CN109281648A - Method and apparatus for determining a reasonable well pattern density of an oil reservoir - Google Patents

Method and apparatus for determining a reasonable well pattern density of an oil reservoir Download PDF

Info

Publication number
CN109281648A
CN109281648A CN201811129781.9A CN201811129781A CN109281648A CN 109281648 A CN109281648 A CN 109281648A CN 201811129781 A CN201811129781 A CN 201811129781A CN 109281648 A CN109281648 A CN 109281648A
Authority
CN
China
Prior art keywords
oil
well
reservoir
target reservoir
density
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811129781.9A
Other languages
Chinese (zh)
Other versions
CN109281648B (en
Inventor
何书梅
王建富
魏朋朋
马子麟
程立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201811129781.9A priority Critical patent/CN109281648B/en
Publication of CN109281648A publication Critical patent/CN109281648A/en
Application granted granted Critical
Publication of CN109281648B publication Critical patent/CN109281648B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B41/0092

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Operations Research (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a method and a device for determining reasonable well pattern density of an oil reservoir, and belongs to the technical field of oil and gas exploitation. The method comprises the following steps: determining a first mobility, a first oil-water well ratio, a first accumulated injection-production ratio and a first oil layer thickness of a target oil reservoir; determining the type of the target oil reservoir according to the first flow; acquiring a first reservoir coefficient of a target reservoir according to the type of the target reservoir; determining a target relational expression according to the first oil reservoir coefficient, the well pattern density of the target oil reservoir and the relational expression between the recovery factors; determining a recovery function according to the target relational expression, the first mobility, the first oil-water well ratio, the first accumulated injection-recovery ratio and the first oil layer thickness, and determining a total input function and a total output function according to the well pattern density parameter and the recovery function; determining economic limit well pattern density and economic optimal well pattern density according to the total input function and the total output function; and determining a first reasonable well pattern density according to the economic limit well pattern density and the economic optimal well pattern density.

Description

The method and apparatus for determining the reasonable well pattern density of oil reservoir
Technical field
The present invention relates to oil and gas exploration technology field, in particular to a kind of reasonable well pattern density of determining oil reservoir Method and apparatus.
Background technique
Well spacing density is an important indicator in oilfield development program design, its size is directly related to oil reservoir harvesting Rate and the economic benefit of oil field development.And the fault block of Complex Fault Block Oil Reservoir is small, construction and reservoir distribution are complicated, reservoir space variation Greatly, poor continuity, therefore, the design of the reasonable well pattern density of Complex Fault Block Oil Reservoir are even more important.
The reasonable well pattern density of Complex Fault Block Oil Reservoir will not only adapt to the characteristic distributions of oil reservoir and reservoir, while meet effect again The condition of benefit exploitation.Therefore, before developing Complex Fault Block Oil Reservoir, it is thus necessary to determine that the reasonable well pattern density of Complex Fault Block Oil Reservoir.
Summary of the invention
The embodiment of the invention provides a kind of method and apparatus of the reasonable well pattern density of determining oil reservoir, can be improved determination The accuracy of the reasonable well pattern density of Complex Fault Block Oil Reservoir.The technical solution is as follows:
On the one hand, a kind of method of the reasonable well pattern density of determining oil reservoir is provided, which comprises
Determine the first mobility, the first oil-water well number ratio, the first cumulative voidage replacement ratio and the first core intersection of target reservoir;
According to first mobility, the type of the target reservoir is determined;
According to the type of the target reservoir, from obtaining the target reservoir in the corresponding relationship of type and oil reservoir coefficient First oil reservoir coefficient;
According to the first oil reservoir coefficient, the target reservoir well spacing density and recovery ratio between relational expression, determine The relationship by objective (RBO) formula of the target reservoir;
According to the relationship by objective (RBO) formula, first mobility, the first oil-water well number ratio, first cumulative voidage replacement ratio With first core intersection, determine the harvesting function of the target reservoir, the harvesting function be include well spacing density parameter Function;
According to the well spacing density parameter of the target reservoir, the target reservoir comprising the well spacing density parameter is determined Total investment volume function, and, according to the harvesting function of the target reservoir, determine described comprising the well spacing density parameter The Gross Output volume function of target reservoir;
According to total investment volume function and the Gross Output volume function, the economic limit well pattern of the target reservoir is determined Density and economic optimum well spacing density;
According to the economy ultimate well spacing density and the economic optimum well spacing density, the first of the target reservoir is determined Reasonable well pattern density.
In a possible implementation, the method also includes:
Obtain the type of each sample oil reservoir in multiple sample oil reservoirs, the second mobility, the second oil-water well number ratio, second tired Product injection-production ratio, the second core intersection and the second reasonable well pattern density;
For the type of each sample oil reservoir, according to the second mobility of the sample oil reservoir of the type, the second grease Well number ratio, the second cumulative voidage replacement ratio, the second core intersection and the second reasonable well pattern density, by linear regression method, determine described in Second oil reservoir coefficient of type;
According to the type and the second oil reservoir coefficient of each sample oil reservoir, establishes type and the corresponding of oil reservoir coefficient is closed System.
It is described according to the well spacing density parameter in a possible implementation, determine to include the well spacing density Total investment volume function of the target reservoir of parameter, comprising:
Determine that the unit of the target reservoir is drilled well cost, average individual well drilling depth, individual well ground investment, oil area;
Well cost, average the individual well drilling depth, the individual well ground are drilled according to the well spacing density parameter, the unit Investment and the oil area determine total investment volume function of the target reservoir by following formula one;
Wherein, P is total investment volume function, and A is the oil area, and S is the well spacing density parameter, and d is described Unit is drilled well cost, and H is the average individual well drilling depth, and g is the individual well ground investment.
In a possible implementation, the harvesting function according to the target reservoir determines to include the well The Gross Output volume function of the target reservoir of reticular density parameter, comprising:
With determining the oil field of the target reservoir comprehensive tax of oil in place, oil sale price, ton oil operating cost, ton oil Gold and commodity rate;
According to the recovery ratio function, the oil field oil in place, the oil sale price, the ton oil operation at Originally, the ton oil comprehensive tax and the commodity rate pass through the Gross Output volume function that following formula two determines the target reservoir;
Formula two: I=Nef(M,m,λ,h)·e-aS(p-o-c)·σ
Wherein, I is the Gross Output volume function, N for the oil field oil in place, ef(M,m,λ,h)·e-aSIt is adopted to be described Yield function, S are the well spacing density parameter, and M is first mobility, and m is the first oil-water well number ratio, and λ is described the One cumulative voidage replacement ratio, h are first core intersection, and a is the first oil reservoir coefficient, and p is the oil sale price, and o is The ton oil operating cost, c are the ton oil comprehensive tax, and σ is the commodity rate.
It is described according to total investment volume function and the Gross Output volume function in a possible implementation, really The economy ultimate well spacing density and economic optimum well spacing density of the fixed target reservoir, comprising:
Determine the mesh in the functional value of total investment volume function and the equal functional value of the Gross Output volume function The well spacing density of mark oil reservoir obtains the economy ultimate well spacing density;
Determine that the difference of the functional value in the functional value and total investment function of the Gross Output volume function reaches maximum value When, the well spacing density of the target reservoir obtains the economic optimum well spacing density.
It is described according to the economy ultimate well spacing density and the economic optimum well pattern in a possible implementation Density determines the first reasonable well pattern density of the target reservoir, comprising:
By the average value of the economy ultimate well spacing density and the economic optimum well spacing density, it is determined as described first and closes Manage well spacing density;
Alternatively, according to the economy ultimate well spacing density and the economic optimum well spacing density, by following formula three or Person's formula four determines the first reasonable well pattern density of the target reservoir;
Wherein, SeFor first reasonable well pattern density, SmFor the economy ultimate well spacing density, SbMost for the economy Excellent well spacing density.
On the other hand, a kind of device of the reasonable well pattern density of determining oil reservoir is provided, described device includes:
First determining module, for determining the first mobility, the first oil-water well number ratio, the first cumulative voidage replacement ratio of target reservoir With the first core intersection;
Second determining module, for determining the type of the target reservoir according to first mobility;
First obtains module, for the type according to the target reservoir, from the corresponding relationship of type and oil reservoir coefficient Obtain the first oil reservoir coefficient of the target reservoir;
Third determining module, for the well spacing density and recovery ratio according to the first oil reservoir coefficient, the target reservoir Between relational expression, determine the relationship by objective (RBO) formula of the target reservoir;
4th determining module, for according to the relationship by objective (RBO) formula, first mobility, the first oil-water well number ratio, First cumulative voidage replacement ratio and first core intersection determine the harvesting function of the target reservoir, the harvesting function It is the function for including well spacing density parameter;
5th determining module determines to include the well spacing density for the well spacing density parameter according to the target reservoir Total investment volume function of the target reservoir of parameter, and, according to the harvesting function of the target reservoir, determine comprising described The Gross Output volume function of the target reservoir of well spacing density parameter;
6th determining module, for determining the target according to total investment volume function and the Gross Output volume function The economy ultimate well spacing density and economic optimum well spacing density of oil reservoir;
7th determining module, for determining according to the economy ultimate well spacing density and the economic optimum well spacing density First reasonable well pattern density of the target reservoir.
In a possible implementation, described device further include:
Second obtains module, for obtaining type, the second mobility, second of each sample oil reservoir in multiple sample oil reservoirs Oil-water well number ratio, the second cumulative voidage replacement ratio, the second core intersection and the second reasonable well pattern density;
8th determining module, for the type for each sample oil reservoir, according to the sample oil reservoir of the type Second mobility, the second oil-water well number ratio, the second cumulative voidage replacement ratio, the second core intersection and the second reasonable well pattern density, pass through line The property Return Law, determines the second oil reservoir coefficient of the type;
Module is established, for the type and the second oil reservoir coefficient according to each sample oil reservoir, establishes type and oil reservoir The corresponding relationship of coefficient.
In a possible implementation, the 5th determining module is also used to determine the unit of the target reservoir It is drilled well cost, average individual well drilling depth, individual well ground investment, oil area;It is bored according to the well spacing density parameter, the unit Complete well cost, the average individual well drilling depth, the individual well ground investment and the oil area are determined by following formula one Total investment volume function of the target reservoir;
Wherein, P is total investment volume function, and A is the oil area, and S is the well spacing density parameter, and d is described Unit is drilled well cost, and H is the average individual well drilling depth, and g is the individual well ground investment.
In a possible implementation, the 5th determining module is also used to determine the oil field of the target reservoir Ground oil in place, oil sale price, ton oil operating cost, ton oil comprehensive tax and commodity rate;According to the recovery ratio function, Oil field ground oil in place, the oil sale price, the ton oil operating cost, the ton oil comprehensive tax and the quotient Product rate determines the Gross Output volume function of the target reservoir by following formula two;
Formula two: I=Nef(M,m,λ,h)·e-aS(p-o-c)·σ
Wherein, I is the Gross Output volume function, N for the oil field oil in place, ef(M,m,λ,h)·e-aSIt is adopted to be described Yield function, S are the well spacing density parameter, and M is first mobility, and m is the first oil-water well number ratio, and λ is described the One cumulative voidage replacement ratio, h are first core intersection, and a is the first oil reservoir coefficient, and p is the oil sale price, and o is The ton oil operating cost, c are the ton oil comprehensive tax, and σ is the commodity rate.
In a possible implementation, the 6th determining module is also used to determine in total investment volume function Functional value and the Gross Output volume function functional value it is equal when, the well spacing density of the target reservoir obtains the economic pole Limit well spacing density;Determine that the difference of the functional value in the functional value and total investment function of the Gross Output volume function reaches maximum When value, the well spacing density of the target reservoir obtains the economic optimum well spacing density.
In a possible implementation, the 7th determining module is also used to the economy ultimate well spacing density With the average value of the economic optimum well spacing density, it is determined as first reasonable well pattern density;
Alternatively, the 7th determining module, is also used to according to the economy ultimate well spacing density and the economic optimum well Reticular density determines the first reasonable well pattern density of the target reservoir by following formula three or formula four;
Wherein, SeFor first reasonable well pattern density, SmFor the economy ultimate well spacing density, SbMost for the economy Excellent well spacing density.
On the other hand, a kind of terminal is provided, which is characterized in that the terminal includes processor and memory, described to deposit Be stored at least one instruction in reservoir, described instruction loaded by the processor and executed with realize as first aspect is any can Really operation performed by the method for the reasonable well pattern density of stand oil hiding is able to achieve in mode.
On the other hand, a kind of computer readable storage medium is provided, at least one finger is stored in the storage medium It enables, described instruction load by processor and executed that stand oil is hidden reasonable really to realize in any possible implementation of first aspect Operation performed by the method for well spacing density.
Technical solution provided in an embodiment of the present invention has the benefit that in embodiments of the present invention, due to combining The type of target reservoir, the first mobility, the first oil-water well number ratio of target reservoir, the first cumulative voidage replacement ratio and the first oil reservoir are thick The construction reservoir characteristics of the target reservoirs such as degree, while considering the relationship between recovery ratio and well spacing density, it is thus determined that target The exploitation that first reasonable well pattern density of oil reservoir is more in line with target reservoir is practical, not only increases and determines that the first rational well pattern is close The accuracy of degree also provides more accurate technical basis for development plan design.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is a kind of method flow diagram of the reasonable well pattern density of determining oil reservoir provided in an embodiment of the present invention;
Fig. 2 is a kind of method flow diagram of the reasonable well pattern density of determining oil reservoir provided in an embodiment of the present invention;
Fig. 3 is a kind of schematic diagram of relationship by objective (RBO) formula provided in an embodiment of the present invention;
Fig. 4 is a kind of schematic diagram of economy ultimate well spacing density provided in an embodiment of the present invention;
Fig. 5 is a kind of schematic diagram of economic optimum well spacing density provided in an embodiment of the present invention;
Fig. 6 is a kind of apparatus structure schematic diagram of the reasonable well pattern density of determining oil reservoir provided in an embodiment of the present invention;
Fig. 7 is a kind of structural schematic diagram of terminal provided in an embodiment of the present invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to embodiment party of the present invention Formula is described in further detail.
Fig. 1 is a kind of flow chart of the method for the reasonable well pattern density of determining oil reservoir provided in an embodiment of the present invention, referring to Fig. 1, the embodiment include:
Step 101: determining the first mobility, the first oil-water well number ratio, the first cumulative voidage replacement ratio and the first oil of target reservoir Thickness degree.
Step 102: according to first mobility, determining the type of the target reservoir.
Step 103: according to the type of the target reservoir, from obtaining the mesh in the corresponding relationship of type and oil reservoir coefficient Mark the first oil reservoir coefficient of oil reservoir.
Step 104: according to the first oil reservoir coefficient, the target reservoir well spacing density and recovery ratio between relationship Formula determines the relationship by objective (RBO) formula of the target reservoir.
Step 105: being tired out according to the relationship by objective (RBO) formula, first mobility, the first oil-water well number ratio, described first Product injection-production ratio and first core intersection, determines the harvesting function of the target reservoir, the harvesting function be include well pattern The function of density parameter.
Step 106: according to the well spacing density parameter of the target reservoir, determining described comprising the well spacing density parameter Total investment volume function of target reservoir, and, according to the harvesting function of the target reservoir, determines and join comprising the well spacing density The Gross Output volume function of several target reservoirs.
Step 107: according to total investment volume function and the Gross Output volume function, determining the economy of the target reservoir Maximum excavation depth and economic optimum well spacing density.
Step 108: according to the economy ultimate well spacing density and the economic optimum well spacing density, determining the target oil First reasonable well pattern density of hiding.
In a possible implementation, the method also includes:
Obtain the type of each sample oil reservoir in multiple sample oil reservoirs, the second mobility, the second oil-water well number ratio, second tired Product injection-production ratio, the second core intersection and the second reasonable well pattern density;
For the type of each sample oil reservoir, according to the second mobility of the sample oil reservoir of the type, the second grease Well number ratio, the second cumulative voidage replacement ratio, the second core intersection and the second reasonable well pattern density, by linear regression method, determine described in Second oil reservoir coefficient of type;
According to the type and the second oil reservoir coefficient of each sample oil reservoir, establishes type and the corresponding of oil reservoir coefficient is closed System.
It is described according to the well spacing density parameter in a possible implementation, determine to include the well spacing density Total investment volume function of the target reservoir of parameter, comprising:
Determine that the unit of the target reservoir is drilled well cost, average individual well drilling depth, individual well ground investment, oil area;
Well cost, average the individual well drilling depth, the individual well ground are drilled according to the well spacing density parameter, the unit Investment and the oil area determine total investment volume function of the target reservoir by following formula one;
Wherein, P is total investment volume function, and A is the oil area, and S is the well spacing density parameter, and d is described Unit is drilled well cost, and H is the average individual well drilling depth, and g is the individual well ground investment.
In a possible implementation, the harvesting function according to the target reservoir determines to include the well The Gross Output volume function of the target reservoir of reticular density parameter, comprising:
With determining the oil field of the target reservoir comprehensive tax of oil in place, oil sale price, ton oil operating cost, ton oil Gold and commodity rate;
According to the recovery ratio function, the oil field oil in place, the oil sale price, the ton oil operation at Originally, the ton oil comprehensive tax and the commodity rate pass through the Gross Output volume function that following formula two determines the target reservoir;
Formula two: I=Nef(M,m,λ,h)·e-aS(p-o-c)·σ
Wherein, I is the Gross Output volume function, N for the oil field oil in place, ef(M,m,λ,h)·e-aSIt is adopted to be described Yield function, S are the well spacing density parameter, and M is first mobility, and m is the first oil-water well number ratio, and λ is described the One cumulative voidage replacement ratio, h are first core intersection, and a is the first oil reservoir coefficient, and p is the oil sale price, and o is The ton oil operating cost, c are the ton oil comprehensive tax, and σ is the commodity rate.
It is described according to total investment volume function and the Gross Output volume function in a possible implementation, really The economy ultimate well spacing density and economic optimum well spacing density of the fixed target reservoir, comprising:
Determine the mesh in the functional value of total investment volume function and the equal functional value of the Gross Output volume function The well spacing density of mark oil reservoir obtains the economy ultimate well spacing density;
Determine that the difference of the functional value in the functional value and total investment function of the Gross Output volume function reaches maximum value When, the well spacing density of the target reservoir obtains the economic optimum well spacing density.
It is described according to the economy ultimate well spacing density and the economic optimum well pattern in a possible implementation Density determines the first reasonable well pattern density of the target reservoir, comprising:
By the average value of the economy ultimate well spacing density and the economic optimum well spacing density, it is determined as described first and closes Manage well spacing density;
Alternatively, according to the economy ultimate well spacing density and the economic optimum well spacing density, by following formula three or Person's formula four determines the first reasonable well pattern density of the target reservoir;
Wherein, SeFor first reasonable well pattern density, SmFor the economy ultimate well spacing density, SbMost for the economy Excellent well spacing density.
In embodiments of the present invention, due to combine the type of target reservoir, the first mobility, target reservoir the first grease Well number than the target reservoirs such as, the first cumulative voidage replacement ratio and the first core intersection construction reservoir characteristics, while consider recovery ratio with Relationship between well spacing density, it is thus determined that the first reasonable well pattern density of target reservoir be more in line with the exploitation of target reservoir It is practical, the accuracy for determining the first reasonable well pattern density is not only increased, also provides more accurate skill for development plan design Art foundation.
All the above alternatives can form the alternative embodiment of the disclosure, herein no longer using any combination It repeats one by one.
Fig. 2 is a kind of flow chart of the method for the reasonable well pattern density of determining oil reservoir provided in an embodiment of the present invention, the party The executing subject of method can be terminal.Referring to fig. 2, which includes:
Step 201: terminal determines the first mobility of target reservoir, the first oil-water well number ratio, the first cumulative voidage replacement ratio and One core intersection.
First core intersection can be average first core intersection of the target reservoir.In a possible implementation In, user can directly input the first mobility of target reservoir, the first oil-water well number ratio, the first cumulative voidage replacement ratio and the first oil reservoir Thickness, to improve acquisition accuracy.Correspondingly, this step can be with are as follows: terminal receives the first of the target reservoir being entered Mobility, the first oil-water well number ratio, the first cumulative voidage replacement ratio and the first core intersection.
In another possible implementation, the oil deposit parameter of multiple oil reservoirs is stored in terminal, oil deposit parameter includes Mobility, oil-water well number ratio, cumulative voidage replacement ratio and core intersection, and to be deposited in the form of the corresponding relationship of oil reservoir mark and oil deposit parameter Storage, to improve acquisition efficiency.Correspondingly, this step can be with are as follows: terminal is identified according to the oil reservoir of the target reservoir, from oil reservoir The first oil deposit parameter of the target reservoir is obtained in the corresponding relationship of mark and oil deposit parameter, which includes first Mobility, the first oil-water well number ratio, the first cumulative voidage replacement ratio and the first core intersection.
In another possible implementation, terminal can obtain the first mobility of target reservoir, from server One oil-water well number ratio, the first cumulative voidage replacement ratio and the first core intersection save end so that terminal does not need storage oil deposit parameter The memory space at end.Correspondingly, this step can be with are as follows: terminal to server sends inquiry request, which carries the mesh Mark the oil reservoir mark of oil reservoir.The inquiry request that server receiving terminal is sent is identified according to the oil reservoir, from oil reservoir mark and oil reservoir The oil deposit parameter that the target reservoir is obtained in the corresponding relationship of parameter returns to the oil deposit parameter of the target reservoir to terminal.Terminal The first oil deposit parameter of the target reservoir that server returns is received, which includes the first mobility, the first grease Well number ratio, the first cumulative voidage replacement ratio and the first core intersection.
Step 202: terminal determines the type of the target reservoir according to first mobility.
In a possible implementation, the corresponding relationship of mobility and type is stored in terminal;Correspondingly, this step can With are as follows: terminal obtains the type of the target reservoir according to first mobility from mobility and the corresponding relationship of type.
Since oil reservoir may have many mobilities, if the corresponding relationship of storage mobility and type, it is larger to occupy memory space. Therefore, in another possible implementation, the corresponding relationship of mobility and type can not be stored in terminal, but stores stream Spend the corresponding relationship of range and type.Correspondingly, this step can be with are as follows: terminal is according to first mobility and mobility range, really Mobility range where fixed first mobility, according to the mobility range where first mobility, from pair of mobility range and type It should be related to the type of the middle determination target reservoir.
The type of the target reservoir can be with are as follows: high mobility oil reservoir, middle mobility oil reservoir, low mobility reservoir and special low mobility oil Hiding.Also, the corresponding mobility range of high mobility oil reservoir is greater than 80,10-3um2/mPa·s;The corresponding mobility model of middle mobility oil reservoir Enclose is 30~80,10-3um2/mPa·s;The corresponding mobility range of low mobility reservoir is 10~30,10-3um2/mPa·s;It is special low The corresponding mobility range of mobility oil reservoir is less than 10,10-3um2/mPa·s。
Step 203: terminal is according to the type of the target reservoir, from obtaining the mesh in the corresponding relationship of type and oil reservoir coefficient Mark the first oil reservoir coefficient of oil reservoir.
The first oil reservoir coefficient includes: corresponding first coefficient of well spacing density, oil-water well number than corresponding second coefficient, tired The corresponding third coefficient of product injection-production ratio, corresponding 4th coefficient of core intersection, corresponding 5th coefficient of mobility and design Wells.And And before this step, terminal determines the oil reservoir coefficient of each type, and storage class and oil by linear regression method Hide the corresponding relationship of coefficient.Wherein, the step of terminal is by linear regression method, determines the oil reservoir coefficient of each type can be with It is realized by following steps (A) to (C), comprising:
(A): terminal obtains the type of each sample oil reservoir in multiple sample oil reservoirs, the second mobility, the second oil-water well number Than, the second cumulative voidage replacement ratio, the second core intersection and the second reasonable well pattern density.
The quantity of multiple sample oil reservoirs can need to be configured and change, in embodiments of the present invention, to multiple samples The quantity of oil reservoir is not especially limited;For example, the quantity of multiple sample oil reservoirs can be 200,250 or 300 etc..
(B): for the type of each sample oil reservoir, second mobility, second oil of the terminal according to the sample oil reservoir of the type Well number ratio, the second cumulative voidage replacement ratio, the second core intersection and the second reasonable well pattern density, by linear regression method, determining should Second oil reservoir coefficient of the type of sample oil reservoir.
(C): terminal establishes the correspondence of type and oil reservoir coefficient according to the type and the second oil reservoir coefficient of each sample oil reservoir Relationship.
In embodiments of the present invention, it on the basis of having fully considered Complex Fault Block Oil Reservoir construction, reservoir characteristics, bases oneself upon more Example is applied in the exploitation of a (such as 200) Complex Fault Block Oil Reservoir, combines the oil-water well number ratio having an impact to Complex Reservoir recovery ratio, tired The multiple parameters such as product injection-production ratio, permeability, core intersection carry out multiple regression analysis, obtain the oil reservoir coefficient of each type, and The corresponding relationship of type and oil reservoir coefficient is established, so that the accuracy of the corresponding relationship of type and oil reservoir coefficient is improved, it is subsequent When determining based on corresponding relationship progress reasonable well pattern density, determining efficiency is equally improved.
For example, type is respectively high mobility oil reservoir, middle mobility oil reservoir, low mobility reservoir and special low mobility reservoir.And high stream Spending the corresponding second oil reservoir coefficient of oil reservoir is (- 0.5309, -0.0308, -0.0613,0.0003, -0.0026,1.95), middle stream Spending the corresponding second oil reservoir coefficient of oil reservoir is (- 0.7862, -0.0126,0.1627,0.0004, -0.0095,3.28), low mobility The corresponding second oil reservoir coefficient of oil reservoir is (- 1.4512, -0.0006,0.2554,0.0081, -0.0048,5.56), special low mobility The corresponding second oil reservoir coefficient of oil reservoir is (- 1.5534,0.0047,0.0388,0.0499, -0.0023,6.44).
Step 204: terminal according to the first oil reservoir coefficient, target reservoir well spacing density and recovery ratio between relationship Formula determines the relationship by objective (RBO) formula of the target reservoir.
The relational expression being previously stored in terminal between well spacing density and recovery ratio, and the pass between well spacing density and recovery ratio It is formula is the relational expression for including the first oil reservoir coefficient.Therefore, in this step, the first oil reservoir coefficient is updated to the relationship by terminal In formula, the relationship by objective (RBO) formula of the target reservoir is obtained.For example, the relational expression between well spacing density and recovery ratio is following formula five It is shown:
Formula five: Er=ef(M,m,λ,h)·e-aS
Wherein, ErFor the recovery ratio, M is oil-water well number ratio, and m is cumulative voidage replacement ratio, and λ is mobility, h is core intersection, and a is 6th coefficient of oil reservoir, S are well spacing density.
When the first oil reservoir coefficient be (- 0.5309, -0.0308, -0.0613,0.0003, -0.0026,1.95), when, target Relational expression is Er=e-0.5309-0.0308M-0.0613m+0.0003λ-0.0026h·e-1.95S;When the first oil reservoir coefficient be (- 0.7862 ,- 0.0126,0.1627,0.0004, -0.0095,3.28) when, relationship by objective (RBO) formula are as follows: Er=e-0.7862-0.0126M+0.1627m+0.0004λ-0.0095h·e-3.28S;When the first oil reservoir coefficient be (- 1.4512, -0.0006,0.2554, 0.0081, -0.0048,5.56) when, relationship by objective (RBO) formula are as follows: Er=e-1.4512-0.0006M+0.2554m+0.0081λ-0.0048h·e-5.56S;When When first oil reservoir coefficient is (- 1.5534,0.0047,0.0388,0.0499, -0.0023,6.44), relationship by objective (RBO) formula is Er=e-1.5534+0.0047M+0.0388m+0.0499λ-0.0023h·e-6.44S, for example, with reference to shown in Fig. 3.
Step 205: terminal is infused according to the relationship by objective (RBO) formula, first mobility, the first oil-water well number ratio, first accumulation Adopt than with first core intersection, determine the harvesting function of the target reservoir, the harvesting function be include well spacing density parameter Function.
The relationship by objective (RBO) formula is thick comprising first runner, the first oil-water well number ratio, the first cumulative voidage replacement ratio and the first oil reservoir The functional value of degree, in this step, terminal is by first runner, the first oil-water well number ratio, the first cumulative voidage replacement ratio and the first oil reservoir Thickness substitutes into relationship by objective (RBO) formula, obtains the harvesting function of target reservoir.
Step 206: terminal determines the target oil comprising the well spacing density parameter according to the well spacing density parameter of target reservoir Total investment volume function of hiding.
This step can be realized by following steps (1) and (2), comprising:
(1): terminal determines that the unit of target reservoir is drilled well cost, average individual well drilling depth, individual well ground investment, contains pasta Product.
The unit that user can directly input target reservoir is drilled well cost, average individual well drilling depth, individual well ground investment, contains Pasta product.Correspondingly, this step can be with are as follows: terminal receives the unit being entered with being drilled well cost, average individual well drilling depth, individual well Face investment, oil area.
(2): terminal is drilled well cost, average the individual well drilling depth, the individual well ground according to the well spacing density parameter, the unit Investment and the oil area by following formula one determine total investment volume function of the target reservoir;
Wherein, P is total investment volume function, and A is oil area, and S is well spacing density parameter, and d is that unit is drilled well cost, H is the average individual well drilling depth, and g is the individual well ground investment.
Step 207: terminal determines the target reservoir comprising well spacing density parameter according to the harvesting function of the target reservoir Gross Output volume function.
This step can be realized by following steps (1) to (2), comprising:
(1): oil in place, oil sale price, ton oil operating cost, ton are oily with determining the oil field of the target reservoir for terminal Comprehensive tax and commodity rate.
In this step, oil in place, oil sale price, ton are oily with can directly inputting the oil field of target reservoir by user Operating cost, ton oil comprehensive tax and commodity rate.Correspondingly, this step can be with are as follows: terminal receives the target reservoir being entered Oil field ground oil in place, oil sale price, ton oil operating cost, ton oil comprehensive tax and commodity rate.
(2): terminal is according to the recovery ratio function, oil field geologic reserves, oil sale price, ton oil operating cost, ton oil Comprehensive tax and commodity rate determine the Gross Output volume function of target reservoir by following formula two.
Formula two: I=Nef(M,m,λ,h)·e-aS(p-o-c)·σ
Wherein, I is the Gross Output volume function, N for the oil field oil in place, ef(M,m,λ,h)·e-aSFor the recovery ratio letter Number, S are the well spacing density parameter, and M is first mobility, and m is the first oil-water well number ratio, and λ is first cumulative voidage replacement ratio, h For first core intersection, a is the first oil reservoir coefficient, and p is the oil sale price, and o is the oily operating cost of this ton, and c is should The oily comprehensive tax of ton, σ are the commodity rate.
Step 208: terminal determines the economic pole of the target reservoir according to total investment volume function and the Gross Output volume function Limit well spacing density and economic optimum well spacing density.
This step can be realized by following steps (1) and (2), comprising:
(1): terminal is determined when the functional value of total investment volume function is equal with the functional value of the Gross Output volume function, is somebody's turn to do The well spacing density of target reservoir obtains the economy ultimate well spacing density.
When total investment volume of target reservoir is equal to Gross Output volume, gross profit is equal to zero, so corresponding well spacing density is Economy ultimate well spacing density.It is in a possible implementation, total investment volume function is equal with the Gross Output volume function, Well spacing density at this time is solved, well spacing density at this time is determined as the economy ultimate well spacing density.
For example, the difference of formula one and formula two be equal to zero, namelyThe economic limit well pattern of target reservoir is obtained by arranging Density calculation formula is following formula six:
The economy ultimate well spacing density of target reservoir can be obtained by solving equation.
In another possible implementation, terminal is by f1(S)=aS,Terminal draws respectively under rectangular coordinate system and is with well spacing density S Abscissa, with f1(S) and f2It (S) is the relation curve of ordinate, f1(S) and f2(S) well spacing density of the corresponding abscissa of intersection point Numerical value be economy ultimate well spacing density.
(2): terminal determines that the difference of the functional value in the functional value of the Gross Output volume function and total investment function reaches most When big value, the well spacing density of the target reservoir obtains the economic optimum well spacing density.
When the Gross Output volume of target reservoir, which subtracts total investment volume, reaches maximum value, economic benefit is best, corresponding well Reticular density is economic optimum well spacing density.Therefore, economic optimum well spacing density should follow shown in the following formula seven of differential relationship:
Differential final finishing obtains shown in the following formula eight of Complex Fault Block Oil Reservoir economic optimum well spacing density calculation formula:
In a possible implementation, target reservoir economy is can be obtained most in the equation of terminal direct solution formula eight Excellent well spacing density.In another possible implementation, terminal enables f1(S)=aS,Terminal draws respectively under rectangular coordinate system and is with well spacing density S Abscissa, with f1(S) and f3It (S) is the relation curve of ordinate, f1(S) and f3(S) well spacing density of the corresponding abscissa of intersection point Numerical value be economic optimum well spacing density,
For example, the oil field geologic reserves of the target reservoir are 112.4 × 104t, oil area for a certain target reservoir For 1.27km2, stratum average effective permeability is 6.8 × 10-3 μm 2, oil viscosity 0.8mPas, the first oil reservoir With a thickness of 13.9m, the first oil-water well number ratio is 2, and average individual well drilling depth is 3576m, and individual well ground investment is 0.5 ten thousand yuan/meter, single Well surface construction investment be 900,000 yuan/well, ton oil operating cost be 750 yuan/ton, ton oil comprehensive tax be 150 yuan/ton, first Cumulative voidage replacement ratio remains 1, and the first mobility of the target reservoir is 8.5 × 10-3um2/mPas.Dimension, terminal use formula Five (recovery ratio of target reservoir and the relationship by objective (RBO) formulas of well spacing density) determine that the value of relationship by objective (RBO) formula f (M, m, λ, h) is 0.33, The value of design Wells a is 6.44, brings parameters into formula six and formula eight, the calculating according to this patent specific embodiment Method determines f1(S) and f2(S) relation curve as shown in figure 4, determine f1(S) and f3(S) relation curve such as Fig. 5 It is shown.Then f1(S) and f2(S) the corresponding abscissa well spacing density of intersection point is 0.039km2The economy of/mouth namely target reservoir Maximum excavation depth is 0.039km2/ mouth, f1(S) and f3(S) the corresponding abscissa well spacing density of intersection point is 0.091km2/ mouth, I.e. the economic optimum well spacing density of target reservoir is 0.091km2/ mouth.
Step 209: terminal determines the target reservoir according to the economy ultimate well spacing density and the economic optimum well spacing density The first reasonable well pattern density.
The first implementation, terminal can between the economy ultimate well spacing density and the economic optimum well spacing density with Machine selects a well spacing density, and the well spacing density of selection is determined as to the first reasonable well pattern density of the target reservoir.
Second of implementation, terminal being averaged the economy ultimate well spacing density and the economic optimum well spacing density Value is determined as the first reasonable well pattern density of the target reservoir.
The third implementation, when the reservoir conditions of target reservoir are good or economic risk is larger, reasonable well pattern density Select the value close to nearest well spacing density.Therefore, terminal is according to the economy ultimate well spacing density and the economic optimum well spacing density, The first reasonable well pattern density of the target reservoir is determined by following formula three.
Wherein, SeFor first reasonable well pattern density, SmFor the economy ultimate well spacing density, SbFor the economic optimum well pattern Density.
4th kind of implementation, when the reservoir conditions of target reservoir difference or smaller economic risk, reasonable well pattern density Select the value close to economy ultimate well spacing density.Therefore, terminal is according to the economy ultimate well spacing density and the economic optimum well pattern Density determines the first reasonable well pattern density of the target reservoir by following formula four.
Wherein, SeFor first reasonable well pattern density, SmFor the economy ultimate well spacing density, SbFor the economic optimum well pattern Density.
It should be noted is that terminal can according to the economy ultimate well spacing density and the economic optimum well spacing density, As long as being greater than the maximum excavation depth by the first reasonable well pattern density of any satisfaction, and it is less than the economic optimum well spacing density Calculation formula determines the first reasonable well pattern density of the target reservoir, in embodiments of the present invention, does not make to have to the calculation formula Body limits namely above four kinds of modes are merely illustrative, and terminal can also be realized by other forms, in the embodiment of the present invention In, this is not especially limited.
For example, target reservoir is ultralow permeable reservoir, oil reservoir condition is poor, the first reasonable well pattern density choosing of target reservoir With the value close to economy ultimate well spacing density.Therefore, terminal is according to economy ultimate well spacing density .039km2/ mouth and economic optimum Well spacing density .091km2/ mouth determines that the first reasonable well pattern density of target reservoir is 0.056km2/ by above formula four Mouthful.
In embodiments of the present invention, due to combine the type of target reservoir, the first mobility, target reservoir the first grease Well number than the target reservoirs such as, the first cumulative voidage replacement ratio and the first core intersection construction reservoir characteristics, while consider recovery ratio with Relationship between well spacing density, it is thus determined that the first reasonable well pattern density of target reservoir be more in line with the exploitation of target reservoir It is practical, the accuracy for determining the first reasonable well pattern density is not only increased, also provides more accurate skill for development plan design Art foundation.
Fig. 6 is a kind of structural schematic diagram of the device of the reasonable well pattern density of determining oil reservoir provided in an embodiment of the present invention, The step of terminal executes in the method for reasonable well pattern density for executing above-mentioned determining oil reservoir.Referring to Fig. 6, which includes:
First determining module 601, for determining the first mobility, the first oil-water well number ratio, the first accumulation note of target reservoir Adopt than with the first core intersection;
Second determining module 602, for determining the type of the target reservoir according to first mobility;
First obtains module 603, for the type according to the target reservoir, from the corresponding relationship of type and oil reservoir coefficient Middle the first oil reservoir coefficient for obtaining the target reservoir;
Third determining module 604, for according to the first oil reservoir coefficient, the target reservoir well spacing density and harvesting Relational expression between rate determines the relationship by objective (RBO) formula of the target reservoir;
4th determining module 605, for according to the relationship by objective (RBO) formula, first mobility, the first oil-water well number Than, first cumulative voidage replacement ratio and first core intersection, the harvesting function of the target reservoir, the harvesting letter are determined Number is the function for including well spacing density parameter;
5th determining module 606 determines close comprising the well pattern for the well spacing density parameter according to the target reservoir Total investment volume function of the target reservoir of parameter is spent, and, according to the harvesting function of the target reservoir, determine to include institute State the Gross Output volume function of the target reservoir of well spacing density parameter;
6th determining module 607, for determining the mesh according to total investment volume function and the Gross Output volume function Mark the economy ultimate well spacing density and economic optimum well spacing density of oil reservoir;
7th determining module 608 is used for according to the economy ultimate well spacing density and the economic optimum well spacing density, really First reasonable well pattern density of the fixed target reservoir.
In a possible implementation, described device further include:
Second obtains module, for obtaining type, the second mobility, second of each sample oil reservoir in multiple sample oil reservoirs Oil-water well number ratio, the second cumulative voidage replacement ratio, the second core intersection and the second reasonable well pattern density;
8th determining module, for the type for each sample oil reservoir, according to the sample oil reservoir of the type Second mobility, the second oil-water well number ratio, the second cumulative voidage replacement ratio, the second core intersection and the second reasonable well pattern density, pass through line The property Return Law, determines the second oil reservoir coefficient of the type;
Module is established, for the type and the second oil reservoir coefficient according to each sample oil reservoir, establishes type and oil reservoir The corresponding relationship of coefficient.
In a possible implementation, the 5th determining module 606 is also used to determine the list of the target reservoir Position is drilled well cost, average individual well drilling depth, individual well ground investment, oil area;According to the well spacing density parameter, the unit It is drilled well cost, the average individual well drilling depth, the individual well ground investment and the oil area, by following formula one, really Total investment volume function of the fixed target reservoir;
Wherein, P is total investment volume function, and A is the oil area, and S is the well spacing density parameter, and d is described Unit is drilled well cost, and H is the average individual well drilling depth, and g is the individual well ground investment.
In a possible implementation, the 5th determining module 606 is also used to determine the oil of the target reservoir Field oil in place, oil sale price, ton oil operating cost, ton oil comprehensive tax and commodity rate;According to the recovery ratio letter Several, the described oil field ground oil in place, the oil sale price, the ton oil operating cost, the ton oil comprehensive tax and institute Commodity rate is stated, the Gross Output volume function of the target reservoir is determined by following formula two;
Formula two: I=Nef(M,m,λ,h)·e-aS(p-o-c)·σ
Wherein, I is the Gross Output volume function, N for the oil field oil in place, ef(M,m,λ,h)·e-aSIt is adopted to be described Yield function, S are the well spacing density parameter, and M is first mobility, and m is the first oil-water well number ratio, and λ is described the One cumulative voidage replacement ratio, h are first core intersection, and a is the first oil reservoir coefficient, and p is the oil sale price, and o is The ton oil operating cost, c are the ton oil comprehensive tax, and σ is the commodity rate.
In a possible implementation, the 6th determining module 607 is also used to determine in total investment volume letter When the functional value of several functional value and the Gross Output volume function is equal, the well spacing density of the target reservoir obtains the economy Maximum excavation depth;Determine that the difference of the functional value in the functional value and total investment function of the Gross Output volume function reaches most When big value, the well spacing density of the target reservoir obtains the economic optimum well spacing density.
In a possible implementation, the 7th determining module 608 is also used to the economic limit well pattern is close The average value of degree and the economic optimum well spacing density, is determined as first reasonable well pattern density;
Alternatively, the 7th determining module 608, is also used to according to the economy ultimate well spacing density and the economic optimum Well spacing density determines the first reasonable well pattern density of the target reservoir by following formula three or formula four;
Wherein, SeFor first reasonable well pattern density, SmFor the economy ultimate well spacing density, SbMost for the economy Excellent well spacing density.
In embodiments of the present invention, due to combine the type of target reservoir, the first mobility, target reservoir the first grease Well number than the target reservoirs such as, the first cumulative voidage replacement ratio and the first core intersection construction reservoir characteristics, while consider recovery ratio with Relationship between well spacing density, it is thus determined that the first reasonable well pattern density of target reservoir be more in line with the exploitation of target reservoir It is practical, the accuracy for determining the first reasonable well pattern density is not only increased, also provides more accurate skill for development plan design Art foundation.
It should be understood that the device of the reasonable well pattern density of determining oil reservoir provided by the above embodiment is determining oil reservoir When reasonable well pattern density, only the example of the division of the above functional modules, in practical application, can according to need and Above-mentioned function distribution is completed by different functional modules, i.e., the internal structure of terminal is divided into different functional modules, with Complete all or part of function described above.In addition, the reasonable well pattern density of determining oil reservoir provided by the above embodiment The embodiment of the method for the reasonable well pattern density of device and determining oil reservoir belongs to same design, and specific implementation process is detailed in method reality Example is applied, which is not described herein again.
Fig. 7 shows the structural block diagram of the terminal 700 of an illustrative embodiment of the invention offer.The terminal 700 can be with Be: smart phone, tablet computer, MP3 player (Moving Picture Experts Group Audio Layer III, Dynamic image expert's compression standard audio level 3), MP4 (Moving Picture Experts Group Audio Layer IV, dynamic image expert's compression standard audio level 4) player, laptop or desktop computer.Terminal 700 be also possible to by Referred to as other titles such as user equipment, portable terminal, laptop terminal, terminal console.
In general, terminal 700 includes: processor 701 and memory 702.
Processor 701 may include one or more processing cores, such as 4 core processors, 8 core processors etc..Place Reason device 701 can use DSP (Digital Signal Processing, Digital Signal Processing), FPGA (Field- Programmable Gate Array, field programmable gate array), PLA (Programmable Logic Array, may be programmed Logic array) at least one of example, in hardware realize.Processor 701 also may include primary processor and coprocessor, master Processor is the processor for being handled data in the awake state, also referred to as CPU (Central Processing Unit, central processing unit);Coprocessor is the low power processor for being handled data in the standby state.? In some embodiments, processor 701 can be integrated with GPU (Graphics Processing Unit, image processor), GPU is used to be responsible for the rendering and drafting of content to be shown needed for display screen.In some embodiments, processor 701 can also be wrapped AI (Artificial Intelligence, artificial intelligence) processor is included, the AI processor is for handling related machine learning Calculating operation.
Memory 702 may include one or more computer readable storage mediums, which can To be non-transient.Memory 702 may also include high-speed random access memory and nonvolatile memory, such as one Or multiple disk storage equipments, flash memory device.In some embodiments, the non-transient computer in memory 702 can Storage medium is read for storing at least one instruction, at least one instruction performed by processor 701 for realizing this Shen Please in embodiment of the method provide really stand oil hiding reasonable well pattern density method.
In some embodiments, terminal 700 is also optional includes: peripheral device interface 703 and at least one peripheral equipment. It can be connected by bus or signal wire between processor 701, memory 702 and peripheral device interface 703.Each peripheral equipment It can be connected by bus, signal wire or circuit board with peripheral device interface 703.Specifically, peripheral equipment includes: radio circuit 704, at least one of touch display screen 705, camera 706, voicefrequency circuit 707, positioning component 708 and power supply 709.
Peripheral device interface 703 can be used for I/O (Input/Output, input/output) is relevant outside at least one Peripheral equipment is connected to processor 701 and memory 702.In some embodiments, processor 701, memory 702 and peripheral equipment Interface 703 is integrated on same chip or circuit board;In some other embodiments, processor 701, memory 702 and outer Any one or two in peripheral equipment interface 703 can realize on individual chip or circuit board, the present embodiment to this not It is limited.
Radio circuit 704 is for receiving and emitting RF (Radio Frequency, radio frequency) signal, also referred to as electromagnetic signal.It penetrates Frequency circuit 704 is communicated by electromagnetic signal with communication network and other communication equipments.Radio circuit 704 turns electric signal It is changed to electromagnetic signal to be sent, alternatively, the electromagnetic signal received is converted to electric signal.Optionally, radio circuit 704 wraps It includes: antenna system, RF transceiver, one or more amplifiers, tuner, oscillator, digital signal processor, codec chip Group, user identity module card etc..Radio circuit 704 can be carried out by least one wireless communication protocol with other terminals Communication.The wireless communication protocol includes but is not limited to: Metropolitan Area Network (MAN), each third generation mobile communication network (2G, 3G, 4G and 5G), wireless office Domain net and/or WiFi (Wireless Fidelity, Wireless Fidelity) network.In some embodiments, radio circuit 704 may be used also To include the related circuit of NFC (Near Field Communication, wireless near field communication), the application is not subject to this It limits.
Display screen 705 is for showing UI (User Interface, user interface).The UI may include figure, text, figure Mark, video and its their any combination.When display screen 705 is touch display screen, display screen 705 also there is acquisition to show The ability of the touch signal on the surface or surface of screen 705.The touch signal can be used as control signal and be input to processor 701 are handled.At this point, display screen 705 can be also used for providing virtual push button and/or dummy keyboard, also referred to as soft button and/or Soft keyboard.In some embodiments, display screen 705 can be one, and the front panel of terminal 700 is arranged;In other embodiments In, display screen 705 can be at least two, be separately positioned on the different surfaces of terminal 700 or in foldover design;In still other reality It applies in example, display screen 705 can be flexible display screen, be arranged on the curved surface of terminal 700 or on fold plane.Even, it shows Display screen 705 can also be arranged to non-rectangle irregular figure, namely abnormity screen.Display screen 705 can use LCD (Liquid Crystal Display, liquid crystal display), OLED (Organic Light-Emitting Diode, Organic Light Emitting Diode) Etc. materials preparation.
CCD camera assembly 706 is for acquiring image or video.Optionally, CCD camera assembly 706 include front camera and Rear camera.In general, the front panel of terminal is arranged in front camera, the back side of terminal is arranged in rear camera.One In a little embodiments, rear camera at least two is main camera, depth of field camera, wide-angle camera, focal length camera shooting respectively Any one in head, to realize that main camera and the fusion of depth of field camera realize background blurring function, main camera and wide-angle Camera fusion realizes that pan-shot and VR (Virtual Reality, virtual reality) shooting function or other fusions are clapped Camera shooting function.In some embodiments, CCD camera assembly 706 can also include flash lamp.Flash lamp can be monochromatic warm flash lamp, It is also possible to double-colored temperature flash lamp.Double-colored temperature flash lamp refers to the combination of warm light flash lamp and cold light flash lamp, can be used for not With the light compensation under colour temperature.
Voicefrequency circuit 707 may include microphone and loudspeaker.Microphone is used to acquire the sound wave of user and environment, and will Sound wave, which is converted to electric signal and is input to processor 701, to be handled, or is input to radio circuit 704 to realize voice communication. For stereo acquisition or the purpose of noise reduction, microphone can be separately positioned on the different parts of terminal 700 to be multiple.Mike Wind can also be array microphone or omnidirectional's acquisition type microphone.Loudspeaker is then used to that processor 701 or radio circuit will to be come from 704 electric signal is converted to sound wave.Loudspeaker can be traditional wafer speaker, be also possible to piezoelectric ceramic loudspeaker.When When loudspeaker is piezoelectric ceramic loudspeaker, the audible sound wave of the mankind can be not only converted electrical signals to, it can also be by telecommunications Number the sound wave that the mankind do not hear is converted to carry out the purposes such as ranging.In some embodiments, voicefrequency circuit 707 can also include Earphone jack.
Positioning component 708 is used for the current geographic position of positioning terminal 700, to realize navigation or LBS (Location Based Service, location based service).Positioning component 708 can be the GPS (Global based on the U.S. Positioning System, global positioning system), the dipper system of China, Russia Gray receive this system or European Union The positioning component of Galileo system.
Power supply 709 is used to be powered for the various components in terminal 700.Power supply 709 can be alternating current, direct current, Disposable battery or rechargeable battery.When power supply 709 includes rechargeable battery, which can support wired charging Or wireless charging.The rechargeable battery can be also used for supporting fast charge technology.
In some embodiments, terminal 700 further includes having one or more sensors 710.The one or more sensors 710 include but is not limited to: acceleration transducer 711, gyro sensor 712, pressure sensor 713, fingerprint sensor 714, Optical sensor 715 and proximity sensor 716.
The acceleration that acceleration transducer 711 can detecte in three reference axis of the coordinate system established with terminal 700 is big It is small.For example, acceleration transducer 711 can be used for detecting component of the acceleration of gravity in three reference axis.Processor 701 can With the acceleration of gravity signal acquired according to acceleration transducer 711, touch display screen 705 is controlled with transverse views or longitudinal view Figure carries out the display of user interface.Acceleration transducer 711 can be also used for the acquisition of game or the exercise data of user.
Gyro sensor 712 can detecte body direction and the rotational angle of terminal 700, and gyro sensor 712 can To cooperate with acquisition user to act the 3D of terminal 700 with acceleration transducer 711.Processor 701 is according to gyro sensor 712 Following function may be implemented in the data of acquisition: when action induction (for example changing UI according to the tilt operation of user), shooting Image stabilization, game control and inertial navigation.
The lower layer of side frame and/or touch display screen 705 in terminal 700 can be set in pressure sensor 713.Work as pressure When the side frame of terminal 700 is arranged in sensor 713, user can detecte to the gripping signal of terminal 700, by processor 701 Right-hand man's identification or prompt operation are carried out according to the gripping signal that pressure sensor 713 acquires.When the setting of pressure sensor 713 exists When the lower layer of touch display screen 705, the pressure operation of touch display screen 705 is realized to UI circle according to user by processor 701 Operability control on face is controlled.Operability control includes button control, scroll bar control, icon control, menu At least one of control.
Fingerprint sensor 714 is used to acquire the fingerprint of user, collected according to fingerprint sensor 714 by processor 701 The identity of fingerprint recognition user, alternatively, by fingerprint sensor 714 according to the identity of collected fingerprint recognition user.It is identifying When the identity of user is trusted identity out, the user is authorized to execute relevant sensitive operation, the sensitive operation packet by processor 701 Include solution lock screen, check encryption information, downloading software, payment and change setting etc..Terminal can be set in fingerprint sensor 714 700 front, the back side or side.When being provided with physical button or manufacturer Logo in terminal 700, fingerprint sensor 714 can be with It is integrated with physical button or manufacturer Logo.
Optical sensor 715 is for acquiring ambient light intensity.In one embodiment, processor 701 can be according to optics The ambient light intensity that sensor 715 acquires controls the display brightness of touch display screen 705.Specifically, when ambient light intensity is higher When, the display brightness of touch display screen 705 is turned up;When ambient light intensity is lower, the display for turning down touch display screen 705 is bright Degree.In another embodiment, the ambient light intensity that processor 701 can also be acquired according to optical sensor 715, dynamic adjust The acquisition parameters of CCD camera assembly 706.
Proximity sensor 716, also referred to as range sensor are generally arranged at the front panel of terminal 700.Proximity sensor 716 For acquiring the distance between the front of user Yu terminal 700.In one embodiment, when proximity sensor 716 detects use When family and the distance between the front of terminal 700 gradually become smaller, touch display screen 705 is controlled from bright screen state by processor 701 It is switched to breath screen state;When proximity sensor 716 detects user and the distance between the front of terminal 700 becomes larger, Touch display screen 705 is controlled by processor 701 and is switched to bright screen state from breath screen state.
It will be understood by those skilled in the art that the restriction of the not structure paired terminal 700 of structure shown in Fig. 7, can wrap It includes than illustrating more or fewer components, perhaps combine certain components or is arranged using different components.
In the exemplary embodiment, a kind of computer readable storage medium is additionally provided, the memory for example including instruction, The method that above-metioned instruction can be executed by the processor in terminal to complete to determine the reasonable well pattern density of oil reservoir in following embodiments. For example, the computer readable storage medium can be ROM, random access memory (RAM), CD-ROM, tape, floppy disk and light Data storage device etc..
Those of ordinary skill in the art will appreciate that realizing that all or part of the steps of above-described embodiment can pass through hardware It completes, relevant hardware can also be instructed to complete by program, the program can store in a kind of computer-readable In storage medium, storage medium mentioned above can be read-only memory, disk or CD etc..
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of method of the reasonable well pattern density of determining oil reservoir, which is characterized in that the described method includes:
Determine the first mobility, the first oil-water well number ratio, the first cumulative voidage replacement ratio and the first core intersection of target reservoir;
According to first mobility, the type of the target reservoir is determined;
According to the type of the target reservoir, from obtaining the first of the target reservoir in the corresponding relationship of type and oil reservoir coefficient Oil reservoir coefficient;
According to the first oil reservoir coefficient, the target reservoir well spacing density and recovery ratio between relational expression, determine described in The relationship by objective (RBO) formula of target reservoir;
According to the relationship by objective (RBO) formula, first mobility, the first oil-water well number ratio, first cumulative voidage replacement ratio and institute The first core intersection is stated, determines the harvesting function of the target reservoir, the harvesting function is the letter for including well spacing density parameter Number;
According to the well spacing density parameter of the target reservoir, the total of the target reservoir comprising the well spacing density parameter is determined Investment volume function, and, according to the harvesting function of the target reservoir, determine the target comprising the well spacing density parameter The Gross Output volume function of oil reservoir;
According to total investment volume function and the Gross Output volume function, the economy ultimate well spacing density of the target reservoir is determined With economic optimum well spacing density;
According to the economy ultimate well spacing density and the economic optimum well spacing density, determine that the first of the target reservoir is reasonable Well spacing density.
2. the method according to claim 1, wherein the method also includes:
Obtain type, the second mobility, the second oil-water well number ratio, the second accumulation note of each sample oil reservoir in multiple sample oil reservoirs Adopt ratio, the second core intersection and the second reasonable well pattern density;
For the type of each sample oil reservoir, according to the second mobility of the sample oil reservoir of the type, the second oil-water well number Than, the second cumulative voidage replacement ratio, the second core intersection and the second reasonable well pattern density the type determined by linear regression method The second oil reservoir coefficient;
According to the type and the second oil reservoir coefficient of each sample oil reservoir, the corresponding relationship of type and oil reservoir coefficient is established.
3. determining includes institute the method according to claim 1, wherein described according to the well spacing density parameter State total investment volume function of the target reservoir of well spacing density parameter, comprising:
Determine that the unit of the target reservoir is drilled well cost, average individual well drilling depth, individual well ground investment, oil area;
Well cost, average the individual well drilling depth, the individual well ground investment are drilled according to the well spacing density parameter, the unit Total investment volume function of the target reservoir is determined by following formula one with the oil area;
Formula one:
Wherein, P is total investment volume function, and A is the oil area, and S is the well spacing density parameter, and d is the unit It is drilled well cost, H is the average individual well drilling depth, and g is the individual well ground investment.
4. the method according to claim 1, wherein the harvesting function according to the target reservoir, determines The Gross Output volume function of the target reservoir comprising the well spacing density parameter, comprising:
With determining the oil field of the target reservoir oil in place, oil sale price, ton oil operating cost, ton oil comprehensive tax and Commodity rate;
According to the recovery ratio function, the oil field oil in place, the oil sale price, the ton oil operating cost, The ton oil comprehensive tax and the commodity rate determine the Gross Output volume function of the target reservoir by following formula two;
Formula two: I=Nef(M,m,λ,h)·e-aS(p-o-c)·σ
Wherein, I is the Gross Output volume function, N for the oil field oil in place, ef(M,m,λ,h)·e-aSFor the recovery ratio letter Number, S are the well spacing density parameter, and M is first mobility, and m is the first oil-water well number ratio, and λ is first accumulation Injection-production ratio, h are first core intersection, and a is the first oil reservoir coefficient, and p is the oil sale price, and o is the ton Oily operating cost, c are the ton oil comprehensive tax, and σ is the commodity rate.
5. the method according to claim 1, wherein described according to total investment volume function and the Gross Output Volume function determines the economy ultimate well spacing density and economic optimum well spacing density of the target reservoir, comprising:
It determines in the functional value of total investment volume function and the equal functional value of the Gross Output volume function, the target oil The well spacing density of hiding obtains the economy ultimate well spacing density;
It determines when the difference of the functional value of the functional value and total investment function of the Gross Output volume function reaches maximum value, institute The well spacing density for stating target reservoir obtains the economic optimum well spacing density.
6. the method according to claim 1, wherein described according to the economy ultimate well spacing density and the warp Help optimum well spacing density, determines the first reasonable well pattern density of the target reservoir, comprising:
By the average value of the economy ultimate well spacing density and the economic optimum well spacing density, it is determined as first Reasonable Well Reticular density;
Alternatively, passing through following formula three or public affairs according to the economy ultimate well spacing density and the economic optimum well spacing density Formula four determines the first reasonable well pattern density of the target reservoir;
Formula three:
Formula four:
Wherein, SeFor first reasonable well pattern density, SmFor the economy ultimate well spacing density, SbFor the economic optimum well Reticular density.
7. a kind of device of the reasonable well pattern density of determining oil reservoir, which is characterized in that described device includes:
First determining module, for determining the first mobility, the first oil-water well number ratio, the first cumulative voidage replacement ratio and of target reservoir One core intersection;
Second determining module, for determining the type of the target reservoir according to first mobility;
First obtains module, for the type according to the target reservoir, from obtaining in the corresponding relationship of type and oil reservoir coefficient First oil reservoir coefficient of the target reservoir;
Third determining module, between the well spacing density and recovery ratio according to the first oil reservoir coefficient, the target reservoir Relational expression, determine the relationship by objective (RBO) formula of the target reservoir;
4th determining module, for according to the relationship by objective (RBO) formula, first mobility, the first oil-water well number ratio, described First cumulative voidage replacement ratio and first core intersection determine that the harvesting function of the target reservoir, the harvesting function are packet Include the function of well spacing density parameter;
5th determining module determines to include the well spacing density parameter for the well spacing density parameter according to the target reservoir The target reservoir total investment volume function, and, according to the harvesting function of the target reservoir, determine to include the well pattern The Gross Output volume function of the target reservoir of density parameter;
6th determining module, for determining the target reservoir according to total investment volume function and the Gross Output volume function Economy ultimate well spacing density and economic optimum well spacing density;
7th determining module, described in determining according to the economy ultimate well spacing density and the economic optimum well spacing density First reasonable well pattern density of target reservoir.
8. device according to claim 7, which is characterized in that described device further include:
Second obtains module, for obtaining type, the second mobility, the second grease of each sample oil reservoir in multiple sample oil reservoirs Well number ratio, the second cumulative voidage replacement ratio, the second core intersection and the second reasonable well pattern density;
8th determining module, for the type for each sample oil reservoir, according to the second of the sample oil reservoir of the type Mobility, the second oil-water well number ratio, the second cumulative voidage replacement ratio, the second core intersection and the second reasonable well pattern density, by linearly returning Gui Fa determines the second oil reservoir coefficient of the type;
Module is established, for the type and the second oil reservoir coefficient according to each sample oil reservoir, establishes type and oil reservoir coefficient Corresponding relationship.
9. device according to claim 7, which is characterized in that
5th determining module is also used to determine that the unit of the target reservoir is drilled well cost, average individual well drilling depth, individual well Ground investment, oil area;Well cost, average the individual well drilling depth, institute are drilled according to the well spacing density parameter, the unit Individual well ground investment and the oil area are stated, by following formula one, determines total investment volume function of the target reservoir;
Formula one:
Wherein, P is total investment volume function, and A is the oil area, and S is the well spacing density parameter, and d is the unit It is drilled well cost, H is the average individual well drilling depth, and g is the individual well ground investment.
10. device according to claim 7, which is characterized in that
5th determining module, oil in place, oil sale price, ton are oily with being also used to determine the oil field of the target reservoir Operating cost, ton oil comprehensive tax and commodity rate;According to the recovery ratio function, the oil field ground oil in place, the crude oil Selling price, the ton oil operating cost, the ton oil comprehensive tax and the commodity rate, by described in the determination of following formula two The Gross Output volume function of target reservoir;
Formula two: I=Nef(M,m,λ,h)·e-aS(p-o-c)·σ
Wherein, I is the Gross Output volume function, N for the oil field oil in place, ef(M,m,λ,h)·e-aSFor the recovery ratio letter Number, S are the well spacing density parameter, and M is first mobility, and m is the first oil-water well number ratio, and λ is first accumulation Injection-production ratio, h are first core intersection, and a is the first oil reservoir coefficient, and p is the oil sale price, and o is the ton Oily operating cost, c are the ton oil comprehensive tax, and σ is the commodity rate.
CN201811129781.9A 2018-09-27 2018-09-27 Method and apparatus for determining a reasonable well pattern density of an oil reservoir Active CN109281648B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811129781.9A CN109281648B (en) 2018-09-27 2018-09-27 Method and apparatus for determining a reasonable well pattern density of an oil reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811129781.9A CN109281648B (en) 2018-09-27 2018-09-27 Method and apparatus for determining a reasonable well pattern density of an oil reservoir

Publications (2)

Publication Number Publication Date
CN109281648A true CN109281648A (en) 2019-01-29
CN109281648B CN109281648B (en) 2020-10-09

Family

ID=65181902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811129781.9A Active CN109281648B (en) 2018-09-27 2018-09-27 Method and apparatus for determining a reasonable well pattern density of an oil reservoir

Country Status (1)

Country Link
CN (1) CN109281648B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110363325A (en) * 2019-05-06 2019-10-22 中国石油化工股份有限公司 Complex Fault Block Oil Reservoir multiple target note adopts optimising and adjustment method
CN111932045A (en) * 2019-05-13 2020-11-13 中国石油天然气股份有限公司 Method and device for determining oil well cleaning mode and storage medium
CN113818859A (en) * 2020-06-19 2021-12-21 中国石油化工股份有限公司 Limit well spacing determination method, limit well spacing determination method and limit well spacing determination device for low-permeability oil reservoir

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2108451C1 (en) * 1997-05-29 1998-04-10 Нефтегазодобывающее управление "Иркеннефть" Акционерное общество "Татнефть" Method for development of oil deposit
CN102839958A (en) * 2012-09-04 2012-12-26 中国石油天然气股份有限公司 Longitudinally-superposed-development three-layer-system oil reservoir well pattern and deployment method thereof
CN104033137A (en) * 2013-03-06 2014-09-10 中国石油化工股份有限公司 Method for improving fault block oil reservoir recovery efficiency by utilizing oilfield wastewater
CN106351630A (en) * 2015-07-17 2017-01-25 中国石油天然气股份有限公司 Method for combined mining by diversion and drainage
CN107448185A (en) * 2016-05-31 2017-12-08 中国石油化工股份有限公司 Offshore oilfield new well in old district encrypts well-arranging procedure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2108451C1 (en) * 1997-05-29 1998-04-10 Нефтегазодобывающее управление "Иркеннефть" Акционерное общество "Татнефть" Method for development of oil deposit
CN102839958A (en) * 2012-09-04 2012-12-26 中国石油天然气股份有限公司 Longitudinally-superposed-development three-layer-system oil reservoir well pattern and deployment method thereof
CN104033137A (en) * 2013-03-06 2014-09-10 中国石油化工股份有限公司 Method for improving fault block oil reservoir recovery efficiency by utilizing oilfield wastewater
CN106351630A (en) * 2015-07-17 2017-01-25 中国石油天然气股份有限公司 Method for combined mining by diversion and drainage
CN107448185A (en) * 2016-05-31 2017-12-08 中国石油化工股份有限公司 Offshore oilfield new well in old district encrypts well-arranging procedure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110363325A (en) * 2019-05-06 2019-10-22 中国石油化工股份有限公司 Complex Fault Block Oil Reservoir multiple target note adopts optimising and adjustment method
CN110363325B (en) * 2019-05-06 2022-04-19 中国石油化工股份有限公司 Multi-target injection-production regulation and optimization method for complex fault block oil reservoir
CN111932045A (en) * 2019-05-13 2020-11-13 中国石油天然气股份有限公司 Method and device for determining oil well cleaning mode and storage medium
CN111932045B (en) * 2019-05-13 2024-03-08 中国石油天然气股份有限公司 Method, device and storage medium for determining oil well cleaning mode
CN113818859A (en) * 2020-06-19 2021-12-21 中国石油化工股份有限公司 Limit well spacing determination method, limit well spacing determination method and limit well spacing determination device for low-permeability oil reservoir
CN113818859B (en) * 2020-06-19 2024-05-31 中国石油化工股份有限公司 Limiting well spacing determining method, judging method and device for low-permeability oil reservoir

Also Published As

Publication number Publication date
CN109281648B (en) 2020-10-09

Similar Documents

Publication Publication Date Title
CN108415705A (en) Webpage generating method, device, storage medium and equipment
CN109281648A (en) Method and apparatus for determining a reasonable well pattern density of an oil reservoir
CN108708695B (en) Method and device for determining dominant seepage channel and storage medium
CN109300485A (en) Methods of marking, device, electronic equipment and the computer storage medium of audio signal
CN110277106A (en) Audio quality determines method, apparatus, equipment and storage medium
CN108320756A (en) It is a kind of detection audio whether be absolute music audio method and apparatus
CN109899056A (en) Method and device for determining parameters of oil pumping unit and computer readable storage medium
CN110174699A (en) Method, device and storage medium for determining fault closure
CN108491748A (en) The identification and generation method of graphic code, device and computer readable storage medium
CN109696706A (en) salt structure detection method, device and storage medium
CN107884823B (en) The method for drafting and device of sand body connected graph
CN110166275A (en) Information processing method, device and storage medium
CN117634166A (en) Unconventional natural gas well fracturing stage fracturing parameter optimization method, device and storage medium
CN109299319A (en) Display methods, device, terminal and the storage medium of audio-frequency information
CN108733902A (en) Method and device for determining permeability of oil reservoir and storage medium
CN109899051A (en) Evaluation criterion determining method and device for oil well equipment and storage medium
CN109036463A (en) Obtain the method, apparatus and storage medium of the difficulty information of song
CN109116424A (en) Low wave number noise separation method and device for seismic wave data and storage medium
CN109343113A (en) Method and device for predicting oil and gas reservoir position
CN109388732A (en) Music ground map generalization and display methods, device and storage medium
CN113153284B (en) Method, device, equipment and storage medium for determining constraint water saturation parameter
CN111812744B (en) Formation compressibility determination method and device and computer storage medium
CN111861780A (en) Method and device for determining production of production layer in production well and storage medium
CN114545507B (en) Coring depth determining method, device, terminal and storage medium
CN113107449B (en) Method and device for determining fracturing parameters of shale reservoir multi-stage fractured horizontal well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant