CN109296165A - A kind of novel overhead system and construction method - Google Patents

A kind of novel overhead system and construction method Download PDF

Info

Publication number
CN109296165A
CN109296165A CN201811229205.1A CN201811229205A CN109296165A CN 109296165 A CN109296165 A CN 109296165A CN 201811229205 A CN201811229205 A CN 201811229205A CN 109296165 A CN109296165 A CN 109296165A
Authority
CN
China
Prior art keywords
nut
foundation bolt
keel
millimeters
overhead system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811229205.1A
Other languages
Chinese (zh)
Other versions
CN109296165B (en
Inventor
马红军
李鹏程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Home Decoration Technology Co Ltd
Original Assignee
Shanghai Home Decoration Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Home Decoration Technology Co Ltd filed Critical Shanghai Home Decoration Technology Co Ltd
Priority to CN201811229205.1A priority Critical patent/CN109296165B/en
Publication of CN109296165A publication Critical patent/CN109296165A/en
Application granted granted Critical
Publication of CN109296165B publication Critical patent/CN109296165B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/024Sectional false floors, e.g. computer floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/024Sectional false floors, e.g. computer floors
    • E04F15/02447Supporting structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Floor Finish (AREA)
  • Foundations (AREA)

Abstract

The present invention is provided with a kind of novel overhead system, including fashioned iron keel, the bottom surface setting of keel is used for levelling foundation bolt and T-nut, keel section isosceles triangle, keel bottom surface is provided with track groove, T-nut is arranged in track groove, and foundation bolt is connected through a screw thread T-nut, is realized by turning T-type nut adjustment foundation bolt levelling.This system is inserted in foundation bolt by lower margin rubber sleeve, then the T-nut of bonding cushioning piece is connected with foundation bolt, and finally Chinese character pin-shaped steel joist is connected with T-nut, passes through Chinese character pin-shaped steel joist top-portion apertures and adjusts foundation bolt realization floor leveling.This programme manufacturing process is simple, precision is high, bearing capacity is very big, intensity is high, recyclable, and good product consistency, quality are relatively light, the investment that simplifies construction technology, facilitate installation, reducing labour, reduce cost.

Description

A kind of novel overhead system and construction method
Technical field
The present invention relates to construction and decoration technical fields, are specifically related to a kind of novel overhead system and construction method.
Background technique
Along with the development of Interior Decoration Industry, assembled renovation process achieves significant achievement, but floor leveling is applied Work technique does not obtain whole improvement, still rests in traditional handicraft.
Traditional floor leveling construction system is wet construction, and there are many problems for this construction technology: such as long in time limit, work Skill is cumbersome, heavy workload, and construction waste material is more, not environmentally friendly enough, at high cost, is difficult to carry out the maintenance and repair in later period, no longer meet Customer demand, there is very big gaps compared with international advanced mounting technology.
It relies on the traditional handicraft that technology was come into being at that time and is no longer satisfied existing production requirement, no longer have advanced Property.Traditional floor leveling system has limited the development of industry, it is therefore desirable to be updated substitution to this technology.
Summary of the invention
Technical problem to be solved by the present invention lies in overcome problems of the prior art, provide a kind of novel rack Empty set system and construction method are inserted in foundation bolt especially by lower margin rubber sleeve, and foundation bolt connects bonding cushioning piece T-nut, be combined into adjustable lower margin component, then the lower margin component combined with Chinese character pin-shaped rigid keel connection composition ground The adjustable load-bearing basic part in face, then square tube is fixed on two groups of load-bearing basic parts with self-tapping screw, it is finally putting into cloth Shandong plate And lower margin component height is adjusted, complete ground leveling.Accessory rigidity is strong, it is easy to adjust with it is easy to use, facilitate construction, therefore can be with For floor leveling.
It is to solve the above-mentioned problems the technical scheme is that such:
A kind of novel overhead system, including fashioned iron keel, the bottom surface setting of keel is for levelling foundation bolt and T-type spiral shell Mother, keel section isosceles triangle, keel bottom surface are provided with track groove, and T-nut is arranged in track groove, and foundation bolt passes through screw thread Connecting T-shaped nut is realized levelling by turning T-type nut adjustment foundation bolt.
Foundation bolt is equipped with 15~30 millimeters of a diameter, 2~6 millimeters of thickness of steel circular discs, and circular discs are grounded downward It places, circular discs top is 15~65 millimeters of long threaded rods, adjusts and uses for T-nut connection, foundation bolt top is equipped with The flat recess of height is adjusted, groove depth is 2~6 millimeters, and groove width is 1~3 millimeter.
Foundation bolt bottom is cased with lower margin rubber sleeve, 3~10 mm of thickness of lower margin rubber gum cover, and 15~30 millimeters of diameter.
T-nut is equipped with 20~40 millimeters of a diameter, and with a thickness of 1~3 millimeter of steel disk, steel disk slides into steel dragon In the track groove of bone, steel disk connection one is 10~30 millimeters long, and 10~15 millimeters of internal diameter of internal screw thread cylindrical body, internal screw thread is used Threaded rod on occlusion foundation bolt.
It is provided with cushioning piece in T-nut, 0.5~1.5 millimeter of cushioning piece thickness, 25~40 millimeters of diameter, damping Gasket is adhered on T-nut steel disk.
Fashioned iron keel siding is 6~20 millimeters, and top of keel is equipped with cloth Shandong plate.
The adjustment hole for adjusting foundation bolt height is provided on fashioned iron keel, adjustment hole is oblong hole, hole 5~20 centimetres of hole spacing, 4~12 millimeters of width.
Cloth Shandong plate is magnesia, magnesium sulfate, wooden chaff, perlite material hard board, and cloth the Shandong long 1200mm of plate, wide 400mm are thick 18mm。
Cloth Shandong plate is that square tube is arranged in seam crossing, and square tube both ends pass through self-tapping screw connecting-type steel joist, square tube height and cloth Shandong plate thickness is identical.
A kind of construction method of novel overhead system,
Lower margin rubber sleeve is inserted in foundation bolt, foundation bolt penetrates the interior spiral shell of the T-nut of bonding cushioning piece Line is combined into adjustable lower margin component;
The adjustable lower margin component organized, then the track groove of Chinese character pin-shaped keel is slid into, load-bearing basic part is formed, then side Effective self-tapping screw is fixed on two groups of load-bearing basic parts, is finally putting into cloth Shandong plate and is adjusted lower margin component height, lower margin spiral shell Bolt height adjustment completes installation well.
Beneficial effect, the present invention solve the problems, such as it is various existing for the levelling operation technique of traditional cement mortar, with its day So top adjusts the height of foundation bolt, is not afraid of tide and damages by worms, and the advantages such as excellent longitudinal stress performance and stability are saved The construction of traditional cement mortar levelling construction is intermittent, has saved time cost and has optimized leveling mode, has improved and adjust essence Accuracy and construction efficiency, and congenital steel configuration non-corrosive is not afraid of tide, it is energy-efficient, economic and environment-friendly, it is provided more to assembled finishing More selections and possibility.
The invention patent can be used for fabricated construction, and whole process does not have wet construction, be suitable for various constructions Environment, and material sheet has excellent rustless property, greatly extends the service life of component as galvanized iron part.
Entire work progress is not constructed waste material, and without secondary processing process, and this is process as environment-friendly materials, green Colour circle is protected.
Since the patent of invention is that the component produced by factory's one-pass molding and customization component, on-site assembly, product are consistent Property is good, and quality is secure, facilitates installation, and manufacturing process is simple, precision is high, good economy performance, simplifies construction technology, reduces labor Investment, the workload of power are small, at low cost.
Due to the invention patent be it is fabricated, its Discerptibility and the characteristic that can be recycled make maintenance more Add conveniently, meets the needs of interior decoration industry is to new technology now, ensure that the construction requirement of high efficiency high quality.Than tradition Wet process or popular dry construction it is more scientific, more rationally, be easier to construction, it is more energy efficient, more environmentally friendly, greatly shorten work Phase can generate extraordinary economic benefit, be able to application of the floor leveling system in public dress and Decoration Industry simple fast It realizes fastly.
Detailed description of the invention
The following describes the present invention in detail with reference to the accompanying drawings and specific embodiments;
Fig. 1 is the mounting plane figure of novel overhead system of the present invention.
Fig. 2 is the A sectional view of the invention patent.
Fig. 3 is the B sectional view of the invention patent.
The reference numerals are as follows, adjustable lower margin component (1), Chinese character pin-shaped steel joist (2), 18*18 square tube (3), cloth Shandong plate (4), lower margin rubber sleeve (101), foundation bolt (102), cushioning piece (103), T-nut (104).
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below Conjunction is specifically illustrating, and the present invention is further explained.
As shown in Figure 1-3, a kind of novel overhead system, comprising: lower margin rubber sleeve 101, foundation bolt 102, T-nut 104, the combination of cushioning piece 103, Chinese character pin-shaped steel joist 2, each component of the thick cloth of 18*18 square tube 3,18 Shandong plate 4 is formed by connecting.
Wherein, the lower margin rubber gum cover 101 is 3~10 mm of thickness, and 15~30 mm wide of diameter is inserted in foundation bolt Rubber mass female feature and soft connection.
It wherein, is 15~30 mm wide of diameter at the foundation bolt 102 1, the steel of 2~6 millimeters thicks is round Disk is adjusted at one for the connection of T-nut 104 for the machined thread of 15~65 mm lengths and is used, is commonly used at one for one The flat recess of height is adjusted, depth is 2~6 millimeters, and width is 1~3 millimeter, and foundation bolt adjusts levelling height by T-nut Degree;
Wherein, at the T-nut 104 1 to be 10~30 millimeters long, the internal screw thread cylindrical body of 10~15 mm wides is used for The machined thread being engaged on foundation bolt.It is 20~40 millimeters of diameter at one, with a thickness of 1~3 millimeter of steel disk, for sliding Enter the track groove of fashioned iron keel 2;
Wherein, the cushioning piece 103 is 0.5~1.5 mm of thickness, the rubber mass self-adhering-type of 25~40 mm wide of diameter Gasket is directly adhered on T-nut steel disk;
It wherein, is the load-supporting part of 6~20 mm wides at the Chinese character pin-shaped steel joist one, for the load-bearing of panel, at one Foundation bolt height hole is adjusted for top, adjustment hole is oblong hole, and 5~20 centimetres of hole spacing, width 4~12 is in the least Rice.
Wherein, the 18*18 square tube 3 is to customize 0.7 thick length 400mm, and both ends, which open to reserve, beats self-tapping screw circular hole Square tube.
Wherein, cloth Shandong plate 4 is market customization high intensity 1200mm long, 400mm wide, 18mm thickness by magnesia, sulphur Bottom plate is made in sour magnesium, the wooden chaff, perlite etc..
As Figure 2-3, when construction, adjustable lower margin component, Chinese character pin-shaped steel joist, 18*18 square tube, cloth Shandong each portion of plate The connection of part.
Adjustable lower margin component includes: lower margin rubber sleeve 101, foundation bolt 102, T-nut 104, cushioning piece 103.Lower margin rubber sleeve groove is inserted in foundation bolt, and foundation bolt penetrates the internal screw thread of the T-nut of bonding cushioning piece, The machined thread for being engaged it on foundation bolt reaches stable connection, is combined into adjustable lower margin component.
As shown in Figure 1, ground portions point includes: adjustable lower margin component, Chinese character pin-shaped steel joist 2, the side 18*18 Pipe 3, cloth Shandong plate 4.
The adjustable lower margin component organized, then the track groove of Chinese character pin-shaped keel is slid into, load-bearing basic part is formed, then side Effective self-tapping screw is fixed on two groups of load-bearing basic parts, is finally putting into cloth Shandong plate and is adjusted lower margin component height, lower margin spiral shell Bolt height adjustment is completed to install well.
This programme main advantage is that the scope of application is big, the construction period is extremely short, various in combination with floor heating, floor tile, stone material etc. Plane materiel, while because it is fabricated construction, whole process does not have wet construction, is suitable for various construction environments, and material Matter sheet has excellent rustless property, greatly extends the service life of component as galvanized iron part.Entire work progress does not have There is construction waste material, without secondary processing process, and this is process as environment-friendly materials, environmentally protective.The patent of invention be by By directly producing, good product consistency, quality is secure, facilitates installation, manufacturing process is simple, precision is high, economy for factory It is good, it is small, at low cost to simplify construction technology, the investment for reducing labour, workload.Since the patent of invention is assembled , its Discerptibility and the characteristic that can be recycled make maintenance more convenient, meet interior decoration industry pair now The demand of new technology ensure that the construction requirement of high efficiency high quality.Than traditional wet process or popular dry construction more Add it is scientific, more rationally, be easier to construction, it is more energy efficient, more environmentally friendly, greatly shorten the duration, extraordinary economic benefit can be generated, Realize application of the floor leveling system in public dress and Decoration Industry quickly and easily.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed range of the invention patent is by the attached claims Book and its equivalent define.

Claims (10)

1. a kind of novel overhead system, characterized in that including fashioned iron keel, the bottom surface setting of keel is used for levelling foundation bolt With T-nut, keel section isosceles triangle, keel bottom surface is provided with track groove, and T-nut is arranged in track groove, foundation bolt It is connected through a screw thread T-nut, is realized by turning T-type nut adjustment foundation bolt levelling.
2. a kind of novel overhead system according to claim 1, characterized in that foundation bolt is equipped with 15~30 milli of a diameter Rice, 2~6 millimeters of thickness of steel circular discs, circular discs are grounded placement downward, and circular discs top is 15~65 millimeters of long screw threads Bar is adjusted for T-nut connection and is used, and foundation bolt top is equipped with the flat recess for adjusting height, and groove depth is 2~6 millimeters, slot Width is 1~3 millimeter.
3. a kind of novel overhead system according to claim 2, characterized in that foundation bolt bottom is cased with lower margin rubber Set, 3~10 mm of thickness of lower margin rubber gum cover, 15~30 millimeters of diameter.
4. a kind of novel overhead system according to claim 1, characterized in that T-nut is equipped with 20~40 milli of a diameter Rice, with a thickness of 1~3 millimeter of steel disk, steel disk is slid into the track groove of steel joist, and steel disk connection one long 10~ 30 millimeters, 10~15 millimeters of internal diameter of internal screw thread cylindrical body, internal screw thread is used for the threaded rod being engaged on foundation bolt.
5. a kind of novel overhead system according to claim 4, characterized in that be provided with cushioning piece in T-nut, subtract 0.5~1.5 millimeter of spacer thickness of shake, 25~40 millimeters of diameter, cushioning piece is adhered on T-nut steel disk.
6. a kind of novel overhead system according to claim 1, characterized in that fashioned iron keel siding is 6~20 millimeters, dragon Cloth Shandong plate is equipped with above bone.
7. a kind of novel overhead system according to claim 1, characterized in that be provided with adjusting on fashioned iron keel adjustably The adjustment hole of foot bolt height, adjustment hole be oblong hole, 5~20 centimetres of hole spacing, 4~12 millimeters of width.
8. a kind of novel overhead system according to claim 6, characterized in that cloth Shandong plate is magnesia, magnesium sulfate, wood Chaff, perlite material hard board, the cloth Shandong long 1200mm of plate, wide 400mm, thick 18mm.
9. a kind of novel overhead system according to claim 6, characterized in that cloth Shandong plate is that square tube, side is arranged in seam crossing By self-tapping screw connecting-type steel joist, square tube height is identical as cloth Shandong plate thickness at pipe both ends.
10. a kind of construction method of novel overhead system, characterized in that
Lower margin rubber sleeve is inserted in foundation bolt, foundation bolt penetrates the internal screw thread of the T-nut of bonding cushioning piece, group Synthesize adjustable lower margin component;
The adjustable lower margin component organized, then the track groove of Chinese character pin-shaped keel is slid into, load-bearing basic part is formed, then square tube is used Self-tapping screw is fixed on two groups of load-bearing basic parts, is finally putting into cloth Shandong plate and is adjusted lower margin component height, foundation bolt height Degree, which regulates, completes installation.
CN201811229205.1A 2018-10-22 2018-10-22 Overhead system Active CN109296165B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811229205.1A CN109296165B (en) 2018-10-22 2018-10-22 Overhead system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811229205.1A CN109296165B (en) 2018-10-22 2018-10-22 Overhead system

Publications (2)

Publication Number Publication Date
CN109296165A true CN109296165A (en) 2019-02-01
CN109296165B CN109296165B (en) 2021-02-19

Family

ID=65157482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811229205.1A Active CN109296165B (en) 2018-10-22 2018-10-22 Overhead system

Country Status (1)

Country Link
CN (1) CN109296165B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110242009A (en) * 2019-06-20 2019-09-17 金螳螂精装科技(苏州)有限公司 A kind of ground screed finish support device, facing mounting structure and installation method
CN111734079A (en) * 2020-07-07 2020-10-02 储国亲 Plastic-wood floor

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201420363Y (en) * 2009-05-21 2010-03-10 嘉丰木业(苏州)有限公司 Floor wood keel structure
CN201809941U (en) * 2010-10-12 2011-04-27 孙小力 Light steel keel capable of being used in fields of construction and decoration
EP2740860A1 (en) * 2012-12-07 2014-06-11 Zurecon Ag Method for installing a raised floor, raised floor and raised floor panel
CN206485512U (en) * 2016-01-19 2017-09-12 R&M 国际有限公司 Suction is made an uproar floor
CN209323888U (en) * 2018-10-22 2019-08-30 上海品宅装饰科技有限公司 A kind of floor leveling fashioned iron grid system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201420363Y (en) * 2009-05-21 2010-03-10 嘉丰木业(苏州)有限公司 Floor wood keel structure
CN201809941U (en) * 2010-10-12 2011-04-27 孙小力 Light steel keel capable of being used in fields of construction and decoration
EP2740860A1 (en) * 2012-12-07 2014-06-11 Zurecon Ag Method for installing a raised floor, raised floor and raised floor panel
CN206485512U (en) * 2016-01-19 2017-09-12 R&M 国际有限公司 Suction is made an uproar floor
CN209323888U (en) * 2018-10-22 2019-08-30 上海品宅装饰科技有限公司 A kind of floor leveling fashioned iron grid system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110242009A (en) * 2019-06-20 2019-09-17 金螳螂精装科技(苏州)有限公司 A kind of ground screed finish support device, facing mounting structure and installation method
CN111734079A (en) * 2020-07-07 2020-10-02 储国亲 Plastic-wood floor
CN111734079B (en) * 2020-07-07 2021-12-17 湖南拓萃工贸有限公司 Plastic-wood floor

Also Published As

Publication number Publication date
CN109296165B (en) 2021-02-19

Similar Documents

Publication Publication Date Title
CN209323888U (en) A kind of floor leveling fashioned iron grid system
CN109296165A (en) A kind of novel overhead system and construction method
CN108678241A (en) A kind of back bolt type plank curtain wall
CN208251619U (en) A kind of assembling truss floor support plate support
CN211850861U (en) Concrete form strutting arrangement for building engineering
CN208455897U (en) A kind of back bolt type plate curtain wall
CN207314715U (en) A kind of sandstone plate
KR200410786Y1 (en) A fixing device for a out side panel of building
CN209494117U (en) Moulding furred ceiling
CN214785586U (en) Decorative panel dry hanging piece for building construction
CN206396996U (en) A kind of Z-type lightgage steel joist
CN205857710U (en) Air-conditioning formwork support structure
CN204326346U (en) A kind of building construction uses lays bricks
CN209942257U (en) Laying device of cement mortar for bricking
CN219622059U (en) Multidirectional adjustable hanging assembly for decorative plate curtain wall
CN201649626U (en) Die plate component for grouting wall
CN212317253U (en) Alloy dry hanging piece for mounting special-shaped stone
CN206110421U (en) Stone material curtain adjustable combination pendant is hung futilely to back of body bolt formula
CN208310209U (en) A kind of stair aluminum alloy mould plate convenient for construction
CN110607888A (en) Wall keel wall surface connecting and leveling device for ceramic tile concrete integrated plate
CN207714590U (en) A kind of integration flooring component
CN201009346Y (en) Wallboard internal mold with adjustable length
CN217353176U (en) Novel light ALC evaporates presses aerated concrete board to assemble structure
CN202731205U (en) Slate partial thickening and mounting structure for architectural ornament
CN219587109U (en) Dry-hanging ceramic tile fixing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An overhead system

Effective date of registration: 20230912

Granted publication date: 20210219

Pledgee: Agricultural Bank of China Limited Shanghai Huangpu Sub branch

Pledgor: SHANGHAI PINZHAI DECORATION TECHNOLOGY CO.,LTD.

Registration number: Y2023310000534

PE01 Entry into force of the registration of the contract for pledge of patent right