CN109308363A - Construction method, system and the computer installation of raft plate slope - Google Patents
Construction method, system and the computer installation of raft plate slope Download PDFInfo
- Publication number
- CN109308363A CN109308363A CN201710629030.2A CN201710629030A CN109308363A CN 109308363 A CN109308363 A CN 109308363A CN 201710629030 A CN201710629030 A CN 201710629030A CN 109308363 A CN109308363 A CN 109308363A
- Authority
- CN
- China
- Prior art keywords
- raft plate
- slope
- polygon
- raft
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/06—Multi-objective optimisation, e.g. Pareto optimisation using simulated annealing [SA], ant colony algorithms or genetic algorithms [GA]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Geometry (AREA)
- Computer Hardware Design (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Evolutionary Computation (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Mathematical Analysis (AREA)
- Computational Mathematics (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of construction methods of raft plate slope, building system, computer installation and the computer readable storage medium of raft plate slope, wherein, the construction method of raft plate slope includes: building raft plate polygon, and raft plate polygon includes the gap between the first raft plate, the second raft plate and the first raft plate and the second raft plate;Surrounding along the first raft plate forms slope sweep volume as the plane slope where default slope angle to the second raft plate;Interception is located at the slope sweep volume of the vertical top of raft plate polygon;Merge and intercept resulting slope sweep volume, forms the side slope body of the first raft plate.The construction method of raft plate slope provided by the invention, so that each side of the first raft plate can be to the second raft plate slope, so that more meeting reality after the building of raft plate slope, and the problem on adjacent side is always extended into when avoiding unilateral slope, improve related algorithm, the accuracy of calculation amount is improved, error is reduced.
Description
Technical field
The present invention relates to Buildings Modeling technical field, in particular to a kind of construction method of raft plate slope, system,
Computer installation and computer readable storage medium.
Background technique
In order to provide the stability of raft foundation, increase additional body construction at the edge of raft plate, these additional bodies claim
For side slope (body), the operation for increasing side slope is known as slope.Generally, raft plate is face formula pel in modeling software, and each edge is all
There can be different side slope constructions, or can also not have.It is total in unilateral slope in some modeling softwares in the related technology
It extends on adjacent side (such as Fig. 1), but such slope structure is undesirable and there are biggish differences with Practical Project, therefore
It is configured to side slope more rationally, the major issue to be solved when being the optimization of raft edges of boards slope construction algorithm.
Summary of the invention
In order to solve the above-mentioned technical problem at least one, the embodiment of the first aspect of the present invention proposes a kind of raft plate and puts
The construction method on slope.
A kind of the second aspect of the present invention embodiment, it is also proposed that building system of raft plate slope.
A kind of the third aspect of the present invention embodiment, it is also proposed that computer installation.
A kind of the fourth aspect of the present invention embodiment, it is also proposed that computer readable storage medium.
In view of this, according to the embodiment of the first aspect of the invention, the invention proposes a kind of buildings of raft plate slope
Method, comprising: building raft plate polygon, raft plate polygon include the first raft plate, the second raft plate and the first raft plate and the second raft
Gap between plate;Surrounding along the first raft plate forms slope as the plane slope where default slope angle to the second raft plate
Sweep volume;Interception is located at the slope sweep volume of the vertical top of raft plate polygon;Merge and intercept resulting slope sweep volume, is formed
The side slope body of first raft plate.
The construction method of raft plate slope provided by the invention presses default slope angle to the along the surrounding of the first raft plate first
Plane slope where two raft plates forms multiple side slopes and forms slope sweep volume, and interception is located at raft plate polygon later
The slope sweep volume of vertical top remerges the resulting slope sweep volume of interception, ultimately forms the side slope body of the first raft plate.Pass through
The construction method of the raft plate slope makes each side of the first raft plate can be to the second raft plate slope, so that raft plate slope constructs
The problem on adjacent side is always extended into when more meeting reality afterwards, and avoiding unilateral slope, is improved related algorithm, is improved
The accuracy of calculation amount, reduces error.
Wherein, it if the angle on the adjacent both sides of the first raft plate is right angle, generally, is formed after this two side slopes processing
Angle between slope sweep volume is 45 °.
In addition, the construction method of the raft plate slope in above-described embodiment provided by the invention can also have additional skill as follows
Art feature:
In the above-mentioned technical solutions, it is preferable that after constructing raft plate polygon further include: the first raft plate slope of detection
Whether crestal line is located in raft plate polygon or raft plate polygon top along the vertical direction, and crestal line is the both sides that the first raft plate is connected
The intersection formed after slope;If the crestal line of the first raft plate slope be located in raft plate polygon or raft plate polygon along the vertical direction
Top then forms slope sweep volume as the plane slope where default slope angle to the second raft plate along the surrounding of the first raft plate.
In the technical scheme, whether the crestal line for the first raft plate slope being detected after constructing raft plate polygon is located at raft plate
In polygon or raft plate polygon top along the vertical direction, crestal line therein are formed after the connected both sides slope of the first raft plate
Intersection, the crestal line if the first raft plate slope be located in raft plate polygon or raft plate polygon top along the vertical direction if illustrate
Have the condition of polygon slope at this time, can along the first raft plate surrounding as the plane where default slope angle to the second raft plate
Slope forms slope sweep volume.By the way that above-mentioned Rule of judgment is arranged, specifies and polygon put can be implemented under what conditions
Slope, if the first raft plate and the second raft plate are only unilateral opposite, then at this time polygon slope can also need not be carried out to the first raft plate
Processing.
In any of the above-described technical solution, it is preferable that further include: if to be not at raft plate more for the crestal line of the first raft plate slope
In the shape of side or raft plate polygon top along the vertical direction, then press default slope for side adjacent with the second raft plate on the first raft plate
Plane slope where from angle to the second raft plate.
In the technical scheme, if the crestal line of the first raft plate slope is not in raft plate polygon or raft plate polygon edge
The top of vertical direction, then can usually illustrate that the first raft plate at this time does not have the condition to the second polygon slope of raft plate, together
When handled without to the polygon slope of the second raft plate, side adjacent with the second raft plate on the first raft plate can be put as default at this time
Slope processing can be realized in plane slope where from angle of slope to the second raft plate.
In any of the above-described technical solution, it is preferable that further include: default slope angle is set.
In the technical scheme, user can be arranged according to actual needs and adjust default slope angle, not only improve in this way
Meet the actual demand of user, while also improving the flexibility during the building of raft plate slope, so that the mould after modeling
Type more tallies with the actual situation or user demand.
Embodiment according to the second aspect of the invention, the invention proposes a kind of building systems of raft plate slope, comprising:
Construction unit, for constructing raft plate polygon, raft plate polygon includes the first raft plate, the second raft plate and the first raft plate and second
Gap between raft plate;Construction unit is also used to flat as where default slope angle to the second raft plate along the surrounding of the first raft plate
Face slope forms slope sweep volume;Processing unit, for intercepting the slope sweep volume for being located at the vertical top of raft plate polygon;
Processing unit is also used to merge the resulting slope sweep volume of interception, forms the side slope body of the first raft plate.
The building system of raft plate slope provided by the invention presses default slope angle to the along the surrounding of the first raft plate first
Plane slope where two raft plates forms multiple side slopes and forms slope sweep volume, and interception is located at raft plate polygon later
The slope sweep volume of vertical top remerges the resulting slope sweep volume of interception, ultimately forms the side slope body of the first raft plate.Pass through
The construction method of the raft plate slope makes each side of the first raft plate can be to the second raft plate slope, so that raft plate slope constructs
The problem on adjacent side is always extended into when more meeting reality afterwards, and avoiding unilateral slope, is improved related algorithm, is improved
The accuracy of calculation amount, reduces error.
Wherein, it if the angle on the adjacent both sides of the first raft plate is right angle, generally, is formed after this two side slopes processing
Angle between slope sweep volume is 45 °.
In addition, the building system of the raft plate slope in above-described embodiment provided by the invention can also have additional skill as follows
Art feature:
In the above-mentioned technical solutions, it is preferable that further include: detection unit, for being detected after constructing raft plate polygon
Whether the crestal line of the first raft plate slope is located in raft plate polygon or raft plate polygon top along the vertical direction, crestal line first
The intersection formed after the connected both sides slope of raft plate;If the crestal line of the first raft plate slope is located in raft plate polygon or raft plate is polygon
The top of shape along the vertical direction, construction unit are then flat as where default slope angle to the second raft plate along the surrounding of the first raft plate
Face slope forms slope sweep volume.
In the technical scheme, whether the crestal line for the first raft plate slope being detected after constructing raft plate polygon is located at raft plate
In polygon or raft plate polygon top along the vertical direction, crestal line therein are formed after the connected both sides slope of the first raft plate
Intersection, the crestal line if the first raft plate slope be located in raft plate polygon or raft plate polygon top along the vertical direction if illustrate
Have the condition of polygon slope at this time, can along the first raft plate surrounding as the plane where default slope angle to the second raft plate
Slope forms slope sweep volume.By the way that above-mentioned Rule of judgment is arranged, specifies and polygon put can be implemented under what conditions
Slope, if the first raft plate and the second raft plate are only unilateral opposite, then at this time polygon slope can also need not be carried out to the first raft plate
Processing.
In any of the above-described technical solution, it is preferable that if the crestal line of the first raft plate slope is not in raft plate polygon
Or the top of raft plate polygon along the vertical direction, construction unit are also used to side adjacent with the second raft plate on the first raft plate by pre-
If the plane slope where slope angle to the second raft plate.
In the technical scheme, if the crestal line of the first raft plate slope is not in raft plate polygon or raft plate polygon edge
The top of vertical direction, then can usually illustrate that the first raft plate at this time does not have the condition to the second polygon slope of raft plate, together
When handled without to the polygon slope of the second raft plate, side adjacent with the second raft plate on the first raft plate can be put as default at this time
Slope processing can be realized in plane slope where from angle of slope to the second raft plate.
In any of the above-described technical solution, it is preferable that further include: setting unit, for default slope angle to be arranged.
In the technical scheme, user can be arranged according to actual needs and adjust default slope angle, not only improve in this way
Meet the actual demand of user, while also improving the flexibility during the building of raft plate slope, so that the mould after modeling
Type more tallies with the actual situation or user demand.
Embodiment according to the third aspect of the invention we, the invention proposes a kind of computer installations, including memory, place
The computer program managing device and storage on a memory and can running on a processor, processor are realized when executing computer program
Such as the construction method of the raft plate slope of any of the above-described.
Computer installation provided by the invention realizes that the raft plate such as any of the above-described is put when processor executes computer program
The construction method on slope to realize the side slope of building raft plate slope, and makes each side of the first raft plate can be to the second raft plate
Slope, so that more meet reality after the building of raft plate slope, and while avoiding unilateral slope always extends into the problem on adjacent side,
Related algorithm is improved, the accuracy of calculation amount is improved, reduces error.
Embodiment according to the fourth aspect of the invention, the invention proposes a kind of computer readable storage mediums, thereon
It is stored with computer program, the building side of the raft plate slope such as any of the above-described is realized when computer program is executed by processor
Method.
Computer readable storage medium provided by the invention is realized when computer program is executed by processor as any of the above-described
The construction method of the raft plate slope of item to realize the side slope of building raft plate slope, and makes each side of the first raft plate can
To the second raft plate slope, so that more meet reality after the building of raft plate slope, and while avoiding unilateral slope, always extends into neighbour
Problem on side, improves related algorithm, improves the accuracy of calculation amount, reduces error.
Additional aspect and advantage of the invention will become obviously in following description section, or practice through the invention
Recognize.
Detailed description of the invention
Above-mentioned and/or additional aspect of the invention and advantage will become from the description of the embodiment in conjunction with the following figures
Obviously and it is readily appreciated that, in which:
Fig. 1 shows a kind of bottom view of raft plate slope structure in the related technology;
Fig. 2 shows the bottom views of raft plate slope structure in one embodiment of the present of invention;
Fig. 3 shows the flow diagram of the construction method of the raft plate slope of one embodiment of the present of invention;
Fig. 4 shows the flow diagram of the construction method of the raft plate slope of another embodiment of the invention;
Fig. 5 shows the schematic block diagram of the building system of the raft plate slope of one embodiment of the present of invention;
Fig. 6 shows the schematic block diagram of the computer installation of one embodiment of the present of invention.
Wherein, the corresponding relationship in Fig. 2 between appended drawing reference and title are as follows:
102 first raft plates, 104 second raft plates, 106 crestal lines.
Specific embodiment
To better understand the objects, features and advantages of the present invention, with reference to the accompanying drawing and specific real
Applying mode, the present invention is further described in detail.It should be noted that in the absence of conflict, the implementation of the application
Feature in example and embodiment can be combined with each other.
In the following description, numerous specific details are set forth in order to facilitate a full understanding of the present invention, still, the present invention may be used also
To be implemented using other than the one described here other modes, therefore, protection scope of the present invention is not by described below
Specific embodiment limitation.
Referring to construction method, the raft plate of raft plate slope described in Fig. 2 to Fig. 6 description according to some embodiments of the invention
The building system and computer installation of slope.
As shown in figure 3, the present invention provides a kind of construction methods of raft plate slope, comprising the following steps:
Step S302, construct raft plate polygon, raft plate polygon include the first raft plate, the second raft plate and the first raft plate with
Gap between second raft plate;
Step S304, the surrounding along the first raft plate are formed as the plane slope where default slope angle to the second raft plate
Slope sweep volume;
Step S306, interception are located at the slope sweep volume of the vertical top of raft plate polygon;
Step S308 merges and intercepts resulting slope sweep volume, forms the side slope body of the first raft plate.
The construction method of raft plate slope provided by the invention presses default slope angle to the along the surrounding of the first raft plate first
Plane slope where two raft plates forms multiple side slopes and forms slope sweep volume, and interception is located at raft plate polygon later
The slope sweep volume of vertical top remerges the resulting slope sweep volume of interception, ultimately forms the side slope body of the first raft plate (as schemed
Shown in 2).By the construction method of the raft plate slope make each side of the first raft plate can to the second raft plate slope so that
The problem on adjacent side is always extended into when more meeting reality after the building of raft plate slope, and avoiding unilateral slope, improves phase
Algorithm is closed, the accuracy of calculation amount is improved, reduces error.
Wherein, as shown in Fig. 2, generally, this two sides are put if the angle on the adjacent both sides of the first raft plate 102 is right angle
Angle after the processing of slope between the slope sweep volume that is formed be 45 ° (crestal line and the angle on side be 45 °).
In one embodiment of the invention, it is preferable that as shown in figure 4, the construction method of raft plate slope, including following step
It is rapid:
Step S402, construct raft plate polygon, raft plate polygon include the first raft plate, the second raft plate and the first raft plate with
Gap between second raft plate;
Step S404 judges whether the crestal line of the first raft plate slope is located in raft plate polygon or raft plate polygon is along vertical
The top in direction;
Step S406, if the judging result of step S404 be it is yes, along the surrounding of the first raft plate press default slope angle to
Plane slope where second raft plate forms slope sweep volume;
Step S408, interception are located at the slope sweep volume of the vertical top of raft plate polygon;
Step S410 merges and intercepts resulting slope sweep volume, forms the side slope body of the first raft plate.
Step S412, if the judging result of step S404 be it is no, side adjacent with the second raft plate on the first raft plate is pressed
Plane slope where default from slope angle to the second raft plate.
In this embodiment, if the crestal line of the first raft plate slope is located in raft plate polygon or raft plate polygon is along vertical side
To top then illustrate the condition for having polygon slope at this time, default slope angle can be pressed along the surrounding of the first raft plate to second
Plane slope where raft plate forms slope sweep volume;If the crestal line of the first raft plate slope be not in raft plate polygon or
The top of raft plate polygon along the vertical direction is put then can usually illustrate that the first raft plate does not have to the second raft plate is polygon at this time
The condition on slope, while handling without to the polygon slope of the second raft plate, at this time can will be adjacent with the second raft plate on the first raft plate
Side as the plane slope where default slope angle to the second raft plate, slope processing can be realized.Sentence by the way that setting is above-mentioned
Broken strip part specifies and polygon slope can be implemented under what conditions, if the first raft plate and the second raft plate be only it is unilateral opposite,
So polygon slope processing can also need not be carried out to the first raft plate at this time.
In addition, as shown in Fig. 2, the first raft plate 102 and the second raft plate 104 distinguish position during the building of raft plate slope
In different height, the four edges of the first raft plate 102 of rectangle are handled to the plane slope where the second raft plate 104 respectively, it
It is screened afterwards by logic, selects actual side slope (dash area in figure), just complete at the slope as shown in Fig. 2
Reason.Dash area therein can be divided into two fractions, and the position of the two fractions intersection is at right angle, and slope is formed
Crestal line 106 then respectively may be about 45 ° with the lower side of the first raft plate 102 of rectangle and the angle of right edge.
The adjacent both sides angle of raft plate in Fig. 2 is larger, does not extend on section to side directly when slope, is optimized to 90 degree
Corner slope, the side slope that not will cause single side thus extends very long situation, to reach more reasonable effect.
In one embodiment of the invention, it is preferable that further include: default slope angle is set.
In this embodiment, user can be arranged according to actual needs and adjust default slope angle, not only improve so full
The actual demand of sufficient user, while the flexibility during the building of raft plate slope is also improved, so that the model after modeling
It more tallies with the actual situation or user demand.
The invention also provides a kind of building systems 5 of raft plate slope, as shown in Figure 5, comprising: construction unit 502 is used for
Construct raft plate polygon, raft plate polygon include between the first raft plate, the second raft plate and the first raft plate and the second raft plate between
Gap;Construction unit 502 is also used to the surrounding along the first raft plate as the plane slope where default slope angle to the second raft plate, shape
At slope sweep volume;Processing unit 504, for intercepting the slope sweep volume for being located at the vertical top of raft plate polygon;Processing is single
Member 504 is also used to merge the resulting slope sweep volume of interception, forms the side slope body of the first raft plate.
The building system 5 of raft plate slope provided by the invention, first along the surrounding of the first raft plate press default slope angle to
Plane slope where second raft plate forms multiple side slopes and forms slope sweep volume, and interception is located at raft plate polygon later
Vertical top slope sweep volume, remerge the resulting slope sweep volume of interception, ultimately form the side slope body of the first raft plate.It is logical
The construction method for crossing the raft plate slope makes each side of the first raft plate can be to the second raft plate slope, so that raft plate slope structure
The problem on adjacent side is always extended into when more meeting reality after building, and avoiding unilateral slope, improves related algorithm, is promoted
The accuracy of calculation amount, reduces error.
Wherein, as shown in Fig. 2, if the angle on the adjacent both sides of the first raft plate is right angle, generally, at this two side slopes
The angle between slope sweep volume formed after reason be 45 ° (crestal line and the angle on side be 45 °).
In one embodiment of the invention, it is preferable that as shown in Figure 5, further includes: detection unit 506, for constructing
Whether the crestal line that the first raft plate slope is detected after raft plate polygon is located in raft plate polygon or raft plate polygon is along vertical side
To top, crestal line is the intersection that is formed after the both sides slope that the first raft plate is connected;If the crestal line of the first raft plate slope is located at raft
In plate polygon or raft plate polygon top along the vertical direction, construction unit 502 are then put along the surrounding of the first raft plate as default
Plane slope where from angle of slope to the second raft plate forms slope sweep volume.
In this embodiment, the crestal line of the first raft plate slope is detected after constructing raft plate polygon, and whether to be located at raft plate more
In the shape of side or raft plate polygon top along the vertical direction, crestal line therein are formed after the connected both sides slope of the first raft plate
Intersection, the crestal line if the first raft plate slope be located in raft plate polygon or raft plate polygon top along the vertical direction if illustrate this
When have the condition of polygon slope, can be put along the surrounding of the first raft plate as the plane where default slope angle to the second raft plate
Slope forms slope sweep volume.By the above-mentioned Rule of judgment of setting, specifies and polygon slope can be implemented under what conditions,
If the first raft plate and the second raft plate are only unilateral opposite, then can also need not be carried out at polygon slope to the first raft plate at this time
Reason.
In one embodiment of the invention, it is preferable that if the crestal line of the first raft plate slope is not at raft plate polygon
The top of interior or raft plate polygon along the vertical direction, construction unit 502 is also used to will be adjacent with the second raft plate on the first raft plate
Side is as the plane slope where default slope angle to the second raft plate.
In this embodiment, if the crestal line of the first raft plate slope is not in raft plate polygon or raft plate polygon is along perpendicular
Histogram to top, then can usually illustrate that the first raft plate at this time does not have the condition to the second polygon slope of raft plate, simultaneously
Without to the polygon slope processing of the second raft plate, side adjacent with the second raft plate on the first raft plate can be pressed to default slope at this time
Slope processing can be realized in plane slope where from angle to the second raft plate.
In one embodiment of the invention, it is preferable that as shown in Figure 5, further includes: setting unit 508, it is pre- for being arranged
If slope angle.
In this embodiment, user can be arranged according to actual needs and adjust default slope angle, not only improve so full
The actual demand of sufficient user, while the flexibility during the building of raft plate slope is also improved, so that the model after modeling
It more tallies with the actual situation or user demand.
The invention also provides a kind of computer installations 6, as shown in fig. 6, including memory 602, processor 604 and storage
On memory 602 and the computer program that can run on a processor, processor 604 are realized as above when executing computer program
State the construction method of the raft plate slope of any one.
Computer installation provided by the invention, processor 604 realize three such as any of the above-described when executing computer program
The construction method of reinforcing bar calculation amount model is tieed up, to realize the side slope of building raft plate slope, and makes each equal energy in side of the first raft plate
It is enough to the second raft plate slope so that more meet reality after the building of raft plate slope, and while avoiding unilateral slope, always extends into
Problem on adjacent side, improves related algorithm, improves the accuracy of calculation amount, reduces error.
The invention also provides a kind of computer readable storage mediums, are stored thereon with computer program, computer program
The construction method of the raft plate slope such as any of the above-described is realized when being executed by processor.
Computer readable storage medium provided by the invention is realized when computer program is executed by processor as any of the above-described
The construction method of the raft plate slope of item to realize the side slope of building raft plate slope, and makes each side of the first raft plate can
To the second raft plate slope, so that more meet reality after the building of raft plate slope, and while avoiding unilateral slope, always extends into neighbour
Problem on side, improves related algorithm, improves the accuracy of calculation amount, reduces error.
In the present invention, term " multiple " then refers to two or more, unless otherwise restricted clearly.Term " peace
Dress ", " connected ", " connection ", the terms such as " fixation " shall be understood in a broad sense, can also be with for example, " connection " may be a fixed connection
It is to be detachably connected, or be integrally connected;" connected " can be directly connected, can also be indirectly connected through an intermediary.It is right
For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific conditions.
In the description of this specification, the description of term " one embodiment ", " some embodiments ", " specific embodiment " etc.
Mean that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one reality of the invention
It applies in example or example.In the present specification, schematic expression of the above terms are not necessarily referring to identical embodiment or reality
Example.Moreover, description particular features, structures, materials, or characteristics can in any one or more of the embodiments or examples with
Suitable mode combines.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of construction method of raft plate slope characterized by comprising
Construct raft plate polygon, the raft plate polygon include the first raft plate, the second raft plate and the first raft plate with it is described
Gap between second raft plate;
Surrounding along the first raft plate is formed slope and is swept as the plane slope where default slope angle to the second raft plate
Retouch body;
Interception is located at the slope sweep volume of the vertical top of the raft plate polygon;
Merge and intercept the resulting slope sweep volume, forms the side slope body of the first raft plate.
2. the construction method of raft plate slope according to claim 1, which is characterized in that the building raft plate polygon it
Afterwards further include:
Whether the crestal line for detecting the first raft plate slope is located in the raft plate polygon or the raft plate polygon is along vertical
The top in direction, the crestal line are the intersection that is formed after the both sides slope that the first raft plate is connected;
If the crestal line of the first raft plate slope be located in the raft plate polygon or the raft plate polygon along the vertical direction
Top, then along the surrounding of the first raft plate as the plane slope where default slope angle to the second raft plate, formation is put
Slope sweep volume.
3. the construction method of raft plate slope according to claim 2, which is characterized in that further include:
If the crestal line of the first raft plate slope is not in the raft plate polygon or the raft plate polygon is along vertical side
To top, then by side adjacent with the second raft plate on the first raft plate by the default slope angle to described second
Plane slope where raft plate.
4. the construction method of raft plate slope according to any one of claim 1 to 3, which is characterized in that further include:
The default slope angle is set.
5. a kind of building system of raft plate slope characterized by comprising
Construction unit, for constructing raft plate polygon, the raft plate polygon includes the first raft plate, the second raft plate and described the
Gap between one raft plate and the second raft plate;
The construction unit is also used to the surrounding along the first raft plate as where default slope angle to the second raft plate
Plane slope forms slope sweep volume;
Processing unit, for intercepting the slope sweep volume for being located at the vertical top of the raft plate polygon;
The processing unit is also used to merge the resulting slope sweep volume of interception, forms the side slope body of the first raft plate.
6. the building system of raft plate slope according to claim 5, which is characterized in that further include:
Whether detection unit, the crestal line for detecting the first raft plate slope after the building raft plate polygon are located at institute
It states in raft plate polygon or raft plate polygon top along the vertical direction, the crestal line is two that the first raft plate is connected
The intersection formed after the slope of side;
If the crestal line of the first raft plate slope be located in the raft plate polygon or the raft plate polygon along the vertical direction
Top, the construction unit is then along the surrounding of the first raft plate as the plane where default slope angle to the second raft plate
Slope forms slope sweep volume.
7. the building system of raft plate slope according to claim 6, which is characterized in that
If the crestal line of the first raft plate slope is not in the raft plate polygon or the raft plate polygon is along vertical side
To top, the construction unit is also used to by described default put side adjacent with the second raft plate on the first raft plate
Plane slope where from angle of slope to the second raft plate.
8. the building system of raft plate slope according to any one of claims 5 to 7, which is characterized in that further include:
Setting unit, for the default slope angle to be arranged.
9. a kind of computer installation, including memory, processor and it is stored on the memory and can be on the processor
The computer program of operation, which is characterized in that the processor realizes such as Claims 1-4 when executing the computer program
Any one of described in raft plate slope construction method.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program
The construction method of raft plate slope according to any one of claims 1 to 4 is realized when being executed by processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710629030.2A CN109308363B (en) | 2017-07-28 | 2017-07-28 | Raft board slope-releasing construction method and system and computer device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710629030.2A CN109308363B (en) | 2017-07-28 | 2017-07-28 | Raft board slope-releasing construction method and system and computer device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109308363A true CN109308363A (en) | 2019-02-05 |
CN109308363B CN109308363B (en) | 2023-04-07 |
Family
ID=65205330
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710629030.2A Active CN109308363B (en) | 2017-07-28 | 2017-07-28 | Raft board slope-releasing construction method and system and computer device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109308363B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110472323A (en) * | 2019-08-01 | 2019-11-19 | 广联达科技股份有限公司 | Ramp 3 D model construction method, device and electronic equipment |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040093817A1 (en) * | 2002-11-18 | 2004-05-20 | Salvador Pujol Barcons | Refinements to the construction systems for structures in reinforced concrete or some other material by means of high-precision integral modular forms |
CN103243731A (en) * | 2013-05-13 | 2013-08-14 | 中建七局(上海)有限公司 | Mould supporting method for trapezoid cross section base of shear wall |
CN103397637A (en) * | 2013-08-27 | 2013-11-20 | 二十二冶集团第一建设有限公司 | Pre-embedding method of grouting sleeve under raft foundation |
CN104471158A (en) * | 2012-05-14 | 2015-03-25 | Nev-X系统有限公司 | Building foundation |
CN106013172A (en) * | 2016-07-01 | 2016-10-12 | 杭州江润科技有限公司 | Double row pile and diagonal brace combined soft soil deep foundation pit supporting structure and construction method |
CN106436732A (en) * | 2016-01-21 | 2017-02-22 | 苏州中固建筑科技股份有限公司 | Reinforcing method and reinforcing structure for replacing strip foundations by raft foundations |
CN106934826A (en) * | 2017-02-28 | 2017-07-07 | 东华理工大学 | A kind of modeling of rock side slope fine structure and block identification method |
-
2017
- 2017-07-28 CN CN201710629030.2A patent/CN109308363B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040093817A1 (en) * | 2002-11-18 | 2004-05-20 | Salvador Pujol Barcons | Refinements to the construction systems for structures in reinforced concrete or some other material by means of high-precision integral modular forms |
CN104471158A (en) * | 2012-05-14 | 2015-03-25 | Nev-X系统有限公司 | Building foundation |
CN103243731A (en) * | 2013-05-13 | 2013-08-14 | 中建七局(上海)有限公司 | Mould supporting method for trapezoid cross section base of shear wall |
CN103397637A (en) * | 2013-08-27 | 2013-11-20 | 二十二冶集团第一建设有限公司 | Pre-embedding method of grouting sleeve under raft foundation |
CN106436732A (en) * | 2016-01-21 | 2017-02-22 | 苏州中固建筑科技股份有限公司 | Reinforcing method and reinforcing structure for replacing strip foundations by raft foundations |
CN106013172A (en) * | 2016-07-01 | 2016-10-12 | 杭州江润科技有限公司 | Double row pile and diagonal brace combined soft soil deep foundation pit supporting structure and construction method |
CN106934826A (en) * | 2017-02-28 | 2017-07-07 | 东华理工大学 | A kind of modeling of rock side slope fine structure and block identification method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110472323A (en) * | 2019-08-01 | 2019-11-19 | 广联达科技股份有限公司 | Ramp 3 D model construction method, device and electronic equipment |
Also Published As
Publication number | Publication date |
---|---|
CN109308363B (en) | 2023-04-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7778810B2 (en) | Method for simulating fluid flows within a medium discretized by a hybrid grid | |
CN110008941B (en) | Method and device for detecting travelable area, computer equipment and storage medium | |
US8725478B2 (en) | Reservoir upscaling method with preserved transmissibility | |
US9361414B2 (en) | Hybrid local nonmatching method for multiphase flow simulations in heterogeneous fractured media | |
Zhang et al. | A robust 2-refinement algorithm in octree or rhombic dodecahedral tree based all-hexahedral mesh generation | |
CN108120441A (en) | Complete coverage path planning method and system | |
CN101770516A (en) | Method for excavating tropical cyclone motion track channel | |
CN109308363A (en) | Construction method, system and the computer installation of raft plate slope | |
CN103049904B (en) | A kind of image extraction method and system, digital certificates method for making and system thereof | |
CN104933208A (en) | Different-dimension crack numerical reservoir simulation comprehensive processing method | |
CN106529044A (en) | Compliant mechanism 0-1 variable configuration type topology graph extraction method | |
CN108519597A (en) | Radar track compression method based on linear prediction | |
CN208650253U (en) | A kind of assembled architecture component based on BIM | |
Tabsh et al. | Numerically based parametric analysis of mat foundations | |
CN106157301A (en) | A kind of threshold value for Image Edge-Detection is from determining method and device | |
Wang et al. | Automatic reconstruction of as-built BIM from laser scanned data of precast concrete elements for dimensional quality assessment | |
CN109308362A (en) | Construction method, system and the computer installation of raft board post poured band | |
CN104807463B (en) | A kind of method and device of path planning | |
GB2591663A (en) | Modeling efficiency of solids removal during wellbore fluids displacements | |
CN208472546U (en) | A kind of period composite construction setback plate | |
CN206603731U (en) | A kind of air flow guiding device and except mite instrument | |
CN205486033U (en) | Infrared touch -screen | |
CN206572078U (en) | A kind of ventilating pipe component and ventilation duct | |
CN206070251U (en) | A kind of anti-seismic rail board | |
CN115205433B (en) | Three-dimensional rendering fusion method based on glTF model and building contour expansion |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |