CN106638674B - A kind of band anchor retaining wall and design method combined with main structure - Google Patents

A kind of band anchor retaining wall and design method combined with main structure Download PDF

Info

Publication number
CN106638674B
CN106638674B CN201611223249.4A CN201611223249A CN106638674B CN 106638674 B CN106638674 B CN 106638674B CN 201611223249 A CN201611223249 A CN 201611223249A CN 106638674 B CN106638674 B CN 106638674B
Authority
CN
China
Prior art keywords
retaining wall
anchor pole
anchor
main structure
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611223249.4A
Other languages
Chinese (zh)
Other versions
CN106638674A (en
Inventor
邱剑
左欢
余宏
温四清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CITIC General Institute of Architectural Design and Research Co Ltd
Original Assignee
CITIC General Institute of Architectural Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CITIC General Institute of Architectural Design and Research Co Ltd filed Critical CITIC General Institute of Architectural Design and Research Co Ltd
Priority to CN201611223249.4A priority Critical patent/CN106638674B/en
Publication of CN106638674A publication Critical patent/CN106638674A/en
Application granted granted Critical
Publication of CN106638674B publication Critical patent/CN106638674B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of band anchor retaining wall combined with main structure, retaining wall bottom is connected with main structure, and aseismatic joint is arranged between retaining wall wall and main structure, and anchor pole is arranged in retaining wall upper end.On retaining wall top, setting anchor pole resists earth lateral pressure, can effectively reduce the moment of flexure and shearing of retaining wall root;Retaining wall bottom is connected with main building basement bottom board or top plate, and the basement overall stiffness of main building is made full use of to prevent retaining wall from sliding.After foundation trench backfilling of earthwork, the soil body generates the soil pressure for acting on retaining wall, soil bolt is capable of providing a pulling force in contrast at this time, reduce bending moment in wall, reduce wall thickness to reach, reduce wall steel bar dosage, controls the purpose of wall basal crack width and top horizontal displacement, can be widely used for the higher-height Structural Engineering of retaining walls body, as subsidence observation, Slope Architectural close to high slope barricade.

Description

A kind of band anchor retaining wall and design method combined with main structure
Technical field
The present invention relates to a kind of retaining walls being connected with main structure, reduce wall thickness by setting anchor pole, reduce wall Body bottom reinforcement bars dosage controls wall basal crack width and top horizontal displacement.It is adjacent with main structure suitable for retaining wall, And the higher-height Structural Engineering of wall, as subsidence observation, Slope Architectural close to high slope barricade.
Background technique
Retaining wall bear outside the soil body generate horizontal loading, when the retaining walls height degree adjacent with main structure compared with The higher area of height, especially level of ground water, this load can make the bottom of the retaining wall of higher wall generate very big moment of flexure And shearing, according to the gravity retaining wall disengaged with main structure, it is larger to will cause wall thickness, excavate range and cost compared with It is high.After retaining wall bottom is connected with main structure, not only can thoroughly avoid retaining wall occur sliding rupture, also can avoid by The retaining wall caused by foundation pit side-wall backfilling of earthwork leakiness sinks, tilts.For Slope Architectural, often only soil is faced in unilateral side, If retaining wall and main structure are completely combined, since the flat in-plane stiffness of retaining wall plays the role of shear wall, flat with retaining wall Under capable geological process, construction torsion deformation can be considerably beyond Criterion restriction.Only retaining wall wall and main structure are disengaged, and It is designed by cantilever design, can avoid causing main structure anti-side rigidity asymmetry, but wall bottom moment is larger, wall body slit is wide Degree and wall top deformation are not easy to meet Criterion restriction requirement, and it is wide to reduce crack in order to reduce quantity of reinforcement according to conventional design thinking Degree, will certainly increase retaining wall wall thickness, and the increase of wall thickness can bring the increase for excavating range, concrete amount and cost again.
Summary of the invention
It is an object of the invention to provide the resistant slide power of retaining wall using main structure, is resisted with soil bolt and reduce gear Cob wall bottom moment reduces earth-retaining wall thickness and arrangement of reinforcement to reach, controls the purpose of wall body slit and top displacement.
The present invention adopts the following technical scheme that, a kind of band anchor retaining wall combined with main structure, retaining wall bottom Portion is connected with main structure, and aseismatic joint is arranged between retaining wall wall and main structure, and anchor pole is arranged in retaining wall upper end.
The anchor pole is made of the body of rod, anchor pole protection beam, enlarged footing and dowel;The body of rod is connected by enlarged footing with dowel, Anchor pole protects beam to wrap up the soil bolt body of rod;Concealed beam is arranged in retaining wall wall and anchor pole junction.
Anchor pole protection beam bottom portion is provided with concrete bearing bed course.
The present invention also provides a kind of band anchor retaining wall design methods combined with main structure, including following step It is rapid:
Retaining wall lower end is connected with main structure, provides the resistant slide power of retaining wall, anchor pole one end using main structure It is connect with retaining wall, the other end is fixed in the soil layer of retaining wall side by enlarged footing and dowel;Anchor pole and retaining wall form Coaction system, it is common to resist outside soil pressure;Anchor pole is placed in retaining wall middle and upper part, between soil excavation face and retaining wall Anchor rod body setting anchor pole protect beam, concealed beam is arranged in anchor pole and retaining wall junction;
Wherein 1) anchor pole inclination angle horizontal by be less than 10 ° of ﹣ or be greater than+10 °;2) anchor pole is fixed on retaining wall side The thickness of earth covering on anchoring section in soil layer is not less than 4.5m;3) length of free section is no less than 5.0m;Anchor pole is free Section passes through Potential failure surface length and is not less than 1.5m;4) anchor pole on retaining wall tie point away from 2 ~ 3m of earth-retaining wall top.
The anchor pole inclination angle is horizontal by 15 °.
Wherein: main structure refers to: being placed on foundation, receives, undertakes and transmit all top lotuses of construction project It carries, maintains the system of systems of superstructure globality, stability and the organic connections of safety;Free section, which refers to, utilizes bullet Property elongation pulling force is passed to the shank portion of anchoring body;Potential failure surface refers to that continuously passing through for failure by shear formation occurs for the soil body Logical curved surface.
The present invention provides the resistant slide power of retaining wall using main structure, and it is curved to resist reduction retaining wall bottom with soil bolt Square reduces earth-retaining wall thickness and arrangement of reinforcement to reach, controls the purpose of wall body slit and top displacement.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the 1-1 view of Fig. 1.
Fig. 3 is structural computational model figure of the invention.
Fig. 4 is that anchor rod anchored position determines schematic diagram.
Specific embodiment
Referring to Fig. 1-2, the present invention includes the band anchor retaining wall combined with main structure, retaining wall bottom and main body knot Structure is connected, and aseismatic joint is arranged between retaining wall wall and main structure, and anchor pole is arranged in retaining wall upper end.
The anchor pole is made of the body of rod, anchor pole protection beam, enlarged footing and dowel;The body of rod is connected by enlarged footing with dowel, Anchor pole protects beam to wrap up the soil bolt body of rod;Concealed beam is arranged in retaining wall wall and anchor pole junction.
Anchor pole protection beam bottom portion is provided with concrete bearing bed course.
Retaining wall lower end is connected with main structure, using main structure provide retaining wall resistant slide power, anchor pole one end with Retaining wall connection, the other end are fixed in the soil layer of retaining wall side by enlarged footing and dowel;Anchor pole and retaining wall composition join Stress system is closed, it is common to resist outside soil pressure.Anchor pole is placed in retaining wall middle and upper part, between soil excavation face and retaining wall Anchor rod body is arranged anchor pole and protects beam, and concealed beam is arranged in anchor pole and retaining wall junction.
The selection and calculation method of design parameter
The selection of 1 design parameter
According to the regulation in " rock soil anchor (rope) technical regulation " (CECS22:2005), 1) anchor pole inclination angle is preferably avoided and water The range that 10 ° ~+10 ° of Heisei ﹣;2) thickness of earth covering on anchor rod anchored section is not preferably less than 4.5m;3) freedom length of anchor pole Potential failure surface should be passed through and be not less than 1.5m;4) length of free segment is no less than 5.0m.Since lesser level inclination can Bigger horizontal component and the longer arm of force are provided, bottom moment is more advantageous to reducing, it is proposed that level inclination takes 15 °.For anchor Bar connects point height on barricade and can choose as follows.
As shown in figure 3, reasonable pulling force effect point should meet anchor pole and barricade comprehensive cost most saves, first according to engineering experience Sectional dimension, rock-bolt length and the sectional dimension of selected retaining wall, structural computational model are as shown in Figure 3.It is longer in order to pass through The arm of force provides biggish moment of flexure in retaining wall bottom, and to achieve the purpose that reduce bottom moment, anchor rod anchored point is preferably placed in gear Wall top portion;But as shown in figure 4, since the inclination angle of anchor pole is smaller, meeting the above-mentioned 2nd when retaining wall top when anchor rod anchored Under the regulation of item, the length of free segment reaches 4500/sin(15°)=17387mm causes rock-bolt length too long, uneconomical to be also not easy Construction, easily has an impact close to buildings in urban area.And when one timing of rock-bolt length, anchoring depth L, anchor point Translation H, valid bonding length can increase as L+H*cos(15 downwards°)/tan(15°)=L+3.6H, corresponding freedom length can Reduce 3.6H.According to the regulation of 7.5.3 item in CECS22:2005, the anchoring depth of soil bolt takes 6 ~ 12m, therefore anchor point It preferably takes and can use 6/3.6 ~ 12/3.6=1.67 ~ 3.33m under wall top, it is proposed that 2 ~ 3m of value.
2 retaining wall calculation methods
Retaining wall calculation diagram is as shown in figure 3, anchor pole can be reduced to pull rod, and retaining wall cantilever segment height is H, and total height is H+H1, bolt action point are X away from wall top distance, and axis force of anchor position is H-X, Triangle-Profile lotus away from basement roof distance Load maximum value be q, calculate Fig. 3 shown in statically indeterminate structure the available retaining wall key position of internal force bending moment design value M1, M2, M3 and axis force of anchor need to select rock-bolt length or section again if axis force of anchor is greater than the design value of anchor pole.
Referring to the invention will be further described shown in Fig. 1 and Fig. 2.
A) present invention include retaining wall 1., the soil bolt body of rod 2., soil bolt enlarged footing 3., dowel 4., anchor pole protection Beam 5., protection beam body end concrete cushion 6., wall concealed beam 7., aseismatic joint 8., main structure outer wall of basement 9., basement Top plate 10., superstructure, waterproof cover composition soil bolt and retaining wall synergy structural system.
B) at the retaining wall 1. a certain elevation location in middle and upper part spaced set soil bolt 2., 3., 4., when needing anchor pole When larger pulling force is provided, also enlarged footing can be set 3. in anchor pole end, 7. 4. soil bolt reinforcing bar is anchored in locates with wall concealed beam.
C) the anchor bar body setting anchor pole between retaining wall and soil excavation face protects beam 5. to be wrapped up, and prevents mechanical backfill Or tamping apparatus generates destruction to the body of rod, 6. protection beam and soil body junction are equipped with concrete bearing bed course, guarantee that end is not sent out Raw excessive sink.
D) 8. retaining wall and main structure setting aseismatic joint, disengage it with main structure, avoid retaining wall to main body knot Structure is antitorque to have an adverse effect;The settable waterproof cover being connected with main structure at the top of retaining wall.

Claims (5)

1. a kind of band anchor retaining wall combined with main structure, it is characterised in that: retaining wall lower end is connected with main structure, Aseismatic joint is set between retaining wall wall and main structure, anchor pole is set in retaining wall upper end;Anchor pole one end is connect with retaining wall, separately One end is fixed in the soil layer of retaining wall side;Anchor pole is placed in retaining wall middle and upper part, the anchor between soil excavation face and retaining wall Club shaft is arranged anchor pole and protects beam, and concealed beam is arranged in anchor pole and retaining wall junction;
Wherein 1) anchor pole inclination angle horizontal by be less than 10 ° of ﹣ or be greater than+10 °;2) anchor pole is fixed on the soil layer of retaining wall side In anchoring section on thickness of earth covering be not less than 4.5m;3) length of free section is no less than 5.0m;Free section is worn Potential failure surface length is crossed not less than 1.5m;4) anchor pole on retaining wall tie point away from 2 ~ 3m of earth-retaining wall top.
2. band anchor retaining wall according to claim 1, it is characterised in that: the anchor pole is by the body of rod, anchor pole protection beam, expansion Major part and dowel are constituted;The body of rod is connected by enlarged footing with dowel, and anchor pole protects beam to wrap up the soil bolt body of rod;Anchor pole passes through expansion Major part and dowel are fixed in the soil layer of retaining wall side.
3. band anchor retaining wall according to claim 2, it is characterised in that: anchor pole protection beam bottom portion is provided with concrete branch Upholstery layer.
4. the design method with anchor retaining wall that one kind is combined with main structure as described in claim 1, including it is following Step:
Retaining wall lower end is connected with main structure, provides the resistant slide power of retaining wall, anchor pole one end and gear using main structure Cob wall connection, the other end are fixed in the soil layer of retaining wall side by enlarged footing and dowel;Anchor pole is combined with retaining wall composition Stress system, it is common to resist outside soil pressure;Anchor pole is placed in retaining wall middle and upper part, the anchor between soil excavation face and retaining wall Club shaft is arranged anchor pole and protects beam, and concealed beam is arranged in anchor pole and retaining wall junction;
Wherein 1) anchor pole inclination angle horizontal by be less than 10 ° of ﹣ or be greater than+10 °;2) anchor pole is fixed on the soil layer of retaining wall side In anchoring section on thickness of earth covering be not less than 4.5m;3) length of free section is no less than 5.0m;Free section is worn Potential failure surface length is crossed not less than 1.5m;4) anchor pole on retaining wall tie point away from 2 ~ 3m of earth-retaining wall top.
5. design method according to claim 4, it is characterised in that: anchor pole inclination angle is horizontal by 15 °.
CN201611223249.4A 2016-12-27 2016-12-27 A kind of band anchor retaining wall and design method combined with main structure Active CN106638674B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611223249.4A CN106638674B (en) 2016-12-27 2016-12-27 A kind of band anchor retaining wall and design method combined with main structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611223249.4A CN106638674B (en) 2016-12-27 2016-12-27 A kind of band anchor retaining wall and design method combined with main structure

Publications (2)

Publication Number Publication Date
CN106638674A CN106638674A (en) 2017-05-10
CN106638674B true CN106638674B (en) 2019-04-02

Family

ID=58832943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611223249.4A Active CN106638674B (en) 2016-12-27 2016-12-27 A kind of band anchor retaining wall and design method combined with main structure

Country Status (1)

Country Link
CN (1) CN106638674B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059916B (en) * 2017-05-11 2019-07-19 同圆设计集团有限公司 A kind of retaining wall and its construction method with body structure portion disengagement
CN107893428A (en) * 2017-11-22 2018-04-10 清华大学 A kind of vertical anchor retaining wall design method
CN111254972A (en) * 2018-11-30 2020-06-09 中衡卓创国际工程设计有限公司 Retaining wall applied to unilateral soil retaining of sloping field building and construction method thereof
CN115752319B (en) * 2022-10-18 2023-08-15 天津风霖物联网科技有限公司 Automatic horizontal displacement monitoring system and monitoring method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452132A (en) * 2013-09-05 2013-12-18 江苏省交通科学研究院股份有限公司 Retaining wall
CN204510259U (en) * 2015-03-11 2015-07-29 上海申元岩土工程有限公司 There is the comprehensive retaining wall of anti-filter function
CN104912225A (en) * 2015-06-05 2015-09-16 上海市园林设计院有限公司 Joint structure of anti-seismic joint and construction method for joint structure
CN206457843U (en) * 2016-12-27 2017-09-01 中信建筑设计研究总院有限公司 A kind of band anchor retaining wall being combined with agent structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58199927A (en) * 1982-05-18 1983-11-21 Kajima Corp Edge releasing method of steel member in cement-based hardened object

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452132A (en) * 2013-09-05 2013-12-18 江苏省交通科学研究院股份有限公司 Retaining wall
CN204510259U (en) * 2015-03-11 2015-07-29 上海申元岩土工程有限公司 There is the comprehensive retaining wall of anti-filter function
CN104912225A (en) * 2015-06-05 2015-09-16 上海市园林设计院有限公司 Joint structure of anti-seismic joint and construction method for joint structure
CN206457843U (en) * 2016-12-27 2017-09-01 中信建筑设计研究总院有限公司 A kind of band anchor retaining wall being combined with agent structure

Also Published As

Publication number Publication date
CN106638674A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106677189B (en) A kind of taper pile wall supporting type foundation pit supporting construction and its construction method
US20200240270A1 (en) I-Shaped Water-Retaining Dam For Underground Reservoir In Coal Mine
CN106638674B (en) A kind of band anchor retaining wall and design method combined with main structure
CN204098049U (en) A kind of protective reinforcing structure of broken rock mass slope
CN103774675B (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN106522270B (en) A kind of the pile foundation barricade antidetonation retaining structure and construction method of the buffer layer containing EPS
CN104533453A (en) Substep dynamic coupling support method for roadway fault fracture zone
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN108360547B (en) Bridge composite foundation suitable for deep water and strong earthquake conditions
CN109339029B (en) Construction method for resisting uplift deformation in excavation of foundation pit above existing tunnel
CN104532868B (en) High abrupt change shape sloped region bridge anchor pull-type high cap pile group basis construction method
CN104018490B (en) A kind of Z-shaped square-section friction pile and construction method thereof
CN105239586A (en) Support structure for supporting foundation pit and method for supporting foundation pit
CN107288046B (en) Especially big high position mud-rock flow Self-resetting energy consumption is blocked structure and implementation
CN104389307A (en) Self-resetting slide-resistant pile structure with energy consumption function and implementation method thereof
CN206457843U (en) A kind of band anchor retaining wall being combined with agent structure
CN207646746U (en) A kind of arch interlocking pile formula foundation pit supporting construction
CN104727340A (en) High cutting slope anchor rope space framework supporting and retaining structure
CN107938685A (en) A kind of new diagonal brace composite support device
CN204311456U (en) Foundation ditch strengthening structure
CN212248284U (en) Steel pipe pile protection system for soft foundation mixed slope
CN111549804B (en) Cutting slope reinforced passive protection system and construction method thereof
CN201502065U (en) Anchor rod joint excavation compound basis
CN216474962U (en) Non-embedded type support pile structure
CN113279374B (en) Rock-fill dam top earthquake-resistant wave-proof structure and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant