CN109307368A - A kind of forced-ventilated gas water heater control method - Google Patents

A kind of forced-ventilated gas water heater control method Download PDF

Info

Publication number
CN109307368A
CN109307368A CN201811082859.6A CN201811082859A CN109307368A CN 109307368 A CN109307368 A CN 109307368A CN 201811082859 A CN201811082859 A CN 201811082859A CN 109307368 A CN109307368 A CN 109307368A
Authority
CN
China
Prior art keywords
temperature
controller
blower
heat exchanger
electric heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811082859.6A
Other languages
Chinese (zh)
Other versions
CN109307368B (en
Inventor
卢宇聪
潘同基
李罗标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Vanward New Electric Co Ltd
Original Assignee
Guangdong Vanward New Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Vanward New Electric Co Ltd filed Critical Guangdong Vanward New Electric Co Ltd
Priority to CN201811082859.6A priority Critical patent/CN109307368B/en
Publication of CN109307368A publication Critical patent/CN109307368A/en
Application granted granted Critical
Publication of CN109307368B publication Critical patent/CN109307368B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2035Arrangement or mounting of control or safety devices for water heaters using fluid fuel

Abstract

The present invention provides a kind of forced-ventilated gas water heater control methods, the temperature on heat exchanger is detected by the first temperature sensor, and by temperature data Real-time Feedback to controller, when the first temperature sensor detects the temperature on heat exchanger lower than programmed values, controller starts blower or electric heating assembly, or successively start blower and electric heating assembly, or start blower and electric heating assembly simultaneously, cold air near heat exchanger is discharged blower from discharge flue, electric heating assembly heats heat exchanger, work as blower, after electric heating assembly is run within the set time, if the first temperature sensor detects that the temperature on heat exchanger is higher than programmed values, controller closes blower and electric heating assembly, gas heater is again introduced into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values, controller closes blower and electric heating assembly, opens frost alert program.

Description

A kind of forced-ventilated gas water heater control method
Technical field
The invention belongs to gas heater technical field more particularly to a kind of forced-ventilated gas water heater control methods.
Background technique
In northern area, winter cold is very long, and wind-force is generally larger, and night outdoor temperature is lower.Due to forced-ventilated gas The smoke exhaust pipe of water heater leads to outdoor, and outdoor cold air is easy to enter in heat exchanger by smoke exhaust pipe.It is remaining in heat exchanger Water freezes when being lower than 0 DEG C, leads to heat exchanger pipeline spalling.Existing gas heater is all largely anti-using electric heating Freeze, electric heating assembly directly connects on the power line, control logic are as follows: a room temperature of connecting directly on electric heating part circuit is opened The temperature controller on road, when the temperature of temperature controller drops to set temperature, temperature controller is connected electric heating assembly and is begun to warm up, and is heated to The temperature of temperature controller disconnects temperature controller when rising to set temperature, electric heating assembly stops heating.Since electric heating assembly is obstructed Master control borad control is crossed, is only controlled by temperature controller, user does not also know in the event of failure for electric heating assembly or temperature controller, only can be until heat Just find that electrical heating antifreezing fails after the freezing house of hydrophone is soaked, the loss for causing user very big.In order to overcome these deficiencies, to strong The control method of row's formula gas heater is developed.
Summary of the invention
Technical problem to be solved by the present invention lies in provide a kind of forced-ventilated gas water heater control method, not only tie Structure is simple, and manufacturing cost is cheap, and energy conservation, antifreezing effect is good, and forced-ventilated gas water heater pipeline can be effectively prevent to be frozen It splits.
In order to solve the above-mentioned technical problems, the present invention provides a kind of forced-ventilated gas water heater control method, combustion gas heat After hydrophone is powered, gas heater enters standby program, detects the temperature on heat exchanger by the first temperature sensor, and will Temperature data Real-time Feedback is to controller, when the first temperature sensor detects the temperature on heat exchanger lower than programmed values When, controller starts blower or electric heating assembly, perhaps successively starting blower and electric heating assembly or start simultaneously blower and The cold air near heat exchanger is discharged from discharge flue for electric heating assembly, blower, and electric heating assembly heats heat exchanger, After blower, electric heating assembly are run within the set time, if the first temperature sensor detects the height of the temperature on heat exchanger When programmed values, controller closes blower and electric heating assembly, gas heater are again introduced into standby mode;If the first temperature When degree sensor detects that the temperature on heat exchanger is still below programmed values, controller closes blower and electric heating assembly, Frost alert program is opened, alarm is issued the user with.
As one of preferred embodiments of the present invention, after gas heater is powered, gas heater enters standby program, and first Temperature sensor and second temperature sensor start the temperature for detecting measurand respectively, and by temperature data Real-time Feedback to control Device processed;
When the first temperature sensor detects the temperature on heat exchanger lower than programmed values, if second temperature senses When device detects that the leaving water temperature of outlet conduit is higher than programmed values, controller starts blower, and is sensed by rotation speed of fan Device judges discharge flue stopping state:
Situation one, when controller judges discharge flue without blocking according to the signal of rotation speed of fan sensor feedback, control Device controls blower by the first revolving speed operation of setting, after blower is run within the set time, if the first temperature sensor detects When temperature on to heat exchanger is higher than programmed values, controller closes blower, and gas heater is again introduced into standby mode; If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values, controller starts electric heating assembly Heat heat exchanger;After electric heating assembly is run within the set time, if the first temperature sensor detects on heat exchanger Temperature be higher than programmed values when, controller simultaneously closes off blower and electric heating assembly, and gas heater is again introduced into standby State;If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values, controller is simultaneously closed off Blower and electric heating assembly open frost alert program, issue the user with alarm;
Situation two, when controller judges that discharge flue has blocking according to the signal of rotation speed of fan sensor feedback, control Device opens to the maximum the revolving speed of blower, at this time when controller according to the signal of rotation speed of fan sensor feedback judge discharge flue without When blocking, controller controls blower by the second revolving speed operation of setting, after blower is run within the set time, if the first temperature Sensor detect the temperature on heat exchanger be higher than programmed values when, controller close blower, gas heater again into Enter standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values, controller is opened Dynamic electric heating assembly heats heat exchanger;After electric heating assembly is run within the set time, if the first temperature sensor detects When temperature on to heat exchanger is higher than programmed values, controller simultaneously closes off blower and electric heating assembly, gas heater It is again introduced into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values, control Device processed simultaneously closes off blower and electric heating assembly, opens frost alert program, issues the user with alarm;
Situation three, when controller judges that discharge flue has blocking according to the signal of rotation speed of fan sensor feedback, control Device opens to the maximum the revolving speed of blower, at this time when controller judges discharge flue still according to the signal of rotation speed of fan sensor feedback When having blocking, controller close blower, and start electric heating assembly heating heat exchanger, when electric heating assembly within the set time After operation, if the first temperature sensor detects that the temperature on heat exchanger is higher than programmed values, controller is closed electricity and is added Hot component, gas heater are again introduced into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still low When programmed values, controller closes electric heating assembly, opens frost alert program, issues the user with alarm.
Further, when the first temperature sensor detects the temperature on heat exchanger lower than programmed values, and the When two temperature sensors detect the leaving water temperature of outlet conduit lower than programmed values, controller starts electric heating assembly heating Heat exchanger, after electric heating assembly is run within the set time, if the first temperature sensor detects the temperature on heat exchanger When degree is higher than programmed values, electric heating assembly is closed, gas heater is again introduced into standby mode;If the first temperature sensor When detecting that the temperature on heat exchanger is still below programmed values, electric heating assembly is closed, opens frost alert program, Xiang Yong Family sounds an alarm.
Further, when the first temperature sensor detects that the temperature on heat exchanger is higher than programmed values, combustion gas Water heater is directly entered standby mode.
Further, when water flow sensor, which is detected, is less than programmed values with the flow of water, into standby program; When water flow sensor, which is detected, is greater than programmed values with the flow of water, stop standby program, is used into normal boot-strap Program.
As the two of preferred embodiments of the present invention, after gas heater is powered, gas heater enters standby program, and first Temperature sensor starts to detect the temperature of measurand, and by temperature data Real-time Feedback to controller;
When the first temperature sensor detects the temperature on heat exchanger lower than programmed values, controller starts simultaneously Blower and electric heating assembly, and discharge flue stopping state is judged by rotation speed of fan sensor:
Situation one, when controller judges discharge flue without blocking according to the signal of rotation speed of fan sensor feedback, control Device controls blower by the first revolving speed operation of setting, after blower is run within the set time, if the first temperature sensor detects When temperature on to heat exchanger is higher than programmed values, controller simultaneously closes off blower and electric heating assembly, gas heater It is again introduced into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values, control Device processed simultaneously closes off blower and electric heating assembly, opens frost alert program, issues the user with alarm;
Situation two, when controller judges that discharge flue has blocking according to the signal of rotation speed of fan sensor feedback, control Device opens to the maximum the revolving speed of blower, at this time when controller according to the signal of rotation speed of fan sensor feedback judge discharge flue without When blocking, controller controls blower by the second revolving speed operation of setting, after blower is run within the set time, if the first temperature When sensor detects that the temperature on heat exchanger is higher than programmed values, controller simultaneously closes off blower and electric heating assembly, Gas heater is again introduced into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below program and sets When definite value, controller simultaneously closes off blower and electric heating assembly, opens frost alert program, issues the user with alarm;
Situation three, when controller judges that discharge flue has blocking according to the signal of rotation speed of fan sensor feedback, control Device opens to the maximum the revolving speed of blower, at this time when controller judges discharge flue still according to the signal of rotation speed of fan sensor feedback When having blocking, controller closes blower, and electric heating assembly continues to heat heat exchanger, when electric heating assembly is transported within the set time After row, if the first temperature sensor detects that the temperature on heat exchanger is higher than programmed values, controller closes electric heating Component, gas heater are again introduced into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below When programmed values, electric heating assembly is closed, frost alert program is opened, issues the user with alarm.
Further, when the first temperature sensor detects that the temperature on heat exchanger is higher than programmed values, combustion gas Water heater is directly entered standby mode.
Further, when water flow sensor, which is detected, is less than programmed values with the flow of water, into standby program; When water flow sensor, which is detected, is greater than programmed values with the flow of water, stop standby program, is used into normal boot-strap Program.
Implement a kind of forced-ventilated gas water heater control method of the invention, compared with prior art, have has as follows Beneficial effect:
The present invention passes through the combination of blower and electric heating assembly, carries out dual anti-frost protection to heat exchanger, blower can incite somebody to action Cold air near heat exchanger is discharged from discharge flue, and electric heating assembly can heat heat exchanger, not only can effectively prevent Forced-ventilated gas water heater pipeline bursting by freezing, and antifreezing effect is significant, and use is safer.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, the attached drawing to embodiment is simply situated between below It continues.
Fig. 1 is a kind of flow chart one of forced-ventilated gas water heater control method provided by the invention;
Fig. 2 is a kind of flowchart 2 of forced-ventilated gas water heater control method provided by the invention;
Fig. 3 be just common water when by water flow judge whether enter booting use program flow chart.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In conjunction with referring to Fig. 1 to Fig. 3, the preferred embodiment of the present invention, a kind of forced-ventilated gas water heater control method, combustion gas After water heater is powered, gas heater enters standby program, detects the temperature on heat exchanger by the first temperature sensor, and By temperature data Real-time Feedback to controller, when the first temperature sensor detects the temperature on heat exchanger lower than program setting When value A, controller starts blower or electric heating assembly, perhaps successively starts blower and electric heating assembly or starts wind simultaneously The cold air near heat exchanger is discharged from discharge flue for machine and electric heating assembly, blower, and electric heating assembly heating heat is handed over Parallel operation, after blower, electric heating assembly are run in setting time T, if the first temperature sensor detects on heat exchanger When temperature is higher than programmed values B, controller closes blower and electric heating assembly, gas heater are again introduced into standby mode; If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values A, controller closes blower and electricity Heating component opens frost alert program, issues the user with alarm.
The present invention passes through the combination of blower and electric heating assembly as a result, carries out dual anti-frost protection, blower to heat exchanger Cold air near heat exchanger can be discharged from discharge flue, electric heating assembly can heat heat exchanger, can not only be effective Forced-ventilated gas water heater pipeline bursting by freezing is prevented, and antifreezing effect is significant, use is safer.
It is specific below by two to further illustrate a kind of forced-ventilated gas water heater control method provided by the invention Embodiment is described in detail:
Embodiment one
As shown in figures 1 and 3, after gas heater is powered, gas heater enters standby program, the first temperature sensor Start the temperature for detecting measurand respectively with second temperature sensor, and by temperature data Real-time Feedback to controller;
When the first temperature sensor detects the temperature on heat exchanger lower than programmed values A, if second temperature passes When sensor detects that the leaving water temperature of outlet conduit is higher than programmed values C, controller starts blower, and is passed by rotation speed of fan Sensor judges discharge flue stopping state:
Situation one, when controller judges discharge flue without blocking according to the signal of rotation speed of fan sensor feedback, control Device controls blower by the first revolving speed S1 operation of setting, after blower is run in setting time T1, if the first temperature sensor When detecting that the temperature on heat exchanger is higher than programmed values B, controller closes blower, and gas heater is again introduced into standby State;If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values A, controller starting electricity adds Hot component heats heat exchanger;After electric heating assembly is run in setting time T2, if the first temperature sensor detects heat When temperature on exchanger is higher than programmed values B, controller simultaneously closes off blower and electric heating assembly, and gas heater is again Into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values A, controller Blower and electric heating assembly are simultaneously closed off, frost alert program is opened, issues the user with alarm;
Situation two, when controller judges that discharge flue has blocking according to the signal of rotation speed of fan sensor feedback, control Device opens to the maximum the revolving speed of blower, at this time when controller according to the signal of rotation speed of fan sensor feedback judge discharge flue without When blocking, controller controls blower and runs by the second revolving speed S2 of setting, after blower is run in setting time T1, if first When temperature sensor detects that the temperature on heat exchanger is higher than programmed values B, controller closes blower, and gas heater is again It is secondary to enter standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values A, control Device starts electric heating assembly and heats heat exchanger;After electric heating assembly is run in setting time T2, if the first temperature sensing When device detects that the temperature on heat exchanger is higher than programmed values B, controller simultaneously closes off blower and electric heating assembly, combustion gas Water heater is again introduced into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values When A, controller simultaneously closes off blower and electric heating assembly, opens frost alert program, issues the user with alarm;
Situation three, when controller judges that discharge flue has blocking according to the signal of rotation speed of fan sensor feedback, control Device opens to the maximum the revolving speed of blower, at this time when controller judges discharge flue still according to the signal of rotation speed of fan sensor feedback When having blocking, controller closes blower, and starts electric heating assembly heating heat exchanger, when electric heating assembly is in setting time T2 After interior operation, if the first temperature sensor detects that the temperature on heat exchanger is higher than programmed values B, controller closes electricity Heating component, gas heater are again introduced into standby mode;If the first temperature sensor detects the temperature on heat exchanger still When lower than programmed values A, controller closes electric heating assembly, opens frost alert program, issues the user with alarm.
Illustratively, when the first temperature sensor detects the temperature on heat exchanger lower than programmed values A, and the When two temperature sensors detect the leaving water temperature of outlet conduit lower than programmed values C, controller starting electric heating assembly adds Heat-heat exchanger, after electric heating assembly is run in setting time T2, if the first temperature sensor detects on heat exchanger Temperature when being higher than programmed values B, close electric heating assembly, gas heater is again introduced into standby mode;If the first temperature When sensor detects that the temperature on heat exchanger is still below programmed values A, electric heating assembly is closed, opens frost alarm journey Sequence issues the user with alarm.
Illustratively, when the first temperature sensor detects that the temperature on heat exchanger is higher than programmed values B, combustion gas Water heater is directly entered standby mode.
Illustratively, when water flow sensor, which is detected, is less than programmed values with the flow of water, into standby program; When water flow sensor, which is detected, is greater than programmed values with the flow of water, stop standby program, is used into normal boot-strap Program.
Embodiment two
As shown in Figures 2 and 3, after gas heater is powered, gas heater enters standby program, the first temperature sensor Start to detect the temperature of measurand, and by temperature data Real-time Feedback to controller;
When the first temperature sensor detects the temperature on heat exchanger lower than programmed values A, controller opens simultaneously Dynamic blower and electric heating assembly, and discharge flue stopping state is judged by rotation speed of fan sensor:
Situation one, when controller judges discharge flue without blocking according to the signal of rotation speed of fan sensor feedback, control Device controls blower by the first revolving speed S1 operation of setting, after blower is run in setting time T1, if the first temperature sensor When detecting that the temperature on heat exchanger is higher than programmed values B, controller simultaneously closes off blower and electric heating assembly, combustion gas heat Hydrophone is again introduced into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values A When, controller simultaneously closes off blower and electric heating assembly, opens frost alert program, issues the user with alarm;
Situation two, when controller judges that discharge flue has blocking according to the signal of rotation speed of fan sensor feedback, control Device opens to the maximum the revolving speed of blower, at this time when controller according to the signal of rotation speed of fan sensor feedback judge discharge flue without When blocking, controller controls blower and runs by the second revolving speed S2 of setting, after blower is run in setting time T1, if first When temperature sensor detects that the temperature on heat exchanger is higher than programmed values B, controller simultaneously closes off blower and electric heating Component, gas heater are again introduced into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below When programmed values A, controller simultaneously closes off blower and electric heating assembly, opens frost alert program, issues the user with alarm;
Situation three, when controller judges that discharge flue has blocking according to the signal of rotation speed of fan sensor feedback, control Device opens to the maximum the revolving speed of blower, at this time when controller judges discharge flue still according to the signal of rotation speed of fan sensor feedback When having blocking, controller closes blower, and electric heating assembly continues to heat heat exchanger, when electric heating assembly is in setting time T2 After operation, if the first temperature sensor detects that the temperature on heat exchanger is higher than programmed values B, controller is closed electricity and is added Hot component, gas heater are again introduced into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still low When programmed values A, electric heating assembly is closed, frost alert program is opened, issues the user with alarm.
Illustratively, when the first temperature sensor detects that the temperature on heat exchanger is higher than programmed values B, combustion gas Water heater is directly entered standby mode.
Illustratively, when water flow sensor, which is detected, is less than programmed values with the flow of water, into standby program; When water flow sensor, which is detected, is greater than programmed values with the flow of water, stop standby program, is used into normal boot-strap Program.
Above disclosed is only presently preferred embodiments of the present invention, cannot limit the right of the present invention with this certainly Range, therefore according to equivalent variations made by scope of the present invention patent, it is still within the scope of the present invention.

Claims (7)

1. a kind of forced-ventilated gas water heater control method, which is characterized in that after gas heater is powered, gas heater enters Standby program detects the temperature on heat exchanger by the first temperature sensor, and by temperature data Real-time Feedback to controller, When the first temperature sensor detects the temperature on heat exchanger lower than programmed values, controller starts blower or electric heating Component perhaps successively starting blower and electric heating assembly or starts blower and electric heating assembly simultaneously, and blower is by heat exchanger Neighbouring cold air is discharged from discharge flue, and electric heating assembly heats heat exchanger, when blower, electric heating assembly are in setting After interior operation, if the first temperature sensor detects that the temperature on heat exchanger is higher than programmed values, controller is closed Blower and electric heating assembly, gas heater are again introduced into standby mode;If the first temperature sensor detects on heat exchanger Temperature when being still below programmed values, controller closes blower and electric heating assembly, opens frost alert program, sends out to user Alarm out.
2. forced-ventilated gas water heater control method as described in claim 1, which is characterized in that after gas heater is powered, Gas heater enters standby program, and the first temperature sensor and second temperature sensor start the temperature for detecting measurand respectively Degree, and by temperature data Real-time Feedback to controller;
When the first temperature sensor detects the temperature on heat exchanger lower than programmed values, if second temperature sensor is examined When measuring the leaving water temperature of outlet conduit higher than programmed values, controller starts blower, and is sentenced by rotation speed of fan sensor Disconnected discharge flue stopping state:
Situation one, when controller judges discharge flue without blocking according to the signal of rotation speed of fan sensor feedback, controller control Blower processed is run by the first revolving speed of setting, after blower is run within the set time, if the first temperature sensor detects heat When temperature on exchanger is higher than programmed values, controller closes blower, and gas heater is again introduced into standby mode;If the When one temperature sensor detects that the temperature on heat exchanger is still below programmed values, controller starts electric heating assembly heating Heat exchanger;After electric heating assembly is run within the set time, if the first temperature sensor detects the temperature on heat exchanger When degree is higher than programmed values, controller simultaneously closes off blower and electric heating assembly, and gas heater is again introduced into standby mode; If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values, controller simultaneously close off blower and Electric heating assembly opens frost alert program, issues the user with alarm;
Situation two, when controller judges that discharge flue has blocking according to the signal of rotation speed of fan sensor feedback, controller will The revolving speed of blower opens to the maximum, at this time when controller judges discharge flue without blocking according to the signal of rotation speed of fan sensor feedback When, controller controls blower by the second revolving speed operation of setting, after blower is run within the set time, if the first temperature sensing Device detect the temperature on heat exchanger be higher than programmed values when, controller close blower, gas heater be again introduced into Machine state;If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values, controller starting electricity Heating component heats heat exchanger;After electric heating assembly is run within the set time, if the first temperature sensor detects heat When temperature on exchanger is higher than programmed values, controller simultaneously closes off blower and electric heating assembly, and gas heater is again Into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values, controller Blower and electric heating assembly are simultaneously closed off, frost alert program is opened, issues the user with alarm;
Situation three, when controller judges that discharge flue has blocking according to the signal of rotation speed of fan sensor feedback, controller will The revolving speed of blower opens to the maximum, and judges discharge flue still according to the signal of rotation speed of fan sensor feedback when controller at this time and has and is stifled When plug, controller closes blower, and starts electric heating assembly heating heat exchanger, when electric heating assembly is run within the set time Afterwards, if the first temperature sensor detects that the temperature on heat exchanger is higher than programmed values, controller closes electric heating group Part, gas heater are again introduced into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below journey When sequence setting value, controller closes electric heating assembly, opens frost alert program, issues the user with alarm.
3. forced-ventilated gas water heater control method as claimed in claim 2, which is characterized in that when the first temperature sensor is examined When measuring the temperature on heat exchanger lower than programmed values, and second temperature sensor detects the leaving water temperature of outlet conduit When lower than programmed values, controller starts electric heating assembly and heats heat exchanger, when electric heating assembly is transported within the set time After row, if the first temperature sensor detects that the temperature on heat exchanger is higher than programmed values, electric heating assembly, combustion are closed Gas water heater is again introduced into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below program setting When value, electric heating assembly is closed, frost alert program is opened, issues the user with alarm.
4. forced-ventilated gas water heater control method as claimed in claim 2, which is characterized in that when the first temperature sensor is examined When measuring the temperature on heat exchanger higher than programmed values, gas heater is directly entered standby mode.
5. forced-ventilated gas water heater control method as described in claim 1, which is characterized in that after gas heater is powered, Gas heater enters standby program, and the first temperature sensor starts to detect the temperature of measurand, and temperature data is real-time Feed back controller;
When the first temperature sensor detects the temperature on heat exchanger lower than programmed values, controller starts blower simultaneously And electric heating assembly, and discharge flue stopping state is judged by rotation speed of fan sensor:
Situation one, when controller judges discharge flue without blocking according to the signal of rotation speed of fan sensor feedback, controller control Blower processed is run by the first revolving speed of setting, after blower is run within the set time, if the first temperature sensor detects heat When temperature on exchanger is higher than programmed values, controller simultaneously closes off blower and electric heating assembly, and gas heater is again Into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values, controller Blower and electric heating assembly are simultaneously closed off, frost alert program is opened, issues the user with alarm;
Situation two, when controller judges that discharge flue has blocking according to the signal of rotation speed of fan sensor feedback, controller will The revolving speed of blower opens to the maximum, at this time when controller judges discharge flue without blocking according to the signal of rotation speed of fan sensor feedback When, controller controls blower by the second revolving speed operation of setting, after blower is run within the set time, if the first temperature sensing When device detects that the temperature on heat exchanger is higher than programmed values, controller simultaneously closes off blower and electric heating assembly, combustion gas Water heater is again introduced into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below programmed values When, controller simultaneously closes off blower and electric heating assembly, opens frost alert program, issues the user with alarm;
Situation three, when controller judges that discharge flue has blocking according to the signal of rotation speed of fan sensor feedback, controller will The revolving speed of blower opens to the maximum, and judges discharge flue still according to the signal of rotation speed of fan sensor feedback when controller at this time and has and is stifled When plug, controller closes blower, and electric heating assembly continues to heat heat exchanger, when electric heating assembly is run within the set time Afterwards, if the first temperature sensor detects that the temperature on heat exchanger is higher than programmed values, controller closes electric heating group Part, gas heater are again introduced into standby mode;If the first temperature sensor detects that the temperature on heat exchanger is still below journey When sequence setting value, electric heating assembly is closed, frost alert program is opened, issues the user with alarm.
6. forced-ventilated gas water heater control method as claimed in claim 5, which is characterized in that when the first temperature sensor is examined When measuring the temperature on heat exchanger higher than programmed values, gas heater is directly entered standby mode.
7. such as forced-ventilated gas water heater control method as claimed in any one of claims 1 to 6, which is characterized in that work as water flow When sensor is detected with the flow of water less than programmed values, into standby program;Water is used when water flow sensor detects Flow be greater than programmed values when, stop standby program, into normal boot-strap use program.
CN201811082859.6A 2018-09-17 2018-09-17 Control method of forced-ventilated type gas water heater Active CN109307368B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811082859.6A CN109307368B (en) 2018-09-17 2018-09-17 Control method of forced-ventilated type gas water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811082859.6A CN109307368B (en) 2018-09-17 2018-09-17 Control method of forced-ventilated type gas water heater

Publications (2)

Publication Number Publication Date
CN109307368A true CN109307368A (en) 2019-02-05
CN109307368B CN109307368B (en) 2021-01-08

Family

ID=65223993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811082859.6A Active CN109307368B (en) 2018-09-17 2018-09-17 Control method of forced-ventilated type gas water heater

Country Status (1)

Country Link
CN (1) CN109307368B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195937A (en) * 2019-05-20 2019-09-03 广东万和新电气股份有限公司 Antifreeze method, antifreeze control system and gas heater
CN110307650A (en) * 2019-05-31 2019-10-08 青岛经济技术开发区海尔热水器有限公司 Gas heater control method and gas heater
CN110779213A (en) * 2019-08-31 2020-02-11 能率(中国)投资有限公司 Anti-freezing method for domestic gas water heater
CN113048657A (en) * 2021-04-29 2021-06-29 芜湖美的厨卫电器制造有限公司 Wind resistance control method for gas water heater and gas water heater
CN115711491A (en) * 2022-10-31 2023-02-24 广东合胜热能科技有限公司 Control method of zero-cold-water gas water heater

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2856844Y (en) * 2005-08-12 2007-01-10 中山华帝燃具股份有限公司 Freezing-proof electrothermal water heater
CN2935008Y (en) * 2006-07-27 2007-08-15 郝新文 Antifreeze combustion gas water-heater
CN201242289Y (en) * 2008-07-04 2009-05-20 广东万和新电气有限公司 Hot air type antifreeze protection device for gas water heater water tube
CN202149590U (en) * 2011-06-30 2012-02-22 美的集团有限公司 Anti-freezing forced-ventilated type gas water heater
CN202419936U (en) * 2012-01-09 2012-09-05 广东万和新电气股份有限公司 Gas water heater with antifreezing alarm function

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2856844Y (en) * 2005-08-12 2007-01-10 中山华帝燃具股份有限公司 Freezing-proof electrothermal water heater
CN2935008Y (en) * 2006-07-27 2007-08-15 郝新文 Antifreeze combustion gas water-heater
CN201242289Y (en) * 2008-07-04 2009-05-20 广东万和新电气有限公司 Hot air type antifreeze protection device for gas water heater water tube
CN202149590U (en) * 2011-06-30 2012-02-22 美的集团有限公司 Anti-freezing forced-ventilated type gas water heater
CN202419936U (en) * 2012-01-09 2012-09-05 广东万和新电气股份有限公司 Gas water heater with antifreezing alarm function

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195937A (en) * 2019-05-20 2019-09-03 广东万和新电气股份有限公司 Antifreeze method, antifreeze control system and gas heater
CN110195937B (en) * 2019-05-20 2021-08-10 广东万和新电气股份有限公司 Anti-freezing method, anti-freezing control system and gas water heater
CN110307650A (en) * 2019-05-31 2019-10-08 青岛经济技术开发区海尔热水器有限公司 Gas heater control method and gas heater
CN110779213A (en) * 2019-08-31 2020-02-11 能率(中国)投资有限公司 Anti-freezing method for domestic gas water heater
CN113048657A (en) * 2021-04-29 2021-06-29 芜湖美的厨卫电器制造有限公司 Wind resistance control method for gas water heater and gas water heater
CN115711491A (en) * 2022-10-31 2023-02-24 广东合胜热能科技有限公司 Control method of zero-cold-water gas water heater
CN115711491B (en) * 2022-10-31 2023-05-09 广东合胜热能科技有限公司 Control method of zero-cooling water gas water heater

Also Published As

Publication number Publication date
CN109307368B (en) 2021-01-08

Similar Documents

Publication Publication Date Title
CN109307368A (en) A kind of forced-ventilated gas water heater control method
KR101160795B1 (en) Water heater with automatic controller
CN109340901A (en) A kind of antifreeze control method of low-temperature air source heat pump heating machine
CN104344567B (en) Water heater pipeline anti-freezing control method and system and water heater
CN201680570U (en) Electric water heater used with solar water heater
CN109654774A (en) A kind of defrosting control method and air source heat pump system
CN110186200A (en) A kind of burning antifreeze control method and the gas heater using it
CN109489257A (en) A kind of quick start method of zero cold water gas instantaneous water heater
CN108302770A (en) A kind of zero cold water fuel gas water heating system automatic freezing-protective method
CN110195937A (en) Antifreeze method, antifreeze control system and gas heater
CN202149590U (en) Anti-freezing forced-ventilated type gas water heater
CN104697197B (en) Solar water heater controls device
JP2011149673A (en) Solar heat hot water supply system
CN208652925U (en) Remaining water emptying system in pipe
CN109990519A (en) A kind of air source heat pump antifreeze control method
CN109099594A (en) A kind of gas-heating water heater automatic water filling and automatic drain system
CN208871832U (en) Gas heater with antifreeze function
CN206234896U (en) A kind of solar energy, burnt gas wall hanging furnace and floor heating set heating system
CN109990486B (en) Antifreezing method for gas water heater and antifreezing gas water heater
CN205580015U (en) Novel solar water heater
CN210165589U (en) Anti-freezing gas water heater
CN105605813B (en) A kind of solar water heater
CN200975747Y (en) Intelligent heating control device
CN106052115A (en) Wall-mounted furnace and control method thereof
CN205957489U (en) Gas hot -water heating equipment freeze -proof device and adoption device's gas hot -water heating equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant