CN109281633A - A kind of preventer group assembly method and tooling for protecting metal sealing cushion ring - Google Patents
A kind of preventer group assembly method and tooling for protecting metal sealing cushion ring Download PDFInfo
- Publication number
- CN109281633A CN109281633A CN201811526115.9A CN201811526115A CN109281633A CN 109281633 A CN109281633 A CN 109281633A CN 201811526115 A CN201811526115 A CN 201811526115A CN 109281633 A CN109281633 A CN 109281633A
- Authority
- CN
- China
- Prior art keywords
- preventer
- guide pipe
- heavy wall
- wall guide
- passing hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/06—Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Gasket Seals (AREA)
Abstract
The invention discloses preventer group assembly method and tooling that one kind can protect metal sealing cushion ring, which is mounted on metal sealing cushion ring on the first preventer;Heavy wall guide pipe is put into the passing hole of the first preventer, wherein heavy wall guide pipe and the passing hole of the first preventer match;The second preventer is sling by several cross bars being arranged in heavy wall guide pipe, the passing hole of the second preventer is directed at the heavy wall guide pipe on the first preventer;The second preventer is fallen, so that heavy wall guide pipe is passed through the passing hole of the second preventer, continues to fall, makes gasket annular groove on the second preventer and the metal sealing cushion ring on the first preventer to being just bonded.Heavy wall guide pipe of the invention can be effectively protected gasket annular groove, gasket ring on preventer, easy to use to lean on, and improve production efficiency, reduce the damage of the gasket annular groove and gasket on preventer, reduce costs.
Description
Technical field
The present invention relates to assembly oil drilling preventer group fields, in particular to a kind of to protect the anti-of metal sealing cushion ring
Spray apparatus group assembly method and tooling.
Background technique
Preventer group is usually to be assembled by double ram type preventer, single ram type perventer and ring-like preventer, they
Between be to be sealed by metal sealing cushion ring, need to bear very high pressure.Since preventer weight is very heavy, there are several tons or more than ten
Ton, when installation, are difficult easily to damage preventer gasket ring groove face and metal sealing cushion ring by pressure to just, cause to leak.To solve
The above problem designs and produces a heavy wall guide pipe, to prevent preventer gasket ring groove face and metal sealing cushion ring from damaging by pressure.
Summary of the invention
The purpose of the present invention is to provide one kind can protect the preventer group assembly method and tooling of metal sealing cushion ring,
When preventer group is installed, the tooling heavy wall guide pipe made first is put into first on the first preventer by gasket ring
In bore diameter of preventer hole, the second preventer is then sling, its passing hole is directed at the heavy wall guide pipe on the first preventer, is fallen
Second plate preventer makes heavy wall guide pipe pass through the passing hole of the second preventer, continues to fall, make the sealing on the second preventer
Gasket ring slot accurately with metal sealing cushion ring to just, be bonded, effectively prevent damaging gasket ring groove face and metal sealing cushion ring by pressure.
In order to achieve the above object, the invention is realized by the following technical scheme:
A kind of preventer group assembly method for protecting metal sealing cushion ring, this method include following procedure:
Metal sealing cushion ring is mounted on the first preventer;
Heavy wall guide pipe is put into the passing hole of first preventer, wherein the heavy wall guide pipe and described the
One bore diameter of preventer hole matches;
The second preventer is sling by several cross bars being arranged in the heavy wall guide pipe, by second preventer
Passing hole is directed at the heavy wall guide pipe on first preventer;
Second preventer is fallen, so that the heavy wall guide pipe is passed through the passing hole of second preventer, under continuing
It falls, makes gasket annular groove on second preventer and the metal sealing cushion ring on first preventer to being just bonded.
Preferably, the gap between the heavy wall guide pipe and the passing hole of first preventer is 0.5-1mm.
Preferably, the both ends of the heavy wall guide pipe are equipped with chamfering.
Preferably, the chamfering of the heavy wall guide pipe is 40 × 45 °.
Preferably, several described cross bars intersect setting respectively.
Preferably, first preventer is annular preventer or single ram type perventer or double ram type preventer;Described
Two preventers are annular preventer or single ram type perventer or double ram type preventer.
The invention also discloses a kind of preventer group tooling for realizing preventer group assembly method as described above, the works
Dress is heavy wall guide pipe, and the heavy wall guide pipe is placed in the passing hole of the first preventer, the heavy wall guide pipe and described the
The passing hole of one preventer matches, several cross bars for slinging the second preventer are provided in the heavy wall guide pipe,
The passing hole of second preventer is directed at the heavy wall guide pipe on first preventer, on second preventer
Gasket annular groove and the metal sealing cushion ring on first preventer are to being just bonded.
Preferably, the gap between the heavy wall guide pipe and the passing hole of first preventer is 0.5-1mm.
Preferably, several described cross bars intersect setting respectively.
Preferably, first preventer is annular preventer or single ram type perventer or double ram type preventer;Described
Two preventers are annular preventer or single ram type perventer or double ram type preventer.
Compared with prior art, the invention has the benefit that heavy wall guide pipe of the invention can be effectively protected it is anti-
Gasket annular groove, gasket ring on spray apparatus, it is easy to use to lean on, production efficiency is improved, the gasket on preventer is reduced
The damage of annular groove and gasket, reduces costs.
Detailed description of the invention
Ring-like preventer structural schematic diagram Fig. 1 of the invention;
The main view of single ram type perventer Fig. 2 of the invention;
The top view of single ram type perventer Fig. 3 of the invention;
Heavy wall guide pipe main view Fig. 4 of the invention;
Heavy wall guide pipe top view Fig. 5 of the invention;
The preventer group assembling schematic diagram for protecting metal sealing cushion ring Fig. 6 of the invention.
Specific embodiment
In order to keep the present invention more obvious and easy to understand, the present invention is done furtherly below in conjunction with the drawings and specific embodiments
It is bright.
As shown in Fig. 1-Fig. 3 combination, preventer group of the invention includes ring-like preventer, double ram type preventer and single disc
Preventer.As shown in Fig. 4 and Fig. 5 combination, the present invention devises a kind of heavy wall guide pipe 3, which, which is equipped with, adds
Big chamfering, such as 40 × 45 °.Heavy wall guide pipe 3 is internally provided with several cross bars 301 to intersect vertically, for lifting by crane.
As shown in fig. 6, the preventer group assembly method for protecting metal sealing cushion ring of the invention specifically:
When installing preventer group, metal sealing cushion ring 4 is first mounted on the first preventer (such as single ram type perventer
2) on, the heavy wall guide pipe 3 made is put into the passing hole of the first preventer, it is anti-then to sling second by cross bar 301
The passing hole of second preventer is directed at the heavy wall guide pipe 3 on the first preventer, then fallen by spray apparatus (such as annular preventer 1)
Lower second preventer, makes heavy wall guide pipe 3 pass through the passing hole of the second preventer, continues to fall, make close on the second preventer
Packing annular groove accurately with the metal sealing cushion ring 4 on the first preventer to just, be bonded, effectively prevent damaging gasket ring groove face by pressure
And metal sealing cushion ring.
Wherein, the gap between heavy wall guide pipe 3 and the passing hole of the first preventer is 0.5-1mm, heavy wall can be facilitated to lead
Enter single ram type perventer passing hole to pipe 3.
First preventer of the invention is not limited only to the single ram type perventer 2 of the present embodiment, can also be other kinds of
Preventer, similarly, the second preventer of the invention are not limited only to the annular preventer 1 of the present embodiment, can also be other types
Preventer.
In conclusion heavy wall guide pipe of the invention can be effectively protected gasket annular groove, gasket on preventer
Ring, it is easy to use to lean on, production efficiency is improved, reduces the damage of the gasket annular groove and gasket on preventer, reduces
Cost.
It is discussed in detail although the contents of the present invention have passed through above preferred embodiment, but it should be appreciated that above-mentioned
Description is not considered as limitation of the present invention.After those skilled in the art have read above content, for of the invention
A variety of modifications and substitutions all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.
Claims (10)
1. the preventer group assembly method that one kind can protect metal sealing cushion ring, which is characterized in that this method includes following procedure:
Metal sealing cushion ring (4) is mounted on the first preventer;
Heavy wall guide pipe (3) is put into the passing hole of first preventer, wherein the heavy wall guide pipe (3) with it is described
The passing hole of first preventer matches;
The second preventer is sling by several cross bars (301) being arranged in the heavy wall guide pipe (3), by second blowout prevention
The passing hole of device is directed at the heavy wall guide pipe (3) on first preventer;
Second preventer is fallen, so that the heavy wall guide pipe (3) is passed through the passing hole of second preventer, under continuing
It falls, makes gasket annular groove on second preventer and the metal sealing cushion ring (4) on first preventer to being just bonded.
2. preventer group assembly method as described in claim 1, which is characterized in that
Gap between the heavy wall guide pipe (3) and the passing hole of first preventer is 0.5-1mm.
3. preventer group assembly method as described in claim 1, which is characterized in that
The both ends of the heavy wall guide pipe (3) are equipped with chamfering.
4. preventer group assembly method as claimed in claim 3, which is characterized in that
The chamfering of the heavy wall guide pipe (3) is 40 × 45 °.
5. preventer group assembly method as described in claim 1, which is characterized in that
Several described cross bars (301) intersect setting respectively.
6. preventer group assembly method as described in claim 1, which is characterized in that
First preventer is annular preventer or single ram type perventer or double ram type preventer;
Second preventer is annular preventer or single ram type perventer or double ram type preventer.
7. a kind of preventer group tooling for the preventer group assembly method realized as described in any one of claim 1-6,
It is characterized in that, which is heavy wall guide pipe (3), and the heavy wall guide pipe (3) is placed in the passing hole of the first preventer, described
Heavy wall guide pipe (3) and the passing hole of first preventer match, and are provided in the heavy wall guide pipe (3) for slinging
Several cross bars (301) of second preventer, the passing hole of second preventer is aligned described on first preventer
Heavy wall guide pipe (3), the metal sealing cushion ring (4) on gasket annular groove and first preventer on second preventer
To positive fitting.
8. preventer group tooling as claimed in claim 7, which is characterized in that
Gap between the heavy wall guide pipe (3) and the passing hole of first preventer is 0.5-1mm.
9. preventer group tooling as claimed in claim 7, which is characterized in that
Several described cross bars (301) intersect setting respectively.
10. preventer group tooling as claimed in claim 7, which is characterized in that
First preventer is annular preventer or single ram type perventer or double ram type preventer;
Second preventer is annular preventer or single ram type perventer or double ram type preventer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811526115.9A CN109281633A (en) | 2018-12-13 | 2018-12-13 | A kind of preventer group assembly method and tooling for protecting metal sealing cushion ring |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811526115.9A CN109281633A (en) | 2018-12-13 | 2018-12-13 | A kind of preventer group assembly method and tooling for protecting metal sealing cushion ring |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109281633A true CN109281633A (en) | 2019-01-29 |
Family
ID=65174314
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811526115.9A Pending CN109281633A (en) | 2018-12-13 | 2018-12-13 | A kind of preventer group assembly method and tooling for protecting metal sealing cushion ring |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109281633A (en) |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2789405Y (en) * | 2005-01-07 | 2006-06-21 | 宿官礼 | Single-stage assembling cashinghead |
CN101424172A (en) * | 2007-11-02 | 2009-05-06 | 中国海洋石油总公司 | Installation and guide device for underwater basal disc for blowout preventer |
CN201335778Y (en) * | 2009-01-05 | 2009-10-28 | 王富涛 | Special pressure testing blind plate of blowout preventer |
CN201622177U (en) * | 2009-12-22 | 2010-11-03 | 丰士俊 | Pressure testing device of blowout preventer |
CN201620806U (en) * | 2009-12-22 | 2010-11-03 | 丰士俊 | Blowout preventer pressure-testing sealing ring for reducing blind plate specification |
CN202718651U (en) * | 2011-12-16 | 2013-02-06 | 卞康群 | Under-pressure operating device for automatically and safely reversing pipe column coupling |
CN203271662U (en) * | 2013-05-07 | 2013-11-06 | 宝鸡石油机械有限责任公司 | Integrated multifunctional blowout preventer |
CN105089542A (en) * | 2014-05-09 | 2015-11-25 | 中国石油化工股份有限公司 | Hydraulic self-locking quick-mounting blowout prevention device and method |
CN205100930U (en) * | 2015-11-09 | 2016-03-23 | 中石化石油工程技术服务有限公司 | Multistage preventer pressure testing system of well head and pressure testing device thereof |
CN105863549A (en) * | 2016-05-27 | 2016-08-17 | 南通普洛斯普海洋工程设备科技有限公司 | Blowout preventer assembly |
CN106050163A (en) * | 2016-07-22 | 2016-10-26 | 葫芦岛龙源采油配套设备有限公司 | Sucker rod guiding device |
CN108877459A (en) * | 2018-06-20 | 2018-11-23 | 中国石油集团渤海钻探工程有限公司 | A kind of oil drilling well-control blowout prevention device group teaching simulating device |
-
2018
- 2018-12-13 CN CN201811526115.9A patent/CN109281633A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2789405Y (en) * | 2005-01-07 | 2006-06-21 | 宿官礼 | Single-stage assembling cashinghead |
CN101424172A (en) * | 2007-11-02 | 2009-05-06 | 中国海洋石油总公司 | Installation and guide device for underwater basal disc for blowout preventer |
CN201335778Y (en) * | 2009-01-05 | 2009-10-28 | 王富涛 | Special pressure testing blind plate of blowout preventer |
CN201622177U (en) * | 2009-12-22 | 2010-11-03 | 丰士俊 | Pressure testing device of blowout preventer |
CN201620806U (en) * | 2009-12-22 | 2010-11-03 | 丰士俊 | Blowout preventer pressure-testing sealing ring for reducing blind plate specification |
CN202718651U (en) * | 2011-12-16 | 2013-02-06 | 卞康群 | Under-pressure operating device for automatically and safely reversing pipe column coupling |
CN203271662U (en) * | 2013-05-07 | 2013-11-06 | 宝鸡石油机械有限责任公司 | Integrated multifunctional blowout preventer |
CN105089542A (en) * | 2014-05-09 | 2015-11-25 | 中国石油化工股份有限公司 | Hydraulic self-locking quick-mounting blowout prevention device and method |
CN205100930U (en) * | 2015-11-09 | 2016-03-23 | 中石化石油工程技术服务有限公司 | Multistage preventer pressure testing system of well head and pressure testing device thereof |
CN105863549A (en) * | 2016-05-27 | 2016-08-17 | 南通普洛斯普海洋工程设备科技有限公司 | Blowout preventer assembly |
CN106050163A (en) * | 2016-07-22 | 2016-10-26 | 葫芦岛龙源采油配套设备有限公司 | Sucker rod guiding device |
CN108877459A (en) * | 2018-06-20 | 2018-11-23 | 中国石油集团渤海钻探工程有限公司 | A kind of oil drilling well-control blowout prevention device group teaching simulating device |
Non-Patent Citations (1)
Title |
---|
集团公司井控培训教材编写组, 东营:石油大学出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204060602U (en) | A kind of bimetallic (spring cone) seal formula casing head | |
CN210484987U (en) | Pipeline plugging device | |
US3463196A (en) | Flange protector | |
CN109281633A (en) | A kind of preventer group assembly method and tooling for protecting metal sealing cushion ring | |
EP2584229B1 (en) | O-ring shield system and method | |
CN209293735U (en) | A kind of preventer group tooling for protecting metal sealing cushion ring | |
CN202852421U (en) | Welded type rupture disk device | |
CN203785952U (en) | Pressure test blind plate | |
CN105672929B (en) | A kind of blowout preventer | |
US9175536B2 (en) | Pipe end plug apparatus and method | |
US10550660B2 (en) | Blind shear ram | |
CN205537999U (en) | Unit axle bush temperature measurement system | |
US4583746A (en) | Method and apparatus for sealing between two concentric members | |
CN204611008U (en) | Air cooling system and explosion proof door thereof | |
CN209325268U (en) | A kind of pipe end closing blind plate | |
CN202914271U (en) | Stuffing box with positioning ring and water seal bolt | |
CN103967442B (en) | Boll-weevil hanger cable penetration device mesoporous metal sealing device | |
CN109236306B (en) | Safety redundancy mechanism for preventing replaceable cutter under normal pressure from falling off and installation method thereof | |
CN201680017U (en) | Self-restore explosion relief valve | |
CN201843557U (en) | Reducing flange capable of realizing pressure testing | |
CN211900496U (en) | Stable form cladding sucker rod convenient to screw up | |
CN205662231U (en) | Oil pipeline installation device | |
CN211058755U (en) | Compact oil production wellhead device | |
CN211081786U (en) | Tube-sealing device for oil and gas development | |
CN203822242U (en) | Metallic seal single-stage casing head with rubber rings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |