate Exception Model to foundation Data acquisition is carried out, in data acquisition, is first powered to small copper wire 701,703, other any two small copper wires measure, and see Survey Potential distribution in sink 4;It powers again to 701,705, other small copper wires measure;And so on, according to what is measured above Mode, wherein any two small copper wire power supply, other small copper wires carry out potential measurement, and the test data of acquisition is saved;
(3) test data extract and processing: the test data of acquisition is pressed in into row data processing, it is too small for electric current or The data for not meeting field distribution are rejected, and the data of requirement extract different device are detected according to working face, to the number of extraction According to inversion procedure is carried out, the total space three-dimensional data of inverting is obtained;
(4) three-dimensional visualization of mine total space inverting data volume: the total space 3D data volume of inverting is imported existing Three-dimensional visualization software establishes the 3D data volume of inverting, and according to the high and low resistance modal position situation of foundation, draws different Dropping cut slice, the terrace cut slice in direction, so that the position in delineation abnormality area, analyzes the validity of test detection achievement.

Claims (3)

1. a kind of mine total space three dimension direct current experimental rig, it is characterised in that main structure includes that the mine total space is three-dimensional Observation device, DC electrical method instrument, 32 core data acquisition cable, cable interface, sink, Natural Water, metallic conductor and nonmetallic Insulator;Wherein mine total space three-dimensional observation device includes pvc pipe plane of vision, pvc pipe pillar, small copper wire, copper conductor structure At mine total space three-dimensional observation device;Pvc pipe plane of vision passes through PVC plane of vision three-way plug by four pvc pipes two-by-two Connection composition rectangular planar structure, for simulating headentry road and return aircourse and working face open-off cut eye etc.;Pvc pipe pillar Including long pvc pipe, pvc pipe pillar three-way plug and short pvc pipe, the identical long pvc pipe of four height is observed by PVC flat respectively Face three-way plug is mounted below pvc pipe plane of vision, and every root long pvc pipe lower end is separately connected a pvc pipe pillar threeway and inserts Head, short pvc pipe are mounted below long pvc pipe by pvc pipe pillar three-way plug, are used to support plane of vision and are stablized pvc pipe Pillar makes pvc pipe plane of vision be located at sustained height;It is wound, is made with mackintosh at each pvc pipe pillar three-way plug Pvc pipe pillar three-way plug and pvc pipe plane of vision stable connection;The small copper wire of 5cm long is equidistantly fixed on pvc pipe sight respectively It surveys on four pvc pipes of plane, for simulating the electrode in tunnel, the quantity of small copper wire is according to pvc pipe in pvc pipe plane of vision Length and small copper wire spacing determine;Small copper wire acquires cable connection by copper conductor and cable interface and core data, and copper is led The length of line is determined according in test demand;Small copper wire and copper conductor junction are wound using mackintosh, prevent copper conductor from leaking Electricity causes electrode to be unable to normal power supply;DC electrical method instrument and 32 core data acquire cable connection, and the cable on cable interface connects Head sheet metal is fastened by copper conductor, and Natural Water is filled in sink, and the height of water level of Natural Water is greater than the height of pvc pipe pillar Degree, less than the height of sink, mine total space three-dimensional observation device is placed in sink, and metallic conductor and non-metallic isolator are put It sets inside mine total space three-dimensional observation device in the sink.
2. mine total space three dimension direct current experimental rig according to claim 1, it is characterised in that the mine is entirely empty Between three-dimensional observation device the preparation method comprises the following steps:
(1) according to principle of similitude design experiment working face plane of vision length and width in the prior art, long 2m is then used Pvc pipe the long two short pvc pipes of interception respectively two, two long two short pvc pipes are fabricated to by PVC plane of vision three-way plug Pvc pipe plane of vision;
(2) according to test demand, the height of pvc pipe pillar is designed, then interception four is mutually level from the pvc pipe of long 2m Long pvc pipe connects the long pvc pipe intercepted at PVC plane of vision three-way plug, uses PVC in the other end of long pvc pipe Tube support three-way plug connects short pvc pipe, is fabricated to pvc pipe pillar, then in PVC plane of vision three-way plug and pvc pipe branch Column three-way plug junction is utilized respectively mackintosh winding, makes to be connected firmly between pvc pipe;
(3) it on pvc pipe plane of vision, measures identical distance and makes marks and preset small copper wire position, then cut on long copper wire Small copper wire is fixed on the place that marked using mackintosh by the small copper wire multistage for taking 5cm;
(4) one end of copper conductor is opened, exposes copper wire, the copper wire exposed in the upper end of small copper wire connection copper conductor, then will Copper wire is wound with small copper wire junction using mackintosh, small copper wire electric leakage is prevented and treated, finally, the walking along pvc pipe by copper conductor To along out, it mostly will be bundled in one piece with copper conductor, be fixed on above pvc pipe, the length of copper conductor can be set according to experiment demand Meter.
3. a kind of method for carrying out the test of mine total space three dimension direct current using device as described in claim 1, feature It is detailed process are as follows:
(1) connection of experimental rig: designing according to test requirements document and build sink, is put into Natural Water into sink, then by mine Total space three-dimensional observation device is put into sink middle position, and small copper wire is fixed on the pvc pipe of pvc pipe plane of vision, will Copper conductor is connected with small copper wire, and copper conductor is then pulled out sink, and copper conductor is wrapped in data acquisition cable connector metal On piece, then prevent from leaking electricity with mackintosh winding, it is then that DC electrical method instrument and 32 core data acquisition cable connection is good, it will be golden Belong to conductor and non-metallic isolator puts the bottom plate Exception Model established in working face mining active process in the sink, experimental rig connects It connects and finishes;
(2) Test Data Collecting: opening DC electrical method instrument, detect to small copper wire connection, if connection is bad, needs It reconnects, after determining that small copper wire connection is intact, starts to carry out the bottom plate Exception Model of foundation data acquisition, and will acquisition Test data saved;
(3) test data is extracted and processing: the test data of acquisition is pressed in into row data processing, it is too small for electric current or be not inconsistent The data for closing field distribution are rejected, and the data of requirement extract different device are detected according to working face, are carried out to data are extracted Inversion procedure obtains the total space three-dimensional data of inverting;
(4) total space 3D data volume of inverting the three-dimensional visualization of mine total space inverting data volume: is imported into existing three-dimensional Visual software establishes the 3D data volume of inverting, and according to the high and low resistance modal position situation of foundation, draws different directions Dropping cut slice, terrace cut slice analyze the validity of test detection achievement thus the position in delineation abnormality area.
CN201811430966.3A 2018-11-28 2018-11-28 Mine full-space three-dimensional direct current method testing device and testing method Active CN109324356B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811430966.3A CN109324356B (en) 2018-11-28 2018-11-28 Mine full-space three-dimensional direct current method testing device and testing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811430966.3A CN109324356B (en) 2018-11-28 2018-11-28 Mine full-space three-dimensional direct current method testing device and testing method

Publications (2)

Publication Number Publication Date
CN109324356A true CN109324356A (en) 2019-02-12
CN109324356B CN109324356B (en) 2020-10-16

Family

ID=65259151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811430966.3A Active CN109324356B (en) 2018-11-28 2018-11-28 Mine full-space three-dimensional direct current method testing device and testing method

Country Status (1)

Country Link
CN (1) CN109324356B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204287168U (en) * 2014-11-26 2015-04-22 山东大学 Tunnel gushing water is to underground water environmental impact monitoring model test unit
CN105022094A (en) * 2015-07-15 2015-11-04 东华理工大学 High-density resistivity method laboratory pool analog device
CN105258765A (en) * 2015-09-08 2016-01-20 安徽理工大学 Dam body hydrostatic level in situ automatic monitoring system and method
CN105277967A (en) * 2014-07-22 2016-01-27 中国石油化工股份有限公司 Water tank physical model ultrasonic automatic detection system and method
CN107942392A (en) * 2017-11-15 2018-04-20 国家海洋局第二海洋研究所 A kind of acoustic seafloor and water column test system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105277967A (en) * 2014-07-22 2016-01-27 中国石油化工股份有限公司 Water tank physical model ultrasonic automatic detection system and method
CN204287168U (en) * 2014-11-26 2015-04-22 山东大学 Tunnel gushing water is to underground water environmental impact monitoring model test unit
CN105022094A (en) * 2015-07-15 2015-11-04 东华理工大学 High-density resistivity method laboratory pool analog device
CN105258765A (en) * 2015-09-08 2016-01-20 安徽理工大学 Dam body hydrostatic level in situ automatic monitoring system and method
CN107942392A (en) * 2017-11-15 2018-04-20 国家海洋局第二海洋研究所 A kind of acoustic seafloor and water column test system and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘盛东 等: ""三维并行电法勘探技术与矿井水害探查"", 《煤炭学报》 *
牟义: ""矿井工作面突水地质异常体电阻率响应特征实验研究"", 《中国优秀硕士学位论文全文数据库 工程科技I辑》 *

Also Published As

Publication number Publication date
CN109324356B (en) 2020-10-16

Similar Documents

Publication Publication Date Title
CN106324687B (en) A kind of buried irony pipeline detection and accurate positioning method
CN102768369B (en) Roadway drivage drilling induced polarization advance water probing forecasting method, device and probe
CN105604066B (en) Application of the resistivity profiling in the detection of building foundation pit building enclosure percolating water
CN107829453A (en) A kind of method and device of vertical plastic spreading seepage proof curtain leak detection
CN102768370B (en) Based on hydraulically created fracture monitoring device and the monitoring method of dynamic electric coupling
CN108802828A (en) Bored grouting curtain quality determining method
CN106547030B (en) Dam leakage electric field 3-D scanning automatic detection device and method
CN106032748B (en) Hydraulic fracturing crack propagation rule detection method based on drilling Transient Electromagnetic Technique
CN109709438A (en) A kind of reverse short distance measurement pressure-wire of grounded screen and current line mutual inductance influence model
CN103207412A (en) Method for detecting solution leaching and groundwater pollution scope of acid in-situ leaching of uranium
CN106226360A (en) Quickly test device and the using method thereof of core wall dam surface check gap space feature
CN103235344B (en) Two lanes multi-electrode electricity perspective detection system
CN103353611B (en) Underground cave multi-facet detection method
CN104834011A (en) Device and method for fast testing hard medium ground electric field
CN107346037B (en) Three-dimensional underground piping accurately detecting method
KR100870061B1 (en) Electrode for electrical resistivity monit0ring and survey line designed using the electrode
CN106443189A (en) Method and system for three-dimensional detection on earth electrode field and surrounding soil resistivity
CN206096020U (en) Test device of core -wall dam table slabbing seam space characteristic fast
CN106246162A (en) Floor undulation is across borescopic imaging device and slip casting effect monitoring method
CN109387878A (en) A kind of mine total space three-dimensional observation device and preparation method
CN207714393U (en) A kind of vertical plastic spreading seepage proof curtain leak detection apparatus
Sazali et al. Study of soil resistivity using wenner four pin method: Case study
CN109324356A (en) A kind of mine total space three dimension direct current experimental rig and test method
CN216767359U (en) Fracturing monitoring experiment device
CN105738955B (en) A kind of quick cloth electrode systems of tunnel water damage forward probe and its detection method based on DC electrical method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 266590 Qingdao economic and Technological Development Zone, Shandong, former Bay Road, No. 579

Applicant after: Shandong University of Science and Technology

Address before: 266000 Daizhong Street 223, Taishan District, Taian City, Shandong Province

Applicant before: Shandong University of Science and Technology