CN109319501A - A kind of pneumatic ash removal system - Google Patents

A kind of pneumatic ash removal system Download PDF

Info

Publication number
CN109319501A
CN109319501A CN201811083558.5A CN201811083558A CN109319501A CN 109319501 A CN109319501 A CN 109319501A CN 201811083558 A CN201811083558 A CN 201811083558A CN 109319501 A CN109319501 A CN 109319501A
Authority
CN
China
Prior art keywords
grey
communicated
pipeline
termination rack
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811083558.5A
Other languages
Chinese (zh)
Inventor
郑荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yili Clean Energy Technology (leling) Co Ltd
Original Assignee
Yili Clean Energy Technology (leling) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yili Clean Energy Technology (leling) Co Ltd filed Critical Yili Clean Energy Technology (leling) Co Ltd
Priority to CN201811083558.5A priority Critical patent/CN109319501A/en
Publication of CN109319501A publication Critical patent/CN109319501A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G53/00Conveying materials in bulk through troughs, pipes or tubes by floating the materials or by flow of gas, liquid or foam
    • B65G53/04Conveying materials in bulk pneumatically through pipes or tubes; Air slides
    • B65G53/16Gas pressure systems operating with fluidisation of the materials
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G53/00Conveying materials in bulk through troughs, pipes or tubes by floating the materials or by flow of gas, liquid or foam
    • B65G53/34Details
    • B65G53/66Use of indicator or control devices, e.g. for controlling gas pressure, for controlling proportions of material and gas, for indicating or preventing jamming of material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The present invention provides a kind of pneumatic ash removal systems, including unloading grey termination rack, the left side unloaded at the top of grey termination rack is fixedly connected with pulse dust collector, the two sides for unloading grey termination rack bottom are fixedly connected to gasification board, the bottom of the gasification board is communicated with electric heater unit by pipeline, the bottom of the electric heater unit is communicated with gasification blower by pipeline, the bottom for unloading grey termination rack is communicated with bilateral bottom storehouse discharger, and the two sides of the bilateral bottom storehouse discharger bottom have been respectively communicated with bulk machine and biaxial rneader;The pneumatic ash removal system has reached concise in technology, non-maintaining, part of appliance is few, no frequent movement, and failure rate is few, almost without the purpose of vulnerable part, low pressure is continuously conveyed, and velocity in pipes is low and constant, thus wear small, low energy consumption, and running cost is low, the comprehensive method of investment is saved, heating effect is improved, is more fully heated convenient for gas, the utilization of resource is reduced.

Description

A kind of pneumatic ash removal system
Technical field
The present invention relates to ash disposal system technical field, specially a kind of pneumatic ash removal system.
Background technique
The structure of Pneumatic conveyer is simple, easy to operate, can make horizontal, vertical or inclined direction conveying, The physical operations such as heating, cooling, drying and the air current classifying of material or certain chemical operations can be also carried out in transmission process simultaneously. Compared with machinery conveying, this method energy consumption is larger, and particle is vulnerable to breakage, and equipment is also vulnerable to abrasion.Water content is more, has adhesiveness Or the material easy to produce static electricity in high-speed motion, it is unsuitable for carrying out pneumatic conveying.
Existing pneumatic ash removal system structure is simple, and dedusting effect is poor, and practicability is lower, while existing pneumatic ash handling It usually needs to heat the gas of gasification board, existing heating device, heating effect is lower, causes the waste of resource.
Summary of the invention
In view of the above-mentioned problems, the present invention proposes a kind of pneumatic ash removal system, the pneumatic ash removal system, by unloading grey termination rack Pulse dust collector is fixedly connected on the left of top, the two sides for unloading grey termination rack bottom are fixedly connected with gasification board, the bottom of gasification board Portion is connected to electric heater unit by pipeline, and the bottom of electric heater unit is connected to gasification blower by pipeline, unloads the bottom of grey termination rack Portion is connected to bilateral bottom storehouse discharger, and the two sides of bilateral bottom storehouse discharger bottom are respectively communicated with bulk machine and biaxial rneader, twin shaft The top of blender is connected to by pipeline with the top for unloading grey termination rack, is unloaded the two sides at the top of grey termination rack and is connected to by pipeline Storehouse pump, the top of storehouse pump is connected to hand operated gate valve, and the top of hand operated gate valve is connected to bellow expansion joint, and the side of storehouse pump is logical Block apparatus is blown in piping connection, and the left side for blowing block apparatus is connected to defeated grey air accumulator by pipeline, blows block apparatus and defeated grey air accumulator Bleed pressure transmitter is set between opposite side, has reached concise in technology, non-maintaining, part of appliance is few, no frequent movement, Failure rate is few, and almost without the purpose of vulnerable part, low pressure is continuously conveyed, and velocity in pipes is low and constant, thus wears small, energy consumption Low, running cost is low, and the comprehensive method of investment is saved.The pneumatic ash removal system includes heating frame, heating frame inner wall two by electric heater unit The bottom of side is fixedly connected with the first flow-stopping plate, and two sides of heating frame inner wall and being located at the top of the first flow-stopping plate are fixedly connected with Electric heater, the two sides of heating frame inner wall and be located at electric heater at the top of be fixedly connected with the second flow-stopping plate, improve heating Effect is more fully heated convenient for gas, reduces the utilization of resource.
In order to solve the problem above-mentioned, the present invention proposes a kind of pneumatic ash removal system, including unloads grey termination rack, described to unload ash Left side at the top of termination rack is fixedly connected with pulse dust collector, and the two sides for unloading grey termination rack bottom are fixedly connected to gasification The bottom of plate, the gasification board is communicated with electric heater unit by pipeline, and the bottom of the electric heater unit is connected to by pipeline There is gasification blower, the bottom for unloading grey termination rack is communicated with bilateral bottom storehouse discharger, the bilateral bottom storehouse discharger bottom Two sides have been respectively communicated with bulk machine and biaxial rneader, and the top of the biaxial rneader passes through pipeline and the top for unloading grey termination rack Portion's connection, the two sides unloaded at the top of grey termination rack pass through pipeline and are communicated with storehouse pump, and the top of the storehouse pump is communicated with manually Gate valve, and bellow expansion joint is communicated at the top of the hand operated gate valve, the side of the storehouse pump is communicated with by pipeline Block apparatus is blown, the left side for blowing block apparatus is communicated with defeated grey air accumulator by pipeline, described to blow block apparatus and defeated grey air accumulator Bleed pressure transmitter is provided between opposite side.
Further improvement lies in that: the left side of the pulse dust collector is communicated with air accumulator by pipeline, the air accumulator Left side is communicated with compressed air pipe.
Further improvement lies in that: the right side unloaded at the top of grey termination rack is fixedly connected with grey library high charge level meter.
Further improvement lies in that: the top for unloading grey termination rack and being located on the left of grey library high charge level meter is fixedly connected with Pressure vacuum relief valve.
Further improvement lies in that: the electric heater unit includes heating frame, and the bottom of heating frame inner wall two sides is solid Surely it is connected with the first flow-stopping plate.
Further improvement lies in that: the two sides of the heating frame inner wall and be located at the first flow-stopping plate at the top of be fixedly connected to Electric heater, the two sides of the heating frame inner wall and be located at electric heater at the top of be fixedly connected to the second flow-stopping plate.
Further improvement lies in that: the quantity of the storehouse pump is four.
The invention has the benefit that
(1) dust removal assembly includes dedusting feed bin, smoke-intake pipe road and smoke pipeline, after flue gas enters dedusting feed bin first, Water inlet pipe at the top of dedusting feed bin sprays water body into dedusting feed bin, so that the dust adsorption moisture in flue gas drops into hydrops slot Interior, the sulfur dioxide in flue gas is entered in smoke pipeline by dedusting strainer, because sulfur dioxide is dissolved in water, is removed to reduce The waste liquid of dirt pipeline discharge does not interfere with external environment, so being provided with heating member in dedusting feed bin, hydrops slot is for storing up Dust water is deposited, for heating wire for heating dust water, it is reversible process that sulfur dioxide, which is dissolved in water, so after heated, sulfur dioxide It is heated to detach liquid, and then re-enter into smoke pipeline, dust removal assembly effectively removes the dust in flue gas;
(2) spray assemblies of desulfurizing tower body interior spray lime stone slurry, effectively remove the sulfur dioxide in flue gas, add The blender of strong environmental protection, desulfurization module removes gypsum tailings, and the partial size of gypsum tailings is made to become smaller, and avoids blocking gypsum liquid pipe road.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention.
Fig. 2 is the structural schematic diagram of bag-type dust of the present invention.
Fig. 3 is the structural schematic diagram of heating device of the present invention.
Wherein: 1, pulse dust collector;2, grey termination rack is unloaded;3, grey library high charge level meter;4, pressure vacuum relief valve;5, gasify Plate;6, bilateral bottom storehouse discharger;7, bulk machine;8, biaxial rneader;9, electric heater unit;91, heating frame;92, the first baffle Plate;93, electric heater;94, the second flow-stopping plate;10, gasify blower;11, air accumulator;12, bellow expansion joint;13, Manual flashboard Valve;14, storehouse pumps;15, block apparatus is blown;16, bleed pressure transmitter;17, defeated grey air accumulator.
Specific embodiment
In order to deepen the understanding of the present invention, the present invention is further described below in conjunction with embodiment, the present embodiment For explaining only the invention, it is not intended to limit the scope of the present invention..
According to Fig. 1,2,3, the present embodiment proposes a kind of pneumatic ash removal system, including unloads grey termination rack 2, described to unload The left side at grey 2 top of termination rack is fixedly connected with pulse dust collector 1, and the two sides for unloading grey 2 bottom of termination rack are fixedly connected with There is gasification board 5, the bottom of the gasification board 5 is communicated with electric heater unit 9 by pipeline, and the bottom of the electric heater unit 9 is logical Piping is communicated with gasification blower 10, and the bottom for unloading grey termination rack 2 is communicated with bilateral bottom storehouse discharger 6, the bilateral library The two sides of 6 bottom of bottom discharger have been respectively communicated with bulk machine 7 and biaxial rneader 8, and the top of the biaxial rneader 8 passes through pipe Road is connected to the top for unloading grey termination rack 2, and the two sides for unloading grey 2 top of termination rack pass through pipeline and are communicated with storehouse pump 14, institute The top for stating storehouse pump 14 is communicated with hand operated gate valve 13, and the top of the hand operated gate valve 13 is communicated with bellow expansion joint 12, the side of the storehouse pump 14 is communicated with by pipeline blows block apparatus 15, and the left side for blowing block apparatus 15 is connected to by pipeline There is a defeated grey air accumulator 17, described blow is provided with bleed pressure transmitter between block apparatus 15 and the opposite side of defeated grey air accumulator 17 16.The left side of pulse dust collector 1 is communicated with air accumulator 11 by pipeline, and the left side of the air accumulator 11 is communicated with compressed air hose Road;It is easy to use convenient for the use of compressed air.The right side for unloading grey 2 top of termination rack is fixedly connected with grey library high charge level meter 3; Convenient for being measured to grey library high charge level.It unloads the top of grey termination rack 2 and the left side for being located at grey library high charge level meter 3 is fixedly connected with Pressure vacuum relief valve 4;Convenient for pressure vacuum release.Electric heater unit 9 includes heating frame 91, the 91 inner wall two sides of heating frame Bottom be fixedly connected to the first flow-stopping plate 92, effectively carry out baffle, it is easy to use.The two sides and position of 91 inner wall of heating frame Electric heater 93 is fixedly connected in the top of the first flow-stopping plate 92, the two sides of 91 inner wall of heating frame and is located at electric heating The top of device 93 is fixedly connected to the second flow-stopping plate 94;Effectively heated.The quantity of storehouse pump 14 is four, multiple cooperations It uses, promotes the efficiency used.
It can to sum up obtain, the pneumatic ash removal system, the left side by unloading grey 2 top of termination rack is fixedly connected with pulse dust collector 1, The two sides for unloading grey 2 bottom of termination rack are fixedly connected with gasification board 5, and the bottom of gasification board 5 is connected to electric heater unit 9 by pipeline, The bottom of electric heater unit 9 is connected to gasification blower 10 by pipeline, unloads the bottom connection bilateral bottom storehouse discharger 6 of grey termination rack 2, The two sides of 6 bottom of bilateral bottom storehouse discharger are respectively communicated with bulk machine 7 and biaxial rneader 8, and the top of biaxial rneader 8 passes through pipe Road is connected to the top for unloading grey termination rack 2, and the two sides for unloading grey 2 top of termination rack are connected to storehouse pump 14 by pipeline, storehouse pump 14 Top is connected to hand operated gate valve 13, and the top of hand operated gate valve 13 is connected to bellow expansion joint 12, and the side of storehouse pump 14 passes through Block apparatus 15 is blown in pipeline connection, and the left side for blowing block apparatus 15 is connected to defeated grey air accumulator 17 by pipeline, blows block apparatus 15 and defeated ash Bleed pressure transmitter 16 is set between the opposite side of air accumulator 17, has reached concise in technology, non-maintaining, part of appliance is few, Without frequent movement, failure rate is few, and almost without the purpose of vulnerable part, low pressure is continuously conveyed, and velocity in pipes is low and constant, thus Wear small, low energy consumption, and running cost is low, and the comprehensive method of investment is saved, and includes heating frame 91,91 inner wall of heating frame by electric heater unit 9 The bottom of two sides is fixedly connected with the first flow-stopping plate 92, two sides of 91 inner wall of the heating frame and top for being located at the first flow-stopping plate 92 is equal It is fixedly connected with electric heater 93, two sides of 91 inner wall of the heating frame and top for being located at electric heater 93 is fixedly connected with the second baffle Plate 94, improves heating effect, is more fully heated convenient for gas, and the utilization of resource is reduced.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe originals of the invention Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle It is fixed.

Claims (7)

1. a kind of pneumatic ash removal system, including unload grey termination rack (2), it is characterised in that: the left side unloaded at the top of grey termination rack (2) Side is fixedly connected with pulse dust collector (1), and the two sides for unloading grey termination rack (2) bottom are fixedly connected to gasification board (5), institute The bottom for stating gasification board (5) is communicated with electric heater unit (9) by pipeline, and the bottom of the electric heater unit (9) passes through pipeline It is communicated with gasification blower (10), the bottom for unloading grey termination rack (2) is communicated with bilateral bottom storehouse discharger (6), the bilateral library The two sides of bottom discharger (6) bottom have been respectively communicated with bulk machine (7) and biaxial rneader (8), the top of the biaxial rneader (8) Portion is connected to by pipeline with the top for unloading grey termination rack (2), and the two sides unloaded at the top of grey termination rack (2) are connected to by pipeline There is storehouse to pump (14), is communicated with hand operated gate valve (13) at the top of the storehouse pump (14), and the top of the hand operated gate valve (13) Portion is communicated with bellow expansion joint (12), and the side of storehouse pump (14) is communicated with by pipeline blows block apparatus (15), it is described blow it is stifled The left side of device (15) is communicated with defeated grey air accumulator (17) by pipeline, described to blow block apparatus (15) and defeated grey air accumulator (17) phase Pair side between be provided with bleed pressure transmitter (16).
2. a kind of pneumatic ash removal system according to claim 1, it is characterised in that: the left side of the pulse dust collector (1) It is communicated with air accumulator (11) by pipeline, is communicated with compressed air pipe on the left of the air accumulator (11).
3. a kind of pneumatic ash removal system according to claim 1, it is characterised in that: described to unload at the top of grey termination rack (2) Right side is fixedly connected with grey library high charge level meter (3).
4. a kind of pneumatic ash removal system according to claim 3, it is characterised in that: the top for unloading grey termination rack (2) And it is located on the left of grey library high charge level meter (3) and is fixedly connected with pressure vacuum relief valve (4).
5. a kind of pneumatic ash removal system according to claim 1, it is characterised in that: the electric heater unit (9) includes adding The bottom of hot frame (91), heating frame (91) the inner wall two sides is fixedly connected to the first flow-stopping plate (92).
6. a kind of pneumatic ash removal system according to claim 5, it is characterised in that: the two sides of heating frame (91) inner wall And be located at the first flow-stopping plate (92) at the top of be fixedly connected to electric heater (93), the two sides of heating frame (91) inner wall and The second flow-stopping plate (94) are fixedly connected at the top of electric heater (93).
7. a kind of pneumatic ash removal system according to claim 1, it is characterised in that: the quantity of the storehouse pump (14) is four It is a.
CN201811083558.5A 2018-09-18 2018-09-18 A kind of pneumatic ash removal system Pending CN109319501A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811083558.5A CN109319501A (en) 2018-09-18 2018-09-18 A kind of pneumatic ash removal system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811083558.5A CN109319501A (en) 2018-09-18 2018-09-18 A kind of pneumatic ash removal system

Publications (1)

Publication Number Publication Date
CN109319501A true CN109319501A (en) 2019-02-12

Family

ID=65266203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811083558.5A Pending CN109319501A (en) 2018-09-18 2018-09-18 A kind of pneumatic ash removal system

Country Status (1)

Country Link
CN (1) CN109319501A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113692196A (en) * 2021-08-23 2021-11-23 宁波星宏智能技术有限公司 Intelligent electric equipment controller

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203158822U (en) * 2013-04-11 2013-08-28 天津海天依电力工程有限公司 Positive-pressure dense-phase pneumatic ash conveying system with ultralow energy consumption
CN203319266U (en) * 2013-06-26 2013-12-04 山东电力工程咨询院有限公司 Dense pneumatic ash conveying system of thermal power plant
CN203731668U (en) * 2014-02-12 2014-07-23 姚梓怡 Counter pressure convection type energy-saving air heater
CN205170899U (en) * 2015-06-30 2016-04-20 中冶南方工程技术有限公司 Converter gas dry de -dusting cinder pneumatic conveying system
CN106516753A (en) * 2016-11-30 2017-03-22 常州市双强机械制造有限公司 Storehouse pump ash conveying device
CN106743671A (en) * 2016-11-20 2017-05-31 嘉善永金金属制品有限公司 Boiler pneumatic ash handling induction system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203158822U (en) * 2013-04-11 2013-08-28 天津海天依电力工程有限公司 Positive-pressure dense-phase pneumatic ash conveying system with ultralow energy consumption
CN203319266U (en) * 2013-06-26 2013-12-04 山东电力工程咨询院有限公司 Dense pneumatic ash conveying system of thermal power plant
CN203731668U (en) * 2014-02-12 2014-07-23 姚梓怡 Counter pressure convection type energy-saving air heater
CN205170899U (en) * 2015-06-30 2016-04-20 中冶南方工程技术有限公司 Converter gas dry de -dusting cinder pneumatic conveying system
CN106743671A (en) * 2016-11-20 2017-05-31 嘉善永金金属制品有限公司 Boiler pneumatic ash handling induction system
CN106516753A (en) * 2016-11-30 2017-03-22 常州市双强机械制造有限公司 Storehouse pump ash conveying device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113692196A (en) * 2021-08-23 2021-11-23 宁波星宏智能技术有限公司 Intelligent electric equipment controller
CN113692196B (en) * 2021-08-23 2023-08-15 宁波星宏智能技术有限公司 Intelligent electrical equipment controller

Similar Documents

Publication Publication Date Title
CN106516753A (en) Storehouse pump ash conveying device
CN107973126A (en) Purification ash comprehensive utilization nitrogen circulation transport system and its application method
CN206126323U (en) Pump hydrodynamic float pneumatic conveyor
CN202410444U (en) Dry fog dust suppression device
CN100592931C (en) Gas and solid separating method and device for gas transporting material system
CN201605036U (en) Fluidized air supply device for ash transportation system
CN206407636U (en) Blow tank conveying device
CN205128525U (en) Prevent that horizontal cleaning tube from blockking up device
CN109319501A (en) A kind of pneumatic ash removal system
CN203878161U (en) Crude dust transporting system
CN102923485A (en) Efficient positive-pressure pneumatic conveying system of pebble coal
CN206203115U (en) A kind of air-transport system
CN107032144B (en) Bulk cargo continuous ship unloader based on pneumatic and mechanical combined conveying technology
CN202912388U (en) Rapid delivery device of powder materials
CN205274759U (en) A dust discharging device for dust remover
CN201320501Y (en) Pebble coal air-drive cleaning apparatus
CN201052927Y (en) Gas-solid separating device for material conveying system by gas
CN205471646U (en) Powder pneumatic conveyor system
CN101732934B (en) Group control device for blast furnace gas cloth bag dust removal system for ash conveying of silo pump
CN201459172U (en) Pneumatic ash transmission device for dedusting for high furnace gas cloth bag
CN201228166Y (en) Positive-pressure pneumatic conveying apparatus with adjustable pressure
CN205258517U (en) A evaporation cooling device that is used for converter coal gas dry process dust pelletizing system
CN2778830Y (en) Ash conveying equipment for blast furnace gas dry method dust collection tanker
CN204280713U (en) A kind of environment-friendly type lead powder blast system
CN110171713A (en) A kind of air-transport system with automatic block clearing valve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190212