CN109281289A - A kind of knockdown shore protection - Google Patents
A kind of knockdown shore protection Download PDFInfo
- Publication number
- CN109281289A CN109281289A CN201811268972.3A CN201811268972A CN109281289A CN 109281289 A CN109281289 A CN 109281289A CN 201811268972 A CN201811268972 A CN 201811268972A CN 109281289 A CN109281289 A CN 109281289A
- Authority
- CN
- China
- Prior art keywords
- shore protection
- prefabricated
- level
- straight wall
- bottom plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
- E02B3/128—Coherent linings made on the spot, e.g. cast in situ, extruded on the spot
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/16—Sealings or joints
Abstract
The invention discloses a kind of knockdown shore protections, it includes cast-in-place level-one shore protection and prefabricated second level shore protection, the second level shore protection is formed by several prefabricated shore protection unit splicings, prefabricated shore protection unit reserves prestressing force pulling eye along shore protection length direction, built-in metal bellows in hole, prestressed cable sequentially passes through the metal bellows of the prefabricated shore protection unit of multistage, described 2~6 prefabricated shore protection units are connected into a section second level shore protection by stretch-draw prestressing force rope, prestressed cable both ends are anchored using backing plate and nut, set deformation joint between two adjacent sections second level shore protection.The present invention solves the problems, such as that landscape engineering implementation lags behind dyke improvement project up to standard along river, carry out the nearly processing at a specified future date combined, with realize recent shore protection it is simple, rapidly, green construction, and the recycling of second level shore protection, reduce abandoned project, difficulty of construction and construction requirement are reduced, and reduces the influence to ambient enviroment.
Description
Technical field
The present invention relates to a kind of knockdown shore protections.
Background technique
Shore protection is in addition to itself Safety of Flood Control security function at this stage, and the functions such as ecoscape and hydrophilic demand are also increasingly
It is taken seriously.The hydrophilic demand of landscape in order to meet river bank, at present frequently with the form of second level shore protection: level-one shore protection wall top
Absolute altitude reduces, and improves hydrophilic experience;Second level shore protection combination landscape function is arranged after level-one revetment, while second level shore protection wall top
Absolute altitude meets requirement of setting up defences.But various odjective causes are limited, shore protection process of construction often can not synchronous reality with landscape construction engineering
It applies, usually first implements bank-protection works, for Safety of Flood Control needs are met, shore protection is generally first using a wall to the pattern on top, after
After continuous landscape engineering qualified to exploit, then built shore protection is carried out to cut top, creates second level shore protection.Above embodiment causes to give up
It abandons engineering, time-consuming consumptive material, therefore the present invention and designs a kind of combined type shore protection and avoid the above problem.
Summary of the invention
The object of the present invention is to provide a kind of knockdown shore protection, with realize recent shore protection it is simple, rapidly, green construction,
And the recycling of second level shore protection at a specified future date, reduce abandoned project.
To achieve the goals above, technical scheme is as follows: a kind of knockdown shore protection comprising cast-in-place level-one
Shore protection and prefabricated second level shore protection, the level-one shore protection use high-rise pile cap formula structure, and wall is cast-in-situ reinforced concrete structure, by bottom plate
With block earth steps composition, wall top is connected with flower trough mud upper thread, and level-one shore protection bottom sets pile foundation, it is characterised in that the second level shore protection is
Prefabricated assembled shore protection, the second level shore protection are placed on level-one shore protection, are connected by mortar cementitious;The prefabricated second level shore protection
It is formed by several prefabricated shore protection unit splicings, it is connected using being spliced by rebate between two contiguous prefabricated shore protection units, in advance
Shore protection unit processed reserves prestressing force pulling eye, built-in metal bellows in prestressing force pulling eye, prestressing force along shore protection length direction
Rope sequentially passes through the metal bellows of the prefabricated shore protection unit of multistage, and stretch-draw prestressing force rope connects the multiple prefabricated shore protection unit
Cheng Yijie second level shore protection, prestressed cable both ends are anchored using backing plate and nut, set deformation joint between two adjacent sections second level shore protection, institute
State and fill pointing polyethylene low ratio foamed plate in deformation joint, between polyethylene low ratio foamed plate embedding neoprene to sealing, and
It is sealed using one-component polyurethane sealant.
Further, every 2~6 prefabricated shore protection units are a section second level shore protection, prefabricated shield in the prefabricated second level shore protection
The full-length of bank unit is 2.5m, and the both ends setting of prefabricated shore protection unit matches rebate, two contiguous prefabricated shore protection lists
It is connected between member using by rebate splicing, rebate riveted is conducive to construction and positions when splicing.
Further, it is set in the groove of the Mosaic face of the rebate with sealing rod, expansive mortar, surface is perfused in stitching portion
Using two-component polysulfide sealing compound, shore protection installation uses 3 waterproof measures, the multiple hermetic seal for effectively ensuring that shore protection
Energy.
Further, it is characterised in that the prefabricated shore protection unit includes bottom plate and straight wall, described prefabricated unit one end
Upstream face side bottom base plate outwardly convex forms the bottom plate tenon being arranged along baseplate width direction, corresponding straight wall upstream face
One end outwardly convex forms the straight wall tenon being arranged along straight wall short transverse, inner end and the straight wall tenon of the bottom plate tenon
Lower end is connected by straightway, and the upper end of the straight wall tenon extends to perpendicular coping, and the outer end of the bottom plate tenon extends
To at a certain distance from plate outer side face, and first extended along floor length direction is set within the scope of the certain distance
Prepared screw-bolt hole is located at straight wall tenon outer fix in straight wall end and the second reserved bolt extended along straight wall length direction is arranged
Hole, the position setting that the bottom end is located at bottom plate tenon upstream face side reserve spiral shell along the third that floor length direction extends
The upstream face side bottom base plate of keyhole, the prefabricated unit other end is recessed inwardly, what formation was arranged along baseplate width direction
Bottom plate blind mortise, the corresponding one end of the straight wall are recessed inwardly, and form the straight wall blind mortise being arranged along straight wall short transverse, the bottom plate
The inner end of blind mortise is connected with the lower end of straight wall blind mortise by straightway, and the upper end of the straight wall blind mortise extends to perpendicular coping,
The inner end of the bottom plate blind mortise extends at a certain distance from plate outer side face, and sets within the scope of the certain distance and the
The prepared screw-bolt hole of one prepared screw-bolt hole cooperation, is located at straight wall blind mortise inner side in straight wall end and sets and the second prepared screw-bolt hole
The prepared screw-bolt hole of cooperation, the bottom end be located at bottom plate blind mortise meet water surface side position set and third prepared screw-bolt hole cooperate
Prepared screw-bolt hole.The Mosaic face of rebate is equipped with the two pass groove to match with watertight rubber item.
Further, side lower part sets a prefabricated baffle and is connected with pile foundation level-one shore protection near water, good appearance.
Preferably, rebate is arranged in second level shore protection both ends, rebate riveted can effectively improve bridging piece splicing effect.
Preferably, prestressing force spiral is passed through after every 2~6 section of second level shore protection is one group of splicing marshalling
Preformed hole synchronous tension, tensioning meet the requirements after by the way of nut lateral connection, be easily installed and disassemble.
Preferably, the second level shore protection needs preformed hole when prefabricated, the position of preformed hole can effectively be controlled, but prefabricated pore-forming
Diameter control is more difficult, directly prefabricated more difficult need to meet design requirement.Pass through pre-buried drilling diameter pair when shore protection is prefabricated
The metal bellows after-pouring concrete answered is to ensure the validity of pore-forming.
Preferably, reserving certain deformation joint when shore protection splicing bridging piece is prefabricated, it is ensured that later period horizontal direction deviation does not influence
The installation of structure.
Preferably, bottom plate and mounting surface are concrete surface, frictional resistance is larger, can be used and smears lubricant mode drag reduction.
Preferably, the level-one shore protection and the second level shore protection wall are all made of armored concrete, level-one shore protection is using high
Pile mesa structure, stretch-draw prestressing force spiral blending bolt connects between second level shore protection, adopts between level-one shore protection and second level shore protection
With mortar cementitious, it can guarantee the safety of structure in this way.
Preferably, setting a baffle, good appearance before the level-one shore protection.
Preferably, the level-one shore protection and the second level shore protection use composite structure, when needing to carry out landscape along river
When engineering construction, the second level shore protection can be separated and be subject to after piecemeal again using greatly shortening the construction time and reduce discarded work
Cheng Liang.
The positive effect of the present invention is that:
1, combination two stage assembled shore protection of the invention can match landscape engineering, meet nearly at a specified future date combine and design, take up an area face
Product is small, is readily transported and lifts, problem that can be narrow with effective solution construction site, and is able to achieve the repetition benefit of second level shore protection
With, reduce abandoned project, meet innovation, coordination, green idea of development.
2, second level assembled shore protection of the invention is prefabricated components, reduces cast-in-situ steel reinforced concrete Jie Ju construction period
Length, speed of application are slow, are influenced the problems such as big by season and weather, shorten construction period.
3, quick construction of the present invention is convenient, and the influence to surrounding enviroment is smaller, and noise is small, and fugitive dust problem is small, is conducive to ring
Border protection.
4, flood control water blocking task may be implemented in bank protection structure monolithic stability of the invention.
Detailed description of the invention
Fig. 1 is the whole sectional view of the present invention.
Fig. 2 is standard paragraphs elevation figure of the invention.
Fig. 3 is that rebate of the invention splices top view.
Specific embodiment
A preferred embodiment is named, and completely illustrates the present invention in conjunction with attached drawing to become apparent from.
As shown in Figure 1, a kind of combined type shore protection comprising level-one shore protection 1 and second level shore protection 2.Second level shore protection 2 passes through mortar
It is cemented in the top of level-one shore protection 1,1 bottom of level-one shore protection sets plain concrete cushion layer 4 and pile foundation, level-one shore protection 1 and second level shore protection 2
Two sides be respectively side and to pull in shore side near water, be equipped with prefabricated baffle 3 in the side near water of level-one shore protection 1 and 3 joint of pile foundation.
Second level shore protection 2 is spliced using concrete prefabricated shore protection section, elevation such as Fig. 2 institute of concrete prefabricated shore protection section
Show comprising prestressing force pulling eye 5 splices rebate 6, pre-buried D40 metal bellows in hole prestressing force pulling eye 5, concrete
Two pass groove 7 is set on the Mosaic face of prefabricated shore protection section one end splicing rebate 6.Two concrete prefabricated shore protection sections are recessed by splicing
Tenon 6 positions riveted, after concrete prefabricated shore protection marshalling in place, by 5 inner stretch-draw prestressing force rope of prestressing force pulling eye, in advance
Stress rope both ends are anchored using backing plate and nut.
As shown in the figure, it is characterised in that the concrete prefabricated unit includes bottom plate and straight wall, described prefabricated unit one end
Upstream face side bottom base plate outwardly convex, form the bottom plate tenon that is arranged along baseplate width direction, corresponding straight wall meets water
Face one end outwardly convex forms the straight wall tenon being arranged along straight wall short transverse, the inner end of the bottom plate tenon and straight wall tenon
Lower end connected by straightway, the upper end of the straight wall tenon extends to perpendicular coping, and the outer end of the bottom plate tenon is prolonged
It reaches at a certain distance from plate outer side face, and the extended along floor length direction is set within the scope of the certain distance
One prepared screw-bolt hole is located at straight wall tenon outer fix in straight wall end and the second reserved spiral shell extended along straight wall length direction is arranged
Keyhole, the third that the position setting that the bottom end is located at bottom plate tenon upstream face side extends along floor length direction are reserved
The upstream face side bottom base plate of bolt hole, the prefabricated unit other end is recessed inwardly, and is formed and is arranged along baseplate width direction
Bottom plate blind mortise, the corresponding one end of the straight wall is recessed inwardly, and forms the straight wall blind mortise being arranged along straight wall short transverse, the bottom
The inner end of plate blind mortise is connected with the lower end of straight wall blind mortise by straightway, and the upper end of the straight wall blind mortise extends to the top of straight wall
The inner end in portion, the bottom plate blind mortise extends at a certain distance from plate outer side face, and sets within the scope of the certain distance
With the prepared screw-bolt hole of the first prepared screw-bolt hole cooperation, it is located at straight wall blind mortise inner side in straight wall end and sets and the second reserved spiral shell
The prepared screw-bolt hole of keyhole cooperation, the bottom end are located at the meet water position of surface side of bottom plate blind mortise and set and third prepared screw-bolt hole
The prepared screw-bolt hole of cooperation.The Mosaic face of rebate is equipped with the two pass groove to match with watertight rubber item, three prestressing force
Tensioning hole 5 is located at bottom plate, side wall and bottom plate and side wall junction.
As shown in figure 3, two section standard paragraphs shore protections splicing rebate matches, shore protection connection effect can effectively improve.It is recessed
It is equipped with hydro-expansive rubber item 10 at slot 7, expansive mortar 9 is perfused at connecting sewing on two splicing rebate Mosaic faces, surface uses
Two-component polysulfide sealing compound 8 is tightly connected seam, forms triple waterproofs.
The second level shore protection takes integral prefabricated, 6 one section second level shore protections of concrete prefabricated shore protection sections formation, single coagulation
The prefabricated shore protection section of soil is 2.5m along water front direction length, and it is highly 1.8m that vertical water front direction width, which is 1.5m, straight wall with a thickness of
0.3m, base plate thickness 0.4m, straight wall and back plate connections are equipped with one 0.3m × 0.5m armpit angle.Each long 15m of section second level shore protection,
20mm deformation joint is set between two section second level shore protections, reserves groove in the middle part of the deformation joint, takes filling bitumen treatment, bubble is set between seam
Foam polyethylene joint filling board, embedding neoprene is and embedding using dual-component polyurethane sealant to sealing between polyethylene joint filling board
Seam, to keep the stability of structure.
It is connected between concrete prefabricated shore protection section using splicing rebate, side bridging piece Mosaic face sets two pass groove, in groove
If hydro-expansive rubber item.Three φ, 40 prestressing force pulling eye, pre-buried D40 metal bellows in hole, to 6 are reserved in wall body for revetment
After the quasi- prefabricated assembled shore protection splicing marshalling of feast-brand mark, prestressing force spiral is passed through into prestressing force pulling eye, one end uses
Anchorage is fixed, other end tensioning, and stretching force is controlled by 70KN, and tensioning is anchored after meeting the requirements by cross bolts level, is formed
One section 15m long standard paragraphs second level shore protection.
Second level shore protection is first arranged in planning river mouth line position in the recent period, realizes the simple, quick of recent shore protection, green construction,
Along the later period when ecoscape Promotion Transformation, innerland range after original prefabricated assembled second level shore protection integral hoisting to wall is incited somebody to action,
It realizes the recycling of second level shore protection, reduces abandoned project.
Under normal conditions, it before construction, needs to carry out planning and designing to the shore protection and riverbed on riverbank.The planning mud face in riverbed
Line, that is, the upper space in riverbed marked on drawing when planning and designing, also known as planning riverbed mud upper thread.It is also required to leaning on
The mud upper thread of bank side carries out planning and designing, to meet requirement of setting up defences.
When land used condition is limited, and the determination and implementation of the landscape engineering scheme after river mouth line lag behind dyke transformation up to standard
Engineering can not disposably be implemented the second level shore protection of dyke in place, when needing to take nearly excess processes at a specified future date, be considered as selecting this
The shore protection of invention.In addition, the bank protection structure pattern that conventional bank section can also be provided using the design.In practical applications, according to reality
Border site condition determines suitable pile foundation length, and then determines other structures size, and it is multiple finally to carry out safety to the design structure
Core is to ensure the safety of structure.
Shore protection of the invention has the advantage that
1, combination two stage assembled shore protection of the invention can match landscape engineering along the river, meet nearly at a specified future date combine and design, account for
Ground area is small, is readily transported and lifts, problem that can be narrow with effective solution construction site, and is able to achieve the weight of second level shore protection
It is multiple to utilize, reduce abandoned project, meet innovation, coordination, green idea of development.
2, second level assembled shore protection of the invention is prefabricated components, reduces cast-in-situ steel reinforced concrete Jie Ju construction period
Length, speed of application are slow, are influenced the problems such as big by season and weather, shorten construction period.
3, quick construction of the present invention is convenient, and the influence to surrounding enviroment is smaller, and noise is small, and fugitive dust problem is small, is conducive to ring
Border protection.
4, flood control water blocking task may be implemented in bank protection structure monolithic stability of the invention.
In the description of the present invention, it is to be understood that, term " on ", "lower", "front", "rear", "left", "right", " perpendicular
To ", " transverse direction ", "top", "bottom", "inner", the instructions such as "outside" orientation or positional relationship be orientation based on the figure or position
Relationship is set, is merely for convenience of description of the present invention and simplification of the description, rather than the device or element of indication or suggestion meaning are necessary
It with specific orientation, is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.
Although specific embodiments of the present invention have been described above, it will be appreciated by those of skill in the art that this is only
For example, protection scope of the present invention is to be defined by the appended claims.Those skilled in the art without departing substantially from
Under the premise of the principle and substance of the present invention, many changes and modifications may be made, but these change and
Modification each falls within protection scope of the present invention.
Claims (5)
1. a kind of knockdown shore protection comprising cast-in-place level-one shore protection and prefabricated second level shore protection, the level-one shore protection use high stake
Bearing platform type structure, wall are cast-in-situ reinforced concrete structure, are made of bottom plate with earth steps are blocked, wall top is connected with flower trough mud upper thread, level-one
Shore protection bottom sets pile foundation, it is characterised in that the second level shore protection is prefabricated assembled shore protection, and the second level shore protection is placed in level-one shield
On bank, it is connected by mortar cementitious;The prefabricated second level shore protection is formed by several prefabricated shore protection unit splicings, and two adjacent pre-
Connected using being spliced by rebate between shore protection unit processed, prefabricated shore protection unit reserves prestressed stretch-draw along shore protection length direction
Hole, built-in metal bellows in prestressing force pulling eye, prestressed cable sequentially pass through the metal bellows of the prefabricated shore protection unit of multistage,
The multiple prefabricated shore protection unit is connected into a section second level shore protection by stretch-draw prestressing force rope, and prestressed cable both ends use backing plate and spiral shell
Mother anchors, and deformation joint is set between two adjacent sections second level shore protection, fills pointing polyethylene low ratio foamed plate, polyethylene in deformation joint
Embedding neoprene is sealed to sealing, and using one-component polyurethane sealant between low ratio foamed plate.
2. knockdown shore protection as described in claim 1, it is characterised in that in the prefabricated second level shore protection every 2~6 it is prefabricated
Shore protection unit is a section, and prefabricated shore protection unit full-length is 2.5m, and the both ends setting of prefabricated shore protection unit matches rebate,
It is connected between two contiguous prefabricated shore protection units using by rebate splicing, rebate riveted is conducive to construction and determines when splicing
Position.
3. knockdown shore protection as claimed in claim 2, it is characterised in that set in the groove of the Mosaic face of the rebate with
Expansive mortar is perfused in watertight rubber item, stitching portion, and surface uses two-component polysulfide sealing compound, and shore protection installation is arranged using 3 waterproofs
It applies, the multiple hermetic seal performance for effectively ensuring that shore protection.
4. knockdown shore protection as described in claim 1, it is characterised in that the prefabricated shore protection unit includes bottom plate and straight wall,
It is convex to form the bottom plate being arranged along baseplate width direction for the upstream face side bottom base plate outwardly convex of described prefabricated unit one end
Tenon, corresponding straight wall upstream face one end outwardly convex form the straight wall tenon being arranged along straight wall short transverse, the bottom plate tenon
Inner end connect with the lower end of straight wall tenon by straightway, the upper end of the straight wall tenon extends to perpendicular coping, described
The outer end of bottom plate tenon extends at a certain distance from plate outer side face, and is arranged within the scope of the certain distance along bottom plate
The first prepared screw-bolt hole that length direction extends is located at straight wall tenon outer fix in straight wall end and is arranged along straight wall length direction
The second prepared screw-bolt hole extended, the position that the bottom end is located at bottom plate tenon upstream face side are arranged along floor length side
To the third prepared screw-bolt hole of extension, the upstream face side bottom base plate of the prefabricated unit other end is recessed inwardly, and forms edge
The bottom plate blind mortise of baseplate width direction setting, the corresponding one end of the straight wall are recessed inwardly, are formed and be arranged along straight wall short transverse
Straight wall blind mortise, the inner end of the bottom plate blind mortise connected with the lower end of straight wall blind mortise by straightway, the straight wall blind mortise it is upper
End extends to perpendicular coping, and the inner end of the bottom plate blind mortise extends at a certain distance from plate outer side face, and described
The prepared screw-bolt hole with the cooperation of the first prepared screw-bolt hole is set within the scope of certain distance, is located at position on the inside of straight wall blind mortise in straight wall end
Install the prepared screw-bolt hole with the cooperation of the second prepared screw-bolt hole, the bottom end is located at the meet water position of surface side of bottom plate blind mortise and sets
With the prepared screw-bolt hole of third prepared screw-bolt hole cooperation, the Mosaic face of rebate is equipped with the two pass to match with watertight rubber item
Groove.
5. knockdown shore protection as described in claim 1, it is characterised in that side lower part sets a prefabricated baffle to level-one shore protection near water
It is connected with pile foundation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811268972.3A CN109281289A (en) | 2018-10-29 | 2018-10-29 | A kind of knockdown shore protection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811268972.3A CN109281289A (en) | 2018-10-29 | 2018-10-29 | A kind of knockdown shore protection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109281289A true CN109281289A (en) | 2019-01-29 |
Family
ID=65177749
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811268972.3A Pending CN109281289A (en) | 2018-10-29 | 2018-10-29 | A kind of knockdown shore protection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109281289A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112376492A (en) * | 2020-10-27 | 2021-02-19 | 上海市政工程设计研究总院(集团)有限公司 | Assembled shore protection |
-
2018
- 2018-10-29 CN CN201811268972.3A patent/CN109281289A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112376492A (en) * | 2020-10-27 | 2021-02-19 | 上海市政工程设计研究总院(集团)有限公司 | Assembled shore protection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10138616B2 (en) | Inverse construction method for deep, large and long pit assembling structure of suspension-type envelope enclosure | |
US10941659B2 (en) | I-shaped water-retaining dam for underground reservoir in coal mine | |
CN106677189B (en) | A kind of taper pile wall supporting type foundation pit supporting construction and its construction method | |
CN106013218B (en) | A kind of method of construction of underground garage open caisson | |
CN110985055B (en) | Tunnel grouting and drainage synchronous construction method for controlling surface uplift | |
CN102704957A (en) | Shed-frame method for shallowly burying large-sized underground structure construction | |
CN102966108A (en) | Construction method of deep foundation pit close to building and adopting underground structure as internal support | |
CN109322277A (en) | A kind of combined type shore protection combined with nearly long term planning | |
CN101914925A (en) | Basement by using optimized composite prefabricated arch wall as external wall | |
CN101418569B (en) | Optimization complex arch wall combining prefabricated arch leaf, support and major structure | |
CN107012871B (en) | A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation pit fabricated construction | |
CN208533540U (en) | Soil Nailing Wall sloping timbering structure | |
CN109372018A (en) | Soft base Self-sinking type underground space structure construction and construction technology | |
CN208346827U (en) | Foundation pit comprehensive support structure | |
CN108798684A (en) | A kind of method of completely decomposed fine sand stratum tunnel excavation | |
CN109457709A (en) | A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable | |
CN109024632A (en) | A kind of the precast lattice beam structure and assembly monolithic construction method of slope reinforcement | |
CN106638674B (en) | A kind of band anchor retaining wall and design method combined with main structure | |
CN205894027U (en) | Structure is oozed in cutting of power station underground factory building | |
CN108265875A (en) | Self waterproofing energy consumption precast shear wall structure and construction method | |
CN109281289A (en) | A kind of knockdown shore protection | |
CN107012791A (en) | Tunnel-Type Anchorage of Suspension Bridge waterproof and water drainage system is with building construction method | |
CN112012762B (en) | Construction method of double-layer secondary lining multi-arch tunnel structure | |
CN209523167U (en) | A kind of knockdown shore protection | |
CN109322276A (en) | A kind of combined type shore protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |