CN109295862A - A kind of stiffening girder of suspension bridge without horizontal traction force swings shifting installation method - Google Patents

A kind of stiffening girder of suspension bridge without horizontal traction force swings shifting installation method Download PDF

Info

Publication number
CN109295862A
CN109295862A CN201811432085.5A CN201811432085A CN109295862A CN 109295862 A CN109295862 A CN 109295862A CN 201811432085 A CN201811432085 A CN 201811432085A CN 109295862 A CN109295862 A CN 109295862A
Authority
CN
China
Prior art keywords
wheel machine
loop wheel
girder
stiff girder
hoist cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811432085.5A
Other languages
Chinese (zh)
Inventor
朱小金
武尚伟
杨敏
王博
张鑫敏
郭雷刚
李博
白丽锋
张富杰
谢国强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHB Fifth Engineering Co Ltd
Original Assignee
CCCC SHB Fifth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHB Fifth Engineering Co Ltd filed Critical CCCC SHB Fifth Engineering Co Ltd
Priority to CN201811432085.5A priority Critical patent/CN109295862A/en
Publication of CN109295862A publication Critical patent/CN109295862A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges

Abstract

The invention belongs to stiffening girder of suspension bridge mounting technique fields, and in particular to a kind of stiffening girder of suspension bridge without horizontal traction force swings shifting installation method.Loop wheel machine Zhi Li switches connection on main push-towing rope, through the loop wheel machine steel strand wires and stiff girder of hoist cable and loop wheel machine, and that realizes stiff girder swings shifting installation.Wherein, stiff girder passes through suspender with hoist cable and loop wheel machine steel strand wires and suspender conversion tool is connect, the suspender conversion tool realizes that the suspension centre of deck erection gantry and the center of gravity of stiff girder are on the same section during the entire process of swinging shifting, it is ensured that stiff girder is steady in entire work progress.This method is not needed using large-scale equipment, is influenced by external environment small, installs simple and fast, easy to operate, construction safety provides helpful reference for the construction of similar bridge, it can be achieved that swing shifting installation at a distance.

Description

A kind of stiffening girder of suspension bridge without horizontal traction force swings shifting installation method
Technical field
The invention belongs to stiffening girder of suspension bridge mounting technique fields, and in particular to a kind of suspension bridge without horizontal traction force adds Strength beam swings shifting installation method.
Background technique
Suspension bridge is paid attention to its Great span ability by builder, and the work across rivers, straits, valley is widely used in Cheng Zhong.Currently, the more application tractions of shifting that swing of stiff girder swing shifting.Traction swings shifting i.e. deck erection gantry and promotes beam section to after swinging shifting height, Using hoist engine horizontally tracting crane hanger, deviates beam section actively from lifting position to installation site, correspond to hoist cable in beam section After the completion of connecting with the beam section, shifting is swung in deck erection gantry unloading, the traction for completing the beam section.Under normal circumstances, it is shorter to swing shifting distance When (allowed band etc of the inclination angle of deck erection gantry in loop wheel machine), shifting is swung using traction.
Due to the distinctive structure of suspension bridge, portion segment stiff girder is located at the shallow water area that ships that transport can not be reached directly Or land, loop wheel machine can not direct vertical lifting, the installation of this partial region beam section need to be solved using measure.
Summary of the invention
The purpose of the present invention is to provide a kind of stiffening girder of suspension bridge without horizontal traction force to swing shifting installation method, overcomes portion Segmented stiff girder is located at the shallow water area or land that ships that transport can not be reached directly, and loop wheel machine can not direct vertical lifting Problem.
Technical solution provided by the invention is as follows:
A kind of stiffening girder of suspension bridge without horizontal traction force swings shifting installation method, and loop wheel machine Zhi Li by hoist cable and is hung on main push-towing rope The loop wheel machine steel strand wires of machine and stiff girder switch connection, and that realizes stiff girder swings shifting installation.
A kind of stiffening girder of suspension bridge without horizontal traction force swings shifting installation method, the specific steps are as follows:
Step 1) by loop wheel machine Zhi Li on main push-towing rope, using loop wheel machine steel strand wires vertical lifting stiff girder to swing move height;
Step 2 pulls at the lower end to stiff girder of hoist cable, and the lower end of hoist cable is made to be connected with stiff girder;
Step 3) loop wheel machine 1, which in stiff girder load transfer to hoist cable, will be realized, switches connection for the first time, under hoist cable pulling force effect, Stiff girder is swung by loop wheel machine position moves to hoist cable position, completes a displacement;
Step 4) loop wheel machine runs to another position along main push-towing rope and fixes, and pulls at loop wheel machine steel strand wires lower end to stiff girder, makes loop wheel machine Steel strand wires lower end is connected again with stiff girder;
For step 5) hoist cable by stiff girder load transfer to loop wheel machine, connection is switched in realization for the second time, is made in loop wheel machine tension of steel strand Under, stiff girder is swung by hoist cable position moves to loop wheel machine position, completes another displacement, and two shifting processes constitute one and swing Move circulation;
If step 6) one is swung after shifting recycles and not up to swings pan position, draws other hoist cables and carry out swinging shifting, repeat step 2-step It is rapid 5), until reach stiff girder swing pan position, that completes stiff girder swings shifting.
Stiff girder passes through suspender with hoist cable and loop wheel machine steel strand wires and suspender conversion tool is connect, the suspender conversion tool Including connecting plate one, connecting plate two, fanning strip and set square, the both ends of the connecting plate one and connecting plate two are respectively equipped with connection Hole, connecting hole is equipped at three angles of the set square, and the arc of the fanning strip is equipped with multiple lifting lug holes, is equipped at segment angle Lifting lug hole;
Two connecting holes of the connecting plate one respectively with a connecting hole pin joint on set square and one on fanning strip arc Connecting hole pin joint, two connecting holes of the connecting plate two respectively with the connecting hole pin joint on suspender and segment angle, the triangle Other two connecting hole and hoist cable on plate pitch ear pin joint, and the loop wheel machine steel strand wires pass through on loop wheel machine anchorage and fanning strip arc One connecting hole pin joint.
After shifting circulation is swung in completion one, the connection of hoist cable and stiff girder is released.
One is swung the two sides that twice position of the loop wheel machine on main push-towing rope in shifting circulation is located at hoist cable.
Hoist cable and loop wheel machine steel strand wires are plumbness in step 1).
Realize that the load that loop wheel machine bears stiff girder is zero when switching connection for the first time;When connection is switched in realization for the second time, hang The load that rope bears stiff girder is zero.
Stiff girder load transfer process in step 3) and step 5) is actively to unload step by step.
It is to be connected using artificial drawing hoist cable with stiff girder in step 2, is twisted using artificial drawing loop wheel machine steel in step 4) Line is connected with stiff girder.
The beneficial effects of the present invention are: this method does not need to be influenced small, installation by external environment using large-scale equipment Simple and fast, easy to operate, construction safety is installed, it can be achieved that swinging shifting at a distance, provides beneficial borrow for the construction of similar bridge Mirror.
It is described in further details below in conjunction with attached drawing.
Detailed description of the invention
Fig. 1 is flow diagram of the invention;
Fig. 2 is a kind of implementation diagram of suspender conversion tool;
Fig. 3 is suspender conversion tool construction process figure.
In figure: 1, loop wheel machine;2, main push-towing rope;3, loop wheel machine steel strand wires;4, hoist cable;5, stiff girder;6, suspender conversion tool;7, it connects Plate one;8, connecting plate two;9, fanning strip;10, set square;11, suspender;12, hoist cable pitches ear;13, loop wheel machine anchorage.
Specific embodiment
Embodiment 1:
It present embodiments provides a kind of stiffening girder of suspension bridge without horizontal traction force and swings shifting installation method, loop wheel machine 1 is stood in main push-towing rope 2 On, it is connect by the loop wheel machine steel strand wires 3 of hoist cable 4 and loop wheel machine 1 with switching for stiff girder 5, that realizes stiff girder 5 swings shifting installation.
The method overcome portion segment stiff girders 5 to be located at the shallow water area or land that ships that transport can not be reached directly On, loop wheel machine 1 can not direct vertical lifting the problem of.
Embodiment 2:
On the basis of embodiment 1, a kind of stiffening girder of suspension bridge without horizontal traction force as shown in Figure 1 is present embodiments provided Swing shifting installation method, the specific steps are as follows:
Step 1) stands loop wheel machine 1 on main push-towing rope 2, using 3 vertical lifting stiff girder 5 of loop wheel machine steel strand wires to swing move height;
Step 2 pulls at the lower end to stiff girder 5 of hoist cable 4, and the lower end of hoist cable 4 is made to be connected with stiff girder 5;
Step 3) loop wheel machine 1, which in stiff girder 5 load transfer to hoist cable 4, will be realized, switches connection for the first time, in 4 pulling force effect of hoist cable Under, stiff girder 5 is swung by 1 position of loop wheel machine moves to 4 position of hoist cable, completes a displacement;
Step 4) loop wheel machine 1 runs to another position along main push-towing rope 2 and fixes, and pulls at loop wheel machine steel strand wires 3 lower end to stiff girder 5, makes 3 lower end of loop wheel machine steel strand wires is connected again with stiff girder 5;
For step 5) hoist cable 4 by stiff girder 5 load transfer to loop wheel machine 1, connection is switched in realization for the second time, is drawn in loop wheel machine steel strand wires 3 Under power effect, stiff girder 5 is swung by 4 position of hoist cable moves to 1 position of loop wheel machine, completes another displacement, two shifting process structures Shifting circulation is swung at one;
If step 6) one is swung after shifting recycles and not up to swings pan position, draws other hoist cables 4 and carry out swinging shifting, repeat step 2- Step 5), until reaching stiff girder 5 swings pan position, that completes stiff girder 5 swings shifting.
As shown in Figure 1, hoist cable 4 and loop wheel machine steel strand wires 3 are plumbness in step 1).Loop wheel machine steel strand wires 3 in step 2 For plumbness, hoist cable 4 and loop wheel machine steel strand wires 3 have angle;Hoist cable 4 is plumbness in step 3) and step 4), and loop wheel machine steel twists Line 3 and hoist cable 4 have angle;Loop wheel machine steel strand wires 3 are plumbness in step 5), and hoist cable 4 and loop wheel machine steel strand wires 3 have angle;Step 6) hoist cable 4 and loop wheel machine steel strand wires 3 are plumbness in.After shifting circulation is swung in completion one, the company of hoist cable 4 and stiff girder 5 is released It connects.
5 load of stiff girder is on loop wheel machine steel strand wires 3 in step 1) and step 2;5 lotus of stiff girder in step 3) and step 4) It is loaded on hoist cable 4;5 load of stiff girder is on loop wheel machine steel strand wires 3 in step 5) and step 6).
As shown in Figure 1, one is swung and moves the two sides that twice position of the loop wheel machine 1 on main push-towing rope 2 in circulation is located at hoist cable 4.
Realize that the load that loop wheel machine 1 bears stiff girder 5 is zero when switching connection for the first time;When connection is switched in realization for the second time, The load that hoist cable 4 bears stiff girder 5 is zero.
In the present embodiment, the 5 load transfer process of stiff girder in step 3) and step 5) is actively to unload step by step.
It is to be connected using artificial drawing hoist cable 4 with stiff girder 5 in step 2, is using artificial drawing loop wheel machine steel in step 4) Twisted wire 3 is connected with stiff girder 5.
Embodiment 3:
On the basis of embodiment 2, present embodiments provides a kind of stiffening girder of suspension bridge without horizontal traction force and swing and move installation side Method, stiff girder 5 are connect by suspender 11 and suspender conversion tool 6 with hoist cable 4 and loop wheel machine steel strand wires 3, and the suspender converts work Filling 6 includes connecting plate 1, connecting plate 28, fanning strip 9 and set square 10, the both ends point of the connecting plate 1 and connecting plate 28 Not She You connecting hole, connecting hole is equipped at three angles of the set square 10, the arc of the fanning strip 9 is equipped with multiple lifting lugs Hole is equipped with lifting lug hole at segment angle;
Two connecting holes of the connecting plate 1 are respectively and on 9 arc of a connecting hole pin joint and fanning strip on set square 10 One lifting lug hole pin joint, two connecting holes of the connecting plate 28 respectively with the lifting lug hole pin joint on suspender 11 and segment angle, institute The other two connecting hole and hoist cable stated on set square 10 pitch 12 pin joint of ear, and the loop wheel machine steel strand wires 3 pass through loop wheel machine anchorage 13 With a lifting lug hole pin joint on 9 arc of fanning strip.As shown in Figure 2.
Since the center of gravity of the permanent lifting lug of stiff girder 5 and 5 segment of stiff girder is not on the same section.Shifting is swung using hoist cable 4 When, to ensure that stiff girder 5 is steady in entire work progress, swinging the hoist cable 4 diverted from one use to another cannot be with the permanent lifting lug phase of stiff girder 5 Even, it is necessary to the suspension centre and stiff girder 5 of the deck erection gantry 1 during the entire process of swinging shifting are realized by a suspender conversion tool 6 Center of gravity on the same section.
As shown in Figure 2 and Figure 3, suspender conversion tool 6 includes connecting plate 1, connecting plate 28, fanning strip 9 and set square 10, Wherein hoist cable 4 is connected by set square 10 and connecting plate with fanning strip 9, and deck erection gantry anchorage 13 is directly connected with fanning strip 9, Suspender 11 is connected by connecting plate 28 with fanning strip 9, and each junction is all made of pin joint, it is ensured that is able to rotate during swinging and moving.It swings When shifting, by the rotation of fanning strip 9, the conversion by the load of beam section between deck erection gantry 1 and hoist cable 4 is realized.When will carry out When the conversion in multiple periods, it can be realized by increasing the lifting lug hole of fanning strip 9.
Embodiment 4:
On the basis of embodiment 2, present embodiments provides a kind of stiffening girder of suspension bridge without horizontal traction force and swing and move installation side Method, steps are as follows:
Step 1: loop wheel machine 1 is using 3 vertical lifting stiff girder 5 of loop wheel machine steel strand wires to swinging pan position;
Step 2: artificial drawing hoist cable 4 is connected with stiff girder 5;
Step 3: loop wheel machine 1 unloads the load of stiff girder 5 actively, step by step, hoist cable 4 step by step, driven bearing by stiff girder 5 load, directly The load that stiff girder 5 is born to loop wheel machine 1 is zero, i.e. the whole loads for bearing stiff girder 5 of hoist cable 4, and stiff girder 5 is in no horizontally tracting It under the action of power, only relies on to be self-possessed and swings the vertical cross section position for moving to hoist cable 4 from the vertical cross section position of loop wheel machine 1, will put more energy into In beam 5 load transfer to hoist cable 4, and complete a displacement;
Step 4: after stiff girder 5 reaches the vertical cross section position of hoist cable 4, when the load of the receiving stiff girder 5 of loop wheel machine 1 is 0, releasing is hung Connection between machine steel strand wires 3 and stiff girder 5, loop wheel machine 1 run to next pan position of swinging along main push-towing rope 2 and fix, and artificial drawing is hung Machine steel strand wires 3 are connected with stiff girder 5;
Step 5: 1 active of loop wheel machine, multistage loadings, it will be in stiff girder 5 load transfer to loop wheel machine 1.From the point of view of stress, when hanging When machine 1 all bears 5 load of stiff girder, i.e., the load that hoist cable 4 bears stiff girder 5 is zero;From the point of view of the position of stiff girder 5, add Strength beam 5 is gradually swung by 4 position of hoist cable in the case where no horizontal drag power moves to 1 position of loop wheel machine, completes another displacement, this Two shifting processes constitute one and swing shifting circulation;
Step 6: the connection for releasing hoist cable 4 and steel box-girder can pull other hoist cables 4 again and carry out swinging shifting if also needing to swing shifting, repeat 2-5 step successively carries out.
The foregoing examples are only illustrative of the present invention, does not constitute the limitation to protection scope of the present invention, all It is within being all belonged to the scope of protection of the present invention with the same or similar design of the present invention.The component that embodiment does not describe in detail With the well-known components and common structure or conventional means of the structure category industry, do not describe one by one here.

Claims (9)

1. a kind of stiffening girder of suspension bridge without horizontal traction force swings shifting installation method, it is characterised in that: loop wheel machine (1) Zhi Li is in main push-towing rope (2) it on, is connect, is realized stiff girder (5) with switching for stiff girder (5) by the loop wheel machine steel strand wires (3) of hoist cable (4) and loop wheel machine (1) Swing shifting installation.
2. a kind of stiffening girder of suspension bridge without horizontal traction force according to claim 1 swings shifting installation method, feature exists In, the specific steps are as follows:
Step 1) by loop wheel machine (1) Zhi Li on main push-towing rope (2), using loop wheel machine steel strand wires (3) vertical lifting stiff girder (5) to swing move it is high Degree;
Step 2 pulls at the lower end to stiff girder (5) of hoist cable (4), and the lower end of hoist cable (4) is made to be connected with stiff girder (5);
Step 3) loop wheel machine (1), which in stiff girder (5) load transfer to hoist cable (4), will be realized, switches connection for the first time, in hoist cable (4) Under pulling force effect, stiff girder (5) is swung by loop wheel machine (1) position moves to hoist cable (4) position, completes a displacement;
Step 4) loop wheel machine (1) runs to another position along main push-towing rope (2) and fixes, drawing loop wheel machine steel strand wires (3) lower end to stiff girder (5) at, loop wheel machine steel strand wires (3) lower end is made to be connected again with stiff girder (5);
For step 5) hoist cable (4) by stiff girder (5) load transfer to loop wheel machine (1), connection is switched in realization for the second time, is twisted in loop wheel machine steel Under line (3) pulling force effect, stiff girder (5) is swung by hoist cable (4) position moves to loop wheel machine (1) position, completes another displacement, and two A shifting process constitutes one and swings shifting circulation;
If step 6) one is swung after shifting recycles and not up to swings pan position, draws other hoist cables (4) and carry out swinging shifting, repeat step 2)-step 5), until reaching stiff girder (5) swings pan position, that completes stiff girder (5) swings shifting.
3. a kind of stiffening girder of suspension bridge without horizontal traction force according to claim 2 swings shifting installation method, feature exists In: stiff girder (5) is connect by suspender (11) and suspender conversion tool (6) with hoist cable (4) and loop wheel machine steel strand wires (3), described Suspender conversion tool (6) includes connecting plate one (7), connecting plate two (8), fanning strip (9) and set square (10), the connecting plate one (7) and the both ends of connecting plate two (8) are respectively equipped with connecting hole, and connecting hole is equipped at three angles of the set square (10), described The arc of fanning strip (9) is equipped with multiple lifting lug holes, is equipped with lifting lug hole at segment angle;
Two connecting holes of the connecting plate one (7) respectively with the connecting hole pin joint and fanning strip (9) on set square (10) A connecting hole pin joint on arc, two connecting holes of the connecting plate two (8) respectively with the company on suspender (11) and segment angle Hole pin joint is connect, the other two connecting hole on the set square (10) and hoist cable pitch ear (12) pin joint, the loop wheel machine steel strand wires (3) Pass through a connecting hole pin joint on loop wheel machine anchorage (13) and fanning strip (9) arc.
4. a kind of stiffening girder of suspension bridge without horizontal traction force according to claim 2 swings shifting installation method, feature exists In: after shifting circulation is swung in completion one, release the connection of hoist cable (4) and stiff girder (5).
5. a kind of stiffening girder of suspension bridge without horizontal traction force according to claim 2 swings shifting installation method, feature exists In: one is swung the two sides moved twice position of the loop wheel machine (1) on main push-towing rope (2) in circulation and be located at hoist cable (4).
6. a kind of stiffening girder of suspension bridge without horizontal traction force according to claim 2 swings shifting installation method, feature exists In: hoist cable (4) and loop wheel machine steel strand wires (3) they are plumbness in step 1).
7. a kind of stiffening girder of suspension bridge without horizontal traction force according to claim 2 swings shifting installation method, feature exists In: realize that the load that loop wheel machine (1) bears stiff girder (5) is zero when switching connection for the first time;When connection is switched in realization for the second time, The load that hoist cable (4) bears stiff girder (5) is zero.
8. a kind of stiffening girder of suspension bridge without horizontal traction force according to claim 2 swings shifting installation method, feature exists In: stiff girder (5) load transfer process in step 3) and step 5) is actively to unload step by step.
9. a kind of stiffening girder of suspension bridge without horizontal traction force according to claim 2 swings shifting installation method, feature exists In: it is to be connected using artificial drawing hoist cable (4) with stiff girder (5) in step 2, is using artificial drawing loop wheel machine steel in step 4) Twisted wire (3) is connected with stiff girder (5).
CN201811432085.5A 2018-11-28 2018-11-28 A kind of stiffening girder of suspension bridge without horizontal traction force swings shifting installation method Pending CN109295862A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811432085.5A CN109295862A (en) 2018-11-28 2018-11-28 A kind of stiffening girder of suspension bridge without horizontal traction force swings shifting installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811432085.5A CN109295862A (en) 2018-11-28 2018-11-28 A kind of stiffening girder of suspension bridge without horizontal traction force swings shifting installation method

Publications (1)

Publication Number Publication Date
CN109295862A true CN109295862A (en) 2019-02-01

Family

ID=65143281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811432085.5A Pending CN109295862A (en) 2018-11-28 2018-11-28 A kind of stiffening girder of suspension bridge without horizontal traction force swings shifting installation method

Country Status (1)

Country Link
CN (1) CN109295862A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152282A (en) * 2021-02-25 2021-07-23 中铁北京工程局集团(天津)工程有限公司 Quick construction method for sling
CN113373828A (en) * 2021-05-27 2021-09-10 武汉一冶建筑安装工程有限责任公司 Bridge turning system and installation and turning method thereof
CN113445428A (en) * 2021-07-15 2021-09-28 中交一公局集团有限公司 Transfer device for air continuous movement of large-sized member and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5257422U (en) * 1975-10-24 1977-04-26
DE19604123A1 (en) * 1996-02-06 1997-09-25 Paul Lingen Multi-part manipulator for three-directional manipulation of component
JPH1192082A (en) * 1997-09-24 1999-04-06 Kitagawa Iron Works Co Ltd Lifting device for construction of bridge beam
CN200992687Y (en) * 2006-12-30 2007-12-19 中交第二公路工程局有限公司 Slingdevice for suspension bridge steel box beam mounting
CN106320182A (en) * 2016-09-19 2017-01-11 中交公局第三工程有限公司 Suspension bridge bank slope beam section long sling swing-shifting mounting device and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5257422U (en) * 1975-10-24 1977-04-26
DE19604123A1 (en) * 1996-02-06 1997-09-25 Paul Lingen Multi-part manipulator for three-directional manipulation of component
JPH1192082A (en) * 1997-09-24 1999-04-06 Kitagawa Iron Works Co Ltd Lifting device for construction of bridge beam
CN200992687Y (en) * 2006-12-30 2007-12-19 中交第二公路工程局有限公司 Slingdevice for suspension bridge steel box beam mounting
CN106320182A (en) * 2016-09-19 2017-01-11 中交公局第三工程有限公司 Suspension bridge bank slope beam section long sling swing-shifting mounting device and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李鸿盛: "连续荡移安装大吨位钢梁关键技术", 《2018世界交通运输大会论文集》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152282A (en) * 2021-02-25 2021-07-23 中铁北京工程局集团(天津)工程有限公司 Quick construction method for sling
CN113373828A (en) * 2021-05-27 2021-09-10 武汉一冶建筑安装工程有限责任公司 Bridge turning system and installation and turning method thereof
CN113445428A (en) * 2021-07-15 2021-09-28 中交一公局集团有限公司 Transfer device for air continuous movement of large-sized member and construction method

Similar Documents

Publication Publication Date Title
CN201024053Y (en) Truss structure modular type super big mast type crane
CN109295862A (en) A kind of stiffening girder of suspension bridge without horizontal traction force swings shifting installation method
CN101537976B (en) Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN202346637U (en) Holding rod of double-flat-arm spinning self-lifting seat
CN103882812A (en) Construction method for midspan main beams of cable-stayed bridge
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN101446074A (en) Installation and closure construction method for steel sliding roadway arch on top surface of steel trussed beam bridge
CN100567129C (en) A kind of hoisting device for loop wheel machine
CN205387439U (en) Mast hoisting accessory
CN110182682A (en) A kind of suspender for the lifting of big segment steel truss girder
CN207090788U (en) A kind of special tie-beam for being used for two cranes and synchronously lifting
CN106012841A (en) Cable crane and installation method thereof
CN210437355U (en) Wind power and sea oil type offshore boarding bridge
CN109629402B (en) Construction method of three-tower four-span suspension bridge girder
CN209194361U (en) A kind of fixed structure of suspension cable bridge section lifting hoisting platform
CN207511723U (en) A kind of flat arm tower crane supporting beam transporting device of new construction inner climbing type
CN209554675U (en) A kind of connection structure of suspender conversion tool and hoist cable, loop wheel machine and suspender
CN202744226U (en) Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane
CN206693031U (en) A kind of large-span suspension bridge cable crane load bearing system of head-rope parallel structure
CN207844943U (en) A kind of assembling tower crane large arm merogenesis self-unloading is lain prone bar
CN210086060U (en) Suspension bridge steel truss lifting and swinging device
CN201530682U (en) Hoisting lifting device suitable for hoisting steel box girder
CN209276035U (en) A kind of self-supporting superelevation Lift-on/Lift-off System
CN109113354A (en) A kind of whole process cableway-type windproof drawknot cable wind system and its construction method in real time
CN201099586Y (en) Crane lifting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination