CN109317344A - Spray carrier and spray-painting production line - Google Patents

Spray carrier and spray-painting production line Download PDF

Info

Publication number
CN109317344A
CN109317344A CN201811451887.0A CN201811451887A CN109317344A CN 109317344 A CN109317344 A CN 109317344A CN 201811451887 A CN201811451887 A CN 201811451887A CN 109317344 A CN109317344 A CN 109317344A
Authority
CN
China
Prior art keywords
longitudinal
spraying
supporting table
pedestal
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811451887.0A
Other languages
Chinese (zh)
Inventor
罗富立
侯海鹏
李沐新
贝赠标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUNWAY PLASTIC CEMENT PRODUCT (ZHUHAI) CO Ltd
Original Assignee
SUNWAY PLASTIC CEMENT PRODUCT (ZHUHAI) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUNWAY PLASTIC CEMENT PRODUCT (ZHUHAI) CO Ltd filed Critical SUNWAY PLASTIC CEMENT PRODUCT (ZHUHAI) CO Ltd
Priority to CN201811451887.0A priority Critical patent/CN109317344A/en
Publication of CN109317344A publication Critical patent/CN109317344A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/90Spray booths comprising conveying means for moving objects or other work to be sprayed in and out of the booth, e.g. through the booth
    • B05B16/95Spray booths comprising conveying means for moving objects or other work to be sprayed in and out of the booth, e.g. through the booth the objects or other work to be sprayed lying on, or being held above the conveying means, i.e. not hanging from the conveying means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B15/00Details of spraying plant or spraying apparatus not otherwise provided for; Accessories
    • B05B15/50Arrangements for cleaning; Arrangements for preventing deposits, drying-out or blockage; Arrangements for detecting improper discharge caused by the presence of foreign matter
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/20Arrangements for spraying in combination with other operations, e.g. drying; Arrangements enabling a combination of spraying operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/52Devices for transferring articles or materials between conveyors i.e. discharging or feeding devices
    • B65G47/64Switching conveyors
    • B65G47/644Switching conveyors by a pivoting displacement of the switching conveyor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Spray Control Apparatus (AREA)

Abstract

The present invention provides a kind of spraying carrier and spray-painting production line, spraying carrier includes front truck, rear car and plummer, front truck includes the first supporting table, first pedestal and multiple longitudinal front wheels, first supporting table is arranged on the first pedestal, multiple longitudinal direction front wheels can be rotationally arranged on the first pedestal in longitudinal surface, rear car includes the second supporting table, second pedestal and multiple longitudinal rear rollers, second supporting table is arranged on the second pedestal, multiple longitudinal direction rear rollers can be rotationally arranged on the second pedestal in longitudinal surface, the front end of plummer and the first supporting table are hinged, the rear end of plummer and the second supporting table are hinged, plummer can be rotated in longitudinal surface.Through the separately positioned and walking of front truck and rear car on predetermined trajectory, pass through the hinged setting of rear ends again, when walking at the switching of different high low orbits, utilize rotatable setting, climbed or is falling slope, the suitability of spraying carrier is not only improved, and also improves the walking stability of spraying carrier.

