CN109284858A - Reinforcing steel bar blanking optimization method and device and storage equipment - Google Patents

Reinforcing steel bar blanking optimization method and device and storage equipment Download PDF

Info

Publication number
CN109284858A
CN109284858A CN201810889106.XA CN201810889106A CN109284858A CN 109284858 A CN109284858 A CN 109284858A CN 201810889106 A CN201810889106 A CN 201810889106A CN 109284858 A CN109284858 A CN 109284858A
Authority
CN
China
Prior art keywords
reinforcing bar
bar length
length
remaining
raw material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810889106.XA
Other languages
Chinese (zh)
Other versions
CN109284858B (en
Inventor
李业学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangyang Guteji Pipe Pile Co ltd
Original Assignee
Hubei University of Arts and Science
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei University of Arts and Science filed Critical Hubei University of Arts and Science
Publication of CN109284858A publication Critical patent/CN109284858A/en
Application granted granted Critical
Publication of CN109284858B publication Critical patent/CN109284858B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E04H6/08Garages for many vehicles
    • E04H6/12Garages for many vehicles with mechanical means for shifting or lifting vehicles
    • E04H6/18Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions
    • E04H6/22Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions characterised by use of movable platforms for horizontal transport, i.e. cars being permanently parked on palettes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E04H6/08Garages for many vehicles
    • E04H6/12Garages for many vehicles with mechanical means for shifting or lifting vehicles
    • E04H6/18Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E04H6/08Garages for many vehicles
    • E04H6/12Garages for many vehicles with mechanical means for shifting or lifting vehicles
    • E04H6/18Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions
    • E04H6/28Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions characterised by use of turntables or rotary rings for horizontal transport
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E04H6/42Devices or arrangements peculiar to garages, not covered elsewhere, e.g. securing devices, safety devices, monitoring and operating schemes; centering devices
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

The invention discloses a method, a device and a storage device for steel bar blanking optimization, wherein the method comprises the following steps: screening an entire steel bar optimized combination scheme, screening a residual steel bar to be blanked optimized combination scheme, node optimization and material local optimization. The invention can make the waste rate of the steel bar less than 1% through the optimized combination of the whole steel bar, the optimized combination of the length of the residual steel bar, the local optimization and the node number optimization after the combination, and compared with the material waste rate of the existing commercial software, the material waste rate of the invention is reduced by 4 percentage points. Meanwhile, the labor cost is reduced by superposition, and the economic benefit is very obvious.

Description

A kind of Steel Reinforcing Bar Material optimization method, device and storage equipment
Technical field
The present invention relates to a kind of Steel Reinforcing Bar Material optimization method, device and storage equipment, belong to technical field of civil engineering.
Background technique
It is found after investigating all kinds of Construction of Civil Engineering projects, worker generallys use empirical method and carries out Steel Reinforcing Bar Material or benefit With existing business software reinforcement detailing, but above-mentioned baiting method reinforcing bar waste rate is generally very big, is typically larger than equal to 5%.With one A general 100,000 side real estate projects are counted, the fund total amount of waste are as follows:
* 4500 (reinforcing bar market price) * 5% (waste rate) of 100000 (side) * 50kg (steel using amount/side)/1000 (being converted into ton) =112.5 ten thousand yuan
For this purpose, proposing a kind of optimization method of lower Steel Reinforcing Bar Material of waste rate, there are very significant economy and society Benefit.
Reinforcing bar Optimization Cutting is an one-dimensional optimum organization problem, and existing research uses simulated annealing, genetic algorithm Deng optimization Steel Reinforcing Bar Material, but these methods rest on theoretical research level, and being applied to engineering reality, there is also problems.With Research has inquired into reinforcing bar Optimizing Cutting Stock Problem using linear programming algorithm, in fact, the steel in Practical Project by simplifying afterwards Muscle Optimization Cutting is not a purely linear problem, and meeting includes multiple nonlinear restrictions in the solving model of engine request, entirely Solving model should be a nonlinear model.Solving nonlinear problem with linear model causes optimum results to be wanted with Practical Project Ask that there are error or even mistakes.
On January 18th, 2012, Chinese patent database disclosed a patent name are as follows: Intelligent steel bar screening Optimization Cutting side Method (Publication No.: CN102322151A): a large amount of Steel Reinforcing Bar Material combinations to be processed are sieved by dynamic setting screening conditions Choosing, and to the preliminary Steel Reinforcing Bar Material assembled scheme screened, row comparison, adjusting and optimizing are combined again, determine final Steel Reinforcing Bar Material Assembled scheme.But this method simulation is a kind of empirical material sieving technology, foundation stone is not that generally acknowledged operational research is excellent Change theory, local optimal solution perhaps can be found by this method, but cannot get globally optimal solution, in other words under final reinforcing bar Expect that assembled scheme is not optimal case.In addition, this method does not account for cost of labor, in fact, cost of labor is also that can not neglect Depending on an engineering cost, when reducing the costs of labor such as reinforcing bar cutting times and welding point, waste of material is usually therewith Increase, that is to say, that cost of labor and waste of material rate are inversely proportional.
Summary of the invention
It is an object of the invention to overcome deficiency in the prior art, provide a kind of Steel Reinforcing Bar Material optimization method, device and Equipment is stored, material cost can be not only saved but also cost of labor can be reduced.
In order to achieve the above objectives, the technical scheme adopted by the invention is that: a kind of Steel Reinforcing Bar Material optimization method, the side Method includes the following steps:
It will be compared one by one to blanking reinforcing bar length and raw material reinforcing bar length, with " reinforcing bar waste rate is less than setting threshold Value, and it is screening conditions that remaining reinforcing bar length, which is less than 35d ", the raw material reinforcing bar for meeting screening conditions directly carries out down Material;Wherein: remaining reinforcing bar length=to blanking reinforcing bar length-raw material reinforcing bar length+reinforcing bar number of nodes * s, d expression raw material Bar diameter, s indicate splice loss;
It is screening with " remaining reinforcing bar length is more than or equal to minimum raw material reinforcing bar length " for residue to blanking reinforcing bar Condition is recycled from remaining raw material reinforcing bar picks out one group as whole Steel Reinforcing Bar Material combination;
The total radical of reinforcing bar is at least for target after being combined with more raw material reinforcing bars, and considers that splice is lost, and filters out Optimal whole Steel Reinforcing Bar Material combination;
With the minimum target of reinforcing bar waste rate, hard constraint is at most combined by two section reinforcing bar groups with every remaining reinforcing bar length, Non-linear lingo model is established, globally optimal solution is solved;
Further carry out node optimization and material local optimum to globally optimal solution, obtain final Steel Reinforcing Bar Material inventory and Reinforcing bar cutting method.
Further, the optimal case for filtering out the combination of whole Steel Reinforcing Bar Material, includes the following steps:
For recycling the whole Steel Reinforcing Bar Material picked out combination from raw material reinforcing bar length sequences, if whole reinforcing bar group Remaining reinforcing bar length is more than or equal to (35d+s) after closing blanking, then the whole reinforcing bar for saving remaining reinforcing bar length data and picking out Blanking data splitting;
If remaining reinforcing bar length is less than (35d+s) after whole reinforcing bar combination blanking, further judge that reinforcing bar waste rate is It is no to be less than given threshold: if reinforcing bar waste rate is less than given threshold, to save to blanking reinforcing bar length data, whole reinforcing bar Blanking data splitting and remaining reinforcing bar length data;
If reinforcing bar waste rate is more than or equal to given threshold, raw material reinforcing bar is deleted from whole Steel Reinforcing Bar Material combination The smallest data of length recalculate and save remaining reinforcing bar length data, while saving under whole reinforcing bar after reconfiguring Expect data splitting;
Finally obtain the optimal case of whole Steel Reinforcing Bar Material combination.
Further, non-linear lingo model is established to include the following steps:
With the minimum target of reinforcing bar waste rate, hard constraint is at most combined by two section reinforcing bar groups with every remaining reinforcing bar length, Write non-linear lingo model:
xij>=35d+s or xij=0
Wherein: xi,jIndicate the jth section reinforcing bar length of composition i-th remaining reinforcing bar length divided by jth root raw material reinforcing bar Length;AjIndicate jth root raw material reinforcing bar length;B (i) expression i-th is to blanking reinforcing bar length;M indicates raw material reinforcing bar Total radical;N indicates total radical to blanking reinforcing bar;D indicates raw material bar diameter;S indicates splice loss.
Further, the node optimization includes the following steps:
The destination file for reading non-linear lingo model output, therefrom obtains the optimum results matrix of remaining reinforcing bar length With reinforcing bar cutting method matrix;
Assuming that each behavior residue reinforcing bar length blanking data splitting of optimum results matrix, reinforcing bar cutting method matrix Each be classified as the data for being combined cutting to whole reinforcing bar according to remaining reinforcing bar length blanking data splitting;
The every a line for reading the optimum results matrix of remaining reinforcing bar length one by one, judges whether the row includes two non-whole Root reinforcing bar length data: if not including, next line is read;If including taking out the two non-whole reinforcing bar length numbers According to, compared with each column of reinforcing bar cutting method matrix, judge two data whether certain column in exist simultaneously: if Do not exist simultaneously, then loop optimization matrix of consequence is to next line, if existed simultaneously, with two data and respectively replace Corresponding data and corresponding data in reinforcing bar cutting method rectangular array in optimum results matrix, until traversing remaining reinforcing bar length Optimum results matrix, the optimum results matrix and the reinforcing bar cutting after node optimization of the remaining reinforcing bar length after obtaining node optimization Segmentation method matrix.
Further, the material local optimum includes the following steps:
The destination file for reading non-linear lingo model output, therefrom obtains the optimum results matrix of remaining reinforcing bar length With reinforcing bar cutting method matrix;
Remaining raw material reinforcing bar length is read, and counts reinforcing bar length type and radical, establishes reinforcing bar length type square Battle array;
Assuming that each of reinforcing bar cutting method matrix is classified as according to remaining reinforcing bar length blanking data splitting to whole reinforcing bar It is combined the data of cutting;
The each column for reading reinforcing bar cutting method matrix one by one, ask the column by the summation of cutting reinforcing bar length;
Each column are incorporated to reinforcing bar length type matrix by the summation of cutting reinforcing bar length and form new matrix, then according to The arrangement of reinforcing bar length descending;
Index of the column by the summation of cutting reinforcing bar length in new matrix is sought, judges whether index is in new matrix most A line afterwards: if so, reading the next column of reinforcing bar cutting method matrix, continuing next circulation, until traversal reinforcing bar cutting side Method matrix;If it is not, then the next index for taking out the index corresponds to numerical value, replace reinforcing bar cutting method rectangular array vector First value, that is, the raw material reinforcing bar length cut.
Further, following processing should be done before establishing non-linear lingo model:
Raw material reinforcing bar length and remaining reinforcing bar length are saved into two column into the same excel file, and respectively pressed Descending arrangement;
It is several subfiles by the excel file cutting of raw material reinforcing bar length and remaining reinforcing bar length is preserved, Ask: each subfile includes 50~60 remaining reinforcing bar length datas, each subfile chinese raw materials reinforcing bar length summation and surplus The difference of remaining reinforcing bar length summation is less than or equal to 10.
Further, before being compared one by one to blanking reinforcing bar length and raw material reinforcing bar length, should respectively by Respectively in descending order of length to blanking reinforcing bar length and raw material reinforcing bar length.
It further, is screening conditions from former material with " remaining reinforcing bar length be more than or equal to minimum raw material reinforcing bar length " One group of data is picked out as whole Steel Reinforcing Bar Material group according to raw material reinforcing bar length bit-reverse loop in material reinforcing bar length sequences It closes.
The present invention also provides a kind of storage equipment, wherein being stored with a plurality of instruction, described instruction is suitable for being added by processor Step described in any one of carrying and execute aforementioned reinforcing bar optimization method.
Compared with prior art, the beneficial effects obtained by the present invention are as follows being:
Artificial baiting method is simulated, whole reinforcing bar optimum combination is extracted using Matlab;It is several by big matrix stripping and slicing Submatrix promotes computational efficiency;Operational research Optimized model is established, the optimal solution of remaining reinforcing bar is solved, obtains reinforcing bar cutting method With remaining Steel Reinforcing Bar Material method;Optimize reinforcing bar cutting method and remaining Steel Reinforcing Bar Material method, reduces reinforcement welding number of nodes;This It invents the Steel Reinforcing Bar Material method and not only controls material utilization amount to greatest extent, reduce waste of material, and pass through the control total root of reinforcing bar Number reduces cutting times and welding node number, optimizes welding node number, to considerably reduce cost of labor.
Detailed description of the invention
Fig. 1 is the flow chart for screening whole reinforcing bar optimum organization scheme;
Fig. 2 is the flow chart for screening remaining reinforcing bar length optimization assembled scheme;
Fig. 3 is the flow chart of node optimization and material local optimum.
Specific embodiment
The present invention provides a kind of materials of Steel Reinforcing Bar Material and cost of labor optimization method, specifically include that whole steel of screening Muscle optimum organization scheme screens remaining reinforcing bar length optimization assembled scheme and node optimization and material local optimum.
The invention will be further described below in conjunction with the accompanying drawings.
As shown in Figure 1, being the flow chart for screening whole reinforcing bar optimum organization scheme, include the following steps:
Step 1: reading and names data.It acquisition raw material reinforcing bar length and to blanking reinforcing bar length and is stored respectively in In two column in same excel.In order to reduce splice, as select length longer as possible in whole reinforcing bar optimum organization Reinforcing bar before optimization, should press respectively respective length descending arrangement by raw material reinforcing bar length and to blanking reinforcing bar length.For convenient for Description arranges here, raw material reinforcing bar length column are named as A, is named as B column to blanking reinforcing bar length column.
Step 2: preliminary optimization.A data are chosen from B column, are compared one by one with the data in A column, if full Sufficient waste rate is less than given threshold and remaining reinforcing bar length is less than the blanking condition of 35d, then direct blanking, and saves remaining steel Muscle length and whole reinforcing bar length delete the root raw material reinforcing bar length data in A column, delete the root in B column and wait for blanking Reinforcing bar length data continues in next step, until traversal B column.The given threshold should be not more than 6%, and preferred given threshold is 4%.
Step 3: judge whether to continue to optimize.Judge to save to which whether the variable of blanking reinforcing bar is sky, if so, showing All optimised blanking, optimization terminate needed blanking reinforcing bar, if not, pointer is moved on to B column beginning, entrance is next Step;
Step 4: the screening conditions of setting whole Steel Reinforcing Bar Material combination, specifically: remaining reinforcing bar length is more than or equal to original The minimum value of material reinforcing bar length.When remaining reinforcing bar length is more than or equal to the minimum value in raw material reinforcing bar length, show energy One whole reinforcing bar is filtered out from remaining raw material reinforcing bar to combine to blanking reinforcing bar.
Step 5: whole Steel Reinforcing Bar Material combination is extracted.One is read in B column to blanking reinforcing bar length data, is arranged from A Middle circulation reads raw material reinforcing bar length data, is saved in whole Steel Reinforcing Bar Material combination, judges whether to meet step 4 setting Screening conditions, if it is satisfied, then continue read raw material reinforcing bar length data;If conditions are not met, then stopping to whole reinforcing bar Data are added in blanking combination, into next step.
Step 6: the remaining reinforcing bar length after whole reinforcing bar optimum organization of calculation basis, if remaining reinforcing bar length is greater than Equal to (35d+s), then remaining reinforcing bar length and whole Steel Reinforcing Bar Material combination are saved, and delete whole Steel Reinforcing Bar Material group from A column The all raw material reinforcing bar length data for including in conjunction.Wherein: s is splice loss, and d is raw material bar diameter.
If remaining reinforcing bar length is less than 35d+s, and reinforcing bar waste rate is less than given threshold, then should be to blanking reinforcing bar It is optimized to finish, save remaining reinforcing bar length, to blanking reinforcing bar length and whole Steel Reinforcing Bar Material combined result.
If remaining reinforcing bar length is less than 35d+s, and reinforcing bar waste rate is greater than given threshold, then from whole Steel Reinforcing Bar Material A shortest raw material reinforcing bar is deleted in combination, recalculates remaining reinforcing bar length, saves whole Steel Reinforcing Bar Material combined result With remaining reinforcing bar length.
After traversing B column, whole Steel Reinforcing Bar Material Combinatorial Optimization terminates, and finally obtains the optimal side of whole Steel Reinforcing Bar Material combination Case.
It as shown in table 1, is the scheme example of whole Steel Reinforcing Bar Material combination, the full-length of usual raw material reinforcing bar has 12 Rice and 9 meters two kinds, by blanking reinforcing bar length be 27.02 meters for, can be used one 12 meters raw material reinforcing bar and one 9 The raw material reinforcing bar of rice is combined, it is assumed that splice loss is 0.06 meter, then remaining reinforcing bar length=27.02-12-9+ 2*0.06=6.14 rice.
1 whole Steel Reinforcing Bar Material combination of table
To blanking reinforcing bar length Raw material reinforcing bar Raw material reinforcing bar Remaining reinforcing bar length
27.02 12 9 6.14
20.58 9 9 2.64
19.98 12 0 8.04
As shown in Fig. 2, being the flow chart for screening remaining reinforcing bar length optimization assembled scheme, include the following steps:
Step 7: remaining reinforcing bar length data and remaining raw material reinforcing bar length data are saved in the same excel text E, F of part are arranged, and E, F column are respectively arranged in descending order.
Step 8: cutting excel file is several subfiles.E, F column usually have thousands of rows, to avoid calculating " crash ", Excel file cutting is usually several subfiles by preceding optimization, and each subfile generally comprises 50~60 remaining reinforcing bar length Data, at this time computational efficiency highest.To guarantee there is solution and waste of material is minimum in lingo optimization process, must be requested that every height The difference of file chinese raw materials reinforcing bar length summation and remaining reinforcing bar length summation is less than or equal to 10.It, will according to above-mentioned two big standards Excel file carries out cutting, is stored in each subfile, it is assumed that raw material reinforcing bar length is protected respectively with remaining reinforcing bar length There are G, H of each subfile column.
Step 9: Optimized model is established.With the minimum target of reinforcing bar waste rate, with every remaining reinforcing bar at most by 2 sections original Material reinforcing bar group is combined into hard constraint, writes the non-linear lingo model of reinforcing bar optimization, specific as follows:
xij>=35d+s or xij=0
Wherein: xi,jIndicate the jth section reinforcing bar length of composition i-th remaining reinforcing bar length divided by jth root raw material reinforcing bar Length;AjIndicate jth root raw material reinforcing bar length;B (i) expression i-th is to blanking reinforcing bar length;M indicates raw material reinforcing bar Total radical;N indicates total radical to blanking reinforcing bar;D indicates raw material bar diameter;S indicates splice loss.
Step 10: being separately optimized the data in subfile using non-linear lingo model, and respectively with the preservation of txt format To in corresponding destination file.
As shown in figure 3, being the flow chart of node optimization and material local optimum, include the following steps:
Step 11: writing program and read all txt destination files, extracts the optimum results square of remaining reinforcing bar length Battle array and reinforcing bar cutting method matrix;Whole Steel Reinforcing Bar Material combined result file is read, whole Steel Reinforcing Bar Material combination is obtained, by surplus Remaining reinforcing bar length difference descending arranges above-mentioned two matrix.
It is exemplified by Table 1, the optimum results matrix and corresponding reinforcing bar cutting method matrix of remaining reinforcing bar length is given below A kind of example:
The optimum results matrix of the remaining reinforcing bar length of table 2
Remaining reinforcing bar length Section 1 Section 2 Section 3
6.14 2.5 0 3.7
2.64 1.2 1.5 0
8.04 2.5 1 4.6
3 reinforcing bar cutting method matrix of table
Whole reinforcing bar 9 4.51 12 4.51
Section 1 2.5 0 3.7 2
Section 2 3.7 1.5 0 1.2
Section 3 2.5 1 4.6 1.2
Step 12: node optimization.
Assuming that each behavior residue reinforcing bar length blanking data splitting of optimum results matrix, reinforcing bar cutting method matrix Each be classified as the data for being combined cutting to whole reinforcing bar according to remaining reinforcing bar length blanking data splitting;
The every a line of optimum results matrix for reading remaining reinforcing bar length one by one, judges whether the row includes two non-whole Reinforcing bar length data, if it is not, then reading next line;If it is, the two data are taken out, with reinforcing bar cutting method matrix Each column compare, judge two data whether certain column in exist, if it is not, then circulation Steel Reinforcing Bar Material inventory arrive down A line, if it is, with two numbers and respectively replace corresponding data and reinforcing bar cutting method matrix in Steel Reinforcing Bar Material inventory row Corresponding data in column.Until traversing the optimum results matrix of remaining reinforcing bar length, the optimum results of remaining reinforcing bar length are obtained Matrix and reinforcing bar cutting method matrix.Aforesaid operations can be substantially reduced the total radical of reinforcing bar, to reduce cutting times and welding time Number, and welding point damage is reduced, material cost can be not only saved, is saved labour turnover simultaneously.
Step 13: further material local optimum: remaining raw material reinforcing bar length is read, and counts reinforcing bar length Type and radical establish reinforcing bar length kind matroid;As shown in table 4, it is an example of reinforcing bar length kind matroid:
4 reinforcing bar length kind matroid of table
Raw material reinforcing bar length Radical
20.59 143
12 250
9 390
4.51 3
Assuming that each of reinforcing bar cutting method matrix is classified as according to remaining reinforcing bar length blanking data splitting to whole reinforcing bar It is combined the data of cutting;
The each column for reading reinforcing bar cutting method matrix one by one, ask the column by the summation of cutting reinforcing bar length;
The column are incorporated to reinforcing bar length type matrix by the summation of cutting reinforcing bar length and form new matrix, then according to surplus Remaining raw material reinforcing bar length descending arrangement;
As shown in table 5, table 4 is incorporated to by the summation of cutting reinforcing bar length in the reinforcing bar cutting method matrix provided for table 3 to mention Reinforcing bar length martyr's matrix of confession is formed by new matrix:
Table 5 is incorporated to the new matrix formed after length summation
Raw material reinforcing bar length Radical
20.59 143
12 250
9 390
8.7 1
4.51 3
Index of the column by the summation of cutting reinforcing bar length in new matrix is sought, judges whether index is in new matrix most A line afterwards: if so, reading the next column of reinforcing bar cutting method matrix, continuing next circulation, until traversal reinforcing bar cutting side Method matrix;If it is not, then the next index for taking out the index corresponds to numerical value, replace reinforcing bar cutting method rectangular array vector First value, that is, the raw material reinforcing bar length cut.
Material local optimum can reduce the use of material, achieve the purpose that save material.
Step 14: Steel Reinforcing Bar Material inventory is obtained.Merge whole Steel Reinforcing Bar Material combination square according to remaining reinforcing bar length data The optimum results matrix of battle array and remaining reinforcing bar length, obtains Steel Reinforcing Bar Material inventory.
The invention will be further described combined with specific embodiments below.Following embodiment is only used for clearly saying Bright technical solution of the present invention, and not intended to limit the protection scope of the present invention.
Specific embodiment:
By taking one project of middle iron as an example, a specific embodiment of the invention is described in further detail.The project is former Material bar diameter is 30mm, and raw material reinforcing bar: 20.59m reinforcing bar 957,12m, 9m reinforcing bar be 1000 each, 4.51m reinforcing bar 1957, totally 4864;20.59m is whole reinforcing bar length of customization, and 12m, 9m are standard reinforcing bar length, and 4.51m is other Allocation of the surplus reinforcing bar length specifically comprises the following steps: totally to blanking reinforcing bar 112 kinds 3087
Raw material reinforcing bar is stored with by matlab reading and to the excel file of blanking reinforcing bar, raw material reinforcing bar is arranged Vector sum waits for that blanking reinforcing bar column vector is stored in respectively in variable Material and Sample, and by length, respectively descending is arranged Material and Sample.
Set blanking condition are as follows: waste rate is less than 4%, and remaining reinforcing bar length is less than 35d.The d is bar diameter. Remaining reinforcing bar length=to blanking reinforcing bar length-raw material reinforcing bar length+reinforcing bar number of nodes * 0.06;The waste rate is residue Reinforcing bar length is divided by the percentage to blanking reinforcing bar length.
A number is taken out from Sample, Material is recycled, compares with it, determines whether to meet setting blanking condition, If it is, direct blanking, remaining reinforcing bar length is saved with negative value, as reinforcing bar through by the label of blanking, and saves whole steel Muscle, reinforcing bar cutting method, if it is not, then into next circulation.After traversing Sample, epicycle optimization terminates, part optimization knot Fruit see the table below.
In this example, in Sample take out 11.87m to blanking reinforcing bar, compared with Material, find 12m raw material steel Muscle subtracts each other to obtain remaining reinforcing bar length 0.13m, is less than 35d=1.05, and waste rate=0.13/11.87=1.1% < 4%, then directly Connect preservation.
Judge whether optimised to blanking reinforcing bar.Whether the variable for judging to save reinforcing bar length to be optimized is empty, if It is to show that all reinforcing bars are optimised, optimization terminates, if not, pointer is moved on to Sample column beginning.
Whole Steel Reinforcing Bar Material combination condition is extracted in setting, sets screening conditions are as follows: remaining reinforcing bar length is greater than raw material steel The minimum length of muscle.The minimum length of this example chinese raw materials reinforcing bar is 4.51m.
It is recycled from column vector Material and chooses reinforcing bar, it is every to choose a reinforcing bar into whole reinforcing bar length combination, it is examining Under the conditions of considering 0.06m splice loss, corresponding remaining reinforcing bar length is calculated, judges whether remaining reinforcing bar length meets screening Otherwise condition, stops screening, combination may be most at present if so, continuing to screen reinforcing bar into whole reinforcing bar length combination Whole excellent reinforcing bar length combination.
When remaining reinforcing bar length is more than or equal to 35d+s, whole reinforcing bar length combination is saved in Section 1~10th section, the 11 sections save remaining reinforcing bar length, in case orderly optimization.It is deleted simultaneously in raw material queue Material corresponding in combination Reinforcing bar.
In this example, remaining reinforcing bar length=55.63-2*20.59-12+3*0.06=2.63 > 35d+s=1.11 is then saved Respective value is shown in Table 1-1.
Whole reinforcing bar optimum organization of table 1-1
When remaining reinforcing bar length be less than 35d+s when, if residue reinforcing bar length can guarantee waste rate 4% hereinafter, if steel Muscle blanking is completed, and whole reinforcing bar length combination and remaining reinforcing bar length are saved.
After the completion of optimization, whole Steel Reinforcing Bar Material combined result file is arranged by reinforcing bar residue length column descending.
In this example, directly optimize remaining reinforcing bar using lingo, then total variable number 3033*1786=5416938, constraint Number 5426576, calculator memory and CPU capacity are inadequate.It before optimization, need to be 50 subfiles, each Ziwen by file declustering Part includes raw material reinforcing bar 57, remaining reinforcing bar about 17.
It establishes and calculates mathematical model, write lingo program, specific division statement is as follows:
Min=@sum (RebarSet (j): (A (j) * (1-T (j))));
@for (Rebarset2 (i) :@sum (Rebarset (j): X (i, j) * A (j))
(@sum (Rebarset (j) :@sign (X (i, j))) -1) * 0.06=B (i));
@for (<=2 Rebarset2 (i) :@sum (Rebarset (j) :@sign (X (i, j))));
@for (RebarSet (j) :@sum (RebarSet2 (i): X (i, j))=T (j));
!@for (<=3 Rebarset (j) :@sum (Rebarset2 (i) :@sign (X (i, j))));
@for (links (i, j) :@semic (Xb (i, j), X (i, j), 1));
@for (Rebarset (j) :@BND (0, T (j), 1));
After optimizing all subfiles, save to txt file, totally 50 files.
Merge all optimum results, obtains the optimum results and cutting method of remaining reinforcing bar.Such as: remaining reinforcing bar 6.62m It is formed by 4.15m and two section reinforcement welding of 2.53m, wherein considering the welding point loss of 0.06m.In table 1-2, whole reinforcing bar 20.59m is cut into 3 section 5.48m and 1 section 4.15m.
The optimum results matrix of table 1-2 residue reinforcing bar
The preliminary reinforcing bar cutting method of table 1-3
After optimizing node, the optimum results and cutting method of new remaining reinforcing bar length are obtained.Specific steps are as follows: circulation Every a line in table 1-2 is read, if only one number of every row, shows an only section reinforcing bar, it is not necessary that optimization, after resuming studies Next column is taken, if there is two data, such as: tertial 5.48,1.2.Each column are then searched in table 1-3, if this two Number appears in same row, then the length after calculating this two reinforcement weldings, it is clear that 5.48,1.2 appear in table 1-3's simultaneously Secondary series, the length after two reinforcement weldings are 5.48+1.2-0.06=6.62.Respectively by 5.48 replacements in table 1-2,1-3 It is 6.62,1.2 to replace with 0, respectively obtains table 1-4,1-5.In this course, it is clear that reduce by a section reinforcing bar, reduce one Node, successively method before optimization, welding node 1835, after optimization, welding node 808, reduces weldering in this example Node 1027 are connect, node optimization rate 56%.
The optimum results matrix of remaining reinforcing bar after table 1-4 node optimization
Table 1-5 reinforcing bar cutting method
Further merge whole Steel Reinforcing Bar Material data splitting, obtains preliminary Steel Reinforcing Bar Material inventory.
Table 1-6 is the blanking inventory of part reinforcing bar, and first row data are indicated to blanking reinforcing bar length, other each column indicate It is combined into each section reinforcing bar length to blanking reinforcing bar length, it considers the losses of each connector 0.06m welding point.Such as: 203.33=20.59*9+12+4.15+2.53- (12-1) * 0.06.
The cutting method of table 1-5 expressed portion steel splitting muscle, the first row data indicate whole raw material reinforcing bar length, other Each row indicates corresponding every section length, and such as: the 20.59 of the second row first row are cut into 2 6.62,1 4.64,1 2.5.3 Totally 4 section reinforcing bar.2 6.62 reinforcing bars therein are welded in Section 11 of 2 31.3m reinforcing bars of table 6.
Calculate the total waste rate of reinforcing bar, the specific steps are as follows: all reinforcing bars in whole reinforcing bar length combination are utilized by whole A, there is no wastes, waste mainly from such as cutting method matrix, such as: second reinforcing bar (in secondary series) in table 5, Its wastage=20.59-2*6.62-4.64-2.53=0.18.It is superimposed each reinforcing bar cutting wastage, as total waste Amount, divided by needed blanking reinforcing bar length summation, as total waste rate.In this example, total wastage 336.07m, to blanking reinforcing bar Length summation 36482.85m, total waste rate are 0.92%.
The blanking inventory of table 1-6 reinforcing bar
The present invention is by simulating artificial blanking, lingo modeling optimization, cutting method local optimum, reinforcing bar node optimization etc. Method, can by waste of material rate control 1% hereinafter, compare the existing business software 5% of other technologies waste rate, optimization Precision improves 4%, is calculated with general 100,000 side project, can save material cost about 900,000.In addition, of the invention When controlling material cost, by lingo model in increase cutting of steel muscles and joints-vital links in a speech number and be no more than 2 this constraint and optimize steel Muscle welding node number and cutting times, to reduce the cost of labor of steel bar meter.
The present invention also provides a kind of Steel Reinforcing Bar Materials to optimize device, comprising:
Processor is adapted for carrying out each instruction;And
Equipment is stored, is suitable for storing a plurality of instruction, described instruction is suitable for being loaded by processor and being executed aforementioned reinforcing bar optimization Step described in any one of method.
The present invention also provides a kind of storage equipment, wherein being stored with a plurality of instruction, described instruction is suitable for being added by processor Step described in any one of carrying and execute aforementioned reinforcing bar optimization method.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer journey Sequence product.Therefore, complete hardware embodiment, complete software embodiment or combining software and hardware aspects can be used in the application The form of embodiment.Moreover, it wherein includes the calculating of computer usable program code that the application, which can be used in one or more, The computer program implemented in machine usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that can be realized by computer program instructions each in flowchart and/or the block diagram The combination of process and/or box in process and/or box and flowchart and/or the block diagram.It can provide these computers Processor of the program instruction to general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices To generate a machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute For realizing the function of being specified in one or more flows of the flowchart and/or one or more blocks of the block diagram Device.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that instruction stored in the computer readable memory generation includes The manufacture of command device, the command device are realized in one box of one or more flows of the flowchart and/or block diagram Or the function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that Series of operation steps are executed on computer or other programmable devices to generate computer implemented processing, thus calculating The instruction executed on machine or other programmable devices is provided for realizing in one or more flows of the flowchart and/or side The step of function of being specified in block diagram one box or multiple boxes.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and deformations can also be made, these improve and become Shape also should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of Steel Reinforcing Bar Material optimization method, which is characterized in that described method includes following steps:
It will be compared one by one to blanking reinforcing bar length and raw material reinforcing bar length, with " reinforcing bar waste rate is less than given threshold, and It is screening conditions that remaining reinforcing bar length, which is less than 35d ", and the raw material reinforcing bar for meeting screening conditions directly carries out blanking;Wherein: Remaining reinforcing bar length=to blanking reinforcing bar length-raw material reinforcing bar length+reinforcing bar number of nodes * s, d indicates raw material bar diameter, S indicates splice loss;
For residue to blanking reinforcing bar, with " remaining reinforcing bar length is more than or equal to minimum raw material reinforcing bar length " be screening conditions from Circulation is picked out one group and is combined as whole Steel Reinforcing Bar Material in remaining raw material reinforcing bar;
The total radical of reinforcing bar is at least for target after being combined with more raw material reinforcing bars, and considers that splice is lost, and filters out optimal Whole Steel Reinforcing Bar Material combination;
With the minimum target of reinforcing bar waste rate, hard constraint is at most combined by two section reinforcing bar groups with every remaining reinforcing bar length, is established Non-linear lingo model solves globally optimal solution;
Further carry out node optimization and material local optimum to globally optimal solution, obtains final Steel Reinforcing Bar Material inventory and reinforcing bar cutting Segmentation method.
2. Steel Reinforcing Bar Material optimization method according to claim 1, which is characterized in that filter out whole Steel Reinforcing Bar Material combination Optimal case includes the following steps:
For recycling the whole Steel Reinforcing Bar Material picked out combination from raw material reinforcing bar length sequences, if whole reinforcing bar combines blanking Remaining reinforcing bar length is more than or equal to (35d+s) afterwards, then the whole Steel Reinforcing Bar Material group for saving remaining reinforcing bar length data and picking out Close data;
If remaining reinforcing bar length is less than (35d+s) after whole reinforcing bar combination blanking, further judge whether reinforcing bar waste rate is small In given threshold: if reinforcing bar waste rate is less than given threshold, saving to blanking reinforcing bar length data, whole Steel Reinforcing Bar Material group Close data and remaining reinforcing bar length data;
If reinforcing bar waste rate is more than or equal to given threshold, raw material reinforcing bar length is deleted most from whole Steel Reinforcing Bar Material combination Small data recalculate and save remaining reinforcing bar length data, while saving the whole Steel Reinforcing Bar Material combination after reconfiguring Data;
Finally obtain the optimal case of whole Steel Reinforcing Bar Material combination.
3. Steel Reinforcing Bar Material optimization method according to claim 2, which is characterized in that establishing non-linear lingo model includes Following steps:
With the minimum target of reinforcing bar waste rate, hard constraint is at most combined by two section reinforcing bar groups with every remaining reinforcing bar length, is write Non-linear lingo model:
xij>=35d+s or xij=0
Wherein: xi,jIndicate the jth section reinforcing bar length of composition i-th remaining reinforcing bar length divided by jth root raw material reinforcing bar length;Aj Indicate jth root raw material reinforcing bar length;B (i) expression i-th is to blanking reinforcing bar length;Total radical of m expression raw material reinforcing bar;n Indicate total radical to blanking reinforcing bar;D indicates raw material bar diameter;S indicates splice loss.
4. Steel Reinforcing Bar Material optimization method according to claim 1, which is characterized in that the node optimization includes following step It is rapid:
The destination file for reading non-linear lingo model output, therefrom obtains the optimum results matrix and steel of remaining reinforcing bar length Muscle cutting method matrix;
Assuming that each behavior residue reinforcing bar length blanking data splitting of optimum results matrix, reinforcing bar cutting method matrix it is each It is classified as the data for being combined cutting to whole reinforcing bar according to remaining reinforcing bar length blanking data splitting;
The every a line for reading the optimum results matrix of remaining reinforcing bar length one by one, judges whether the row includes two non-whole reinforcing bars Length data: if not including, next line is read;If including the two non-whole reinforcing bar length datas being taken out, with steel Each column of muscle cutting method matrix compare, and judge whether two data exist simultaneously in certain column: if do not deposited simultaneously , then loop optimization matrix of consequence is to next line, if existed simultaneously, with two data and respectively replace optimum results square Corresponding data and corresponding data in reinforcing bar cutting method rectangular array in battle array, until traversing the optimum results square of remaining reinforcing bar length Battle array, the optimum results matrix and the reinforcing bar cutting method matrix after node optimization of the remaining reinforcing bar length after obtaining node optimization.
5. Steel Reinforcing Bar Material optimization method according to claim 1, which is characterized in that the material local optimum includes as follows Step:
The destination file for reading non-linear lingo model output, therefrom obtains the optimum results matrix and steel of remaining reinforcing bar length Muscle cutting method matrix;
Remaining raw material reinforcing bar length is read, and counts reinforcing bar length type and radical, establishes reinforcing bar length kind matroid;
Assuming that each be classified as of reinforcing bar cutting method matrix carries out whole reinforcing bar according to remaining reinforcing bar length blanking data splitting Combine the data of cutting;
The each column for reading reinforcing bar cutting method matrix one by one, ask the column by the summation of cutting reinforcing bar length;
Each column are incorporated to reinforcing bar length type matrix by the summation of cutting reinforcing bar length and form new matrix, it is then long according to reinforcing bar Spend descending arrangement;
Seek index of the column by the summation of cutting reinforcing bar length in new matrix, judge index whether be in new matrix last Row: if so, reading the next column of reinforcing bar cutting method matrix, continuing next circulation, until traversal reinforcing bar cutting method square Battle array;If it is not, then the next index for taking out the index corresponds to numerical value, replace first of reinforcing bar cutting method rectangular array vector Value, that is, the raw material reinforcing bar length cut.
6. Steel Reinforcing Bar Material optimization method according to claim 1, which is characterized in that answered before establishing non-linear lingo model As following processing:
Raw material reinforcing bar length and remaining reinforcing bar length are saved into two column into the same excel file, and respectively in descending order Arrangement;
It is several subfiles by the excel file cutting of raw material reinforcing bar length and remaining reinforcing bar length is preserved, it is desirable that: it is each Subfile includes 50~60 remaining reinforcing bar length datas, and each subfile chinese raw materials reinforcing bar length summation and remaining reinforcing bar are long The difference for spending summation is less than or equal to 10.
7. Steel Reinforcing Bar Material optimization method according to claim 1, which is characterized in that will be to blanking reinforcing bar length and raw material Before reinforcing bar length compare one by one, length drop will respectively should be pressed to blanking reinforcing bar length and raw material reinforcing bar length respectively Sequence arrangement.
8. Steel Reinforcing Bar Material optimization method according to claim 1, which is characterized in that with " remaining reinforcing bar length is more than or equal to Minimum raw material reinforcing bar length " is for screening conditions according to raw material reinforcing bar length bit-reverse loop from raw material reinforcing bar length sequences One group of data is picked out to combine as whole Steel Reinforcing Bar Material.
9. a kind of Steel Reinforcing Bar Material optimizes device characterized by comprising
Processor is adapted for carrying out each instruction;And
Equipment is stored, is suitable for storing a plurality of instruction, described instruction is suitable for by processor load and perform claim requires to appoint in 1~8 Step described in one.
10. a kind of storage equipment, which is characterized in that be wherein stored with a plurality of instruction, described instruction is suitable for by processor load simultaneously Step described in any one of perform claim requirement 1~8.
CN201810889106.XA 2018-04-26 2018-08-07 Reinforcing steel bar blanking optimization method and device and storage equipment Active CN109284858B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2018103834249 2018-04-26
CN201810383424.9A CN108360890A (en) 2018-04-26 2018-04-26 A kind of parking systems

Publications (2)

Publication Number Publication Date
CN109284858A true CN109284858A (en) 2019-01-29
CN109284858B CN109284858B (en) 2021-10-22

Family

ID=63009641

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201810383424.9A Pending CN108360890A (en) 2018-04-26 2018-04-26 A kind of parking systems
CN201810885695.4A Pending CN108999447A (en) 2018-04-26 2018-08-06 A kind of parking systems and its stop storage, pick-up warehouse-out method
CN201810889106.XA Active CN109284858B (en) 2018-04-26 2018-08-07 Reinforcing steel bar blanking optimization method and device and storage equipment
CN201811276805.3A Active CN109376438B (en) 2018-04-26 2018-10-30 Reinforcing steel bar blanking optimization method and device and storage equipment

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201810383424.9A Pending CN108360890A (en) 2018-04-26 2018-04-26 A kind of parking systems
CN201810885695.4A Pending CN108999447A (en) 2018-04-26 2018-08-06 A kind of parking systems and its stop storage, pick-up warehouse-out method

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201811276805.3A Active CN109376438B (en) 2018-04-26 2018-10-30 Reinforcing steel bar blanking optimization method and device and storage equipment

Country Status (1)

Country Link
CN (4) CN108360890A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109732021A (en) * 2019-03-19 2019-05-10 湖北文理学院 A kind of Steel Reinforcing Bar Material method
CN110555563A (en) * 2019-09-05 2019-12-10 湖北文理学院 large-scale steel bar grouping and blanking optimization method and device
CN110705839A (en) * 2019-09-12 2020-01-17 广联达科技股份有限公司 Building material information processing and optimizing method, system and computer readable storage medium
CN113761635A (en) * 2021-09-18 2021-12-07 广联达科技股份有限公司 Method for determining processing shape of reinforcing steel bar and reinforcing steel bar processing method

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206354B (en) * 2019-06-13 2020-12-18 湖北亘华工科有限公司 Lifting type intelligent parking equipment
WO2021102819A1 (en) * 2019-11-28 2021-06-03 李晓敏 Multilayered garage for vehicle automatic storage/pickup
CN111411806B (en) 2020-04-24 2021-05-28 齐齐哈尔璞世科技有限公司 Multi-elevator vertical lifting three-dimensional parking lot
CN111636735B (en) * 2020-05-27 2022-03-08 无锡科技职业学院 Intelligent stereo garage management system
CN112096152B (en) * 2020-09-21 2021-12-07 淮北创谷科技有限公司 Intelligent parking lot
CN112983077B (en) * 2021-02-25 2022-05-17 常州工学院 Independent rotating multi-ring disc type three-dimensional parking device
CN112983075B (en) * 2021-02-25 2022-05-06 常州工学院 Multilayer multi-ring disc type stereo parking garage
CN113806690B (en) * 2021-09-28 2024-03-19 西安理工大学 Intelligent optimization method, system and storable medium for steel bar blanking
CN113719170B (en) * 2021-10-11 2023-03-24 坪安坪泊(北京)科技有限公司 Three-dimensional parking system
WO2023060388A1 (en) * 2021-10-11 2023-04-20 坪安坪泊(北京)科技有限公司 Three-dimensional parking system
CN113882727A (en) * 2021-10-25 2022-01-04 华南理工大学 Lifting type automatic wireless charging three-dimensional parking system and working method
CN114575642A (en) * 2022-03-03 2022-06-03 武汉轻工大学 Three-dimensional parking system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002036177A (en) * 2000-05-26 2002-02-05 Gerber Technol Inc Device and method for cutting out combination of sheet members
CN101739606A (en) * 2008-11-19 2010-06-16 北京理工大学 Raw material-saving one-dimensional stock-cutting method
CN102322151A (en) * 2011-05-26 2012-01-18 中国建筑标准设计研究院 Intelligent steel bar screening and blanking optimization method
CN103455848A (en) * 2013-08-05 2013-12-18 浙江大学城市学院 Method for optimizing and cutting rolled steel
CN105488301A (en) * 2015-12-24 2016-04-13 上海市基础工程集团有限公司 Three-dimensional reinforcing steel bar lofting method
CN107729662A (en) * 2017-10-23 2018-02-23 朱海涛 Steel Reinforcing Bar Material matching process based on BIM technology
CN107862117A (en) * 2017-10-27 2018-03-30 广东星层建筑科技股份有限公司 A kind of 3D solid reinforcing bar generation method and equipment based on BIM

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE667357A (en) * 1964-07-29
JP4941053B2 (en) * 2007-03-29 2012-05-30 Jfeスチール株式会社 Steel product production planning method and manufacturing method
CN203201208U (en) * 2013-01-31 2013-09-18 中冶南方工程技术有限公司 Novel lifting, rotating and horizontally moving stereo garage
CN104929399B (en) * 2015-06-24 2017-07-14 黄河科技学院 Automatic rotary multilayer parking system
CN105332510A (en) * 2015-11-12 2016-02-17 徐仁贵 Construction method of complicated beam column joint core area
CN205153653U (en) * 2015-11-27 2016-04-13 黄延庆 Multilayer garage parking
CN211081183U (en) * 2018-04-26 2020-07-24 湖北文理学院 Three-dimensional parking garage

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002036177A (en) * 2000-05-26 2002-02-05 Gerber Technol Inc Device and method for cutting out combination of sheet members
CN101739606A (en) * 2008-11-19 2010-06-16 北京理工大学 Raw material-saving one-dimensional stock-cutting method
CN102322151A (en) * 2011-05-26 2012-01-18 中国建筑标准设计研究院 Intelligent steel bar screening and blanking optimization method
CN103455848A (en) * 2013-08-05 2013-12-18 浙江大学城市学院 Method for optimizing and cutting rolled steel
CN105488301A (en) * 2015-12-24 2016-04-13 上海市基础工程集团有限公司 Three-dimensional reinforcing steel bar lofting method
CN107729662A (en) * 2017-10-23 2018-02-23 朱海涛 Steel Reinforcing Bar Material matching process based on BIM technology
CN107862117A (en) * 2017-10-27 2018-03-30 广东星层建筑科技股份有限公司 A kind of 3D solid reinforcing bar generation method and equipment based on BIM

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张玉岩等: "钢筋下料问题的数学规划模型", 《渤海大学学报(自然科学版)》 *
漏家俊: "基于MATLAB的钢筋下料优化算法", 《建筑施工》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109732021A (en) * 2019-03-19 2019-05-10 湖北文理学院 A kind of Steel Reinforcing Bar Material method
CN110555563A (en) * 2019-09-05 2019-12-10 湖北文理学院 large-scale steel bar grouping and blanking optimization method and device
CN110555563B (en) * 2019-09-05 2022-02-08 湖北文理学院 Large-scale steel bar grouping and blanking optimization method and device
CN110705839A (en) * 2019-09-12 2020-01-17 广联达科技股份有限公司 Building material information processing and optimizing method, system and computer readable storage medium
CN110705839B (en) * 2019-09-12 2022-07-08 广联达科技股份有限公司 Building material information processing and optimizing method, system and computer readable storage medium
CN113761635A (en) * 2021-09-18 2021-12-07 广联达科技股份有限公司 Method for determining processing shape of reinforcing steel bar and reinforcing steel bar processing method
CN113761635B (en) * 2021-09-18 2024-04-05 广联达科技股份有限公司 Method for determining processing shape of steel bar and method for processing steel bar

Also Published As

Publication number Publication date
CN108360890A (en) 2018-08-03
CN109376438A (en) 2019-02-22
CN109376438B (en) 2023-02-03
CN108999447A (en) 2018-12-14
CN109284858B (en) 2021-10-22

Similar Documents

Publication Publication Date Title
CN109284858A (en) Reinforcing steel bar blanking optimization method and device and storage equipment
Imran et al. Cell formation in a cellular manufacturing system using simulation integrated hybrid genetic algorithm
Guo et al. A harmony search-based memetic optimization model for integrated production and transportation scheduling in MTO manufacturing
Mehdizadeh et al. A vibration damping optimization algorithm for solving a new multi-objective dynamic cell formation problem with workers training
US7970683B2 (en) System and method for multi-state tax analysis
CN107451747B (en) Workshop scheduling system based on self-adaptive non-dominated genetic algorithm and working method thereof
Nasseri et al. A fuzzy primal simplex algorithm and its application for solving flexible linear programming problems
Chargui et al. Berth and quay crane allocation and scheduling with worker performance variability and yard truck deployment in container terminals
Tiwari et al. Project scheduling by integration of time cost trade-off and constrained resource scheduling
CN107229693A (en) The method and system of big data system configuration parameter tuning based on deep learning
CN101615217A (en) Different design shape to similar characteristics is classified/device shown and method
Cheng et al. A hybrid mechanism for optimizing construction simulation models
US8271311B2 (en) System and method for resource allocation of semiconductor testing industry
CN114881301A (en) Simulation scheduling method and system for production line, terminal device and storage medium
Chargui et al. A novel robust exact decomposition algorithm for berth and quay crane allocation and scheduling problem considering uncertainty and energy efficiency
Bucki et al. Modelling decision-making processes in the management support of the manufacturing element in the logistic supply chain
Eklin et al. Model for cost estimation in a finite-capacity stochastic environment based on shop floor optimization combined with simulation
Karder et al. Simulation-based optimisation for worker cross-training
WO2023087418A1 (en) Computer second-type assembly line balance optimization method based on migration genetic algorithm
Suchanek et al. MODELLING AND SIMULATION OF A DECISION-MAKING PROCESS SUPPORTING BUSINESS SYSTEM LOGISTICS
JP3347006B2 (en) Planning device and planning method
CN104217058A (en) Thick plate intelligent material design method
CN113052418A (en) Production planning method and system based on multi-dimensional data structure
Zanic et al. Safety as objective in multicriterial structural optimization
Sadeghi et al. Impact of queuing theory and alternative process routings on machine busy time in a dynamic cellular manufacturing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220505

Address after: 441000 yujiahu Industrial Park, Xiangcheng, Xiangyang City, Hubei Province

Patentee after: Xiangyang guteji pipe pile Co.,Ltd.

Address before: No. 296, Luzhong Road, Xiangyang, Hubei Province

Patentee before: HUBEI University OF ARTS AND SCIENCE

TR01 Transfer of patent right