CN109296161A - Colosseum wood floor structure and its installation method - Google Patents
Colosseum wood floor structure and its installation method Download PDFInfo
- Publication number
- CN109296161A CN109296161A CN201811162380.3A CN201811162380A CN109296161A CN 109296161 A CN109296161 A CN 109296161A CN 201811162380 A CN201811162380 A CN 201811162380A CN 109296161 A CN109296161 A CN 109296161A
- Authority
- CN
- China
- Prior art keywords
- levelling
- keel
- flooring
- rubber
- air permeable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02044—Separate elements for fastening to an underlayer
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/04—Flooring or floor layers composed of a number of similar elements only of wood or with a top layer of wood, e.g. with wooden or metal connecting members
- E04F15/041—Flooring or floor layers composed of a number of similar elements only of wood or with a top layer of wood, e.g. with wooden or metal connecting members with a top layer of wood in combination with a lower layer of other material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/18—Separately-laid insulating layers; Other additional insulating measures; Floating floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/22—Resiliently-mounted floors, e.g. sprung floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02044—Separate elements for fastening to an underlayer
- E04F2015/0205—Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F2290/00—Specially adapted covering, lining or flooring elements not otherwise provided for
- E04F2290/04—Specially adapted covering, lining or flooring elements not otherwise provided for for insulation or surface protection, e.g. against noise, impact or fire
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Wood Science & Technology (AREA)
- Floor Finish (AREA)
Abstract
The invention discloses a kind of colosseum wood floor structure and its installation methods, it is by enclosing rectangle air permeable plate along surrounding setting one at large-scale timber floor center, it is connected to the channel between its gas vent and upper lower keel, so that underground moisture be allow to be discharged along the channel between keel by gas vent.
Description
Technical field
The present invention relates to a kind of timber floor more particularly to a kind of colosseum wood floor structures and its installation method.
Background technique
Colosseum timber floor is in construction with more and more extensive.If the moisture below timber floor fails properly
It solves, it will timber floor protuberance phenomenon is caused also to will increase construction time and construction to increase number of rewelding and maintenance cost
The complexity of technique.It there is no a kind of good method to can solve timber floor at present to get damp problem.
Summary of the invention
The technical issues of getting damp for large area timber floor existing in the prior art, the purpose of the present invention is to provide one
Kind of colosseum wood floor structure and its installation method, it by the way that air permeable plate is arranged along surrounding at large-scale timber floor center, then
Using the gap between following keel, underground moisture is discharged along the channel between keel by gas vent.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of colosseum wood floor structure, the levelling resilient cushion of rubber including setting gradually from bottom to top, damp-proof membrane, lower dragon
Bone, resilient rubbber cushion, upper keel, carcass-flooring, non-woven fabrics, timber floor and panel and air permeable plate, the upper keel and lower keel
It is arranged in cross type, the position in the carcass-flooring and timber floor apart from wall side certain distance is equipped with to match with air permeable plate
Hole to be provided, offer several gas vents on the air permeable plate, formed between the gas vent and upper keel and lower keel
The two sides of channel connection, the air permeable plate are equipped with wing plate, and the air permeable plate is ridden upon in timber floor by its wing plate, and is consolidated
Fixed connection.
According to the above technical scheme, it is fixedly connected between the wing plate and timber floor of the air permeable plate by sealant.
According to the above technical scheme, the air permeable plate is white steel air permeable plate.
Correspondingly, the present invention also provides a kind of installation methods of colosseum wood floor structure, comprising the following steps:
S1, on cement flooring according to requiring successively to install the levelling resilient cushion of rubber, damp-proof membrane, lower keel, elasticity from bottom to top
Position in rubber pad, upper keel, carcass-flooring, non-woven fabrics and timber floor, carcass-flooring and timber floor apart from wall side certain distance is set
There is the hole to be provided to match with air permeable plate;
S2, in the hole to be provided position of sound production air permeable plate of carcass-flooring and timber floor, the air permeable plate rides upon the wooden ground by its wing plate
On plate and it is fixedly connected;
S3, installation panel.
According to the above technical scheme, step S1 is specifically included:
S101, site clearing: cement flooring is cleaned out before timber floor construction;
S102, instrument are levelling: positive negative zero as requested carries out cement flooring with level levelling, finds height difference;
S103, put reference line: the center line required on cement flooring according to construction design drawing is away from releasing lower keel and pliosaur
The hookup wire of the hookup wire of bone, lower keel and upper keel arranges that two-wire cross-point locations are the levelling resilient cushion of rubber in groined type
Center;
S104, datum mark is looked for: with level by anyhow horizontal at interval of determining at the two-wire cross-point locations of several hookup wires
It is carried out after ± 0 levelling;
S105, laying damp-proof membrane: the damp-proof membrane for being used for sports ground timber floor is laid with direction by panel and is sprawled, seam crossing is kept away
Exempt to be overlapped, seam crossing pressure sensitive adhesive tape adhesion;
S106, the installation levelling resilient cushion of rubber: the levelling resilient cushion of rubber is placed in two-wire cross-point locations, progress is levelling, levelling
After the levelling resilient cushion of rubber be fixedly mounted on cement flooring;
S107, place lower keel: lower keel is placed on the levelling resilient cushion of rubber according to the center spacing of design requirement, under two
The fitting end of keel is placed on the levelling resilient cushion of rubber, not the engaging portion of two lower keels on the levelling resilient cushion of rubber
Lower section increase wood block filler reinforced;
S108, installation resilient rubbber cushion: elastic rubber is fixedly mounted corresponding to the position of the levelling resilient cushion of rubber on lower keel
Pad;
S109, place upper keel: upper keel is placed in resilient rubbber cushion according to the center spacing of design requirement, two upper keels
End intersection is fixedly connected, and the end saw kerf of upper keel carries out preservative treatment;
S110, keel are levelling: it carries out levelling after the completion of upper keel pre-installation, height error is down within 3m horizontal ruler 2mm,
In all horizontal rear progress next procedures up to standard;
S111, installation carcass-flooring: carcass-flooring directly spreads and is mounted in upper keel, and expansion joint, hair are reserved at carcass-flooring and the closing in of wall side
Floor installation is fixed with air nail;
S112, open up air permeable plate hole to be provided: the position in carcass-flooring apart from wall side certain distance is opened up for placing air permeable plate
Hole to be provided;
S113, non-woven fabrics and timber floor are laid with: are successively laid with non-woven fabrics and timber floor in carcass-flooring, opened up in timber floor pair
The hole to be provided answered.
According to the above technical scheme, further include step S4, wood strip is installed at panel closing in.
According to the above technical scheme, further include step S5, clean out the rubbish on panel.
The beneficial effect comprise that: the present invention is by the surrounding in large-scale timber floor at the foot of a wall centainly processing
One circle rectangle air permeable plate of setting, using the channel between upper keel and lower keel, allow underground moisture along the channel by
Gas vent discharge, to solve the problems, such as that large area timber floor is got damp, the present invention is at low cost, and construction technology is simple.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is the structural schematic diagram of the embodiment of the present invention;
Fig. 2 is the top view of the embodiment of the present invention.
In figure: the levelling resilient cushion of 1- rubber, 2- lower keel, 3- upper keel, 4- carcass-flooring, 5- non-woven fabrics, 6- timber floor, 7-
Air permeable plate, 8- damp-proof membrane, 9- resilient rubbber cushion.
Specific embodiment
In the description of the present invention, it should be noted that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower",
"front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", " orientation or positional relationships of the instructions such as "inner", "outside"
To be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description of the present invention and simplification of the description, rather than indicate or
It implies that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as
Limitation of the present invention.In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply phase
To importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can
To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary
Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition
Concrete meaning in invention.In addition, in the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or two
More than.
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiments of the present invention, instead of all the embodiments.It should be appreciated that specific embodiment described herein only to
It explains the present invention, is not intended to limit the present invention.Based on the embodiments of the present invention, those of ordinary skill in the art are not doing
Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
As shown in Figure 1 and Figure 2, a kind of colosseum wood floor structure, the rubber including setting gradually from bottom to top are levelling
Resilient cushion 1, damp-proof membrane 8, lower keel 2, resilient rubbber cushion 9, upper keel 3, carcass-flooring 4, non-woven fabrics 5, timber floor 6 and panel (figure
In do not illustrate) and air permeable plate 7, upper keel 3 and lower keel 2 are in cross type arrangement, distance in carcass-flooring 4 and timber floor 6
The position of wall side certain distance is equipped with the hole to be provided to match with air permeable plate 7, offers several gas vents on air permeable plate 7, arranges
The channel formed between stomata and upper keel and lower keel is connected to, and the two sides of air permeable plate 7 are equipped with wing plate, and air permeable plate 7 passes through its wing
Plate rides upon in timber floor 6, and is fixedly connected.
In a preferred embodiment of the invention, company is fixed by sealant between the wing plate and timber floor of air permeable plate
It connects, wherein air permeable plate is white steel air permeable plate.
Correspondingly, the present invention also provides a kind of installation methods of colosseum wood floor structure, as shown in Figure 1 and Figure 2,
The following steps are included:
S1, on cement flooring according to requiring successively to install the levelling resilient cushion 1 of rubber, damp-proof membrane 8, lower keel 2, bullet from bottom to top
Property rubber pad 9, upper keel 3, carcass-flooring 4, non-woven fabrics 5 and timber floor 6, apart from wall side certain distance in carcass-flooring and timber floor
Position is equipped with the hole to be provided to match with air permeable plate;
S2, in the hole to be provided position of sound production air permeable plate 7 of carcass-flooring and timber floor, air permeable plate is ridden upon in timber floor by its wing plate
And it is fixedly connected;
S3, installation panel.
In a preferred embodiment of the invention, as shown in Figure 1, step S1 is specifically included:
S101, site clearing: cement flooring is cleaned out before timber floor construction;
S102, instrument are levelling: positive negative zero as requested carries out cement flooring with level levelling, finds height difference;
S103, put reference line: the center line required on cement flooring according to construction design drawing is away from releasing lower keel and pliosaur
The hookup wire of the hookup wire of bone, lower keel and upper keel arranges that two-wire cross-point locations are the levelling resilient cushion of rubber in groined type
Center;
S104, datum mark is looked for: with level by anyhow horizontal at interval of determining at the two-wire cross-point locations of several hookup wires
It is carried out after ± 0 levelling;
S105, laying damp-proof membrane: the damp-proof membrane for being used for sports ground timber floor is laid with direction by panel and is sprawled, seam crossing is kept away
Exempt to be overlapped, seam crossing pressure sensitive adhesive tape adhesion;
S106, the installation levelling resilient cushion of rubber: the levelling resilient cushion of rubber is placed in two-wire cross-point locations, progress is levelling, levelling
After the levelling resilient cushion of rubber be fixedly mounted on cement flooring;
S107, place lower keel: lower keel is placed on the levelling resilient cushion of rubber according to the center spacing of design requirement, under two
The fitting end of keel is placed on the levelling resilient cushion of rubber, not the engaging portion of two lower keels on the levelling resilient cushion of rubber
Lower section increase wood block filler reinforced;
S108, installation resilient rubbber cushion: elastic rubber is fixedly mounted corresponding to the position of the levelling resilient cushion of rubber on lower keel
Pad;
S109, place upper keel: upper keel is placed in resilient rubbber cushion according to the center spacing of design requirement, two upper keels
End intersection is fixedly connected, and the end saw kerf of upper keel carries out preservative treatment;
S110, keel are levelling: it carries out levelling after the completion of upper keel pre-installation, height error is down within 3m horizontal ruler 2mm,
In all horizontal rear progress next procedures up to standard;
S111, installation carcass-flooring: carcass-flooring directly spreads and is mounted in upper keel, and expansion joint, hair are reserved at carcass-flooring and the closing in of wall side
Floor installation is fixed with air nail;
S112, open up air permeable plate hole to be provided: the position in carcass-flooring apart from wall side certain distance is opened up for placing air permeable plate
Hole to be provided;
S113, non-woven fabrics and timber floor are laid with: are successively laid with non-woven fabrics and timber floor in carcass-flooring, opened up in timber floor pair
The hole to be provided answered.
In a preferred embodiment of the invention, this method further includes step S4, installs wood strip at panel closing in.
In a preferred embodiment of the invention, this method further includes step S5, cleans out the rubbish on panel.
When colosseum wood floor structure provided by the invention is installed in certain place, installation method includes following step
It is rapid:
1, timber floor is installed:
(1) site clearing: construct sundries, rubbish, the dust etc. on preceding ground of timber floor must be cleaned out;
(2) instrument is levelling: being carried out to venue cement flooring with level levelling according to the positive negative zero that Party A requires, finds difference of height
Value;
(3) reference line is put: according to the every 400mm × 400mm center line of construction design drawing away from keel installation line above and below releasing, two-wire
It is arranged in well word, two-wire cross-point locations are the center of the levelling resilient cushion of rubber;
(4) look for datum mark: being carried out after determining horizontal ± 0 at two-wire cross-point locations with about 3m or so with level levelling;
(5) laying damp-proof membrane: being laid with direction by panel for the dedicated damp-proof membrane of sport timber floor and sprawl, and overlapping should be avoided in seam,
Seam application pressure sensitive adhesive tape adhesion;
(6) place lower keel: lower keel is placed on the levelling resilient cushion of rubber according to the center 400mm spacing, two lower keel connectors
End should be placed on the levelling resilient cushion of rubber, and the lower section of the engaging portion of two lower keels on the levelling resilient cushion of rubber is not answered
Increase wood block filler to be reinforced;
(7) resilient rubbber cushion is installed: on the basis of damping pad position levelling by rubber on lower keel, installing elasticity at interval of 400mm
Rubber pad, it is surely solid with iron nail and lower keel;
(8) place upper keel: upper keel spacing 400mm, upper lower keel are installed at cross type, upper keel with 100 from bore silk into
Row is reinforced, and two upper keel end intersections are attached with 50 air nails, should carry out preservative treatment to upper keel end saw kerf;
(9) keel are levelling: after the completion of upper keel pre-installation, it is accurate levelling to carry out third time, it is necessary to which height error is down to 3m water
Within leveling ruler 2mm, next procedure can be carried out after all levels are up to standard;
(10) install carcass-flooring: in order to keep timber floor negative force uniform, carcass-flooring directly spreads installation, should reserve at hair plates and the closing in of wall side
The expansion joint 100mm, carcass-flooring installation are fixed with 50mm air nail;
(11) snap the line, fluting: position snap the line apart from wall side 3m positions the hole to be provided of reserved 100mm air permeable plate, be laid with non-woven fabrics and
Timber floor rides in timber floor in the left and right both wings of hole to be provided position of sound production air permeable plate, air permeable plate, and air permeable plate is connect with timber floor
Place is attached with resistance to thick sealant;
(12) maple panel is installed: after completing above-mentioned workload, can carry out panel installation, the installation basic demand of panel is longitudinal
It is the long face of venue, should is laterally the wide face of venue, it, should be according to sport timber floor to panel to reduce the flexible expansion rate in floor
Length specification progress is reasonably combined, and acceptance criteria is to indulge to meet similar in both sides to cannot be less than 100mm, and installation panel should use dedicated
Flooring nail nail joint, pitch of nails are not greater than 600mm, and flooring nail should pour in plate, in order to avoid influence joint close, the split off-seam gap of panel
2mm should be not more than, piece difference of height should be not more than 1mm, should reserve the expansion joint 100mm, expansion joint at timber floor and the closing in of wall side
To answer straight at rabbet, width should be consistent, if in the case that timber floor and wall side can not reserve expansion joint, it can be longitudinally every in panel
It is spaced the expansion joint of one meter of reserved 2-3mm;
2, closing in wood strip is installed: wood strip is installed at panel closing in;
3, final cleanup: the rubbish on panel is cleaned out.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features;
And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and
Range.
Claims (7)
1. a kind of colosseum wood floor structure, the levelling resilient cushion of rubber, damp-proof membrane including setting gradually from bottom to top, under
Keel, resilient rubbber cushion, upper keel, carcass-flooring, non-woven fabrics, timber floor and panel, the upper keel and lower keel are handed in cross
Forked type arrangement, which is characterized in that further include air permeable plate, the position in the carcass-flooring and timber floor apart from wall side certain distance is set
Have the hole to be provided to match with air permeable plate, offer several gas vents on the air permeable plate, the gas vent and upper keel and
The channel connection formed between lower keel, the two sides of the air permeable plate are equipped with wing plate, and the air permeable plate is ridden upon by its wing plate
In timber floor, and it is fixedly connected.
2. colosseum wood floor structure according to claim 1, which is characterized in that the wing plate and wood of the air permeable plate
It is fixedly connected between floor by sealant.
3. colosseum wood floor structure according to claim 1, which is characterized in that the air permeable plate is ventilative for white steel
Plate.
4. the installation method of colosseum wood floor structure described in a kind of any one of claim 1-3, which is characterized in that packet
Include following steps:
S1, on cement flooring according to requiring successively to install the levelling resilient cushion of rubber, damp-proof membrane, lower keel, elasticity from bottom to top
Position in rubber pad, upper keel, carcass-flooring, non-woven fabrics and timber floor, carcass-flooring and timber floor apart from wall side certain distance is set
There is the hole to be provided to match with air permeable plate;
S2, in the hole to be provided position of sound production air permeable plate of carcass-flooring and timber floor, the air permeable plate rides upon the wooden ground by its wing plate
On plate and it is fixedly connected;
S3, installation panel.
5. the installation method of colosseum wood floor structure according to claim 4, which is characterized in that step S1 is specific
Include:
S101, site clearing: cement flooring is cleaned out before timber floor construction;
S102, instrument are levelling: positive negative zero as requested carries out cement flooring with level levelling, finds height difference;
S103, put reference line: the center line required on cement flooring according to construction design drawing is away from releasing lower keel and pliosaur
The hookup wire of the hookup wire of bone, lower keel and upper keel arranges that two-wire cross-point locations are the levelling resilient cushion of rubber in groined type
Center;
S104, datum mark is looked for: with level by anyhow horizontal at interval of determining at the two-wire cross-point locations of several hookup wires
It is carried out after ± 0 levelling;
S105, laying damp-proof membrane: the damp-proof membrane for being used for sports ground timber floor is laid with direction by panel and is sprawled, seam crossing is kept away
Exempt to be overlapped, seam crossing pressure sensitive adhesive tape adhesion;
S106, the installation levelling resilient cushion of rubber: the levelling resilient cushion of rubber is placed in two-wire cross-point locations, progress is levelling, levelling
After the levelling resilient cushion of rubber be fixedly mounted on cement flooring;
S107, place lower keel: lower keel is placed on the levelling resilient cushion of rubber according to the center spacing of design requirement, under two
The fitting end of keel is placed on the levelling resilient cushion of rubber, not the engaging portion of two lower keels on the levelling resilient cushion of rubber
Lower section increase wood block filler reinforced;
S108, installation resilient rubbber cushion: elastic rubber is fixedly mounted corresponding to the position of the levelling resilient cushion of rubber on lower keel
Pad;
S109, place upper keel: upper keel is placed in resilient rubbber cushion according to the center spacing of design requirement, two upper keels
End intersection is fixedly connected, and the end saw kerf of upper keel carries out preservative treatment;
S110, keel are levelling: it carries out levelling after the completion of upper keel pre-installation, height error is down within 3m horizontal ruler 2mm,
In all horizontal rear progress next procedures up to standard;
S111, installation carcass-flooring: carcass-flooring directly spreads and is mounted in upper keel, and expansion joint, hair are reserved at carcass-flooring and the closing in of wall side
Floor installation is fixed with air nail;
S112, open up air permeable plate hole to be provided: the position in carcass-flooring apart from wall side certain distance is opened up for placing air permeable plate
Hole to be provided;
S113, non-woven fabrics and timber floor are laid with: are successively laid with non-woven fabrics and timber floor in carcass-flooring, opened up in timber floor pair
The hole to be provided answered.
6. the installation method of colosseum wood floor structure according to claim 4, which is characterized in that further include step
S4, wood strip is installed at panel closing in.
7. the installation method of colosseum wood floor structure according to claim 4, which is characterized in that further include step
S5, the rubbish on panel is cleaned out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811162380.3A CN109296161A (en) | 2018-09-30 | 2018-09-30 | Colosseum wood floor structure and its installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811162380.3A CN109296161A (en) | 2018-09-30 | 2018-09-30 | Colosseum wood floor structure and its installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109296161A true CN109296161A (en) | 2019-02-01 |
Family
ID=65161679
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811162380.3A Pending CN109296161A (en) | 2018-09-30 | 2018-09-30 | Colosseum wood floor structure and its installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109296161A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111119440A (en) * | 2020-01-03 | 2020-05-08 | 中国十七冶集团有限公司 | Floor structure of indoor sports basketball court |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2435461Y (en) * | 2000-05-19 | 2001-06-20 | 孙德仁 | Indoor ventilating floor device |
CN2532169Y (en) * | 2002-03-15 | 2003-01-22 | 李英 | Ventilated floor |
CN201499858U (en) * | 2009-06-05 | 2010-06-09 | 东莞市冠辉五金有限公司 | Ventilation plate |
CN104859021A (en) * | 2015-04-29 | 2015-08-26 | 桐城市诚信木塑科技材料有限公司 | Manufacturing technology of damp-proof floor |
CN106499154A (en) * | 2016-11-21 | 2017-03-15 | 常州第建筑集团有限公司 | Floated wood floor board for sports ground system and its construction method |
CN107013011A (en) * | 2017-04-26 | 2017-08-04 | 南京汉威体育工程实业有限公司 | A kind of double-layer keel Sports floor structure and its installation method |
CN206448485U (en) * | 2017-01-18 | 2017-08-29 | 安徽中亭建材有限公司 | A kind of timber floor for being easy to quick volatilization formaldehyde |
CN207700603U (en) * | 2017-12-06 | 2018-08-07 | 深圳市创想城建实业有限公司 | A kind of gymnasium indoor floor |
-
2018
- 2018-09-30 CN CN201811162380.3A patent/CN109296161A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2435461Y (en) * | 2000-05-19 | 2001-06-20 | 孙德仁 | Indoor ventilating floor device |
CN2532169Y (en) * | 2002-03-15 | 2003-01-22 | 李英 | Ventilated floor |
CN201499858U (en) * | 2009-06-05 | 2010-06-09 | 东莞市冠辉五金有限公司 | Ventilation plate |
CN104859021A (en) * | 2015-04-29 | 2015-08-26 | 桐城市诚信木塑科技材料有限公司 | Manufacturing technology of damp-proof floor |
CN106499154A (en) * | 2016-11-21 | 2017-03-15 | 常州第建筑集团有限公司 | Floated wood floor board for sports ground system and its construction method |
CN206448485U (en) * | 2017-01-18 | 2017-08-29 | 安徽中亭建材有限公司 | A kind of timber floor for being easy to quick volatilization formaldehyde |
CN107013011A (en) * | 2017-04-26 | 2017-08-04 | 南京汉威体育工程实业有限公司 | A kind of double-layer keel Sports floor structure and its installation method |
CN207700603U (en) * | 2017-12-06 | 2018-08-07 | 深圳市创想城建实业有限公司 | A kind of gymnasium indoor floor |
Non-Patent Citations (2)
Title |
---|
刘杰等: "《室内装饰材料与施工应用》", 30 June 2012, 武汉:湖北科学技术出版社 * |
杨金铎等: "《现代建筑装饰构造与材料》", 30 June 1994, 中国建筑工业出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111119440A (en) * | 2020-01-03 | 2020-05-08 | 中国十七冶集团有限公司 | Floor structure of indoor sports basketball court |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112411901B (en) | Waterproof and heat-insulating construction process for roof deformation joint | |
CN108442717A (en) | For concrete structure side curing means and construction method | |
CN109296161A (en) | Colosseum wood floor structure and its installation method | |
CN105370315A (en) | Drainage construction technology for seasonally-frozen ground tunnel | |
CN208637978U (en) | A kind of cable tray pre-embedded device | |
CN210117845U (en) | Wooden assembled roof | |
CN207974398U (en) | roof waterproof structure | |
CN208294111U (en) | For concrete structure side curing means | |
CN205874888U (en) | A drainage face brick check room structure for sidewalk is last | |
CN205955008U (en) | Basement roof arch without beam pile cap node that is all -trans | |
CN204919325U (en) | Multi -purpose embedding slot way of railway | |
CN212506439U (en) | Waterproof structure adopting combined steel-edge rubber waterstop | |
CN201517192U (en) | Anti-raising and anti-splashing sidewalk board | |
CN207974391U (en) | Waterproof construction for roof | |
US10465380B2 (en) | Insulation dam for buried ducts and buried duct insulation depth indicator | |
CN206127808U (en) | Grade crossing pavement board with prevent ponding function | |
CN206308613U (en) | Beam-ends percolating water ejector at a kind of expansion joint | |
KR101654781B1 (en) | Moisture exhaust induction waterproof system and method of the structure | |
JP4391446B2 (en) | Foundation packing | |
CN205822271U (en) | External labeling type Water stop structure for the active-passive integrated sealing of movement joint | |
CN211227918U (en) | Outdoor ceramic tile caulking strip that permeates water | |
CN221760980U (en) | Waterproof structure of bottom plate post-pouring belt | |
CN211775164U (en) | Roofing waterproof construction of high stability | |
CN217680264U (en) | Expansion joint system for ground rubber | |
CN209874278U (en) | Waterproof roof of assembled integrated house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190201 |
|
RJ01 | Rejection of invention patent application after publication |