Description

Spray carrier and spray-painting production line
Technical field
The present invention relates to spraying baking vanish production technology field more particularly to a kind of spraying carriers and spray-painting production line.
Background technique
It in process of producing product, is typically necessary and spray painting coating is carried out to workpiece, surface spraying is to improve workpiece performance And an important manufacturing procedure of aesthetic appearance, as plastic parts, metalwork blank machine-shaping after, then need to send to spraying area Spray treatment is carried out, then carries out paint baking, and traditional spraying method is: manually by blank from putting paint spray booth into one by one, Hand spray is carried out, then takes out be placed on combined padding and drying system one by one, finally takes out and is placed on discharging area.The repetition of this artificial high intensity Property labour, it is low with product qualification rate that the highly intensive labour of this repeatability causes production efficiency low, and spray painting paint vehicle damage work The health of people.
Summary of the invention
The first object of the present invention is to provide a kind of spraying carrier for facilitating circulation to transport.
The second object of the present invention is to provide a kind of spray-painting production line for facilitating circulation to transport.
In order to realize that the first object of the present invention, the present invention provide a kind of spraying carrier, including front truck, rear car and carrying Platform, front truck include the first supporting table, the first pedestal and multiple longitudinal front wheels, and the first supporting table is arranged on the first pedestal, more A longitudinal direction front wheel can be rotationally arranged on the first pedestal in longitudinal surface, and rear car includes the second supporting table, the second pedestal and multiple Longitudinal rear roller, the second supporting table are arranged on the second pedestal, and multiple longitudinal direction rear rollers can rotationally be arranged second in longitudinal surface On pedestal, plummer is provided with front end and rear end, and front end and the first supporting table are hinged, rear end and the second support table-hinges It connects, plummer can be rotated in longitudinal surface.
By above scheme as it can be seen that by the separately positioned of front truck and rear car, and front truck and rear car can walk in default rail On road, then pass through the hinged setting of front end and rear end, when walking at the switching of different high low orbits, utilizes longitudinal surface Rotatable setting, enable spraying carrier ground to be climbed or fall slope, not only improve the suitability for spraying carrier, and also mention The walking stability of height spraying carrier.
Further scheme is that plummer is provided with mounting groove, and the first supporting table and the second supporting table are respectively positioned on installation In slot.
Therefore by the limit of mounting groove, to improve the connective stability of plummer.
Further scheme is that mounting groove is transversely provided through first positioning hole, the first supporting table in front end It is transversely penetratingly provided with second location hole, the first pin passes through first positioning hole and second location hole.
Further scheme is that mounting groove is transversely provided through third location hole, third supporting table in rear end It is transversely penetratingly provided with the 4th location hole, third pin passes through third location hole and the 4th location hole.
Therefore by lateral location hole, it is articulated and connected by pin, installation is easy to connect, and structure Stablize.
Further scheme is that front truck further includes at least two lateral front wheels, and lateral front wheel can turn in lateral face It is arranged on the first pedestal dynamicly, lateral front wheel is separately positioned on the two sides of front truck in a forward direction.
Further scheme be at least two in the quantity of the lateral front wheel of the side of front truck in a forward direction It is a, it is at least two in the quantity of longitudinal front wheel of the side of front truck in a forward direction, the lateral front wheel of the same side is equal Between longitudinal front wheel of the same side.
Further scheme is that rear car further includes at least two lateral rear rollers, and lateral rear roller can turn in lateral face It is arranged on the second pedestal dynamicly, lateral rear roller is separately positioned on the two sides of rear car in a forward direction.
Further scheme be at least two in the quantity of the lateral rear roller of the side of rear car in a forward direction It is a, it is at least two in the quantity of longitudinal rear roller of the side of rear car in a forward direction, the lateral rear roller of the same side is equal Between longitudinal rear roller of the same side.
Therefore longitudinal idler wheel is the walking with support front truck or rear car, and lateral idler wheel is then used for lateral limit Position allows front truck or rear car according to preset track travel, and using the arrangement of idler wheel, reduces front truck or rear car for rail The side in road rubs, and the position by being located at middle part is arranged, and improves the operation stability of front truck and rear car.
In order to realize that the second object of the present invention, the present invention provide a kind of spray-painting production line, including rail assembly and spraying Carrier, the spraying carrier of spraying carrier using the above scheme, front truck and rear car are arranged on rail assembly.
By above scheme as it can be seen that by the separately positioned of front truck and rear car, and front truck and rear car can walk in default rail On road, then pass through the hinged setting of front end and rear end, when walking at the switching of different high low orbits, utilizes longitudinal surface Rotatable setting, enable spraying carrier ground to be climbed or fall slope, not only improve the suitability for spraying carrier, and also mention The walking stability of height spraying carrier.
Further scheme is that rail assembly includes symmetrically arranged two orbital members, and orbital member is provided with sliding slot, sliding The opening of slot is in laterally opening up, and the opening of two orbital members is oppositely arranged, and longitudinal front wheel is separately positioned on front truck in advance side On upward two sides, longitudinal rear roller is separately positioned on the two sides of rear car in a forward direction, and longitudinal front wheel is respectively set In the sliding slot on corresponding side, longitudinal rear roller is separately positioned in the sliding slot on corresponding side.
Therefore by the opposite orbital member that is open, so that front truck and rear car can be stably positioned in orbital member Walking, and opened up by the way that opening is lateral, be conducive to the preferred arrangement of structure, be that the equipment of lower section arranges reserved design space.
Detailed description of the invention
Fig. 1 is the plane figure of spray-painting production line embodiment of the present invention.
Fig. 2 is the plane figure of priming paint spraying coating line in spray-painting production line embodiment of the present invention.
Fig. 3 is the plane figure of finishing coat spraying coating line in spray-painting production line embodiment of the present invention.
Fig. 4 is the configuration schematic diagram of spraying area in spray-painting production line embodiment of the present invention.
Fig. 5 is the structure chart of operation station embodiment of the present invention.
Fig. 6 is the explosive view of spray equipment embodiment of the present invention.
Fig. 7 is the structure chart of spray equipment embodiment of the present invention.
Fig. 8 is the structure chart of spray equipment embodiment of the present invention in the locked state.
Fig. 9 is the explosive view of present invention spraying carrier embodiment.
Figure 10 is the structure chart that operation station embodiment of the present invention is under halted state.
Figure 11 is the structure chart that operation station embodiment of the present invention is under walking states.
Figure 12 is the spraying carrier cooperation schematic diagram of operation station embodiment of the present invention.
Figure 13 is the structure chart of rail assembly embodiment of the present invention.
Figure 14 is the structure chart of changeover module in rail assembly embodiment of the present invention.
Figure 15 is the first switching state schematic diagram of switch piece in rail assembly embodiment of the present invention.
Figure 16 is the second switching state schematic diagram of switch piece in rail assembly embodiment of the present invention.
Figure 17 is that embodiment is located at the explosive view at baffle plate assembly between spraying operation of the present invention.
Figure 18 is the diagrammatic cross-section of embodiment device distribution between spraying operation of the present invention.
Figure 19 is the structure chart between spraying operation of the present invention in embodiment at third protective plate.
Figure 20 is the side schematic view between spraying operation of the present invention in embodiment at third protective plate.
Figure 21 is the structure chart of multi-functional switching jig embodiment of the present invention.
The invention will be further described with reference to the accompanying drawings and embodiments.
Specific embodiment
Spray-painting production line embodiment:
Referring to Fig.1, spray-painting production line includes basecoat paint line 1, the change change rail of rail assembly 31, second of finishing coat spraying coating line 2, first Component 32, third become rail assembly the 33, the 4th and become the change rail assembly 35 of rail assembly the 34, the 5th and the 6th change rail assembly 36.Reference Fig. 2, Basecoat paint line 1 includes the first transmission chain device 10, priming paint clear area, basecoat application zones 12, the first priming paint levelling area 131, the Two priming paint levelling areas 132, priming paint Coating Area 14 and the first loading and unloading area 15, priming paint clear area, basecoat application zones 12, the first priming paint Levelling area 131 and priming paint Coating Area 14 pass sequentially through the connection of transmission chain device 10, and the feeding end 151 in the first loading and unloading area 15 passes through Transmission chain device 10 is connect with priming paint clear area, and the discharging end in the first loading and unloading area 15 passes through transmission chain device 10 and priming paint baking vanish The output end 152 in area 14 connects.
Priming paint clear area includes dehumidifying area 111, electrostatic automatic dust removing area 112, dry ice cleaning treatment area 113 and automatic dust removing Area 114, dehumidifying area 111 are provided with dehumidification device, and electrostatic automatic dust removing area is provided with electrostatic precipitator, dry ice cleaning treatment area Dry ice cleaner is provided in 113, dry ice cleaner can carry out injection control by three-dimensional mechanical hand, can be deep by dry ice cleaning Degree cleaning blank.The settable three-dimensional mechanical hand in automatic dust removing area 114 and gas tip can be further dusted.Priming paint Clear area is located at the periphery of priming paint Coating Area 14.It is provided with three-dimensional mechanical hand in basecoat application zones 12, is set on hand in three-dimensional machinery It sets to paint spraying head, transmission chain device 10 is provided with spraying carrier by basecoat application zones 12 on transmission chain device 10, Basecoat application zones 12 carry out paint spraying to blank.
First priming paint levelling area 131 is used to carry out the stop of preset time to blank, can be sent after stop to the and priming paint stream In flat area 132 or priming paint Coating Area 14, second becomes the output end company in the input terminal of rail assembly 32 and the first priming paint levelling area 131 It connecing, the first output end of the second change rail assembly 32 is connect with the input terminal in the second priming paint levelling area 132, second becomes rail assembly 32 Second output terminal connect with priming paint Coating Area 14, the output end in the second priming paint levelling area 132 and third become the of rail assembly 33 The connection of one input terminal.Priming paint Coating Area 14 is cold including priming paint preheating zone 141, primer curing oven area 142 and the priming paint set gradually But area 143, priming paint preheating zone 141, primer curing oven area 142 are different with the temperature of priming paint cooling zone 143, and each area is to pass through biography Dynamic chain apparatus 10 connects, and the transmission chain of priming paint Coating Area 14 can effectively save space in arrangement of spiraling.
The input terminal of first change rail assembly 31 is connect with the output end of priming paint Coating Area 14, and first becomes the first of rail assembly 31 Output end is connect with the second input terminal that third becomes rail assembly 33, and first becomes the second output terminal of rail assembly 31 and and about first Expect that the discharging end 152 in area 15 connects.
Referring to Fig. 3, finishing coat spraying coating line 2 includes transmission chain device 20, finishing coat clear area, finishing coat spraying area 22, finishing coat levelling Area 23, finishing coat Coating Area 24 and the second loading and unloading area 25, finishing coat clear area, finishing coat spraying area 22, finishing coat levelling area 23 and finishing coat Coating Area 24 passes sequentially through the connection of transmission chain device 20, and the feeding end in the second loading and unloading area 25 passes through transmission chain device 20 and finishing coat The input terminal of clear area connects, and the discharging end in the second loading and unloading area 25 is connect by transmission chain device 20 with finishing coat Coating Area 24.
Finishing coat clear area includes the dehumidifying area 211 being sequentially arranged, electrostatic automatic dust removing area 212 and automatic dust removing area 213, is removed Wet area 211 is provided with dehumidification equipment, dehumidifying area 211 in addition to dehumidify it is outer can also its levelling act on, the configuration of finishing coat spraying area 22 It is identical as basecoat application zones 12.Finishing coat levelling area 23 finishes carry out levelling in finishing coat spray painting for placing blank.
Finishing coat Coating Area 24 includes finishing coat preheating zone 241, topcoating cures furnace area 242 and the finishing coat cooling zone set gradually 243, finishing coat preheating zone 241, topcoating cures furnace area 242 are different with the temperature of finishing coat cooling zone 243, and each area is to pass through transmission chain Device 20 connects, and the transmission chain of finishing coat Coating Area 24 is in spiral arrangement, the output end of finishing coat Coating Area 24 and the second loading and unloading area 25 discharging end 252 connects.
The output end of 4th change rail assembly 34 is connect with the input terminal of finishing coat clear area, and the second of the 4th change rail assembly 34 is defeated Enter end and is connect with the output end that third becomes rail assembly 33.5th becomes the feeding in the input terminal of rail assembly 35 and the second loading and unloading area 25 251 connection of end, the first output end of the 5th change rail assembly 35 are connect with the first input end of the 4th change rail assembly 34, and the 5th becomes rail The second output terminal of component 35 is connect with the first input end of the 6th change rail assembly 36, and the 6th becomes the second input terminal of rail assembly 36 It is connect with the second output terminal of the first change rail assembly 31, the 6th becomes the blanking in the output end of rail assembly 36 and the first loading and unloading area 15 152 connection of end.
Spray-painting production line includes the basecoat application zones 12 and finishing coat spraying area 22 in relative closure setting, priming paint clear area 11, basecoat application zones 12, the first priming paint levelling area 131 and priming paint Coating Area 14 are respectively positioned in basecoat application zones 12, can from Fig. 2 See, dehumidifying area 111, electrostatic automatic dust removing area 112, dry ice cleaning treatment area 113, automatic dust removing area 114, basecoat application zones 12, First priming paint levelling area 131, the second priming paint levelling area 132 are in turn distributed in the periphery of priming paint Coating Area 14, the first loading and unloading Area 15 is located at outside basecoat application zones 12.It can be seen from figure 3 that finishing coat clear area, finishing coat spraying area 22, finishing coat levelling area 23 and finishing coat are roasting Paint area 24 is respectively positioned in finishing coat spraying area 22, dehumidifying area 211, electrostatic automatic dust removing area 212, automatic dust removing area 213, finishing coat spraying Area 22 and finishing coat levelling area 23 are in turn distributed in the periphery of finishing coat Coating Area 24, and the second loading and unloading area 25 is located at finishing coat spraying area Outside 22.Also, the first loading and unloading area 15 and the second loading and unloading area 25 are located on the same side, and in conllinear arrangement.
Spray-painting production line is additionally provided with orbital transfer area, and first, which becomes rail assembly 31, second, becomes rail assembly 32, third change rail assembly 33, the 4th change rail assembly the 34, the 5th becomes rail assembly 35 and the 6th change rail assembly 36 is arranged in orbital transfer area, and orbital transfer area is located at bottom It paints between spraying coating line 1 and finishing coat spraying coating line 2, and between the first loading and unloading area 15 and the second loading and unloading area 25.
Above-mentioned clear area, spraying area, levelling area, Coating Area and loading and unloading area are provided with operation station, and operation station is equal Configured with carrier loader, rail assembly, barrier assembly and transmission chain device, in addition also configuration selection can be carried out according to actual process, Corresponding cleaning device is needed to configure as Coating Area needs to configure stop operation station, heating device and ventilation device, clear area With cleaning operation station, spraying area then configures corresponding spray assembly, and referring to Fig. 4 and Fig. 5, Fig. 4 is that the configuration in spraying area is shown It is intended to, Fig. 5 is the structure chart of spray equipment, and spraying area includes that spraying operation is disposed between spraying between the spraying of relative closure Station, spraying operation station include spray equipment, spraying carrier, rail assembly, barrier assembly and transmission chain device, transmission chain dress It sets and track is connected between different operation stations, carrier loader is walked on rail assembly, and transmission chain device is along direction of advance It is mobile, it then realizes and transports carrier loader to the different corresponding process of operation station progress.
Referring to figure 6 and figure 7, spray equipment 4 includes bearing assembly 45, rotary components, spray assembly 121 and locked component 47, spray assembly 121 includes that three-dimensional mobile manipulator and spray head, spray head are arranged on the free end of three-dimensional mobile manipulator, It can be realized multi-angle and multi-faceted adjusting, spray head is arranged towards 46 ground of runing rest of bearing assembly 45.
Bearing assembly 45 includes fixed bracket 451 and runing rest 46, and fixed bracket 451 is arranged on transmission chain device, Fixed bracket 451 has pedestal and the cylinder on pedestal, and the cylinder of fixed bracket 451 is vertically arranged with mounting hole 452, Runing rest 46 includes disk body section 461 and positioning column 462, and disk body section 461 is disc-shaped horizontally disposed, and positioning column 462 is connected to disk The lower section in body portion 461, and disk body section 461 and 462 coaxial line of positioning column arrangement, the periphery of disk body section 461 is provided with teeth portion, teeth portion Including multiple driving teeth portion 463 and multiple toothless portion)s 464, toothless portion) 464 and driving teeth portion 463 are interspersed, positioning column 462 It is mounted in mounting hole 452, so that runing rest 46 can be freely rotated around own axes, and disk body section 461 rotates in lateral face, Hanger 48 is arranged on disk body section 461, and carry blank is used on hanger 48, and hanger 48 is rotated with the rotation of runing rest 46. Multiple lockholes 465 are additionally provided on disk body section 461, multiple lockholes 465 are respectively positioned on the inside of teeth portion, in the present embodiment, lockhole It is arranged using square hole, and two lockholes, as one group, one group of lockhole is arranged in parallel, and the lockhole of adjacent sets is mutually perpendicular to, one Lockhole 465 is located at close to corresponding 464 ground of toothless portion) arrangement.
Rotary components include rotation drive device 43, rotary disc assembly 41, connecting bracket 441, track 442 and connection driving dress 443 are set, rotary disc assembly 41 includes disk body 411, disk body 412 and multiple rotary columns 413, and rotation drive device 43 is provided with drive shaft 431 and encoder 42, encoder 42 is used to monitor the rotation situation of rotation drive device 43, i.e., rotation drive device 43 is using electricity When machine drives, the turnning circle and rotation direction of rotation drive device 43, the drive shaft 431 of rotation drive device 43 can be known Longitudinally arranged, drive shaft 431 and disk body 411,412 coaxial connections then realize that driving disk body rotates in lateral face.
The periphery of disk body 411, disk body 412 is arranged in multiple rotary columns 413, and rotary column 413 is rotatably connected to 411 He of disk body It between disk body 412, is fixedly connected between disk body 411 and disk body 412 by multiple fixing screws 414 being evenly arranged, fixed spiral shell Be cased with outside nail 414 can rotation pivoted housing, rotary column 413 is uniformly distributed circumferentially around own axis, rotary column 413, and with fixation Screw 414 is spacedly distributed, and a fixing screws and pivoted housing, rotation drive device 43 is arranged in every five rotary columns in the present embodiment Disk body 411 and disk body 412 is driven to rotate in lateral face, multiple rotary columns 413 engage connection with teeth portion, by rotary column 413 around disk body Center line rotation, then realize rotary column drive runing rest 46 rotate.
Rotation drive device 43 and rotary disc assembly 41 are arranged in connecting bracket 441, the lower section connection of connecting bracket 441 There is track 442, track 442 extends transversely arrangement, and connecting bracket 441 is arranged on track 442 and can laterally move along track 442 Dynamic, connection driving device 443 is driven using cylinder, and connection driving device 443 is drivingly connected bracket 441 towards or away from holding Carry that component 45 is mobile, then realize the connection of rotary disc assembly 41 and runing rest 46 with separate, when needing to carry out rotary spraying, Then rotary disc assembly 41 drives runing rest 46 to rotate, and spray head then turns towards 46 spray paint of runing rest when needing to pinpoint spraying Disk component 41 is separated with runing rest 46, and spray head adjustable point carries out spraying or moveable spraying carries out sweeping spray.
Locked component 47 includes two lock brackets 471, locking driving device 48, connecting rod 476 and clump weight 474, lock bracket 471 arrange in the form of sheets, and lock bracket 471 is separately positioned in the radially opposite sides of fixed bracket 451, and lock bracket 471 is located at disk body The lower section in portion 461, lock bracket 471 are provided with articulated section 473 and sticking department 472, and articulated section 473 is the through-hole being arranged along the horizontal, Articulated section 473 is located at the middle part of lock bracket 471, and fixed bracket 451 is radially also equipped with through-hole in peripheral wall, and screw is transversely worn The through-hole of articulated section and fixed bracket 451 is crossed, then realizes that lock bracket 471 can be rotated in longitudinal surface.
Sticking department 472 and clump weight 474 are separately positioned on the both ends of lock bracket 471, and articulated section 473 is located at sticking department 472 On position between clump weight 474, clump weight 474 is located at the outside of disk body section 461, and sticking department 472 is located under disk body section Side, clump weight 474 are connected between two lock brackets 471, and clump weight 474 includes connecting shaft and pivoted housing, and connecting shaft is connected to two Between a lock bracket 471, pivoted housing rotationally covers outside connecting shaft.
Sticking department 472 is in hook-shaped arrangement, passes through hook-shaped sticking department 472 and 465 lock fit of lockhole, two connecting rods 476 It is connected between two lock brackets 471 positioned at the place close to sticking department 472, then realizes the locking intensity for improving sticking department 472.
Lock bracket 471 is additionally provided with the drive rod 475 stretched out outwardly, and drive rod 475 and sticking department 472 are separately positioned on hinge The two sides of socket part 473, drive rod 475 are located on the same side of clump weight 474.Driving device 48 is locked to be arranged in bearing assembly 45 Side on, and be located on the opposite side of rotary components, locking driving device 48 includes support bracket 481 and cylinder driver 482, the driving end of cylinder driver 482 is connect with support bracket 481, and cylinder driver 482 drives support bracket 481 along longitudinal direction Mobile, support bracket 481 with drive rod 475 for connecting.
Referring to Fig. 7 and Fig. 8, when carrying out flat spray, support bracket 481, which is located at, is moved to lower section, separates, locks with drive rod 475 Portion 472 and lockhole 465 cooperate, and rotating bracket 461 realizes that position is fixed, and then moveable spray head carries out flat spray to blank.Into When line position sets adjusting, support bracket 481, which is located at, is moved to top, and 481 support drive rod 475 of support bracket makes drive rod 475 is past to move up It is dynamic, then lock bracket 471 is driven to rotate around articulated section 473, sticking department 472 is separated with lockhole 465, then is turned by rotary components The dynamic position for realizing runing rest is adjusted, and last support bracket 481, which is located at, is moved to lower section, realizes locking again, spray head can just not Flat spray is carried out with position or different angle, therefore spray equipment 4 can select rotary spraying or flat spray according to process requirements.
Referring to Fig. 9 and Figure 10, spraying carrier includes carrier loader 5 and plummer 53, and carrier loader 5 includes front truck 51 and rear car 52, front truck 51 includes the first supporting table 511, the first pedestal 513, multiple longitudinal front wheels 515 and four lateral front wheels 516, First supporting table 511 is arranged on the first pedestal 513, and the cylindrical arrangement of the first supporting table 511, the first supporting table 511 is along cross To second location hole 512 is penetratingly provided with, the first pedestal 513 can be rotationally arranged in longitudinal surface in multiple longitudinal direction front wheels 515 On, multiple longitudinal direction front wheels 515 are distributed in the surrounding of the first pedestal 513, and longitudinal front wheel 515 is used to support front truck 51 in track Walking on part.Lateral front wheel 516 can be rotationally arranged on the first pedestal 513 in lateral face, and lateral front wheel 516 is set respectively It sets on the two sides in a forward direction of front truck 51, in the number of the lateral front wheel 516 of the side of front truck 51 in a forward direction Amount is two, is two in the quantity of longitudinal front wheel 515 of the side of front truck 51 in a forward direction, coming for the same side is a It crosses lateral front wheel 516 to be respectively positioned between two longitudinal front wheels 515 of the same side, lateral front wheel 516 is used for and orbital member It is adjacent, it is used for the cross spacing in orbital member.
The structure of front truck and the structure of rear car are essentially identical, and rear car 52 includes the second supporting table 521,523 and of the second pedestal Four lateral rear rollers 526 of longitudinal rear roller 525, four, the second supporting table 521 are arranged on the second pedestal 523, the second support Platform 521 is transversely penetratingly provided with the 4th location hole 522, and multiple longitudinal direction rear rollers 525 can rotationally be arranged the in longitudinal surface On two pedestals 523, lateral rear roller 526 can be rotationally arranged on the second pedestal 523 in lateral face, and lateral rear roller 526 is distinguished It is arranged on the two sides of rear car 52 in a forward direction, the lateral rear roller 526 in the side of rear car 52 in a forward direction Quantity is two, is two in the quantity of longitudinal rear roller 525 of the side of rear car 52 in a forward direction, the transverse direction of the same side Rear roller 526 is respectively positioned between longitudinal rear roller 525 of the same side.Gear is provided on the rear end of direction of advance in rear car 52 Plate 55, operation portion 541 and baffle 55 are correspondingly arranged in the horizontal direction, and baffle 55 includes positioned at the guide surface 551 in outside and interior The groove portion 552 of side, the setting of the inclined face of guide surface 551, guide surface 551 are connected to groove portion 552, and the position of guide surface 551 is higher than The position of groove portion 552.
Plummer 53 is arranged in framework 922,923, and plummer 53 is provided with mounting groove 531, and plummer 53 has at middle part Installation position 534, installation position 534 are used to be fixedly connected with fixed bracket 451, and plummer 53 is provided with front end and rear end, peace Tankage 531 is transversely provided through first positioning hole 532 in front end, and mounting groove 531 transversely runs through setting in rear end There is third location hole 533, the first supporting table 511 and the second supporting table 521 are respectively positioned in mounting groove 531, and the first pin 514 passes through First positioning hole 532 and second location hole 512, the front end of plummer 53 and the first supporting table 511 are hinged, the second pin 524 Across third location hole 533 and the 4th location hole 522, the rear end of plummer 53 and the second supporting table 521 are hinged, then make Plummer 53 can be rotated in longitudinal surface, when front truck and rear car are walked in the rail assembly of different height, by rotatable Design is switched so that plummer 53 and fixed bracket 451 are correspondingly rotated with adapting to stablizing for height.
Referring to Fig.1 0 and combine Fig. 9, Fig. 5, rail assembly includes symmetrically arranged two orbital members 61 and 62, with orbital member 61 for example, orbital member 61 is provided with sliding slot 611, and the opening of sliding slot 611 is opened up in lateral inward, two orbital members 61,62 Opening be oppositely arranged, since longitudinal front wheel 515 is separately positioned on the two sides of front truck 51 in a forward direction, rolled behind longitudinal direction Wheel 525 is separately positioned on the two sides of rear car 52 in a forward direction, therefore front truck and rear car are rolled before longitudinal when orbital member is walked Wheel 515 is separately positioned in the sliding slot on corresponding side, and longitudinal rear roller 525 is separately positioned in the sliding slot on corresponding side.
Stopping device is additionally provided between front truck and rear car, stopping device includes driving device 661, sliding block 663 and stops Block 664 is moved back, the driving end 662 of driving device 661 and sliding block 663 are hinged, and sliding block 663 is driven to laterally move, with front truck Direction of travel it is parallel, 1 and Figure 10 referring to Fig.1, retreat stop block 664 includes positioned at articulated section, the retaining face positioned at lower part at middle part With the lead-in chamfered portion for being located at side, the articulated section of retreat stop block 664 is articulated with sliding block 663, and retaining face is for the top with sliding block 663 Face is adjacent, and the available pedestal with front truck or rear car in lead-in chamfered portion is slidably matched, when front truck or the pedestal of rear car are along direction of advance When by retreat stop block 664, hinge point can be such that retreat stop block 664 rotates in the front end of the direction of advance in lead-in chamfered portion, and suitable Benefit passes through, and when retreating, since retreat stop block 664 is between front truck and rear car, and hinge point is in the direction of advance in retaining face Front end, therefore when pedestal of front truck retreats, is then adjacent with retreat stop block 664, and the blocking in retaining face is so that retreat stop block 664 can not Rotation, then realizes stopping function.
The lower section of rail assembly, the extending direction of transmission chain device 65 and prolonging for rail assembly is arranged in transmission chain device 65 Stretch that direction is identical, the periphery of transmission chain device 65 is provided with shell 64, operating of the transmission chain device 65 in shell 64, transmission chain dress Setting 65 includes multiple drive blocks 653, multiple longitudinal idler wheels 651, chain and multiple transverse-rollers 652, longitudinal idler wheel 651 and cross Way roller 652 is evenly spaced apart to be arranged on chain, and drive block 653 is also in be evenly spaced apart to be arranged on chain, drive block 653 Upper end be provided with driving portion 664, driving portion 664 is in driving step setting.
Rotating bar 54 is additionally provided in the lower section of front truck 51, turns part 575, actuator 56, fixed plate 517 and fixed plate 518, Fixed plate 517 and fixed plate 518 are longitudinally arranged, and fixed plate 517 and fixed plate 518 are separately fixed at the lower section of pedestal 513 On two sides, actuator 56 is additionally provided between fixed plate 517 and fixed plate 518 between fixed plate 517 and fixed plate 518 Four roller bearings 571, roller bearing 572, roller bearing 573 and roller bearing 574, roller bearing 571 and roller bearing 572 are opposite, 574 phase of roller bearing 573 and roller bearing It is right, the first limiting slot is formed between four roller bearings, the first limiting slot extends longitudinally arrangement, and actuator 56 is located at the first limiting slot Interior longitudinal movement.Above-mentioned roller bearing includes the limited post of fixed setting and covers the roll sleeve outside limited post, and roll sleeve can freely turn Dynamic setting.
Actuator 56 includes the body of rod 564, driving portion, the second limiting slot 563, over-hang part 92567 and effector 565, driving Portion is located at the lower end of actuator 56, and driving portion includes middle stopper 561 and two side block portions 562, and position is distinguished in two side block portions 562 In the both lateral sides of middle stopper 561, the body of rod 564 is located at middle part, and the body of rod 564 is located at the first limiting slot and the ground edge between roller bearing Longitudinal movement, effector 565 are located at the upper end of actuator 56, and in crossing out, the second limiting slot 563 is located at effector 565 At lower end, roller bearing 572 is located in the second limiting slot 563, and the second limiting slot 563 is provided with confined planes in upside, and downside is set It is equipped with opening.
Turn part 575 and be provided with groove portion, and be respectively arranged with hook part in the two sides of groove portion, turns part 575 and be rotatably arranged in Between fixed plate 517 and fixed plate 518, turning part 575 can rotate in longitudinal surface, and over-hang part 92567 is located at the second limiting slot 563 On side and it is located in the groove portion for turning part 575, the longitudinal movement of actuator 56 can be with the rotation of turn part 575.
Rotating bar 54 includes operation portion 541, articulated section 542 and rotation section 543, and articulated section 542 is located at middle part, operation portion 541 and rotation section 543 be located at the two sides of articulated section 542, rotating bar 54 is hinged on the fixed plate 517 of front truck by articulated section 542 Between fixed plate 518, operation portion 541 and rotation section 543 are rotated rotating around articulated section 542 in longitudinal surface, the first base of front truck Through-hole is arranged in front end in seat 513, and operation portion 541 passes through the through-hole, and operation portion 541 is located at outside front truck 51, and operation portion 541 In carrier loader 5 on the front end of direction of advance, the lower surface of rotation section 543 and effector 565 is adjacent, passes through 54 band of rotating bar Dynamic rotation section 543 rotates, and the rotate driving actuator 56 of rotation section 543 moves longitudinally.
Transverse-roller 581 and transverse-roller 582, transverse-roller 581 and transverse-roller are additionally provided in the lower section of front truck 51 582 can rotate in lateral face, and transverse-roller 581 and transverse-roller 582 are located at the front-end and back-end of direction of advance, laterally The shaft of idler wheel 581 and the shaft of transverse-roller 582 are fixed between fixed plate 517 and fixed plate 518, and transverse-roller 581 In the lower section of rotating bar 54, the shaft and transverse-roller 582 of transverse-roller 581 are located on sustained height, and transverse-roller 581 turns The outer peripheral surface of axis and the outer peripheral surface of transverse-roller 582 are respectively positioned on except fixed plate 517 and fixed plate 518, and fixed plate 517 and solid Corresponding escape groove is respectively set in fixed board 518.The lower section of rear car 52 is provided with transverse-roller 583, transverse-roller 584, fixation Plate 527 and fixed plate 528, transverse-roller 583 and transverse-roller 584 are rotatably arranged in fixed plate 527 and fixed plate respectively Between 528, transverse-roller 583 and transverse-roller 584 are located at the front-end and back-end of direction of advance.
Barrier assembly is fixed at the lower section of carrier loader 5, and barrier assembly includes stopping driving device 621, two blockings Part 63 and connection frame 634, block piece 63 are provided with blocking portion 631, guide surface 632 and articulated section 633, and the setting of blocking portion 631 exists Guide surface 632 is located at the front end of direction of advance, and guide surface 632 is inclined to set, and the height of guide surface 632 is along direction of advance by small It continuously enlarges, the two sides that transmission chain device 65 is located at direction of advance are arranged in two block pieces 63, and connection frame 634 is in frame-type cloth Set, two block pieces 63 respectively with connect frame 634 and be fixedly connected, articulated section 633 is connect with the outline border 64 of transmission chain device 65, resistance Keep off driving device 621 use cylinder driver, stop driving device 621 driving end 622 with connect frame 634 hingedly, hindering It keeps off under the transversal stretching driving of driving device 621, block piece 63 is rotated in longitudinal surface, realizes that blocking portion 631 and guide surface 632 exist Longitudinal position is mobile.
Referring to Fig.1 1, when spraying carrier and needing to transport by transmission chain device 65, block piece 63 is turned on the lower Position, and with the drive part of actuator 56 from since under the gravity of actuator 56, the driving portion of actuator 56 is along vertical It is specifically driven to walking position is movable at this point, the driving portion 664 of transmission chain device 65 will be drivingly connected with actuator 56 Portion 664 and middle stopper 561 are drivingly connected, and by the walking of the hoofing part actuator 56 of transmission chain device 65, then realize band Dynamic front truck and entire spraying carrier are mobile.
Referring to Fig.1 2, when spraying carrier and needing to stop at operation station, it is possible to which single spraying carrier stops at work At industry station, it is also possible to be two or two or more spraying carriers while rest at operation station, when two or two When above spraying carrier is adjacent, the baffle 55 of previous spraying carrier is by the rotating bar 54 of the spraying carrier with latter The connection cooperation of operation portion 541.
When previous spraying carrier stops, block piece 63 turns to position against the top, the guide surface 632 of block piece 63 Cooperation is connect with the driving portion of actuator 56 with blocking portion 631, specifically two blocking portions 631 and two side block portions 562 are adjacent, And actuator 56 is driven to move longitudinally upward, 56 driving portion of actuator is movable along the longitudinal to stop position, at this point, transmission chain fills Setting 65 driving portion 664 will separate with actuator 56, then realize the stopping of previous spraying carrier.
When the rotating bar 54 of latter spraying carrier connect cooperation, rotating bar with the baffle 55 of previous spraying carrier 54 can abut along guide surface 551 and slide into groove portion 552, and rotating bar 54 is then made to rotate, and make to drive actuator 56 It moves longitudinally upward, 56 driving portion of actuator is movable along the longitudinal to stop position, but also the driving portion of transmission chain device 65 664 will separate with actuator 56, then also realize the stopping of latter spraying carrier.Since transmission chain device 65 is normally being transported It keeps in the trade constantly along direction of advance transport, and passes through the separation of transmission chain device 65 and actuator 56, to realize Spray the stopping of carrier.
3 and Figure 14 referring to Fig.1, Figure 13 are the structure charts of rail assembly, and Figure 14 is the structure chart of changeover module, the track groups Part can be used as above-mentioned change rail assembly use in orbital transfer area, then realize the switching of track.Rail assembly includes main orbit, divides Track, the first transmission chain device 65, the second transmission chain device 66 and changeover module 75, main orbit and point of rail road transversely prolong It stretches, point of rail road is connect at changed track position 70 with main orbit.
Main orbit includes the first orbital member 71, the second orbital member 72 and third orbital member 73, and point of rail road includes the 4th track The structure of above-mentioned orbital member 61 and 62 can be used in part 74, orbital member, that is, has sliding slot and opposite transverse opening, the first track Main orbit is constituted between part 71 and the straight line portion of the second orbital member 72, is constituted between the first orbital member 71 and third orbital member 73 Main orbit, main orbit be it is extending in a straight line, constitute point of rail between the 4th orbital member 74 and the bending part of the second orbital member 72 Road, point of rail road is bent extension at changed track position, therefore the first orbital member 71 is positioned close on the side of main orbit, the second track Part 72 is positioned close on the side in point of rail road.First transmission chain device 65 is located at the lower section of main orbit and the extension with main orbit Direction arrangement, the second transmission chain device 66 are located at the lower section in point of rail road and arrange with the extending direction in point of rail road.
Changeover module 75 includes bracket 752, switch piece 751 and switching driving device 753, and switching driving device 753 can be adopted Flexible driving is carried out with gas bar, switch piece 751 is arranged at changed track position 70, and both lateral sides of the switch piece 751 in end are distinguished It is provided with the first guide portion and the second guide portion, the first guide portion is towards main orbit, and the second guide portion is towards point of rail road, switch piece 751 are provided with point 7515 between the first guide portion and the second guide portion, and the first guide portion is arranged in first step, and first Step includes the first bottom surface 7512 and the first guide sides 7511, and for the first guide sides 7511 in arrangement is faced directly, first guides side Face 7511 and direction of advance angle arrangement (see Figure 15) at an acute angle, the second guide portion are arranged in second step, and second step includes Second bottom surface 7514 and the second guide sides 7513, the second guide sides 7513 are arranged in cambered surface, the second guide sides 7513 with 4th orbital member 74 is in curved arrangement in the same direction (see Figure 16), and the first bottom surface 7512 and the second bottom surface 7514 are in co-planar arrangement.
Switch piece 751 is provided with articulated section and interconnecting piece 917516, and articulated section and interconnecting piece 917516 are located remotely from guidance On the one end in portion, for hinge point in middle part, the conventional arrangements such as through-hole or cylinder are can be used in articulated section, and interconnecting piece 917516 is located at hinge The intersection at changed track position 70 and being located at third track and the 4th track, bracket 752 is arranged in the periphery of socket part, bracket 752 Fixed frame 7521 be fixedly connected with third orbital member 73, the fixed frame 7522 and the 4th orbital member 74 of bracket 752, switch piece 751 can be rotatably arranged on bracket 752 around the articulated section at center, the driving end 754 of switching driving device 753 and interconnecting piece 917516 is hinged, under the flexible driving of switching driving device 753, realizes that driving switch piece 751 turns in lateral face around articulated section It is dynamic, then realize that the position rotation of the first guide portion and the second guide portion is adjusted.
5 and combination Fig. 9 and Figure 10 referring to Fig.1, when spraying carrier along main orbit linear running, switch piece turns to close On the side in point of rail road, and the second sliding slot of the second orbital member 72 is provided with the second bottom wall and the second transverse opening, therefore switch piece The second bottom surface 7514 be embedded in below the second bottom wall, the second guide sides 7513 are located at the second transverse opening, and first guides Side 7513 and the first track 71 constitute the guidance of main orbit.The transverse-roller 581 of the setting height and front truck 51 of switch piece 75 Match setting, therefore the transverse-roller 581 of front truck 51 is run at the first guide sides 7511 and by the adjoining of the first guide sides Cooperation guidance, subsequent transverse-roller 582, transverse-roller 583, transverse-roller 584 are correspondingly guided, and then realize spraying The main orbit of carrier correctly guides.
Referring to Fig.1 6, when spraying carrier needs and switching to point of rail road from main orbit, switch piece is turned to close to the first rail On the side of road part 71, and the sliding slot of the first orbital member 71 is provided with the first bottom wall and the first transverse opening, therefore the of switch piece One bottom surface 7512 is embedded in below the first bottom wall, and the first guide sides 7511 are located at the second transverse opening, the second guide sides 7513 and second track 72 constitute point of rail road guidance.The transverse-roller 581 of front truck 51 is run at the second guide sides 7513 And by the adjacent cooperation guidance of the second guide sides, so that the turning of front truck 51 is mobile and drives into point of rail road, subsequent transverse-roller 582, transverse-roller 583, transverse-roller 584 are correspondingly guided, and then realize that rail guidance is cut in the point of rail road of spraying carrier.
Above-mentioned usage mode is using an input terminal and two output ends, is one such usage mode, on The rail assembly stated can also be used as two input terminals and output end, that is, meet the use need of above-mentioned change rail assembly It asks.
Mutually independent work should mutually be had by being respectively set in above-mentioned clear area, spraying area, levelling area, Coating Area and loading and unloading area It between industry, is connected between operating room by rail assembly, operating room is corresponding closed by end wall progress, corresponding in operating room setting Operation station, the corresponding equipment of setting is to realize the processing technology to be realized of the region in operation station, and 7 simultaneously referring to Fig.1 It, below will be to be specifically described between spraying operation between spraying operation in conjunction with Fig. 4.
It include multiple end walls between spraying operation, multiple end walls surround relatively closed working space, and working space is provided with Spraying operation station, the opposite end wall 811 of two of them and end wall 812 are respectively arranged with entrance, positioned at the discrepancy of end wall 811 Mouth includes that the product entrance 812 being located above and underlying track entrance 813, product entrance 812 and track go out About 813 entrance is connected to, and the entrance positioned at end wall 821 includes the product entrance 822 and underlying rail being located above Road entrance 823, product entrance 822 are connected to about 823 track entrance.Rail assembly and transmission chain device go out from track Simultaneously connection operation station is passed through with entrance 813 and track entrance 823, and hanger 48 and blank disposed thereon are then through product Entrance 812 and product entrance 822 enter and leave.
Operating room further includes two baffle plate assemblies, and baffle plate assembly is separately positioned on product entrance 812 and product entrance At 822, with the baffle plate assembly of product entrance 812 for example, baffle plate assembly further includes 814, two first, the first track companies The top of entrance 812 transversely is arranged in fitting 831, the second track 815 and the second connector 832, the first track 814, Second track 815 transversely is arranged at the side of entrance 812 on the lower, and the first connector 831 is arranged in barrier driving At the top of device 816, the second connector 832 is arranged at the lower section of Baffle drive device 816, the first connector 831 and The connection cooperation of one track 814, the second connector 832 connect cooperation with the second track 815, and connector is arranged using sliding block, in cunning Sliding slot is provided on block, sliding slot and track cooperation are slided, this is one of embodiment certainly, and the cooperation of track and connector is also Can be used: track is provided with sliding slot, and connector is then slidably matched by the way of idler wheel, and there are also some conventional limits certainly The implementation of position sliding.
816 driving device of Baffle drive device uses gas bar or liquid bar, 816 driving device of Baffle drive device, and baffle drives Dynamic 816 driving device of device is located in the longitudinal direction between the first track 814 and the second track 815, and Baffle drive device 816 drives Device is horizontally located between Baffle drive device 816 and end wall 811,812.The driving end 817 of Baffle drive device 816 with Baffle 83 connects, and referring to Fig.1 8, under the flexible driving of Baffle drive device 816, baffle 83 can be along track towards or away from production 812 transverse shifting of product entrance, and realize baffle 83 for covering product entrance 812.
Referring to Fig.1 8 to Figure 20, spraying operation station is additionally provided with protective plate component 84, and protective plate component 84 includes first Protective plate 841, the second protective plate 842, third protective plate 843 and protective plate driving device 844, the first protective plate 841 and second Protective plate 842 is separately positioned on the two sides in the direction of advance of transmission chain device, the upper end and second of the first protective plate 841 Sliding slot 85 is formed between the upper end of protective plate 842, sliding slot 85 is in through setting, the upper end of the first protective plate 841 exists up and down The second elastic lattice gear is arranged in the elastic lattice block piece 851 of setting first in sliding slot 85, the upper end of the second protective plate 842 in sliding slot 85 Part 852, elastic lattice block piece can be used brush item or sheet rubber and block to sliding slot 85.First protective plate of protective plate component 84 841 and second protective plate 842 be connected between track entrance 813 and track entrance 823, protective plate component 84 also can be right Track entrance 813 and track entrance 823 realize that closing is blocked.
Bearing assembly, rotary components, locked component, spraying carrier, barrier assembly, rail assembly and transmission chain device are all provided with It sets in protective plate component 84, hanger 48 is provided with rod body part, outer end and inner end, and rod body part is connected to outer end and inner end Between portion, the inner end of hanger 48 is fixedly connected on the runing rest 46 of bearing assembly, and rod body part passes through sliding slot 85 and can edge Sliding slot 85 is mobile, and the outer end of hanger 48 can be used for connecting carry jig 49, and carry jig 49 can be used for carry blank, hanger 48 Outer end be located at the outside of protective plate component 84, the inner end of hanger 48 is located at the inside of protective plate component 84, spray assembly position In outside protective plate component 84, spray head can be towards the outer end of hanger 48.
Third protective plate 843 and protective plate driving device 844 are respectively positioned in protective plate component 84, and third protective plate 843 is set It is equipped with escape groove 845, the direction of advance for extending perpendicularly to transmission chain device of escape groove 845, protective plate driving device 844 Driving 843 transverse shifting of third protective plate simultaneously cooperates escape groove 845 and the rod body part of hanger 48, then realizes keeping away for rod body part It allows, and more direct hide is carried out to the equipment of lower section by the occlusion part that third protective plate 843 is located at 845 outside of escape groove Gear.Except of course that it is traversing outer, third protective plate can be driven to rotate, i.e., arc setting can be used in escape groove, protects by third The rotation of plate also can be realized escape groove and be embedded at rod body part, also can be realized and avoids and block accordingly.
Referring to Figure 21, hanger 48 also can be used multi-functional switching jig 9 and carry out carry, multi-functional switching jig 9 to blank It is provided with interconnecting piece 91, over-hang part 92 and multiple carry portions 93, interconnecting piece 91 is located in the middle part of the lower section of over-hang part 92, interconnecting piece 91 It is in the form of a column arrangement, interconnecting piece 91 is provided with connecting hole along the vertical direction, and the rod body part extended vertically is inserted into connecting hole, connection Drive surface is provided in hole, drive surface can surround triangle or rectangle etc..
Over-hang part 92 in framework arrange, specifically include the framework 922 positioned at outside, the framework 923 positioned inside arrangement and The connecting plate 924 being connected between framework, framework arrange in circular ring shape and are in concentric circles distribution, framework 922, framework 923 and connecting plate Be formed between 924 it is multiple engrave hole, periphery is provided with multiple mounting holes 925 in framework 922, carry portion 93 is arranged in cylinder, One carry portion 93 is mounted in a mounting hole, and the outer end of cylinder is provided with positioning step 931, and positioning step 931 is distributed It is arranged radially towards other places, carry portion 93 is for carry blank and is positioned by positioning step 931 to blank, rotary spraying When, the rotation of hanger will drive multi-functional switching jig 9 to rotate in lateral face, and spray head is sprayed towards multi-functional switching jig 9.
Therefore paint clear area, spraying area, levelling area, Coating Area and loading and unloading are sequentially connected by transmission chain device Area, so that this case spray-painting production line can realize the spraying baking vanish of comprehensive automation, while optional using the first change rail assembly realization Carry out single layer paint or double-deck paint spraying with selecting improves the wide usage flexibility of spray-painting production line, and cleaning, spraying and baking vanish are complete Cheng Buyong worker participates in, and operation intensity is effectively reduced, and effectively paint is avoided to pollute, simultaneously because using full-automatic life It produces, the coating quality of product is effectively ensured.After basecoat paint, after the of short duration levelling in the first priming paint levelling area, such as The baking vanish for not needing to carry out priming paint, then can become rail assembly by the second change rail assembly and third and go to finishing coat spraying coating line and carry out the Two layers of lacquer painting spraying, this case can provide good suitability for the practical paint application of product.Become rail assembly and the second Three change rail assemblies between add the second priming paint levelling area, can when priming paint levelling effect it is be more good, then can be improved finishing coat Spraying effect, to improve whole coating quality.By adding the 4th change rail assembly, so that basecoat paint line and finishing coat spray Painting line, which can make up parallel single layer paint spray-painting production line, can effectively improve capacity efficiency by flexible combination.It is logical It crosses the 5th change rail assembly and the 6th and becomes the setting of rail assembly, so that loading and unloading area is connected to, then neatly single layer paint can be sprayed It applies or the double-deck paint spraying carries out selection switching.By the centralized arrangement of orbital transfer area, space utilization rate is effectively improved, obtains production line It is highly efficient reasonable to be laid out.By will close setting basecoat application zones and finishing coat spraying area, can effectively prevent paint pollute, and It is convenient to carry out air filtration, exhaust-gas treatment etc., effectively improves Environmental Protection Level, while utilizing clear area, spraying area and levelling Area is arranged in the periphery of Coating Area, can effectively improve space utilization rate, be laid out production line must highly efficient reasonable.
Also, runing rest is driven by rotary components, and is cooperated using the sticking department of lock bracket and lockhole to realize Runing rest position is fixed, and is then realized that the position rotation of runing rest is adjusted and position is fixed, is then passed through the oil of spray head Paint sprays the flat spray that different location can be achieved, and guarantees the lacquer painting quality of blank by the spray painting processing of automation.By that will lock The lower section of disk body section is arranged in frame, so that the blank above disk body section not interfered to spray, layout is more reasonable, passes through two and locks The setting of frame setting and clump weight, so that sticking department is to maintain the locking to runing rest in normal state, and clump weight is It can be rotatably set the operation that can be convenient to worker to lock bracket.By the setting of connecting rod, so that two sticking departments are connected to one It rises, to improve the locking stability to runing rest.By the setting of teeth portion and toothless portion), can be effectively improved using toothless portion) The fault-tolerance that connection is, while the position correction of runing rest is also carried out using toothless portion), and the position of closing piece and toothless portion) Position be correspondingly arranged, locking access stability, the appearance for effectively avoiding sticking department and closing piece from misplacing can be improved.For lock bracket Rotate driving, also settable overhanging drive rod carries out position using the locking driving device of peripheral hardware and adjusts driving, and can realize The holding of lock state or unlocked state.
In addition, being cooperatively connected by the teeth portion of rotary column and runing rest in rotary disc assembly, since rotary column itself can be rotated Ground setting, therefore the transmission connection stability that rotary disc assembly and rotating bracket will be effectively improved, and connection fault tolerant is high, can effectively mention High equipment durability carries out spray painting processing using the runing rest of spray head towards rotation, is handled and is guaranteed by the spray painting of automation The lacquer painting quality of blank.By at least two disk bodies by multiple rotary columns be clamped in middle part, in this way to rotating bracket into Row rotate driving can greatly improve the durability of rotary disc assembly, and improve fault-tolerance when connection.Existed by teeth portion setting On disk body section, and be provided with toothless portion), using toothless portion) can effectively improve connection be fault-tolerance, while also using toothless portion) into The position correction of row runing rest, and be provided with hanger so that accessory can carry lacquer painting spraying is carried out on hanger.Pass through company The setting for connecing bracket and connection driving device can both have been realized at the uniform velocity so that rotary components are separably to connect with bearing assembly Rotation spraying can also realize fixed point spraying, and the bearing assembly after separation can be transported to next process flow and go, and pinpoint setting Rotary components and spray assembly can connect and be sprayed with next bearing assembly.
Furthermore by the separately positioned of front truck and rear car, and front truck and rear car can walk on predetermined trajectory, then pass through The hinged setting of front end and rear end is set when walking at the switching of different high low orbits using can be rotated for longitudinal surface It sets, is climbed or fall slope with enabling spraying carrier, not only improve the suitability of spraying carrier, and also improve spraying carrier Walking stability.By the limit of mounting groove, to improve the connective stability of plummer.By lateral location hole, lead to It crosses pin to be articulated and connected, installation is easy to connect, and stable structure.Longitudinal idler wheel is the row with support front truck or rear car It walks, and lateral idler wheel is then used for cross spacing, allows front truck or rear car according to preset track travel, and utilizes idler wheel Arrangement, reduce front truck or rear car and rub for the side of track, and the position by being located at middle part is arranged, improve front truck and after The operation stability of vehicle.By the opposite orbital member that is open, so that front truck and rear car can be stably positioned in orbital member expert It walks, and is opened up by the way that opening is lateral, be conducive to the preferred arrangement of structure, be that the equipment of lower section arranges reserved design space.
And carrier loader can carry blank to be sprayed or complete the blank sprayed, by carrier loader in track groups It walks in part, realizes that blank facilitates circulation in production line, while utilizing underlying block piece, pass through block piece Longitudinal lifting, which can be realized, to be fixed the station position of carrier loader or position locking release, and technique behaviour then can be steadily carried out Make.Carrier loader can be driven to operate in rail assembly by rotating chain apparatus, and by the longitudinal movement of actuator, realized Actuator is optionally connect with block piece, or is connect with transmission chain device, then realizes the position simplicity lock of operation station Fixed or unlock.By the structural optimization of block piece and transmission chain device, locking, the unlock of the carrier loader of operation station are improved And run stability.Pass through the longitudinal movement of the setting limitation actuator of the first limiting slot, and setting by the second limiting slot The active strokes of limitation actuator are set, so as to effectively improve the job stability of actuator.By the setting of rotating bar, turn The rotation of lever can drive the longitudinal movement of actuator, then can be realized separation or the company of actuator and transmission chain device It connects, and utilizes the external setting of operation portion, the operation for the personnel that are convenient to operation.It is kept off by being arranged in the rear end of carrier loader Plate, and operation portion is arranged in front end, when so that being closed on before and after two carrier loaders being on same rail assembly, previous fortune The baffle of carrier vehicle can cooperate with the operation portion of latter carrier loader, and operation portion and rotating bar is then made to rotate, When adjacent, then the rotation of rotating bar can be realized actuator and separate with transmission chain device, when mutually separating, then rotating bar Rotation can be realized actuator and connect with transmission chain device, and the running order problem of carrier loader is able to solve by above structure.
In addition, passing through the setting in point of rail road, using the guide portion of rotatable switch piece, the switching of track is then realized, Since track can connect different operation stations, enables structure simply and easy to operate rail assembly makes blank or product Selectively carry out different process processing.Carrier steadily can be subjected to track switching by the setting of point, also can The friction in track switching is reduced, abrasion is reduced.Cooperated by the bottom wall of the bottom surface of step and sliding slot, and by guide sides It is arranged at transverse opening, guide portion is steadily rotate in place, and guide sides are capable of providing stable switching branch Support force.By the setting of bracket, so that switch piece can be rotated steadily in lateral face, and the hinged of switching driving device is utilized Driving avoids switch piece rotation dislocation so that the mating connection of switch piece and track is more stable.
Also, the connection of rail assembly, transmission chain device is located at the operation station in operating room, and blank utilizes track operation Corresponding process is carried out to station, effectively improves the automated job degree of spray-painting production line, while in order to improve The tightness of working space needs to carry out corresponding masking processing to the entrance that blank passes in and out, therefore use can automate control The mobile baffle of system is covered, so as to effectively improve the tightness of working space, in the free oil to operating room When paint carries out exhausting processing, exhausting area can be reduced, greatly energy saving, while also can be improved the rate of recovery of waste material, from And realize the energy conservation and environmental protection of operating room.Stable support platform can be provided for the movement of baffle by being arranged for track, and by It is the space for being not required to equipment empty avoiding in the top of entrance, therefore the first track is arranged in the top of entrance, baffle can be made Entrance is steadily moved to be covered.And since the lower section of entrance is equipment avoiding space, therefore can only be by the second track It is arranged at the side of entrance on the lower, and by being used cooperatively with the first track, so that the equal energy of the upper and lower side of baffle It is enough to be steadily moved at entrance, then realize good masking.By the built-in setting of Baffle drive device, can not only optimize Device layout, additionally it is possible to Baffle drive device be carried out by baffle to block protection, the spluttering of paint, detergent is avoided to influence The service life of Baffle drive device.By the pipelining arrangement of two entrances, circulation efficiency and operation can be improved Efficiency, and the protection by the masking of baffle plate assembly and protective plate component to rail assembly and transmission chain device, it can be ensured that The cleannes of track and transmission chain reduce the equipment failure rate of operating room, and service life extends.
Moreover, by protection of the protective plate to bearing assembly, rail assembly and transmission chain device, so that spray assembly is to extension When the blank of the outer end of tool carries out spraying operation, the paint for being reduced as far as spraying is trickled down to bearing assembly, rail assembly On transmission chain device, the durability and stability of equipment can be improved by good operating environment.Pass through the protection of two sides The sliding slot that plate is formed enables hanger to pass through sliding slot and moves along the chute, hanger is circulated with rail assembly to not Same station.By elastic lattice block piece to the carry out elastic packing of sliding slot, and hanger can pass through elastic lattice block piece and not influence normally Spraying operation, can further improve protective performance.It is embedded at the position of rod body part by third protective plate, after And third protective plate can further improve the protection at rotating bracket.
Finally, passing through multiple carry portions of periphery, it can then carry more blank and participate in rotary spraying, energy Spray efficiency is enough improved, coating, while the setting by engraving hole are also saved, so that accumulating on coating no longer jig, Yi Jitong Cross the setting outwardly of positioning step so that the orientation of blank be when rotated it is fixed, so as to improve coating quality.

Claims (10)

1. spraying carrier characterized by comprising
Front truck, the front truck include the first supporting table, the first pedestal and multiple longitudinal front wheels, and the first supporting table setting exists On first pedestal, multiple longitudinal front wheels can be rotationally arranged on first pedestal in longitudinal surface;
Rear car, the rear car include the second supporting table, the second pedestal and multiple longitudinal rear rollers, and the second supporting table setting exists On second pedestal, multiple longitudinal rear rollers can be rotationally arranged on second pedestal in longitudinal surface;
Plummer, the plummer are provided with front end and rear end, and the front end and first supporting table are hinged, described Rear end and second supporting table are hinged, and the plummer can be rotated in longitudinal surface.
2. spraying carrier according to claim 1, it is characterised in that:
The plummer is provided with mounting groove, and first supporting table and second supporting table are respectively positioned in the mounting groove.
3. spraying carrier according to claim 2, it is characterised in that:
The mounting groove is transversely provided through first positioning hole in the front end, and first supporting table transversely runs through Ground is provided with second location hole, and the first pin passes through the first positioning hole and the second location hole.
4. spraying carrier according to claim 2, it is characterised in that:
The mounting groove is transversely provided through third location hole in the rear end, and the third supporting table transversely runs through Ground is provided with the 4th location hole, and third pin passes through the third location hole and the 4th location hole.
5. spraying carrier according to any one of claims 1 to 4, it is characterised in that:
The front truck further includes at least two lateral front wheels, and the transverse direction front wheel can rotationally be arranged described the in lateral face On one pedestal, the transverse direction front wheel is separately positioned on the two sides of the front truck in a forward direction.
6. spraying carrier according to claim 5, it is characterised in that:
It is at least two in the quantity of the lateral front wheel of the side of the front truck in a forward direction, exists in the front truck The quantity of longitudinal front wheel of side in direction of advance is at least two, and the lateral front wheel of the same side is respectively positioned on Between longitudinal front wheel of the same side.
7. spraying carrier according to any one of claims 1 to 4, it is characterised in that:
The rear car further includes at least two lateral rear rollers, and the transverse direction rear roller can rotationally be arranged described the in lateral face On two pedestals, the transverse direction rear roller is separately positioned on the two sides of the rear car in a forward direction.
8. spraying carrier according to claim 7, it is characterised in that:
It is at least two in the quantity of the lateral rear roller of the side of the rear car in a forward direction, exists in the rear car The quantity of longitudinal rear roller of side in direction of advance is at least two, and the lateral rear roller of the same side is respectively positioned on Between longitudinal rear roller of the same side.
9. spray-painting production line, which is characterized in that including rail assembly and spraying carrier, the spraying carrier is wanted using aforesaid right Seek 1 to 8 described in any item spraying carriers;
The front truck and the rear car are arranged on the rail assembly.
10. spray-painting production line according to claim 9, it is characterised in that:
The rail assembly includes symmetrically arranged two orbital members, and the orbital member is provided with sliding slot, the opening of the sliding slot In laterally opening up, the opening of two orbital members is oppositely arranged;
The longitudinal direction front wheel is separately positioned on the two sides of the front truck in a forward direction, and the longitudinal direction rear roller is set respectively It sets on rear car two sides in a forward direction;
The longitudinal direction front wheel is separately positioned in the sliding slot on corresponding side, and the longitudinal direction rear roller is separately positioned on pair It answers in the sliding slot on side.
CN201811451887.0A 2018-11-29 2018-11-29 Spray carrier and spray-painting production line Withdrawn CN109317344A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811451887.0A CN109317344A (en) 2018-11-29 2018-11-29 Spray carrier and spray-painting production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811451887.0A CN109317344A (en) 2018-11-29 2018-11-29 Spray carrier and spray-painting production line

Publications (1)

Publication Number Publication Date
CN109317344A true CN109317344A (en) 2019-02-12

Family

ID=65255889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811451887.0A Withdrawn CN109317344A (en) 2018-11-29 2018-11-29 Spray carrier and spray-painting production line

Country Status (1)

Country Link
CN (1) CN109317344A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110252567A (en) * 2019-04-27 2019-09-20 西安阿尔斯通永济电气设备有限公司 Rotor spray painting and dynamic balancing processing line

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200957978Y (en) * 2006-09-26 2007-10-10 天津起重设备有限公司 Transporting-line lifter
CN101081662A (en) * 2006-06-02 2007-12-05 株式会社日立工业设备技术 Unmanned carrying vehicle
CN101195437A (en) * 2006-11-17 2008-06-11 日本阿西斯特技术株式会社 Rail transport apparatus
CN201784734U (en) * 2010-07-16 2011-04-06 陈金铭 Four-direction technique car
CN102050155A (en) * 2009-11-10 2011-05-11 神技保寿美株式会社 Automatic transport vehicle
CN203064700U (en) * 2013-01-14 2013-07-17 苏州柳溪机电工程有限公司 Quadrilateral circulation conveying system
CN105857323A (en) * 2016-03-31 2016-08-17 北京航天发射技术研究所 Bidirectional stepless-adjustment butt joint vehicle
CN105883321A (en) * 2016-05-25 2016-08-24 江苏亨通光电股份有限公司 Electric railcar for carrying cable reel
CN209715523U (en) * 2018-11-29 2019-12-03 三威塑胶制品(珠海)有限公司 Spray carrier and spray-painting production line

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101081662A (en) * 2006-06-02 2007-12-05 株式会社日立工业设备技术 Unmanned carrying vehicle
CN200957978Y (en) * 2006-09-26 2007-10-10 天津起重设备有限公司 Transporting-line lifter
CN101195437A (en) * 2006-11-17 2008-06-11 日本阿西斯特技术株式会社 Rail transport apparatus
CN102050155A (en) * 2009-11-10 2011-05-11 神技保寿美株式会社 Automatic transport vehicle
CN201784734U (en) * 2010-07-16 2011-04-06 陈金铭 Four-direction technique car
CN203064700U (en) * 2013-01-14 2013-07-17 苏州柳溪机电工程有限公司 Quadrilateral circulation conveying system
CN105857323A (en) * 2016-03-31 2016-08-17 北京航天发射技术研究所 Bidirectional stepless-adjustment butt joint vehicle
CN105883321A (en) * 2016-05-25 2016-08-24 江苏亨通光电股份有限公司 Electric railcar for carrying cable reel
CN209715523U (en) * 2018-11-29 2019-12-03 三威塑胶制品(珠海)有限公司 Spray carrier and spray-painting production line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110252567A (en) * 2019-04-27 2019-09-20 西安阿尔斯通永济电气设备有限公司 Rotor spray painting and dynamic balancing processing line

Similar Documents

Publication Publication Date Title
CN109351524A (en) A kind of rotatable spray equipment and spray-painting production line
JP6808003B2 (en) Stations and plants for surface treatment of objects
CN109261419A (en) Spray-painting production line
CN109332054A (en) Rail assembly and spray-painting production line
CN104602867B (en) Facility for spraying coating material
CN209715523U (en) Spray carrier and spray-painting production line
CN209317987U (en) Rail assembly and spray-painting production line
DE102010032143A1 (en) Plant for surface treatment of objects
CN109277243A (en) Operation station and spray-painting production line
CN110508427A (en) A kind of automatic spraying equipment suitable for rotary body
CN209715525U (en) Operation station and spray-painting production line
CN103846176A (en) Automatic coating production line for steel spare parts
CN209318015U (en) Spray-painting production line
CN209317989U (en) A kind of rotatable spray equipment and spray-painting production line
CN209318016U (en) A kind of spray equipment and spray-painting production line for putting down spray
CN109317344A (en) Spray carrier and spray-painting production line
CN209715526U (en) Spraying operation station and spray-painting production line
CN209317988U (en) A kind of spray equipment with multi-functional switching jig
CN209715524U (en) Operating room and spray-painting production line
CN109290113A (en) A kind of spray equipment and spray-painting production line for putting down spray
JPS6025565A (en) Automatic spray painting method and apparatus
CN104307719A (en) Powder spraying baking system for tooling parts
CN220238976U (en) Powder spraying device
CN215141284U (en) Spraying robot base device
JPS5976570A (en) Method and device for electrostatic painting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190212

WW01 Invention patent application withdrawn after publication