CN109292598A - A kind of Super High contraction structure construction elevator corridor and preparation method thereof - Google Patents

A kind of Super High contraction structure construction elevator corridor and preparation method thereof Download PDF

Info

Publication number
CN109292598A
CN109292598A CN201811395755.0A CN201811395755A CN109292598A CN 109292598 A CN109292598 A CN 109292598A CN 201811395755 A CN201811395755 A CN 201811395755A CN 109292598 A CN109292598 A CN 109292598A
Authority
CN
China
Prior art keywords
construction elevator
plate
corridor
turning door
building structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811395755.0A
Other languages
Chinese (zh)
Inventor
董浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201811395755.0A priority Critical patent/CN109292598A/en
Publication of CN109292598A publication Critical patent/CN109292598A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B13/00Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
    • B66B13/02Door or gate operation
    • B66B13/04Door or gate operation of swinging doors

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention discloses a kind of Super High contraction structure construction elevator corridors and preparation method thereof, the construction elevator corridor includes construction elevator and building structure, plate-turning door is installed in the exit of construction elevator, the lower end of the plate-turning door is connect with the lower rotation that construction elevator exports, the top drawknot that the upper end of plate-turning door passes through wirerope and construction elevator outlet, plate-turning door is plugged into after downwardly turning over expansion with building structure, and the construction elevator corridor of connection is formed.Plate-turning door and overhang steel corridor are combined together by the present invention, Super High is solved the problems, such as because structure both shrinks cause not being connected between construction elevator, have many advantages, such as that the saving duration, assembly is flexible, simple to install, can be used in turn, is easy for construction, is economical and practical, is safe and reliable, there is wide applicability and generalization.

Description

A kind of Super High contraction structure construction elevator corridor and preparation method thereof
Technical field
The present invention relates to a kind of Super High contraction structure construction elevator corridors and preparation method thereof, belong to building construction technology Field.
Background technique
Currently, the case where structure both shrinks can be encountered during construction of super highrise building, i.e., because the variation of Super High alien invasion is led Planar structure contour line is caused to gradually become smaller, structure is gradually inside contracted to Core Walls Structure direction, and structural edge is constructed away from construction on facade The case where elevator Edge Distance is gradually increased causes structural edge to be gradually increased away from construction construction elevator Edge Distance, and construction is applied Personnel and material are unable to reach in floor in work elevator, influence normal construction.
Summary of the invention
The object of the present invention is to provide a kind of Super High contraction structures that is easy for construction, at low cost, being used in turn to apply Work elevator hallway and production method, to overcome deficiency in the prior art.
Technical solution of the present invention: a kind of Super High contraction structure construction elevator corridor and preparation method thereof will apply first The existing elevator door of work elevator is replaced with the plate-turning door that can be spun upside down, the bottom of the lower end of the plate-turning door and construction elevator outlet Portion's rotation connection, the top drawknot that the upper end of plate-turning door passes through wirerope and construction elevator outlet;When building for Super High shrinking zone When the spacing of building structure edge and construction elevator is less than the length of plate-turning door, the wirerope of plate-turning door upper end is unclamped, plate-turning door is made Expansion is downwardly turned over, so that plate-turning door be made to plug into this layer of building structure, forms the construction elevator corridor of connection;When Super High is received When the building structure edge and construction elevator spacing in contracting area are greater than the length of plate-turning door, overhang steel is installed in this layer of building structure Corridor docks plate-turning door and overhang steel corridor, forms the construction elevator corridor of connection.
In the above method, in construction elevator operation, the wirerope on plate-turning door is collapsed, is closed plate-turning door, turnover panel Door is used as closing door at this time.
Meanwhile the present invention also provides a kind of Super High contraction structure construction elevator corridors, including construction elevator and building Structure is equipped with plate-turning door, the lower rotation of the lower end of the plate-turning door and construction elevator outlet in the exit of construction elevator Connection, the upper end of plate-turning door by the top drawknot of wirerope and construction elevator outlet, plate-turning door downwardly turn over after expansion with build Building structure is plugged into, and the construction elevator corridor of connection is formed.
Above-mentioned construction elevator corridor further includes the overhang steel corridor being mounted in building structure floor, and the overhang steel is walked The outer end of corridor is fixed by wirerope and superstructure structure drawknot, and the bottom in overhang steel corridor is built by wirerope and this layer Structure drawknot is fixed, and plate-turning door docks after downwardly turning over expansion with overhang steel corridor, forms the construction elevator corridor of connection.
Further, the overhang steel corridor includes two main joists being fixed in building structure floor in parallel and hangs down One group of secondary joist being directly welded on two main joists, is welded with checkered steel plate on secondary joist.
Due to the adoption of the above technical scheme, the present invention has the advantages that the present invention combines plate-turning door and overhang steel corridor Together, Super High is solved the problems, such as because structure both shrinks cause not being connected between construction elevator, is had and is saved Duration, it is assembled flexibly, simple to install, the advantages that being used in turn, is easy for construction, is economical and practical, is safe and reliable, have extensive Practicability and generalization.
Detailed description of the invention
Fig. 1 is the structural schematic diagram in construction elevator corridor in embodiment 1;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the structural schematic diagram in construction elevator corridor in embodiment 2;
Fig. 4 is the top view of Fig. 3.
Description of symbols: 1- construction elevator, 2- building structure, 3- plate-turning door, 4- overhang steel corridor, 5- wirerope, 6- Main joist, 7- secondary joist, 8- checkered steel plate.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and examples to this hair It is bright to be described in further detail.
Embodiment 1
Referring to Fig. 1 and Fig. 2, a kind of Super High contraction structure construction elevator corridor of the invention, including construction elevator 1 and Building structure 2 is equipped with plate-turning door 3 in the exit of construction elevator 1, what the lower end of the plate-turning door 3 and construction elevator 1 exported Lower rotation connection, the top drawknot that the upper end of plate-turning door 3 is exported by wirerope 5 and construction elevator 1, plate-turning door 3 turn over downwards It plugs into after turning expansion with building structure 2, forms the construction elevator corridor of connection.
When making above-mentioned Super High contraction structure construction elevator corridor, the existing elevator door of construction elevator 1 is replaced first At the plate-turning door 3 that can be spun upside down, the lower end of the plate-turning door 3 is connect with the lower rotation that construction elevator 1 exports, plate-turning door 3 The top drawknot that is exported by wirerope 5 and construction elevator 1 of upper end;Referring to Fig. 1 and Fig. 2, when the building of Super High shrinking zone When the spacing of 2 edge of structure and construction elevator 1 is less than the length of plate-turning door 3, the wirerope 5 of 3 upper end of plate-turning door is unclamped, turnover panel is made Door 3 downwardly turns over expansion, so that plate-turning door 3 be made to plug into this layer of building structure 2, forms the construction elevator corridor of connection.
Embodiment 2
Referring to Fig. 3 and Fig. 4, above-mentioned construction elevator corridor further includes the overhang steel corridor being mounted in 2 floor of building structure 4, the outer end in the overhang steel corridor 4 is fixed by wirerope 5 and 2 drawknot of superstructure structure, the bottom in overhang steel corridor 4 It is fixed by wirerope 5 and this layer of 2 drawknot of building structure, plate-turning door 3 docks after downwardly turning over expansion with overhang steel corridor 4, shape At the construction elevator corridor of connection.The overhang steel corridor 4 includes two main dragons being fixed in 2 floor of building structure in parallel Bone 6 and one group of secondary joist 7 being vertically welded on two main joists 6, are welded with checkered steel plate 8 on secondary joist 7.
When making above-mentioned Super High contraction structure construction elevator corridor, the existing elevator door of construction elevator 1 is replaced first At the plate-turning door 3 that can be spun upside down, the lower end of the plate-turning door 3 is connect with the lower rotation that construction elevator 1 exports, plate-turning door 3 The top drawknot that is exported by wirerope 5 and construction elevator 1 of upper end;Referring to Fig. 3 and Fig. 4, when the building of Super High shrinking zone When 2 edge of structure and 1 spacing of construction elevator are greater than the length of plate-turning door 3, overhang steel corridor 4 is installed in this layer of building structure 2, Plate-turning door 3 and overhang steel corridor 4 are docked, the construction elevator corridor of connection is formed.
When construction elevator 1 is run, the wirerope 5 on plate-turning door 3 is collapsed, is closed plate-turning door 3, plate-turning door 3 is at this time It is used as closing door.

Claims (5)

1. a kind of production method in Super High contraction structure construction elevator corridor, it is characterised in that: first that construction elevator (1) is existing Some elevator doors are replaced with the plate-turning door (3) that can be spun upside down, what the lower end and construction elevator (1) of the plate-turning door (3) exported Lower rotation connection, the top drawknot that the upper end of plate-turning door (3) passes through wirerope (5) and construction elevator (1) outlet;Work as Super High When building structure (2) edge of shrinking zone and the spacing of construction elevator (1) are less than the length of plate-turning door (3), unclamp plate-turning door (3) The wirerope (5) of upper end, makes plate-turning door (3) downwardly turn over expansion, so that plate-turning door (3) is made to plug into this layer of building structure (2), Form the construction elevator corridor of connection;It is turned over when building structure (2) edge of Super High shrinking zone is greater than with construction elevator (1) spacing When the length of plate door (3), overhang steel corridor (4) are installed on this layer of building structure (2), make plate-turning door (3) and overhang steel corridor (4) it docks, forms the construction elevator corridor of connection.
2. the production method in Super High contraction structure construction elevator corridor according to claim 1, it is characterised in that: applying When work elevator (1) is run, the wirerope (5) on plate-turning door (3) is collapsed, is closed plate-turning door (3), plate-turning door (3) is made at this time For closing door use.
3. a kind of Super High contraction structure construction elevator corridor, including construction elevator (1) and building structure (2), feature exists In: it is equipped with plate-turning door (3) in the exit of construction elevator (1), the lower end and construction elevator (1) of the plate-turning door (3) export Lower rotation connection, the top drawknot of the upper end of plate-turning door (3) by wirerope (5) and construction elevator (1) outlet, plate-turning door (3) it plugs into after downwardly turning over expansion with building structure (2), forms the construction elevator corridor of connection.
4. Super High contraction structure construction elevator corridor according to claim 3, it is characterised in that: further include being mounted on to build The outer end in the overhang steel corridor (4) in building structure (2) floor, the overhang steel corridor (4) is built by wirerope (5) with upper layer Building structure (2) drawknot is fixed, and the bottom of overhang steel corridor (4) is fixed by wirerope (5) and this layer of building structure (2) drawknot, Plate-turning door (3) docks after downwardly turning over expansion with overhang steel corridor (4), forms the construction elevator corridor of connection.
5. Super High contraction structure construction elevator corridor according to claim 4, it is characterised in that: the overhang steel corridor (4) include two main joists (6) being fixed in building structure (2) floor in parallel and be vertically welded in two main joists (6) one group of secondary joist (7) on, is welded with checkered steel plate (8) on secondary joist (7).
CN201811395755.0A 2018-11-22 2018-11-22 A kind of Super High contraction structure construction elevator corridor and preparation method thereof Pending CN109292598A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811395755.0A CN109292598A (en) 2018-11-22 2018-11-22 A kind of Super High contraction structure construction elevator corridor and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811395755.0A CN109292598A (en) 2018-11-22 2018-11-22 A kind of Super High contraction structure construction elevator corridor and preparation method thereof

Publications (1)

Publication Number Publication Date
CN109292598A true CN109292598A (en) 2019-02-01

Family

ID=65143740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811395755.0A Pending CN109292598A (en) 2018-11-22 2018-11-22 A kind of Super High contraction structure construction elevator corridor and preparation method thereof

Country Status (1)

Country Link
CN (1) CN109292598A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201825625U (en) * 2010-10-22 2011-05-11 中国建筑第四工程局有限公司 Construction elevator with flap gate
JP2013220859A (en) * 2012-04-12 2013-10-28 Toshiba Elevator Co Ltd Head extension method for elevator for construction
CN204714276U (en) * 2015-05-27 2015-10-21 江苏广通工程机械有限公司 Construction hoist wall-attaching equipment
CN205527238U (en) * 2016-04-08 2016-08-31 中建八局第二建设有限公司 Move construction elevator who turns over board door with electricity
CN207032882U (en) * 2017-04-28 2018-02-23 中铁建工集团有限公司 A kind of construction elevator, which is encorbelmented, passes in and out layer platform
CN207878907U (en) * 2018-01-12 2018-09-18 中国建筑一局(集团)有限公司 A kind of elevator shaft operating platform
CN209161272U (en) * 2018-11-22 2019-07-26 中建四局第六建筑工程有限公司 A kind of construction elevator overhang steel corridor for facade contraction structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201825625U (en) * 2010-10-22 2011-05-11 中国建筑第四工程局有限公司 Construction elevator with flap gate
JP2013220859A (en) * 2012-04-12 2013-10-28 Toshiba Elevator Co Ltd Head extension method for elevator for construction
CN204714276U (en) * 2015-05-27 2015-10-21 江苏广通工程机械有限公司 Construction hoist wall-attaching equipment
CN205527238U (en) * 2016-04-08 2016-08-31 中建八局第二建设有限公司 Move construction elevator who turns over board door with electricity
CN207032882U (en) * 2017-04-28 2018-02-23 中铁建工集团有限公司 A kind of construction elevator, which is encorbelmented, passes in and out layer platform
CN207878907U (en) * 2018-01-12 2018-09-18 中国建筑一局(集团)有限公司 A kind of elevator shaft operating platform
CN209161272U (en) * 2018-11-22 2019-07-26 中建四局第六建筑工程有限公司 A kind of construction elevator overhang steel corridor for facade contraction structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴展航: "超高层建筑综合施工技术分析" *

Similar Documents

Publication Publication Date Title
CN205637106U (en) Building structure system of completely assembling formula steel construction
CN204703534U (en) A kind of large-scale unit plates of curtain wall two-rail hanging apparatus
CN105822072A (en) Hoisting construction structure and method for air corridor ceiling
CN112112418B (en) Construction method of high-rise building aluminum formwork climbing frame combined system
CN102502378A (en) Climbing elevator for building construction
CN209161272U (en) A kind of construction elevator overhang steel corridor for facade contraction structure
CN205557951U (en) Novel local cast -in -place assembled coincide building roof boarding
CN109292598A (en) A kind of Super High contraction structure construction elevator corridor and preparation method thereof
CN207700708U (en) A kind of shellring shape ceiling mounted tracks of unit glass curtain wall
CN203947755U (en) A kind of large Steel Cantilever trussed construction high-altitude construction first floor steel truss erecting device
CN205654127U (en) Portable operation protective platform of assembly type structure stairwell
CN108675170A (en) Roofing monorail crane and its construction method
CN206503350U (en) A kind of safety rope fixing point
CN210562811U (en) Multi-effect structure of elevator shaft partition wall of super high-rise building
CN103352579A (en) Reinforcement and reconstruction masonry structure using externally-added gallery bridge and externally-added elevator and construction method
CN210714100U (en) Prefabricated assembled prevents hot wall
CN208899873U (en) A kind of K plate conversion equipment
CN109838094A (en) A kind of building traffic cable energy conservation welding node and its installation method
CN207484998U (en) A kind of device for ensureing masonry horizontal mortar joint
CN109898818A (en) It is a kind of using Bailey beam structure as the excessive bracket and its method for tooling of bearing substrate
CN206737358U (en) A kind of prefabricated assembled steel reinforced concrete framework elevator shaft structure
CN205838299U (en) A kind of simple and easy hoisting device
CN216921293U (en) Building construction operation platform
CN205555882U (en) Heavy single track hangs
CN205243034U (en) Passageway of a contact core section of thick bamboo and peripheral steel construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190201

RJ01 Rejection of invention patent application after publication