CN109306703A - Basement bottom board plugging dewatering well method - Google Patents

Basement bottom board plugging dewatering well method Download PDF

Info

Publication number
CN109306703A
CN109306703A CN201710629865.8A CN201710629865A CN109306703A CN 109306703 A CN109306703 A CN 109306703A CN 201710629865 A CN201710629865 A CN 201710629865A CN 109306703 A CN109306703 A CN 109306703A
Authority
CN
China
Prior art keywords
dewatering well
valve
water
steel pipe
bottom board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710629865.8A
Other languages
Chinese (zh)
Inventor
张延彬
徐凯
黄升
蔡俊兵
张仲用
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710629865.8A priority Critical patent/CN109306703A/en
Publication of CN109306703A publication Critical patent/CN109306703A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/16Restraining of underground water by damming or interrupting the passage of underground water by placing or applying sealing substances
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to basement bottom boards.Basement bottom board plugging dewatering well method, it includes: step 1, concentrates the water in extraction dewatering well with water pump;Step 2, rubber ring rivet interlacement in steel pallet;Step 3, the two welds together after the coating steel pipe that diameter is 20-30mm is passed through steel pallet;Upper part stretches out plate upper surface, and is bent and is placed in base surface, which is provided with sealing valve;Coating steel pipe after valve reserves one end length, makes it possible to connect with rubber hose;Step 4 is placed into steel pallet in dewatering well, makes the gap between rubber ring supporting plate closed as far as possible and dewatering well;Step 5 pours the part that high grade rapid hardening water-tight concrete is located at bottom plate to dewatering well;Step 6 closes sealing gate valve after concrete strength reaches design strength, and spot welding is lived;To be buried underground in the building screed-coat of room.Base plate leakage problem caused by effective solution of the present invention precipitation deficiency, provides against hidden trouble.

Description

Basement bottom board plugging dewatering well method
Technical field
The present invention relates to basement bottom board more particularly to the dewatering wells of basement bottom board.
Background technique
In practice of construction, the dewatering well of basement is completed or is basically completed in building structure construction, meets design After anti-floating requires, just start to block.Since the underground water in dewatering well is many times artesian water, water is again bigger, especially It is when blocking the last one dewatering well, these unfavorable factors, which seem, especially to be concentrated.Handle bad, precipitation well area easily forms bottom Plate leakage, and the position later period is difficult to handle.
Summary of the invention
The present invention is directed to overcome the deficiencies of existing technologies, a kind of basement bottom board plugging dewatering well method is provided.The present invention Base plate leakage problem caused by effective solution precipitation deficiency, provides against hidden trouble.
In order to solve the above-mentioned technical problem, basement bottom board plugging dewatering well method, it includes:
Step 1 concentrates the water in extraction dewatering well with water pump;
Step 2, rubber ring rivet interlacement in steel pallet;
Step 3, the two welds together after the coating steel pipe that diameter is 20-30mm is passed through steel pallet;Upper part stretches out bottom Plate upper surface, and be bent and be placed in base surface, which is provided with sealing valve;It is long that coating steel pipe after valve reserves one end Degree, makes it possible to connect with rubber hose;
Step 4 is placed into steel pallet in dewatering well, makes the gap between rubber ring supporting plate closed as far as possible and dewatering well;
Step 5 pours the part that high grade rapid hardening water-tight concrete is located at bottom plate to dewatering well;
Step 6 closes sealing gate valve after concrete strength reaches design strength, and spot welding is lived;To be buried underground room It builds in screed-coat.
The basement bottom board plugging dewatering well method, in the step 5, the dewatering well crystalline substance is located at the portion of bottom plate Divide and reserved when constructing bottom plate, lateral surface is provided with dense mesh.
The basement bottom board plugging dewatering well method, it further includes, if artesian pressure is especially big, sealing gate valve is closed It closes not tight, then the reserved end of the coating steel pipe after valve is connected with rubber hose, rubber hose is pre-buried to basement edge Gutter in, formed functional in organized water drainage.
The present invention is mainly connected by the steel dewatering well, steel pallet, rubber ring, rubber ring and the steel pallet that are embedded in floor bottoms Rivet, coating steel pipe, the sealing gate valve, the rubber hose composition to match with coating steel pipe connect.Effective solution of the present invention Base plate leakage problem caused by precipitation deficiency, design is rationally, easy to implement, provides against hidden trouble.
Specific embodiment
A kind of basement bottom board plugging dewatering well method of the present invention is mainly 300mm by the diameter for being embedded in floor bottoms Steel dewatering well, diameter be 295mm the steel pallet with a thickness of 3mm, the width with a thickness of 5mm be the rubber ring of 50mm, rubber Rivet that rubber ring is connect with steel pallet, diameter are 20(or 30mm, and view water yield size is chosen) coating steel pipe, sealing gate valve and The rubber hose composition that coating steel pipe matches.
When construction:
1, the water in extraction dewatering well is concentrated with water pump;
2, the steel support with a thickness of 3mm for being 295mm in diameter with rivet interlacement the rubber ring that the width with a thickness of 5mm is 50mm On plate.
3, it is 20(or 30mm diameter) coating steel pipe is across steel pallet about 50mm, and the two welds together later.Thereon Plate upper surface is slightly stretched out in portion, and is bent and is placed in base surface, which is provided with sealing valve.Coating steel pipe after valve is pre- One end length is stayed, makes it possible to connect with rubber hose.
4, steel pallet is placed into dewatering well, makes the gap between rubber ring supporting plate closed as far as possible and dewatering well.
5, high grade rapid hardening water-tight concrete to dewatering well is poured to be located at the part of bottom plate (section is pre- when constructing bottom plate It stays, lateral surface is provided with dense mesh.)
6, after concrete strength reaches design strength, sealing gate valve is closed, spot welding is lived.It is buried underground the building of room in the future In screed-coat (the thickness degree is typically designed as 100mm, completely can be with embedding gate valve).
If 7, artesian pressure is especially big, sealing gate valve is not closed completely, then the reserved end of the coating steel pipe after valve with Rubber hose connects, and rubber hose is pre-buried in the gutter of basement edge, forms functional in organized water drainage.

Claims (3)

1. basement bottom board plugging dewatering well method, which is characterized in that it includes:
Step 1 concentrates the water in extraction dewatering well with water pump;
Step 2, rubber ring rivet interlacement in steel pallet;
Step 3, the two welds together after the coating steel pipe that diameter is 20-30mm is passed through steel pallet;Upper part stretches out bottom Plate upper surface, and be bent and be placed in base surface, which is provided with sealing valve;It is long that coating steel pipe after valve reserves one end Degree, makes it possible to connect with rubber hose;
Step 4 is placed into steel pallet in dewatering well, makes the gap between rubber ring supporting plate closed as far as possible and dewatering well;
Step 5 pours the part that high grade rapid hardening water-tight concrete is located at bottom plate to dewatering well;
Step 6 closes sealing gate valve after concrete strength reaches design strength, and spot welding is lived;To be buried underground room It builds in screed-coat.
2. basement bottom board plugging dewatering well method according to claim 1, which is characterized in that in the step 5, institute It states dewatering well and is located at the part of bottom plate and reserved when constructing bottom plate, lateral surface is provided with dense mesh.
3. basement bottom board plugging dewatering well method according to claim 1, which is characterized in that it further includes, if pressure-bearing Water pressure is especially big, and sealing gate valve is not closed completely, then the reserved end of the coating steel pipe after valve is connected with rubber hose, rubber Glue hose is pre-buried in the gutter of basement edge, forms functional in organized water drainage.
CN201710629865.8A 2017-07-28 2017-07-28 Basement bottom board plugging dewatering well method Pending CN109306703A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710629865.8A CN109306703A (en) 2017-07-28 2017-07-28 Basement bottom board plugging dewatering well method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710629865.8A CN109306703A (en) 2017-07-28 2017-07-28 Basement bottom board plugging dewatering well method

Publications (1)

Publication Number Publication Date
CN109306703A true CN109306703A (en) 2019-02-05

Family

ID=65205067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710629865.8A Pending CN109306703A (en) 2017-07-28 2017-07-28 Basement bottom board plugging dewatering well method

Country Status (1)

Country Link
CN (1) CN109306703A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424694A (en) * 2020-04-17 2020-07-17 广东省水利水电第三工程局有限公司 Well sealing device and well sealing method for foundation structure water collecting well

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201172828Y (en) * 2008-03-19 2008-12-31 山西第六建筑有限公司 Well-covering device for dewatering well
CN203960916U (en) * 2014-06-27 2014-11-26 中建三局第一建设工程有限责任公司 A kind of plugging device of deep foundation ditch base plate pressure-bearing drainage sump
JP2014234681A (en) * 2013-06-04 2014-12-15 株式会社大林組 Ground-water level lowering system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201172828Y (en) * 2008-03-19 2008-12-31 山西第六建筑有限公司 Well-covering device for dewatering well
JP2014234681A (en) * 2013-06-04 2014-12-15 株式会社大林組 Ground-water level lowering system
CN203960916U (en) * 2014-06-27 2014-11-26 中建三局第一建设工程有限责任公司 A kind of plugging device of deep foundation ditch base plate pressure-bearing drainage sump

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424694A (en) * 2020-04-17 2020-07-17 广东省水利水电第三工程局有限公司 Well sealing device and well sealing method for foundation structure water collecting well

Similar Documents

Publication Publication Date Title
CN103469973B (en) A kind of flat seam type, detachable deformation joint of roof and building method thereof
CN202788022U (en) Wall crack combined type repair structure
CN104452949A (en) Embedded leak-proof joint
CN106320353A (en) Basement construction dewatering and drainage device and construction method thereof
CN112982300B (en) Seepage-proofing and drainage connecting structure for bank asphalt concrete panel and reservoir bottom geomembrane and construction method
CN103437556A (en) Waterproof and heat-preservation construction method for building water supply and drainage and heating engineering
KR101017117B1 (en) Method and device for waterproofing steel pipe loop structure by a water drainage process for constructing underground structure by non-excavation
CN104846849B (en) A kind of method for preventing basement bottom plate rear pouring tape seepage
CN109306703A (en) Basement bottom board plugging dewatering well method
CN105780792B (en) A kind of foundation pit high water head Dewatering by pressure reduction well shut-in well method and structure of shunting in a well
KR101200016B1 (en) Method of constructing underground structure using steel pipe loop structure employing a water drainage process and water drainage type underground structure constructed using the same
CN107687201B (en) Direct-connected drain pipe floor drain and installation method thereof
CN103410318A (en) Construction method for preventing leakage of restroom tubular well
CN103205986A (en) Concrete raft foundation construction-joint grouting device and construction method
KR101182955B1 (en) Manhole with support rib
CN103806604A (en) Method for constructing siphon type hanging pipe rain water system
CN110905053A (en) Construction method for indoor drainage pipeline penetrating through floor slab
CN203701217U (en) Secondary drainage leak-proof structure of bathroom
CN205636783U (en) Keep off native lateral wall from waterproof basement
JP5315208B2 (en) Drainage container
CN205024824U (en) Bathroom mounting structure
US20220090369A1 (en) Leakage prevention drainage trap with joint reinforcing member, and installation method thereof
KR101121990B1 (en) Drainage system of architectural structure
CN201512836U (en) Water accumulation and drainage device
RU2646915C2 (en) Method for repairing sewage wells

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190205