CN109299841A - Industrial Engineering Specialty teaching ERP module - Google Patents
Industrial Engineering Specialty teaching ERP module Download PDFInfo
- Publication number
- CN109299841A CN109299841A CN201710610113.7A CN201710610113A CN109299841A CN 109299841 A CN109299841 A CN 109299841A CN 201710610113 A CN201710610113 A CN 201710610113A CN 109299841 A CN109299841 A CN 109299841A
- Authority
- CN
- China
- Prior art keywords
- module
- product
- production
- plan
- erp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/20—Education
- G06Q50/205—Education administration or guidance
Abstract
The invention discloses a kind of Industrial Engineering Specialty teaching ERP modules, which includes: basic modeling module, planning management module, inventory management module.The ERP module can be used for formulating the production schedules of product and determine required material according to the production schedules and formulate corresponding material allocation plan, and be distributed to production module.By using ERP module disclosed by the invention, the range of experiment is expanded, reduces the development cost of experimental system.
Description
Technical field
The present invention relates to a kind of teaching experiment system, in particular to a kind of Industrial Engineering Specialty teaching ERP modules.
Background technique
Culture is able to carry out the specialized personnel of planning, design, evaluation and innovation to complicated manufacture system, is that Industrial Engineering is special
How the elementary object of industry ensures training quality, reaches training objective especially in terms of the fostering requirement of undergraduate education profession
It is required that experiment teaching system is key link for Industrial Engineering Specialty very strong for practicality.
Undergraduate course Industrial Engineering Specialty teaching comprehensive experimental system in the prior art, is difficult to support Industrial Engineering Specialty course
The development of required all specialized course's experimental activities.
Summary of the invention
A kind of Industrial Engineering Specialty teaching ERP module, comprising: basic modeling module, planning management module, stock control
Module;
Basic modeling module includes: Modeling in Product module, the configured list for material needed for establishing each product of production;Technique
Modeling module, for establishing the technique list that material needed for each product is processed and assembled;Resource Modeling module, is used for
The list of required resource when establishing using processing and assembly technology;Wherein, including hardware resource and virtual emulation resource;
Planning management module includes: main production plan module, for determining product to be produced;Material requirements calculating module is used
The material needed for the product for calculating production;Procurement plan module formulates material for material needed for the product according to production
Procurement plan;Production schedules module, for formulating and issuing the production plan of the product;Material allocation schedule module is used
The material needed for being calculated according to the production plan of the product simultaneously formulates distribution plan;
Inventory management module includes: stock management module, and the material for purchasing to the procurement plan module is carried out into depositary management
Reason;Database management module out, for formulating the corresponding materiel warehouse-out of distribution plan progress according to the material allocation schedule module and matching
It send;Stock material analysis module is analyzed for the material to inventory.
As seen from the above technical solution provided by the invention, the purpose of invention is to provide a kind of Industrial Engineering Specialty religion
It learns and uses ERP module, expand the range of experiment, reduce the development cost of experimental system.
Specific embodiment
The following is a clear and complete description of the technical scheme in the embodiments of the invention, it is clear that described embodiment
Only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiment of the present invention, ordinary skill
Personnel's every other embodiment obtained without making creative work, belongs to protection scope of the present invention.
ERP module is divided into three parts to introduce:
1) basic modeling module, when for material, processing and assembly technology and processing needed for configuring each product of production and assembly
Required resource.It is broadly divided into three parts: Modeling in Product module, Technology Modeling module and Resource Modeling module.Product is built
Mould module, for establish produce each product needed for material configured list, for example, production product A need component a, component b with
Component c, meanwhile, component c is made by component d and component e.Technology Modeling module, for establishing to needed for each product
The technique list that material is processed and assembled, for example, the processing work of component a, component b and component c needed for establishing production product A
Skill list, and establish the technique list etc. for assembling component a, component b and component c;Furthermore it is also possible in technique list
The technique informations such as technology characteristics information, operation card, job instruction, standard work force, processing quality specification are set.Resource Modeling
Module, the list of required resource when for establishing using processing and assembly technology, including hardware resource and virtual emulation resource;This
The hardware resource at place mainly indicates the resource of physical presence, for example, machining tool, assembly line etc.;Virtual emulation resource is mainly wrapped
Include simulation model, video etc.;Its role is to when producing the corresponding technique of a certain product can not be realized by hardware resource, then
System can recall corresponding video or simulation model, can understand corresponding process by video or simulation model, and
And system by quality and working hour distribution function, can calculate the time of the process process finishing and the remaining mass of processing,
The data that these data are obtained with the process of practical hands-on, so as to subsequent progress qualitative data analysis and production performance
Analysis.
2) planning management module formulates distribution plan for the material according to needed for producing a certain generation.It specifically includes that master
Production plan module, material requirements calculating module, procurement plan module, production schedules module and material allocation plan mould
Block.Main production plan module forms main production plan according to production requirement for determining product to be produced.Material requirement
Computing module, for material needed for calculating the product produced, for example, material needed for each product in combination product modeling module
Configured list calculate produce the product needed for material type and quantity.Procurement plan module, for the production according to production
Material needed for product formulates material procurement plan, can also be formulated according to the checkout result combination quantity in stock of material requirements calculating module
Procurement plan.Production schedules module, for formulating and issuing the production plan of the product.Material allocation schedule module is used
The material needed for being calculated according to the production plan of the product simultaneously formulates distribution plan.
3) inventory management module, buying for being issued according to planning management module or distribution plan carry out materiel warehouse-in or
Corresponding materiel warehouse-out and dispatching.It specifically includes that stock management module, go out database management module and stock material analysis module.Storage
Management module, the material for purchasing to the procurement plan module carry out stock management;Database management module out, for according to institute
It states material allocation schedule module and formulates the corresponding materiel warehouse-out of distribution plan progress and dispatching;Stock material analysis module, for pair
The material of inventory is analyzed.
Claims (4)
1. a kind of Industrial Engineering Specialty teaching ERP module, which is characterized in that the module includes: basic modeling module, plan pipe
Manage module, inventory management module.
2. Industrial Engineering Specialty teaching ERP module according to claim 1, which is characterized in that the basis modeling mould
Block includes: Modeling in Product module, the configured list for material needed for establishing each product of production;Technology Modeling module, is used for
Establish the technique list that material needed for each product is processed and assembled;Resource Modeling module, for establishing using processing
And when assembly technology required resource list;Wherein, including hardware resource and virtual emulation resource.
3. Industrial Engineering Specialty teaching ERP module according to claim 1, which is characterized in that the planning management mould
Block includes: main production plan module, for determining product to be produced;Material requirements calculating module, for calculating being somebody's turn to do for production
Material needed for product;Procurement plan module formulates material procurement plan for material needed for the product according to production;Production is made
Industry schedule module, for formulating and issuing the production plan of the product;Material allocation schedule module, for the life according to the product
Material needed for production plan calculates simultaneously formulates distribution plan.
4. Industrial Engineering Specialty teaching ERP module according to claim 1, which is characterized in that the stock control mould
Block includes: stock management module, and the material for purchasing to the procurement plan module carries out stock management;Outbound manages mould
Block carries out corresponding materiel warehouse-out and dispatching for formulating distribution plan according to the material allocation schedule module;Stock material point
Module is analysed, is analyzed for the material to inventory.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710610113.7A CN109299841A (en) | 2017-07-25 | 2017-07-25 | Industrial Engineering Specialty teaching ERP module |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710610113.7A CN109299841A (en) | 2017-07-25 | 2017-07-25 | Industrial Engineering Specialty teaching ERP module |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109299841A true CN109299841A (en) | 2019-02-01 |
Family
ID=65167811
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710610113.7A Pending CN109299841A (en) | 2017-07-25 | 2017-07-25 | Industrial Engineering Specialty teaching ERP module |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109299841A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103106559A (en) * | 2013-01-28 | 2013-05-15 | 北京交通大学 | Virtual-actual fusion industrial engineering comprehensive experiment system |
KR101285555B1 (en) * | 2012-12-18 | 2013-07-12 | 모두웨어주식회사 | Method and system for the enterprise resource planning which automatically applies user-custom menus purchased at a web-market |
CN106296087A (en) * | 2016-08-04 | 2017-01-04 | 中冶赛迪电气技术有限公司 | A kind of Spare Parts Inventory Management System of Facing to Manufacturing industry |
-
2017
- 2017-07-25 CN CN201710610113.7A patent/CN109299841A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101285555B1 (en) * | 2012-12-18 | 2013-07-12 | 모두웨어주식회사 | Method and system for the enterprise resource planning which automatically applies user-custom menus purchased at a web-market |
CN103106559A (en) * | 2013-01-28 | 2013-05-15 | 北京交通大学 | Virtual-actual fusion industrial engineering comprehensive experiment system |
CN106296087A (en) * | 2016-08-04 | 2017-01-04 | 中冶赛迪电气技术有限公司 | A kind of Spare Parts Inventory Management System of Facing to Manufacturing industry |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Halenar et al. | Virtualization of production using digital twin technology | |
Komarova et al. | The fourth industrial revolution and staff development strategy in manufacturing | |
Doh et al. | Systems integration in the lean manufacturing systems value chain to meet industry 4.0 requirements | |
CN108198093B (en) | CPS-based intelligent building system | |
Ikumapayi et al. | Overview of recent advancement in globalization and outsourcing initiatives in manufacturing systems | |
CN103106559A (en) | Virtual-actual fusion industrial engineering comprehensive experiment system | |
Da Fonseca | The future of employment: Evaluating the impact of STI foresight exercises | |
Chang et al. | Lean production implement model for aerospace manufacturing suppliers | |
Shodiyev et al. | WAYS TO SOLVE ECONOMIC PROBLEMS IN ANALYSIS OF ENTERPRISES | |
Kusmin | Industry 4.0 | |
Nedelcu et al. | Digital factory–A prerequisite for revitalizing the production sector | |
Ulewicz et al. | Mining Industry 4.0--Opportunities and Barriers. | |
Bentaher et al. | Supply chain management 4.0: a literature review and research framework | |
Mathews | New production concepts | |
CN109299841A (en) | Industrial Engineering Specialty teaching ERP module | |
Theuer | Extension of value stream design for the simulation of autonomous production systems | |
Feldt et al. | Breaking through the bottlenecks using artificial intelligence | |
KR101434390B1 (en) | System for management and controlling based in Process Realtime Monitoring | |
KR20220057164A (en) | Work sequence and work distribution simulation method using plan data | |
Astuti et al. | Strategic Development and SWOT Analysis of Canting Batik Industry | |
Avdeeva et al. | Transformation of the industrial sector into an information-networked environment within industry 4.0: Prospects and challenges | |
Junghare et al. | Mathematical Modeling of Production Scheduling Problem: A Case Study for Manufacturing Industry | |
Haruna et al. | Effect of advanced manufacturing technology (AMT) on the product output of manufacturing small and medium scale enterprises in Nigeria | |
Logesh et al. | A review on implementation of lean manufacturing techniques in manufacturing industry to deploy green manufacturing through reduction of hazardous waste | |
Seidel et al. | Productivity improvement in job shop production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190201 |